DE3941216A1 - Ridge tile fastener with ridge clamp - which has its lower end bent into horizontal U=shape to form fastening foot - Google Patents

Ridge tile fastener with ridge clamp - which has its lower end bent into horizontal U=shape to form fastening foot

Info

Publication number
DE3941216A1
DE3941216A1 DE3941216A DE3941216A DE3941216A1 DE 3941216 A1 DE3941216 A1 DE 3941216A1 DE 3941216 A DE3941216 A DE 3941216A DE 3941216 A DE3941216 A DE 3941216A DE 3941216 A1 DE3941216 A1 DE 3941216A1
Authority
DE
Germany
Prior art keywords
ridge
ridge tile
holder according
nail
bend
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE3941216A
Other languages
German (de)
Other versions
DE3941216C2 (en
Inventor
Oskar Fleck
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from DE8815566U external-priority patent/DE8815566U1/en
Priority claimed from DE8903976U external-priority patent/DE8903976U1/en
Application filed by Individual filed Critical Individual
Priority to DE3941216A priority Critical patent/DE3941216C2/en
Publication of DE3941216A1 publication Critical patent/DE3941216A1/en
Application granted granted Critical
Publication of DE3941216C2 publication Critical patent/DE3941216C2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D1/00Roof covering by making use of tiles, slates, shingles, or other small roofing elements
    • E04D1/34Fastenings for attaching roof-covering elements to the supporting elements
    • E04D1/3402Fastenings for attaching roof-covering elements to the supporting elements for ridge or roofhip tiles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D1/00Roof covering by making use of tiles, slates, shingles, or other small roofing elements
    • E04D1/34Fastenings for attaching roof-covering elements to the supporting elements
    • E04D2001/3408Fastenings for attaching roof-covering elements to the supporting elements characterised by the fastener type or material
    • E04D2001/3414Metal strips or sheet metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D1/00Roof covering by making use of tiles, slates, shingles, or other small roofing elements
    • E04D1/34Fastenings for attaching roof-covering elements to the supporting elements
    • E04D2001/3452Fastenings for attaching roof-covering elements to the supporting elements characterised by the location of the fastening means
    • E04D2001/3458Fastenings for attaching roof-covering elements to the supporting elements characterised by the location of the fastening means on the upper or lower transverse edges of the roof covering elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D1/00Roof covering by making use of tiles, slates, shingles, or other small roofing elements
    • E04D1/34Fastenings for attaching roof-covering elements to the supporting elements
    • E04D2001/3488Fastenings for attaching roof-covering elements to the supporting elements characterised by the type of roof covering elements being fastened
    • E04D2001/3497Spanish type tiles

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The ridge tiles fastener consists of an elastic strip clamp of steel or plastics bent into an S-shape. The elastic clamp has three horizontal shanks (23,25), connected by two vertical webs. On the underside of a horizontal shank (25), a spike (55) is fixed by welding, riveting etc. The spike is driven into the ridge rafter, using a pin (54) places loosely through a hole (56). The length of the horizontal shanks corresponds to the amount of overlapping of two consecutive tiles. ADVANTAGE - Simple and long service life fastening.

Description

Die Erfindung betrifft eine Firstziegelhalterung nach dem Oberbegriff des Patentanspruchs 1.The invention relates to a ridge tile holder according to the preamble of claim 1.

Bei einer bekannten, von Dachdeckern allgemein verwende­ ten Firstziegelhalterung der genannten Art besteht der als Befestigungsfuß ausgebildete untere Teil der First­ klammer aus einem mit mehreren Nagellöchern versehenen Abschnitt eines Metall- oder Kunststoffstreifens. Dieser gelochte Abschnitt der Firstklammer ist parallel zu der den oberen Abschluß eines Dachstuhls bildenden First­ bohle ausgerichtet; jeweils ein oder zwei Firstklammern pro Firstziegel werden von Hand flach auf die Firstbohle aufgenagelt, was sehr umständlich und zeitaufwendig ist. Außerdem ist für die Anbringung dieser Halterung Voraus­ setzung, daß die Firstbohle zugänglich ist, was jedoch bei einem Trockenfirst, d.h. einem mörtellos ausgeführ­ ten First, der mit auf die Firstbohle aufgesetzten First­ lüftungselementen versehen ist, nicht der Fall ist. Ein weiterer Nachteil, der bei bekannten Firstziegelhalterun­ gen auftritt, ist, daß der oder die Firstnägel häufig keinen sicheren Halt des betreffenden Firstziegels gewährleisten, weil zum einen dessen Nagellöcher herstellungsbedingt im Durchmesser stark streuen und häufig zu groß ausfallen, und weil zum anderen das Nagelloch des Firstziegels häufig beim Einschlagen des Nagels beschädigt wird.In a known, generally used by roofers ridge tile holder of the type mentioned is the lower part of the ridge designed as a fastening foot clip from one with several nail holes Section of a metal or plastic strip. This Perforated section of the ridge bracket is parallel to that the ridge forming the upper end of a roof structure screed aligned; one or two ridge clips each pro ridge tiles are laid flat on the ridge plank by hand nailed, which is very cumbersome and time consuming. It is also necessary to attach this bracket setting that the ridge board is accessible, but what with a dry ridge, i.e. one carried out without mortar ten ridge, the ridge placed on the ridge plank ventilation elements is provided, is not the case. A Another disadvantage of the known ridge tile holder gene occurs is that the ridge nail (s) are common no secure hold of the ridge tile in question ensure because on the one hand its nail holes Due to the manufacturing process, widely scatter in diameter and often turn out to be too big, and because of the other Nail hole of the ridge tile often when driving in Nagels is damaged.

Es stellt sich daher die Aufgabe, eine Firstziegelhal­ terung der eingangs genannten Art zu schaffen, die auch bei Trockenfirsten einfache und dauerhaft sichere Befestigung der Firstziegel gewährleistet.It is therefore the task of a ridge tile neck creation of the type mentioned at the beginning, which also with dry ridges simple and permanently safe Fastening of the ridge tiles guaranteed.

Die Lösung dieser Aufgabe gelingt durch eine Firstziegel­ halterung der eingangs genannten Art, welche dadurch gekennzeichnet ist, daß die Firstklammer in ihrem unteren Teil zur Bildung des Befestigungsfußes entgegen­ gesetzt zu ihrem oberen U-Bogen ebenfalls zu einem liegenden U-Bogen geformt ist, wobei der obere und der untere U-Bogen einen gemeinsamen Mittelschenkel und je einen eigenen Außenschenkel aufweisen, und wobei der untere U-Bogen federnd auf das tiefliegende Ende eines zuvor verlegten Firstziegels aufklemmbar ist.This task is solved with a ridge tile Bracket of the type mentioned, which thereby is characterized in that the ridge clamp in its lower part to form the mounting foot set to your upper U-bend also to one lying U-shaped, the upper and the lower U-bend a common middle leg and each have their own outer leg, and wherein the lower U-bend resilient on the low-lying end of a previously laid ridge tile can be clamped on.

Der wesentliche Vorteil der neuen Firstziegelhalterung ist, daß hier ein Annageln der Firstklammer(n) nicht mehr erforderlich ist. Der für die Befestigung der Klammer erforderliche Arbeitsaufwand reduziert sich auf ein Aufschieben auf den zuvor verlegten Firstziegel. Damit werden aufeinanderfolgende Firstziegel relativ zueinander in ihrer Lage gesichert, behalten aber eine für den Ausgleich von thermisch bedingten Spannungen innerhalb der Dachkonstruktion ausreichende Beweglich­ keit. Aufgrund der Elastizität der Klammer(n) werden Schäden an den Firstziegeln weitestgehend ausgeschlossen und es erfolgt bei Auslenkung der Ziegel eine sichere Rückstellung in ihre Grundposition.The main advantage of the new ridge tile holder is that nailing the ridge clip (s) is not more is needed. The one for attaching the Clamp required workload is reduced to pushing onto the previously laid ridge tile. This makes successive ridge tiles relative secured to each other in their position, but keep one for the compensation of thermal stresses sufficient mobility within the roof structure speed. Due to the elasticity of the clip (s) Damage to the ridge tiles largely excluded and there is a safe when the bricks are deflected Reset to their basic position.

Vorzugsweise wird die Firstziegelhalterung der genannten Art dadurch ergänzt, daß eine gewölbte, am tiefliegenden Ende eines Firstziegels auf dessen Außenfläche sattel­ artig auflegbare, mit wenigstens einem Nagelloch und/ oder Nagel versehene Andruckspange vorgesehen wird, deren Wölbung in entspanntem Zustand stärker ist als die des Firstziegels. Hierdurch wird erreicht, daß auch im Bereich des den Firstziegel durchsetzenden Firstnagels eine sichere und zugleich elastische Befestigung des Firstziegels erfolgt. Die gegenüber der Wölbung des Firstziegels stärkere Wölbung der Andruckspange sorgt dafür, daß letztere nach Eintreiben des Firstnagels eng am Firstziegel anliegt und auf diesen eine elastische Haltekraft ausübt. Außerdem werden so die bisher in der unmittelbaren Umgebung des Nagelloches an dem First­ ziegel angreifenden, diesen leicht beschädigenden, durch den Kopf des Firstnagels ausgeübten Kräfte auf eine große Fläche verteilt und unschädlich gemacht. Anstelle der Andruckspange kann gegebenenfalls auch eine Scheibe oder dergleichen aus ähnlichem Material, auch Kunst­ stoff, verwendet werden.The ridge tile holder is preferably the one mentioned Art complements that a domed, at the deepest Saddle the end of a ridge tile on its outer surface well placed, with at least one nail hole and / or nail-provided pressure clip is provided, whose curvature is stronger than that when relaxed the ridge tile. This ensures that also in  Area of the ridge nail penetrating the ridge tile a secure and elastic fastening of the Ridge tile is made. The opposite of the curvature of the Ridge tile ensures greater curvature of the pressure clip for the latter being tight after driving in the ridge nail rests on the ridge tile and an elastic one on it Holds. In addition, the so far in the immediate vicinity of the nail hole on the ridge attacking, slightly damaging, brick the head of the ridge nail exerted forces on a large area distributed and rendered harmless. Instead of if necessary, the pressure clip can also be a disk or the like from a similar material, including art fabric.

Damit die Firstklammer auch im Bereich des Firstziegels angebracht werden kann, wird vorgeschlagen, daß der untere Außenschenkel mit einem spaltartigen Schlitz versehen wird, so daß der Nagelschaft in den Bereich des Schlitzes eintreten kann.So that the ridge clamp also in the area of the ridge tile can be attached, it is proposed that the lower thighs with a slit-like slit is provided so that the nail shaft in the area of Slot can occur.

Die Firstziegelhalterung kann dabei entweder aus zwei oder drei zusammengehörenden Einzelteilen, d.h. ein oder zwei separaten Firstklammern und einer zugehörigen An­ druckspange bestehen; sie kann aber auch als kombinierte Halterung einstückig ausgebildet sein. Die erstgenannte Ausführung ist in der Herstellung besonders günstig, da nur Materialstreifen ohne Verschnitt benötigt werden, jedoch ist die Anbringung etwas umständlicher. Die zweite Ausführung ist in der Herstellung etwas aufwen­ diger, jedoch in der Handhabung besonders vorteilhaft.The ridge tile holder can either consist of two or three related parts, i.e. one or two separate ridge brackets and an associated an pressure clip exist; but it can also be combined Bracket be integrally formed. The former Execution is particularly cheap to manufacture because only material strips without waste are required, however, the attachment is somewhat more cumbersome. The second version is somewhat expensive to manufacture diger, but particularly advantageous in handling.

Als Material für die Firstziegelhalterung eignet sich besonders rostfreier Edelstahl, da dieser witterungsbe­ ständig und ermüdungsarm ist und somit eine der üblichen Lebensdauer von Dacheindeckungen entsprechende Standzeit der Halterung gewährleistet. Auch witterungsfeste, ausreichend stabile und elastische Kunststoffe sind verwendbar. Außer für die Befestigung von Firstziegeln auf Dachfirsten ist die erfindungsgemäße Halterung auch für die Befestigung von Gratziegeln verwendbar. Schließ­ lich können anstelle von Firstnägeln auch Schraubnägel oder Schrauben verwendet werden.Suitable as a material for the ridge tile holder especially rust-free stainless steel, as this is permanent and low-fatigue and therefore one of the usual Lifespan of roof coverings corresponding lifespan the bracket ensures. Also weatherproof,  are sufficiently stable and elastic plastics usable. Except for the fixing of ridge tiles the holder according to the invention is also on ridges can be used for fixing burr tiles. Close Instead of ridge nails, screw nails can also be used or screws can be used.

Weitere Merkmale und Ausgestaltungen der Erfindung sind in den Unteransprüchen 5 bis 7 angegeben.Further features and refinements of the invention are specified in subclaims 5 to 7.

Die vorstehende erfindungsgemäße Lösung geht davon aus, daß das Befestigungselement innerhalb des Lagebereiches des zweiten Firstziegels verläuft. Hierbei ist ein Firstziegel erforderlich, der jeweils mit einer Bohrung versehen ist, und eine Firstklammer, die ent­ sprechend der Abmessungen von Firstziegel und Lage der Bohrung geformt und perforiert ist. Hierdurch ist ein nicht unerheblicher Aufwand an Lagerung und Vorrats­ haltung erforderlich.The above solution according to the invention assumes that the fastener within the Position area of the second ridge tile runs. Here a ridge tile is required, each with a Hole is provided, and a ridge bracket, the ent speaking of the dimensions of the ridge tile and location of the Hole is shaped and perforated. This is a not inconsiderable effort in storage and storage attitude required.

Es stellt sich demnach weiterhin die Aufgabe, das First­ ziegelhalterungssystem so zu vereinfachen, daß First­ ziegel verschiedener Art und Größe, insbesondere solche, die kein Nagelloch besitzen, auf dem First gehalten werden können.The task, the ridge, continues to arise Brick system to simplify so that First bricks of various types and sizes, especially those that don't have a nail hole on the ridge can be.

Die Aufgabe wird gelöst durch eine Firstziegelhalterung, bei der die vertikale Achse des nagelartigen Befesti­ gungslementes außerhalb des Nagelbereiches des zweiten Firstziegels und vor dessen Ende durch den unteren U-Bogen der Firstklammer verläuft.The task is solved by a ridge tile holder, where the vertical axis of the nail-like fastener elements outside the nail area of the second ridge tile and before its end by the lower U-bend of the ridge bracket.

Die vordefinierte Raumform ermöglicht im wesentlichen zwei Ausführungformen:The predefined spatial shape essentially allows two versions:

  • - beide U-Schenkel des unteren U-Bogens weisen je eine Bohnung auf, die in vertikale Richtung koinzidieren und in denen ein gesondertes nagelartiges Befesti­ gungselement geführt ist. Letzteres kann ein normaler 2-Zoll-Nagel oder dergleichen sein;- Both U-legs of the lower U-bend each have one Rabe that coincide in the vertical direction  and in which a separate nail-like attachment guiding element is guided. The latter can be a normal one Be 2 inch nail or the like;
  • - der unterste, als Befestigungsfuß ausgebildete Teil der Firstklammer ist mit einem unterhalb des Befesti­ gungsfußes angebrachten, nach unten zeigenden Ein­ treibsporn versehen.- The bottom part, designed as a mounting foot the ridge clip is with one below the fastening attached foot facing downward spur provided.

Letzterer kann beispielsweise mit Hilfe eines Dorns über eine oberhalb des Eintreibsporns angebrachte Bohrung im mittleren U-Schenkel eingetrieben werden.The latter can, for example, with the help of a mandrel a hole in the above the driving spur middle U-leg can be driven.

Die weiteren Unteransprüche beziehen sich auf Weiter­ bildung der genannten Raumformen und sind in der nach­ folgenden Beschreibung erläutert.The further subclaims relate to Next formation of the spatial forms mentioned and are in the after following description explained.

Der wesentliche Vorteil der vorstehend genannten Aus­ führungsform ist es, daß das nagelartige Befestigungs­ element nicht mehr durch den Firstziegel selbst getrieben werden muß, sondern außerhalb des Firstziegels liegt. Durch die Klemmung und durch das Gewicht der Firstziegelreihe ist nach den Erfahrungen, die an Proto­ typen gewonnen wurden, eine absolut sichere und schnelle Verlegung einer Firstziegelreihe möglich. Bei First­ ziegeln, die in der Mitte einen Wulst oder eine Verdickung aufweisen, werden zwei der vorgenannten Firstklammern rechts und links neben der Verdickung angebracht. Da die Dicke des Firstziegels im Anbringungs­ bereich im wesentlichen bei allen Firstziegeln gleich ist, ist es nunmehr nur noch erforderlich, wenige Grundtypen der Firstklammern bereitzuhalten, um prak­ tisch alle vorkommenden Firstziegel, Firststeine und auch Lüftungselemente zu berücksichtigen. Die First­ ziegelhalterung eignet sich sowohl für die Trocken- als auch für die Mörtelverlegung des Firstes. The main advantage of the above is it that the nail-like attachment element no longer through the ridge tile itself must be driven, but outside the ridge tile lies. By clamping and by the weight of the The ridge tile series is based on the experience of Proto types were won, an absolutely safe and fast A ridge tile row can be laid. At First bricks that have a bead or one in the middle Have thickening, two of the aforementioned Ridge clips to the right and left of the thickening appropriate. Because the thickness of the ridge tile in the attachment area essentially the same for all ridge tiles is now only a few Keep basic types of ridge clips ready to be practical all ridge tiles, ridge stones and ventilation elements must also be taken into account. The ridge Brick holder is suitable for both dry and also for mortar laying of the ridge.  

Ausführungsbeispiele der Erfindung werden im folgenden anhand einer Zeichnung erläutert. Die Figuren der Zeichnung zeigen:Embodiments of the invention are as follows explained using a drawing. The figures of the Show drawing:

Fig. 1 eine Firstziegelhalterung in einer ersten, drei­ teiligen Ausführung in eingebautem Zustand in perspektivischer Ansicht; Figure 1 is a ridge tile holder in a first, three-part version in the installed state in a perspective view.

Fig. 2 eine Firstklammer als Teil der Firstziegelhal­ terung nach Fig. 1 in einer geänderten Ausfüh­ rung und in vergrößerter perspektivischer Dar­ stellung; Fig. 2 is a ridge bracket as part of the ridge tile holder according to Fig. 1 in a modified embodiment and in an enlarged perspective position;

Fig. 3 eine Andruckspange als weiteres Teil der First­ ziegelhalterung nach Fig. 1, ebenfalls in ver­ größerter perspektivischer Darstellung; Fig. 3 is a pressure clip as a further part of the ridge tile holder of Figure 1, also in ver enlarged perspective view.

Fig. 4 die Firstziegelhalterung in einer zweiten, ein­ stückigen Ausführung, ebenfalls in perspekti­ vischer Darstellung; Fig. 4, the ridge tile holder in a second, one-piece version, also in perspecti vical representation;

Fig. 5 eine weitere Ausführungsform der Firstziegel­ halterung; Fig. 5 shows another embodiment of the ridge tile holder;

Fig. 6 eine Verlegesituation im Bereich des Firstes mit einer Firstziegelhalterung einer weiteren Aus­ führungsform; Fig. 6 is a laying situation in the area of the ridge guide die with a ridge tile support from another;

Fig. 7 eine Firstklammer mit Befestigungselement gemäß Ausführung der Fig. 6; FIG. 7 a ridge clamp with fastening element according to the embodiment in FIG. 6;

Fig. 8 eine weitere Ausführungsform. Fig. 8 shows another embodiment.

Wie die Fig. 1 der Zeichnung zeigt, besteht bei dem hier dargestellten Ausführungsbeispiel die Firstziegel­ halterung 1 aus zwei Firstklammern 2 und einer Andruckspange 3, die über den Schenkel des tiefliegenden Endes 40 eines Firstziegels 4 in Abstand angeordnet sind. In der Mitte des Firstziegels 4 ist die Andruck­ spange 3 oberhalb eines im Firstziegel 4 vorhandenen Nagelloches angeordnet. Die Andruckspange 3 besitzt die Form eines gewölbten Streifens, wobei in entspanntem Zustand die Wölbung der Andruckspange 3 größer ist als die Wölbung der Außenfläche 41 des Firstziegels 4. Die Andruckspange 3 weist ihrerseits ebenfalls ein Nagelloch auf, durch welches ein Nagel 32 führbar ist. Dieser Nagel verläuft weiter durch das Nagelloch in Firstziegel 4 und steckt mit seinem unteren Ende in eingeschlagenem Zustand in einer Firstbohle, die unterhalb eines unter dem Firstziegel 4 liegenden Firstlüftungselementes 5 in dessen Längsrichtung verläuft.As shown in FIG. 1 of the drawing, in the exemplary embodiment shown here, the ridge tile holder 1 consists of two ridge clips 2 and a pressure clip 3 , which are arranged at a distance above the legs of the low-lying end 40 of a ridge tile 4 . In the middle of the ridge tile 4 , the pressure clip 3 is arranged above an existing nail hole in the ridge tile 4 . The pressure clip 3 has the shape of a curved strip, the curvature of the pressure clip 3 being greater than the curvature of the outer surface 41 of the ridge tile 4 in the relaxed state. The pressure clip 3 in turn also has a nail hole through which a nail 32 can be guided. This nail continues through the nail hole in the ridge tile 4 and is inserted with its lower end in the hammered-in state in a ridge screed, which runs in the longitudinal direction below a ridge ventilation element 5 located under the ridge tile 4 .

Links und rechts von der Andruckspange 3 ist jeweils eine der beiden Firstklammern 2 angebracht. Die First­ klammer 2 besitzt dabei eine aus zwei U-Bögen zusammen­ gesetzte Form, die einem flachen "S" ähnelt. Mittels des unteren U-Bogens ist die Firstklammer 2 von der Stirn­ seite des Firstziegels 4 her auf dessen tiefliegendes Ende 40 aufgeschoben und wird dort im Klemmsitz gehalten. Der obere U-Bogen der Firstklammer 2 liegt an der Außenfläche 41 des Firstziegels 4 und ist in Richtung zu einem nachfolgend aufzulegenden weiteren Firstziegels geöffnet. Dieser nachfolgend aufzulegende Firstziegel kommt mit seinem hochliegenden Ende innerhalb der beiden oberen U-Bögen der Firstklammern 2 zu liegen und wird dort ebenfalls eingeklemmt.Left and right of the Andruckspange 3 one of the two first brackets 2 is mounted in each case. The ridge bracket 2 has a shape composed of two U-bends, which resembles a flat "S". By means of the lower U-bend, the ridge bracket 2 is pushed from the end face of the ridge tile 4 onto its low-lying end 40 and is held there in the press fit. The upper U-bend of the ridge clamp 2 lies on the outer surface 41 of the ridge tile 4 and is opened in the direction of a further ridge tile to be placed subsequently. This ridge tile to be placed next comes to lie with its high-lying end within the two upper U-arches of the ridge clamps 2 and is also clamped there.

Fig. 2 der Zeichnung zeigt eine Firstklammer 2 in etwas geänderter Ausführung, wobei die Änderung hier darin besteht, daß die Außenschenkel 24 und 25 des oberen U-Bogens 21 und unteren U-Bogens 22 in ihrer Länge der Länge des gemeinsamen Mittelschenkels 23 entsprechen. Im Ausführungsbeispiel gemäß Fig. 1 waren die beiden Außenschenkel gegenüber dem Mittelschenkel verkürzt ausgeführt. Die Längengestaltung hängt im wesentlichen von dem Maß der Überlappung der aufeinanderfolgenden Firstziegel ab; Weiterhin ist aus der Fig. 2 ersicht­ lich, daß der die Firstklammer 2 bildende Streifen, z.B. Federstahl, mit einer in Längsrichtung verlaufenden Knickung oder Sicke 30 versehen ist, die die First­ klammer 2 besonders stabil gegen nachträgliche Verbie­ gung macht. Weiterhin besitzt die Firstklammer gemäß Fig. 2 einen spaltartigen Schlitz 26, der sich in eine Öffnung 27 erweitert. Hierbei ist die Möglichkeit gegeben, daß die Firstklammer auch über die Andruck­ spange in deren Mitte geschoben werden kann, wobei der Schaft des Nagels 32 im Schlitz 26 bzw. in der Öffnung 27 Platz hat. Fig. 2 of the drawing shows a ridge bracket 2 in a slightly modified version, the change here being that the outer legs 24 and 25 of the upper U-arm 21 and lower U-arm 22 correspond in length to the length of the common middle leg 23 . In the embodiment shown in FIG. 1, the two outer legs were shortened compared to the middle leg. The length depends essentially on the degree of overlap of the successive ridge tiles; Furthermore, it is apparent from FIG. 2 that the ridge clip 2 forming strip, for example spring steel, is provided with a longitudinal kink or bead 30 which makes the ridge clip 2 particularly stable against subsequent bending. Further, according to the ridge clamp 2 has FIG. A gap-like slot 26 that extends in an opening 27. This gives the possibility that the ridge clip can also be pushed over the pressure clip in the middle, the shaft of the nail 32 in the slot 26 or in the opening 27 has space.

Fig. 3 zeigt die Andruckspange 3 in vergrößerter Dar­ stellung, wobei besonders deren Wölbung deutlich wird. Im Scheitelpunkt der Andruckspange 3 ist das Nagelloch 31 angeordnet, durch welches der Nagel 32 geführt ist. Der Nagel 32 kann auch fest mit der Andruckspange 3 verbunden sein. Außerdem können auch mehrere Nägel 32 pro Andruckspange 3 vorgesehen sein. Fig. 3 shows the pressure clip 3 in an enlarged Dar position, the curvature of which is particularly clear. The nail hole 31 through which the nail 32 is guided is arranged at the apex of the pressure clip 3 . The nail 32 can also be firmly connected to the pressure clip 3 . In addition, a plurality of nails 32 can be provided per pressure clip 3 .

Fig. 4 schließlich zeigt eine Firstziegelhalterung 10, die im Unterschied zu den zuvor beschriebenen Ausfüh­ rungsbeispielen einstückig mit zwei Firstklammern 2 und einer diese miteinander verbindenden Andruckspange 3 ausgebildet ist. Im Scheitel der gewölbten Andruckspange 3 ist wieder das Nagelloch 31 zu sehen. Fig. 4 finally shows a ridge tile holder 10 which, in contrast to the exemplary embodiments described above, is formed in one piece with two ridge clamps 2 and a pressure clip 3 connecting them. In the apex of the arched pressure clip 3 , the nail hole 31 can be seen again.

Fig. 5 zeigt eine weitere kombinierte Klammer 10′, bei der eine Firstklammer 2′ mittig mit der Andruckspange 3 einstückig verbunden ist, wobei der Schlitz 26 gewähr­ leistet, daß der Nagel 32 in der Anbringposition Platz findet; Letzterer wird durch das Nagelloch 31 einge­ trieben. Fig. 5 shows a further combined bracket 10 ', in which a ridge bracket 2 ' is integrally connected in the middle with the pressure clip 3 , the slot 26 ensures that the nail 32 finds place in the attachment position; The latter is driven through the nail hole 31 .

Alle gezeigten Ausführungen der Firstziegelhalterung 1, 10 können sehr einfach als Blechstanz- und Biegeteile hergestellt werden. Auch die einstückige Ausführung der Halterung 10 ist aus einem flachen Blechstück durch Ausstanzen sowie nachfolgendes Biegen herstellbar.All shown versions of the ridge tile holder 1 , 10 can be produced very easily as sheet metal stamped and bent parts. The one-piece design of the holder 10 can also be produced from a flat piece of sheet metal by punching out and subsequent bending.

In Fig. 6 ist eine andere Firstziegelhalterung 1′ dargestellt. Eine Firstbohle 12 liegt im Anlagebereich zweier Dachsparren 17 über die Länge des Firstes auf. Auf die Firstbohle 12 ist bei der Trockenverlegung von Firstelementen ein Firstlüftungselement 5 aufgelegt, an dessen Seiten Dichtungsstreifen 18 auf den Oberkanten der Dacheindeckungsplatten 16, hier Dachziegeln, dichtend aufliegt. Eine Reihe von Firstziegeln 13, 4 sind jeweils überlappend aufgelegt und mit Hilfe von Firstklammern 2′′ auf der Firstbohle 12 und in gegen­ seitig festgelegter Lage befestigt.In Fig. 6 another ridge tile holder 1 'is shown. A ridge plank 12 lies in the contact area of two rafters 17 over the length of the ridge. On the ridge board 12, a ridge ventilation element 5 is placed in the drying installation of First elements sealingly rests on the sides of sealing strips 18 on the upper edges of the roofing plates 16, here tiles. A number of ridge tiles 13 , 4 are each placed overlapping and fastened with the help of ridge brackets 2 '' on the ridge plank 12 and in a mutually fixed position.

Dabei ist eine S-förmige Firstklammer 2′′ vorgesehen, wie sie insbesondere aus der Fig. 7 hervorgeht. Die Firstklammer 2′′ besteht aus einem federelastischen Metall- oder Kunststoffstreifen, wobei insbesondere rostfreier Edelstahl gewählt worden ist. Dieser ist witterungsbeständig und ermüdungsarm und gewährleistet eine der üblichen Lebensdauer von Dacheindeckungen entsprechende Standzeit.An S-shaped ridge bracket 2 '' is provided, as can be seen in particular from FIG. 7. The ridge bracket 2 '' consists of a resilient metal or plastic strip, in particular stainless steel has been selected. This is weather-resistant and low-fatigue and guarantees a service life that corresponds to the usual service life of roof coverings.

Wie aus der Fig. 7 zu ersehen ist, die die Firstklammer 2′′ in etwa natürliche Größe zeigt, hat sie eine S-Form, deren Außenschenkel 25 als Befestigungsfuß ausgebildet ist. Die oberen Teile sind zu zwei entgegengesetzt liegenden U-Bögen 21 (oberer U-Bogen) und 22 (unterer U-Bogen) geformt. Zwischen den U-Schenkeln der vorgenann­ ten U-Bögen 21 und 22 werden das hochliegende Ende eines ersten Firstziegels 4 und das tiefliegende Ende eines zweiten Firstziegels 13 eingeklemmt, wie dies aus dem mittleren Teil der Fig. 6 deutlich erkennbar ist. As can be seen from Fig. 7, which shows the ridge bracket 2 '' in approximately natural size, it has an S-shape, the outer leg 25 is designed as a mounting foot. The upper parts are formed into two opposite U-bends 21 (upper U-bend) and 22 (lower U-bend). Between the U-legs of the vorgenann th U-arches 21 and 22 , the high end of a first ridge tile 4 and the low end of a second ridge tile 13 are clamped, as can be clearly seen from the middle part of FIG. 6.

Weiterhin ist für die Firstziegelhalterung ein die First­ klammer 2′′ mit der unten liegenden Firstbohle 12 ver­ bindendes, nagelartiges Befestigungselement, hier Nagel 32, vorgesehen.Furthermore, a ridge bracket 2 '' with the ridge screed 12 lying below, nail-like fastening element, here nail 32 , is provided for the ridge tile holder.

Die vertikale Achse A des Nagels 32 liegt dabei außerhalb des Lagereiches des zweiten Firstziegels 13, d.h., vor dem Ende des Lagebereiches des (eingescho­ benen) Firstziegels 13. Hierfür sind zwei übereinander­ liegende, koinzidierende Bohrungen 36, 37 im Mittel­ schenkel 23 und im Außenschenkel 25 vorgesehen. Der obere Außenschenkel 24, der ganz oben liegt und den ersten Firstziegel 4 an dessen Ende überdeckt, ist mit seinem Ende 24′ gegen das geschlossene Ende des unteren U-Bogens 22 nach hinten versetzt und läßt den Bereich der vertikalen Achse A des Nagels 32 frei.The vertical axis A of the nail 32 lies outside the position area of the second ridge tile 13 , ie, before the end of the position area of the (inserted) ridge tile 13 . For this purpose, two superimposed, coinciding bores 36 , 37 in the middle leg 23 and in the outer leg 25 are provided. The upper outer leg 24 , which is at the top and covers the first ridge tile 4 at its end, is offset with its end 24 'against the closed end of the lower U-arch 22 to the rear and leaves the area of the vertical axis A of the nail 32 free .

Im vorliegenden Falle wird zunächst die erste First­ klammer 2′′ am Ende der Firstbohle 12 aufgenagelt und das hintere Ende des Firstziegels 13 in den oberen U-Bogen 21 eingeschoben. Anschließend wird am gegenüber­ liegenden Ende des Firstziegels 13 eine bereits mit einem eingeschobenen Nagel versehene Firstklammer 2′′ so aufgeschoben, daß der untere U-Bogen 22 über das andere Ende des Firstziegels 13 klemmend aufgeschoben wird. Anschließend wird der Nagel 32 durch das Firstlüftungs­ element 5 in die Firstbohle 12 eingetrieben, bis der Kopf des Nagels den Mittelschenkel 23 auf das Ende des Firstziegels 4 aufdrückt. Jetzt liegt der obere U-Bogen 21 frei, so daß das Ende des zweiten Firstziegels 4 in den oberen U-Bogen 21 eingeschoben werden kann. Eine weitere Befestigung erfolgt nicht, da der Firstziegel 4 in dem U-Bogen 21 aufgrund der Klemmwirkung festgehalten ist. Eine weitere Firstklammer 2′′ wird auf das vordere Ende des Firstziegels 4 aufgeschoben, dort eingenagelt usw. In the present case, the first ridge bracket 2 '' is nailed at the end of the ridge beam 12 and the rear end of the ridge tile 13 is inserted into the upper U-arch 21 . Then, at the opposite end of the ridge tile 13, a ridge clamp 2 'already provided with an inserted nail is pushed in such a way that the lower U-arch 22 is pushed over the other end of the ridge tile 13 in a clamping manner. Then the nail 32 is driven through the ridge ventilation element 5 into the ridge plank 12 until the head of the nail presses the middle leg 23 onto the end of the ridge tile 4 . Now the upper U-bend 21 is exposed, so that the end of the second ridge tile 4 can be inserted into the upper U-bend 21 . A further fastening does not take place since the ridge tile 4 is held in the U-arch 21 due to the clamping effect. Another ridge clamp 2 '' is pushed onto the front end of the ridge tile 4 , nailed there, etc.

In Fig. 8 ist eine andere Ausführungsform einer First­ klammer 2′′′ dargestellt. Hierbei ist der unterste, als Befestigungsfuß ausgebildete Teil 51 mit einem unterhalb dieses Befestigungsfußes angebrachten, nach unten zeigenden Eintreibsporn 55 versehen. Dieser kann beispielsweise eingenietet, eingeschweißt oder aber auch ausgestanzt und ausgebogen sein. Bei der Firstklammer 2′′′ gemäß Fig. 8 ist oberhalb des Eintreibsporns 55 eine Bohrung 56 in dem Mittelschenkel 23 vorgesehen, so daß ein Dorn 54 durchgesteckt werden kann, der das Eintreiben des Eintreibsporns 55 ermöglicht. In diesem Falle ist ein gewisses Spiel der Firstziegel innerhalb der Firstklammer 2′′′ nach dem Eintreiben gegeben. Im Prinzip erfolgt jedoch die Verlegung der Firstziegel mit Hilfe der Firstziegelhalterung 1 analog zu dem der Ausführungsform gemäß Fig. 7.In Fig. 8 another embodiment of a ridge bracket 2 '''is shown. Here, the lowermost part 51 , which is designed as a fastening foot, is provided with a driving-in spur 55 , which is arranged below this fastening foot and points downward. This can, for example, be riveted, welded in or punched out and bent out. In the ridge bracket 2 '''according to FIG. 8, a bore 56 is provided in the central leg 23 above the driving spur 55 , so that a mandrel 54 can be inserted, which enables the driving in of the driving spur 55 . In this case there is a certain play of the ridge tile within the ridge bracket 2 '''after driving. In principle, however, the ridge tile is laid with the aid of the ridge tile holder 1 analogous to that of the embodiment according to FIG. 7.

In beiden Ausführungsformen ist der Mittelschenkel 23 im wesentlichen geradlinig verlaufend. Die beiden Außenschenkel 24 bzw. 25 verlaufen in flachen, zum Mittelschenkel 23 hin einwärts gewölbten Bogen.In both embodiments, the middle leg 23 is essentially straight. The two outer legs 24 and 25 run in flat arches curved toward the middle leg 23 .

Die Ausführungsformen der Firstklammern 2, 2′, 2′′, 2′′′ können als Blechstanz- oder Biegeteile hergestellt werden. Es sei jedoch nicht ausgeschlossen, daß sie auch aus Kunststoff, z.B, glasfaserverstärktem Kunststoff, hergestellt werden.The embodiments of the ridge brackets 2 , 2 ', 2 '', 2 ''' can be manufactured as sheet metal stamping or bent parts. However, it should not be excluded that they are also made of plastic, e.g. glass fiber reinforced plastic.

Claims (13)

1. Firstziegelhalterung, insbesondere für einen Trocken­ first, bestehend aus wenigstens einer Firstklammer, die aus einem federelastischen Metall- oder Kunststoff­ streifen gebildet ist, wobei die Firstklammer in ihrem unteren Teil als Befestigungsfuß ausgebildet und in ihrem oberen Teil zu einem liegenden U-Bogen geformt ist, zwischen dessen U-Schenkel das hochliegende Ende eines Firstziegels federnd einklemmbar ist, und weiter bestehend aus wenigstens einem das tiefliegende Ende des Firstziegels mit einer unterliegenden Firstbohle ver­ bindenden, durch den Firstziegel geführten Firstnagel, dadurch gekennzeichnet, daß die Firstklammer 2, 2′, 2′′, 2′′′ in ihrem unteren Teil zur Bildung des Befestigungs­ fußes entgegengesetzt zu ihrem oberen U-Bogen (21) ebenfalls zu einem liegenden U-Bogen (22) geformt ist, wobei der obere und der untere U-Bogen (21, 22) einen gemeinsamen Mittelschenkel (23) und je einen eigenen Außenschenkel (24, 25, 51) aufweisen, und wobei der untere U-Bogen (22) federnd auf das tiefliegende Ende (40) eines zuvor verlegten Firstziegels (4) aufklemmbar ist.1. ridge tile holder, in particular for a dry ridge, consisting of at least one ridge clip which is formed from a resilient metal or plastic strip, the ridge clip being designed in its lower part as a fastening foot and shaped in its upper part to form a lying U-bow is, between the U-leg of the high end of a ridge tile is resiliently clamped, and further consisting of at least one ver the low-lying end of the ridge tile with an underlying ridge plank, guided by the ridge tile ridge nail, characterized in that the ridge clip 2 , 2 ' , 2 '', 2 '''in its lower part to form the fastening foot opposite to its upper U-bend ( 21 ) is also formed into a lying U-bend ( 22 ), the upper and lower U-bends ( 21 , 22 ) have a common middle leg ( 23 ) and each have its own outer leg ( 24 , 25 , 51 ), and wherein the lower U-bend ( 22 ) can be resiliently clamped onto the low-lying end ( 40 ) of a previously laid ridge tile ( 4 ). 2. Firstziegelhalterung nach Anspruch 1, dadurch gekenn­ zeichnet, daß die Firstziegelhalterung weiterhin eine gewölbte, am tiefliegenden Ende (4) eines Firstziegels (4) auf dessen Außenfläche (41) sattelartig auflegbare, mit wenigstens einem Nagelloch (31) und/oder Nagel (32) versehene Andruckspange (3) umfaßt, deren Wölbung in entspanntem Zustand stärker ist als die des Firstziegels (4). 2. ridge tile holder according to claim 1, characterized in that the ridge tile holder further has a curved, at the low-lying end ( 4 ) of a ridge tile ( 4 ) on its outer surface ( 41 ) saddle-like, with at least one nail hole ( 31 ) and / or nail ( 32 ) provided pressure clip ( 3 ), the curvature of which is stronger in the relaxed state than that of the ridge tile ( 4 ). 3. Firstziegelhalterung nach Anspruch 2, dadurch gekenn­ zeichnet, daß die Andruckspange (3) aus einem federela­ stischen Metall- oder Kunststoffstreifen gebildet ist.3. ridge tile holder according to claim 2, characterized in that the pressure clip ( 3 ) is formed from a federela-elastic metal or plastic strip. 4. Firstziegelhalterung nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß der untere Außenschenkel (25) der Firstklammer mit einem spaltartigen Schlitz (26) versehen ist.4. ridge tile holder according to claim 1 or 2, characterized in that the lower outer leg ( 25 ) of the ridge bracket is provided with a gap-like slot ( 26 ). 5. Firstziegelhalterung nach den Ansprüchen 2 bis 4, dadurch gekennzeichnet, daß jeweils ein oder zwei First­ klammern (2) und eine Andruckspange (3) als kombinierte Halterung (10) einstückig ausgebildet sind.5. ridge tile holder according to claims 2 to 4, characterized in that one or two ridge brackets ( 2 ) and a pressure clip ( 3 ) are integrally formed as a combined bracket ( 10 ). 6. Firstziegelhalterung nach den Ansprüchen 1 bis 5, dadurch gekennzeichnet, daß die beiden Außenschenkel (24, 25) der Firstklammer (2) gegenüber dem Mittel­ schenkel (23) verkürzt sind.6. ridge tile holder according to claims 1 to 5, characterized in that the two outer legs ( 24 , 25 ) of the ridge bracket ( 2 ) relative to the middle leg ( 23 ) are shortened. 7. Firstziegelhalterung nach den Ansprüchen 1 bis 6, da­ durch gekennzeichnet, daß der Mittelschenkel (23) im wesentlichen geradlinig verläuft und daß die beiden Außenschenkel (24, 25) jeweils in einem flachen, zum Mittelschenkel (23) hin einwärts gewölbten Bogen verlaufen.7. ridge tile holder according to claims 1 to 6, characterized in that the middle leg ( 23 ) extends substantially rectilinearly and that the two outer legs ( 24 , 25 ) each run in a flat, to the middle leg ( 23 ) arched inwards. 8. Firstziegelhalterung nach Anspruch 1, dadurch gekenn­ zeichnet, daß die vertikale Achse des Befestigungs­ elementes (32) innerhalb des Lagebereiches des zweiten Firstziegels (13) verläuft. 8. ridge tile holder according to claim 1, characterized in that the vertical axis of the fastening element ( 32 ) within the position range of the second ridge tile ( 13 ). 9. Firstziegelhalterung nach Anspruch 1, dadurch gekennzeichnet, daß die vertikale Achse (A) des nagelartigen Befestigungs­ elementes (15, 55) außerhalb des Lagebereiches des zweiten Firstziegels (13) und vor dessen Ende durch den unteren U-Bogen (22) der Firstklammer (2′′) verläuft.9. ridge tile holder according to claim 1, characterized in that the vertical axis ( A ) of the nail-like fastening element ( 15 , 55 ) outside the position area of the second ridge tile ( 13 ) and before its end by the lower U-bend ( 22 ) of the ridge bracket ( 2 ′ ′) runs. 10. Firstziegelhalterung nach Anspruch 9, dadurch gekenn­ zeichnet, daß das Ende (24′) des freien Schenkels des oberen U-Bogens (21) gegen das geschlossene Ende des unteren U-Bogens (22) nach hinten versetzt ist und den Bereich der vertikalen Achse (A) des Befestigungsele­ mentes (32) freiläßt.10. ridge tile holder according to claim 9, characterized in that the end ( 24 ') of the free leg of the upper U-bend ( 21 ) against the closed end of the lower U-bend ( 22 ) is offset to the rear and the area of the vertical Axis ( A ) of the fastening element ( 32 ) leaves free. 11. Firstziegelhalterung nach Anspruch 9 oder 10, dadurch gekennzeichnet, daß die beiden U-Schenkel (23, 25) des unteren U-Bogens (22) je eine Bohrung (36, 37) aufweisen, die in vertikaler Richtung koinzidieren und in denen ein gesondertes nagelartiges Befestigungs­ element (32) geführt ist.11. ridge tile holder according to claim 9 or 10, characterized in that the two U-legs ( 23 , 25 ) of the lower U-bend ( 22 ) each have a bore ( 36 , 37 ) which coincide in the vertical direction and in which one separate nail-like fastening element ( 32 ) is guided. 12. Firstziegelhalterung nach Anspruch 1 und 9 bis 11, dadurch gekennzeichnet, daß der unterste, als Befestigungsfuß ausgebildete Teil (51) der Firstklammer (2′′′) mit einem unterhalb des Befestigungsfußes (21) angebrachten, nach unten zeigenden Eintreibsporn (55) versehen ist.12. ridge tile holder according to claim 1 and 9 to 11, characterized in that the lowermost part designed as a fastening foot ( 51 ) of the ridge bracket ( 2 ''') with a below the fastening foot ( 21 ) attached, pointing downward driving spur ( 55 ) is provided. 13. Firstziegelhalterung nach Anspruch 12, dadurch gekenn­ zeichnet, daß bei der Firstklammer (2′′′) oberhalb des Eintreibsporns (55) eine zum Durchstechen eines Dorns geeignete Bohrung (56) im mittleren U-Schenkel (23) vorgesehen ist.13. ridge tile holder according to claim 12, characterized in that in the ridge bracket ( 2 ''') above the driving spur ( 55 ) a suitable for piercing a mandrel bore ( 56 ) is provided in the central U-leg ( 23 ).
DE3941216A 1988-12-15 1989-12-14 Ridge tile holder Expired - Fee Related DE3941216C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE3941216A DE3941216C2 (en) 1988-12-15 1989-12-14 Ridge tile holder

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE8815566U DE8815566U1 (en) 1988-12-15 1988-12-15 Ridge tile bracket
DE8903976U DE8903976U1 (en) 1989-04-01 1989-04-01 Ridge tile bracket, consisting of at least one S-shaped ridge clamp and a nail-like fastening element
DE3941216A DE3941216C2 (en) 1988-12-15 1989-12-14 Ridge tile holder

Publications (2)

Publication Number Publication Date
DE3941216A1 true DE3941216A1 (en) 1990-06-21
DE3941216C2 DE3941216C2 (en) 1997-09-04

Family

ID=25953879

Family Applications (1)

Application Number Title Priority Date Filing Date
DE3941216A Expired - Fee Related DE3941216C2 (en) 1988-12-15 1989-12-14 Ridge tile holder

Country Status (1)

Country Link
DE (1) DE3941216C2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0683285A1 (en) * 1994-05-17 1995-11-22 Redland Dakprodukten B.V. Ridge tile hook
FR2758842A1 (en) * 1997-01-24 1998-07-31 Ossenberg Schule & Soehne DEVICE FOR THE INSTALLATION OF TILES FAITIERES ON FAITIERE FAILURE OF A ROOF
EP0939178A1 (en) * 1998-02-23 1999-09-01 Vincenzo Santagata Method for fixing tiles or the like to one another for covering a roof and gripping elements used to carry out this method
WO2007000303A1 (en) * 2005-06-29 2007-01-04 Creaton Ag Device for fixing dry laying ridge tiles and ridge stones
EP2239393A3 (en) * 2009-04-06 2013-07-24 Friedrich Ossenberg-Schule & Söhne GmbH. & Co. KG. Holding clamp for a roof decking panel
EP3348735A1 (en) * 2017-01-17 2018-07-18 BTS BauTechnischeSysteme GmbH & Co. KG Retaining clip for a roofing plate

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT42449B (en) * 1908-06-09 1910-06-10 Karl Vater Clamp to hold hollow tiles, especially ridge and hip tiles.
DE1798415U (en) * 1959-07-30 1959-10-22 Erhard Biallas DEVICE FOR FASTENING THE ROOF RIM AND RIB WITHOUT MOERTEL.
DE6927285U (en) * 1969-07-09 1969-11-20 Gapa Werk Papenberg & Garz PAN CLAMP FOR FASTENING CONCRETE ROOF TUBES TO ROOF SLATS
DE1709312A1 (en) * 1968-07-12 1971-12-30 Braas & Co Gmbh Device for fastening ridge tiles
US3646717A (en) * 1969-10-17 1972-03-07 Eddie R Parker Roofing clip
EP0113182A1 (en) * 1982-11-29 1984-07-11 John Vincent Higgins Roofing
DE8415483U1 (en) * 1984-05-22 1984-08-30 Staboplast Kunststoffe GmbH & Co KG, 5758 Fröndenberg FIRST CLIP
DE8616301U1 (en) * 1986-06-18 1986-07-31 Fleck, Oskar, 4354 Datteln Nail for fastening ridge stones
DE8631336U1 (en) * 1986-11-22 1987-01-22 Ossenberg-Schule + Söhne KG, 5990 Altena Ridge clamp

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT42449B (en) * 1908-06-09 1910-06-10 Karl Vater Clamp to hold hollow tiles, especially ridge and hip tiles.
DE1798415U (en) * 1959-07-30 1959-10-22 Erhard Biallas DEVICE FOR FASTENING THE ROOF RIM AND RIB WITHOUT MOERTEL.
DE1709312A1 (en) * 1968-07-12 1971-12-30 Braas & Co Gmbh Device for fastening ridge tiles
DE6927285U (en) * 1969-07-09 1969-11-20 Gapa Werk Papenberg & Garz PAN CLAMP FOR FASTENING CONCRETE ROOF TUBES TO ROOF SLATS
US3646717A (en) * 1969-10-17 1972-03-07 Eddie R Parker Roofing clip
EP0113182A1 (en) * 1982-11-29 1984-07-11 John Vincent Higgins Roofing
DE8415483U1 (en) * 1984-05-22 1984-08-30 Staboplast Kunststoffe GmbH & Co KG, 5758 Fröndenberg FIRST CLIP
DE8616301U1 (en) * 1986-06-18 1986-07-31 Fleck, Oskar, 4354 Datteln Nail for fastening ridge stones
DE8631336U1 (en) * 1986-11-22 1987-01-22 Ossenberg-Schule + Söhne KG, 5990 Altena Ridge clamp

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0683285A1 (en) * 1994-05-17 1995-11-22 Redland Dakprodukten B.V. Ridge tile hook
NL9400805A (en) * 1994-05-17 1996-01-02 Redland Dakprod Bv Frost hook.
FR2758842A1 (en) * 1997-01-24 1998-07-31 Ossenberg Schule & Soehne DEVICE FOR THE INSTALLATION OF TILES FAITIERES ON FAITIERE FAILURE OF A ROOF
EP0939178A1 (en) * 1998-02-23 1999-09-01 Vincenzo Santagata Method for fixing tiles or the like to one another for covering a roof and gripping elements used to carry out this method
WO2007000303A1 (en) * 2005-06-29 2007-01-04 Creaton Ag Device for fixing dry laying ridge tiles and ridge stones
EP2239393A3 (en) * 2009-04-06 2013-07-24 Friedrich Ossenberg-Schule & Söhne GmbH. & Co. KG. Holding clamp for a roof decking panel
EP3348735A1 (en) * 2017-01-17 2018-07-18 BTS BauTechnischeSysteme GmbH & Co. KG Retaining clip for a roofing plate

Also Published As

Publication number Publication date
DE3941216C2 (en) 1997-09-04

Similar Documents

Publication Publication Date Title
DE202004015772U1 (en) Roof edge connector
DE3941216A1 (en) Ridge tile fastener with ridge clamp - which has its lower end bent into horizontal U=shape to form fastening foot
DE3509077A1 (en) Cramp for fastening roof-covering elements
EP0430224B1 (en) Fixing device
DE69508839T2 (en) Hook for ridge tiles
CH678882A5 (en) Facade-tile invisible mounting - comprises hat-section rails with holes engaged by holding clamps
DE4428412A1 (en) Bracket with holders for shuttering panels
EP3936680B1 (en) Façade or roof lining with covering elements
DE4013459C2 (en) Fastening device for an end strip
DE68914009T2 (en) Fastening device for roof tiles.
DE3106740A1 (en) Arrangement and device for fastening a longitudinal beam
DE4310420C1 (en) Device for fastening ridge coverings on the roof ridge of a roof covering
EP0864808B1 (en) Mounting device for recessed lighting fixture
DE3317334C1 (en) Ridge-batten holder
EP0027196B1 (en) Coating structure with clamping device and covering element
DE8815566U1 (en) Ridge tile bracket
DE3941097C1 (en) Cable channel or tray support - has coupling element fixable from above in form of shaft fitting selectable slots and with projection to act like hook
DE8903976U1 (en) Ridge tile bracket, consisting of at least one S-shaped ridge clamp and a nail-like fastening element
DE2622084A1 (en) Ridge cap holding clip - has lower anchor with notches engaging flange and upper section between and over cap pieces
DE3713442A1 (en) Securing means for wooden battens on buildings, in particular ridge or arris battens in a steep-pitched-roof structure
DE7442068U (en) Fixing nails, in particular for insulating panels
DE7203975U (en) Device for the invisible fastening of door or window frames to the masonry
DE4141029C2 (en) Cover against plaster material for projecting parts of a roof and method for their attachment
DE60012109T2 (en) clip
EP1319769B1 (en) Roof-insulating slab

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
D2 Grant after examination
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee