DE3409591C2 - - Google Patents

Info

Publication number
DE3409591C2
DE3409591C2 DE19843409591 DE3409591A DE3409591C2 DE 3409591 C2 DE3409591 C2 DE 3409591C2 DE 19843409591 DE19843409591 DE 19843409591 DE 3409591 A DE3409591 A DE 3409591A DE 3409591 C2 DE3409591 C2 DE 3409591C2
Authority
DE
Germany
Prior art keywords
piping
soil
excavated
shield
essentially
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
DE19843409591
Other languages
German (de)
Other versions
DE3409591C3 (en
DE3409591A1 (en
Inventor
Des Erfinders Auf Nennung Verzicht
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Walter Bau AG
Original Assignee
Dyckerhoff and Widmann AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dyckerhoff and Widmann AG filed Critical Dyckerhoff and Widmann AG
Priority to DE19843409591 priority Critical patent/DE3409591C3/en
Publication of DE3409591A1 publication Critical patent/DE3409591A1/en
Application granted granted Critical
Publication of DE3409591C3 publication Critical patent/DE3409591C3/en
Publication of DE3409591C2 publication Critical patent/DE3409591C2/de
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/002Ground foundation measures for protecting the soil or subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/006Sealing of existing landfills, e.g. using mining techniques
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/48Foundations inserted underneath existing buildings or constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Description

Die Erfindung betrifft zwei Verfahren zur nachträglichen Herstellung einer unterirdischen Dichtungssohle nach dem Oberbegriff der Ansprüche 1 und 2. Außerdem betrifft sie eine Vorrichtung zur Durchführung des Verfahrens.The invention relates to two methods for subsequent Production of an underground sealing sole after the The preamble of claims 1 and 2. It also relates a device for performing the method.

Derartiges ist aus der EP 00 59 020 A1 bekannt. Immer werden zur Entfernung von unerwünschten verseuchenden Stoffen aus Erdböden verseuchte Bodenteile nach deren Abschirmung von seitlich benachbarten Bodenteilen entfernt. Zur vertikalen Abschirmung der verseuchten Bodenteile soll eine horizontale Dichtungsschicht aus Lehm oder Ton in den Erdboden eingebracht werden. Wie letztere eingebracht wird, ist allerdings nicht angegeben.Such is known from EP 00 59 020 A1. always are used to remove unwanted contaminants Substances from soil contaminated soil parts after their Shielding of adjacent floor parts away. For vertical shielding of the contaminated Floor parts should have a horizontal sealing layer made of clay or clay can be brought into the ground. Like the latter is introduced, however, is not specified.

Der Erfindung liegt die Aufgabe zugrunde, Verfahren dieser Art zu entwickeln, mit denen als solche Dichtungssohle nachträglich auf technisch einfache Weise eingebracht werden kann, und außerdem eine Vorrichtung zur Durchführung solcher Verfahren anzugeben.The invention has for its object the method of this Kind of develop with those as such sealing sole subsequently introduced in a technically simple manner can be, and also a device for performing to specify such procedures.

Die erfindungsgemäße Lösung dieser Aufgabe ist im kennzeichnenden Teil des Anspruchs 1 enthalten. Eine alternative Lösung ist im Kennzeichen des Anspruchs 2 angegeben. The achievement of this task is in characterizing part of claim 1 included. A alternative solution is in the characterizing part of claim 2 specified.  

Diese Verfahren ermöglichen insbesondere dann, wenn sie in lockeren Gesteinsböden angewendet werden können, eine wirtschaftliche Abdichtung des Untergrunds bestehender Mülldeponien gegenüber dem darunter befindlichen Erdboden, welche ein Absickern von gelösten oder flüssigen Giftstoffen oder anderen umweltzerstörenden oder -gefährdenden Schadstoffen in das Erdreich bzw. das Grundwasser verhindert. Die Verfahren sind relativ einfach und zuverlässig durchzuführen, ohne daß in bestehende Mülldeponien eingegriffen werden muß oder diese ganz oder teilweise abgetragen werden müssen.These procedures enable, in particular, if they are in loose rock floors can be applied, a economical waterproofing of existing substrates Landfills opposite the ground below, which seeps away from dissolved or liquid Toxins or other environmentally destructive or -Dangerous pollutants in the soil or that Groundwater prevented. The procedures are relatively simple and perform reliably without getting into existing ones Landfills must be intervened or this whole or must be partially removed.

Die erfindungsgemäßen Verfahren werden also so durchgeführt, daß zueinander im wesentlichen parallele Löcher im Erdboden unter der Mülldeponie hindurchgebohrt werden, wobei gleichzeitig zur Abstützung des Erdbodens fortlaufend mit der Herstellung der Bohrlöcher in diese eine Verrohrung eingeschoben wird, durch welche hindurch das vor dem Stirnende der Verrohrung ausgebrochene Bodenmaterial aus dem Erdboden herausbefördert wird. Nach Fertigstellung der Bohrlöcher werden diese durch Eindrücken von im wesentlichen flüssigkeitsdichtem Füllmaterial gefüllt, wobei oder worauf die eingeschobene Verrohrung aus den Löchern wieder entfernt wird.The methods according to the invention are thus so performed that essentially parallel to each other Drilled holes in the ground under the landfill be, at the same time to support the ground continuously with the production of the boreholes in these a piping is inserted through which the one that broke out in front of the end of the piping Soil material is transported out of the ground. To Completion of the boreholes will complete this Indentation of essentially liquid-tight Filling material filled, where or on which the inserted Piping is removed from the holes.

Vorteilhafte Weiterentwicklungen oder Abwandlungen der erfindungsgemäßen Verfahren und zu ihrer Durchführung dienende Vorrichtungen ergeben sich aus den Unteransprüchen.
Advantageous further developments or modifications of the methods according to the invention and devices used for their implementation result from the subclaims.

In der Zeichnung sind zwei besonders vorteilhafte Aus­ führungsbeispiele des erfindungsgemäßen Verfahrens sowie der zur Durchführung dieses Verfahrens dienenden Vorrichtung dargestellt, die im folgenden näher beschrie­ ben werden:In the drawing are two particularly advantageous examples of the method according to the invention as well as the person performing this procedure Device shown, which was described in more detail below will be:

Fig. 1 zeigt einen Querschnitt durch eine Mülldeponie mit einer nach dem erfindungsgemäßen Verfahren hergestellten Dichtungssohle im darunter befind­ lichen Erdboden; Fig. 1 shows a cross section through a landfill with a sealing sole produced by the method according to the invention in the earth beneath;

Fig. 2 ist ein Querschnitt durch die Dichtungssohle nach Linie II-II in Fig. 1; Fig. 2 is a cross section through the sealing sole according to line II-II in Fig. 1;

Fig. 3 ist ein Querschnitt durch die Dichtungssohle einer anderen Ausführungsform; Fig. 3 is a cross section through the sealing sole of another embodiment;

Fig. 4 veranschaulicht einen Längsschnitt durch das Stirnende eines nach dem erfindungsgemäßen Ver­ fahrens hergestellten Bohrlochs mit Verrohrung; Fig. 4 illustrates a longitudinal section through the front end of a borehole with piping manufactured according to the method according to the invention;

Fig. 5 zeigt dieses Bohrloch während seines erfindungs­ gemäßen Ausfüllens in gleicher Darstellungs­ weise wie in Fig. 4. Fig. 5 shows this borehole during its fiction, modern filling in the same presentation, as shown in Fig. 4.

Zur Herstellung einer in Fig. 1 gezeigten Dichtungs­ sohle 1 unter einer Mülldeponie 2 wird neben dieser eine Baugrube 3 hergestellt. Diese Baugrube dient als Anfahrschacht, von dem aus im Schildvortrieb Bohr­ löcher horizontal und mit gerader Achse im Erdboden 4 unter der Mülldeponie 2 hindurchgebohrt werden, wo­ bei gleichzeitig eine Verrohrung der Bohrlöcher er­ folgt. Schildkonstruktion und Rohrwerkstoff können den Bodenverhältnissen und den Einsatzhäufigkeiten angepaßt werden.To produce a seal as shown in FIG. 1, the sole 1 at a landfill 2, a pit 3 formed next to this. This excavation pit serves as an access shaft, from which holes are drilled horizontally and with a straight axis in the ground 4 under the landfill site 2 , where at the same time he piped the drill holes. Shield construction and pipe material can be adapted to the soil conditions and frequency of use.

Bei dem dargestellten Ausführungsbeispiel des erfin­ dungsgemäßen Verfahrens ist für die Herstellung die­ ser Bohrlöcher eine Schildkonstruktion mit erdge­ stützter Ortsbrust mit einem vorderem Schneidrad als Ausbrecheinrichtung 5 und einem im Abstand dahinter befindlichen Druckschott als Trennrand 6 verwendet, die für das weitere Verfahren Vorteile bietet, jedoch nicht zwingend notwendig ist. Das Schneidrad 5 baut den Erdboden 4 an der Ortsbrust ab und fördert ihn in vermengtem Zustand in den hinter dem Schneidrad 5 und vor dem Druckschott 6 befindlichen Abbauraum 7. Dieser Abbauraum ist von einem Schildmantel 8 umgeben, an welchen sich das Druckschott 6 dicht anschließt.In the illustrated embodiment of the method according to the invention, for the manufacture of these boreholes, a shield construction with an erdge-supported face is used with a front cutting wheel as a stripping device 5 and a pressure bulkhead located at a distance behind it as a separating edge 6 , which offers advantages for the further method, but not is imperative. The cutting wheel 5 removes the ground 4 from the working face and conveys it in the mixed state into the excavation space 7 located behind the cutting wheel 5 and in front of the pressure bulkhead 6 . This mining space is surrounded by a shield jacket 8 , to which the pressure bulkhead 6 is closely connected.

An der Rückseite des Druckschottes 6 sind Steuerpres­ sen 9 angesetzt, die zur Steuerung des Schildes wäh­ rend des Schildvortriebs dienen. Mit den hinter die­ sen Steuerpressen angesetzten Rohrschüssen 10, die in das mit dem Schild hergestellte Bohrloch eingetrie­ ben werden, wird der Schild im Erdboden 4 unter der Deponie 2 hindurch mit gerader Achse im wesentlichen horizontal vorgetrieben, bis die gesamte Mülldeponie unterfahren ist. Hierbei wird je nach Gehalt an bindigen Bestandteilen des Erdbodens über eine Öffnung 11 im Druckschott 6 mehr oder weniger viel Dichtungs­ zusatz, beispielsweise in Form einer Tonmehlsuspen­ sion, in den Abbauraum 7 des Schildes eingeleitet und dann mit dem an der Ortsbrust abgebauten Erdboden vermengt. Die Vermengung erfolgt durch eine vom Schneidrad 5 hervorgerufene Quirlbewegung, wobei eine plastische Masse entsteht, die zunächst hinrei­ chend wasserundurchlässig ist.At the back of the pressure bulkhead 6 Steuerpres sen 9 are used, which serve to control the shield during the shield drive. With the pipe sections 10 attached behind the control presses, which are driven into the borehole made with the shield, the shield is driven horizontally in the ground 4 under the landfill 2 through with a straight axis until the entire landfill is underrun. Here, depending on the content of cohesive constituents of the soil via an opening 11 in the pressure bulkhead 6, more or less sealing additive, for example in the form of a clay flour suspension, is introduced into the excavation space 7 of the shield and then mixed with the soil mined on the face. The mixing takes place by a whisking movement caused by the cutting wheel 5 , whereby a plastic mass is formed which is initially sufficiently water-impermeable.

Über einen durch eine andere Öffnung im Druckschott in den Abbauraum 7 hineinragenden Schneckenförderer 12 wird diese Masse durch die von den Rohrschüssen 10 gebildete Verrohrung des Bohrloches hindurch in die Baugrube 3 abgezogen und von dort an die Geländeober­ fläche transportiert, wo sie zwischengelagert wird. In einer in der Zeichnung nicht dargestellten Aufberei­ tungsanlage kann diese Masse weiterbehandelt werden mit dem Ziel, eine von der Konsistenz her pumpfähige und hochwasserundurchlässige Dichtmasse zu erhalten, wobei zumindest größere Steine ausgesondert werden.Via a through another opening in the pressure bulkhead in the mining space 7 projecting screw conveyor 12 , this mass is withdrawn through the casing formed by the pipe sections 10 of the borehole into the excavation pit 3 and from there to the surface of the terrain, where it is stored temporarily. In a processing plant not shown in the drawing, this mass can be treated further with the aim of obtaining a pumpable and highly water-impermeable sealing compound, at least larger stones being separated out.

Nachdem die Deponie vollständig unterfahren ist, wird der Rohrvortrieb gestoppt. Schneidrad 5 und alle für den Bodenabbau und -transport notwendigen Einbauten, wie Schneckenförderer 12, werden aus dem Schild ausge­ baut, so daß im Abbauraum 7 lediglich der nackte Schild­ mantel 8 verbleibt. Nun wird das abgebaute und zu einer Dichtmasse aufbereitete Bodenmaterial über eine nicht dargestellte Pumpleitung durch eine Öffnung 13 in den Abbauraum 7 gepumpt. Die Vortriebspressen im Anfahrschacht 3 werden entfernt. Durch Aufbringen von ausreichendem Druck auf die Pumpleitung entsteht eine Vortriebskraft auf das Druckschott 6, so daß Schild und Verrohrung in Richtung Anfahrschacht zurückge­ drückt werden bei gleichzeitiger Ausfüllung des entstehenden Bodenhohlraumes mit Dichtmasse 14. Die einzelnen Schüsse 10 der Verrohrung sowie der Schild werden auf diese Weise wiedergewonnen und stehen für erneuten Einsatz zur Verfügung.After the landfill is completely undershot, the pipe jacking is stopped. Cutting wheel 5 and all necessary for soil removal and transport internals, such as screw conveyor 12 , are built out of the shield, so that only the bare shield shell 8 remains in the excavation space 7 . The ground material which has been removed and prepared to form a sealing compound is now pumped through an opening 13 into the extraction space 7 via a pump line (not shown). The jacking presses in the start shaft 3 are removed. By applying sufficient pressure to the pump line, a propulsive force is created on the pressure bulkhead 6 , so that the shield and piping are pushed back in the direction of the approach shaft while the resulting floor cavity is filled with sealing compound 14 . The individual shots 10 of the piping and the shield are recovered in this way and are available for renewed use.

Zur Erzielung einer vollständigen Dichtungssohle werden nacheinander zahlreiche Bohrlöcher nebeneinan­ der hergestellt und mit Dichtmasse 14 gefüllt.In order to achieve a complete sealing sole, numerous boreholes are made one after the other and filled with sealing compound 14 .

Die Anordnung der Bohrlöcher kann auf zwei verschie­ dene Weisen erfolgen, die in Fig. 2 und 3 dargestellt sind.The arrangement of the boreholes can be done in two different ways, which are shown in FIGS. 2 and 3.

In Fig. 2 sind die mit Füllmaterial gefüllten Bohr­ löcher mit Überschneidung eng nebeneinanderliegend angeordnet. Das Maß der Überschneidung richtet sich nach der erforderlichen, in der Regel versuchsmäßig festzulegenden Dicke der Dichtungssohle. Während des Rohrvortriebs ist die Überschneidung mit dem benachbarten bereits gefüllten Bohrloch durch ge­ eignete Maßnahmen kontrollierbar. So können durch klei­ ne Öffnungen im Schildmantel hindurch Flügel- oder Schlitzsonden nach außen gebracht werden, mit denen Bodenproben in den Schild hereingeholt werden können. Im Schildmantel können auch Fenster vorgesehen sein, durch die hindurch die Bodenbeschaffenheit erkenn­ bar ist.In Fig. 2 the holes filled with filling material are arranged closely adjacent to one another with overlap. The degree of overlap depends on the required thickness of the sealing base, which is usually to be determined experimentally. During pipe jacking, the overlap with the neighboring already filled borehole can be checked by suitable measures. So wing or slot probes can be brought out through small openings in the shield jacket, with which soil samples can be brought into the shield. Windows can also be provided in the shield jacket, through which the floor condition can be recognized.

In Fig. 3 ist eine sparsame Methode gezeigt, die bei injizierten Böden gewählt werden kann. Die Rohrvortriebe werden hier in einem solchen Abstand angeordnet, daß der dazwischen befindliche Erdboden aus Vortriebsröhren 15 heraus durchbohrt und in der geforderten Mächtigkeit durch chemische Boden­ injektion vollständig gedichtet werden kann, um zusammen mit den dann mit dichtendem Füllmaterial 14 auszufüllenden Bohrlöchern eine durchgehende Dich­ tungssohle 14, 16 zu bilden. In diesem Fall müssen die Vortriebsröhren 15 begehbar sein, was bei der in Fig. 2 gezeigten Variante nicht notwendig ist.In Fig. 3 is an economical method is shown that can be selected for the injected soil. The pipe jacking are here arranged in such a distance that the intervening ground located in propelling tubes 15 out can be pierced and sealed in the required thickness by chemical soil injection complete in order, together with the then be filled with a sealing filler material 14 holes tung sole a continuous log 14 To form 16 . In this case, the jacking tubes 15 must be accessible, which is not necessary in the variant shown in FIG. 2.

Abschließend wird eine die Mülldeponie 2 an ihren Seiten dicht umschließende vertikale Dichtwand 17 so in den Erdboden 4 eingebracht, daß sie in die Dich­ tungssohle 1 einbindet. Besteht diese Dichtwand 17 aus mehreren einzelnen Wandabschnitten, sollten diese mit bekannten Maßnahmen gegeneinander abgedichtet sein.Finally, a landfill 2 tightly enclosing on both sides of the vertical sealing wall 17 is introduced into the ground 4 in such a way that it integrates with the sole 1 . If this sealing wall 17 consists of several individual wall sections, these should be sealed off from one another by known measures.

Claims (15)

1. Verfahren zur nachträglichen Herstellung einer unterirdischen Dichtungssohle unter einer auf dem Erdboden gelagerten Mülldeponie durch Einbringen einer flüssigkeitsdichten etwa waagerechten Schicht in den Erdboden, dadurch gekennzeichnet, daß von der Seite der Mülldeponie ausgehend sich unter der Mülldeponie hindurcherstreckende im wesentlichen waagerechte, parallel zueinander seitlich dicht aneinanderliegende oder sich überschneidende Bohrlöcher gebohrt werden, wobei gleichzeitig zur Abstützung des darüber befindlichen Erdbodens fortlaufend mit der Herstellung der Bohrlöcher in diese eine Verrohrung eingeschoben wird, durch welche hindurch vor der Verrohrung ausgebrochenes Bodenmaterial herausbefördert wird, worauf die Verrohrung durch Eindrücken von im wesentlichen flüssigkeitsdichtem Füllmaterial gefüllt und anschließend aus den Bohrlöchern entfernt wird.1. A method for the subsequent production of an underground sealing sole under a garbage dump stored on the ground by introducing a liquid-tight approximately horizontal layer in the ground, characterized in that starting from the side of the garbage dump extending under the garbage dump essentially horizontal, parallel to each other laterally sealed adjacent or overlapping boreholes are drilled, at the same time to support the soil above it, with the production of the boreholes, a piping is pushed into it, through which broken-out soil material is conveyed out before the piping, whereupon the piping by pressing in essentially liquid-tight filling material filled and then removed from the drill holes. 2. Verfahren zur nachträglichen Herstellung einer unterirdischen Dichtungssohle unter einer auf dem Erdboden gelagerten Mülldeponie durch Einbringen einer flüssigkeitsdichten etwa waagerechten Schicht in den Erdboden, dadurch gekennzeichnet, daß von der Seite der Mülldeponie ausgehend sich unter der Mülldeponie hindurcherstreckende im wesentlichen waagerechte, parallel zueinander im gegenseitigen Abstand seitlich nebeneinanderliegende Bohrlöcher gebohrt werden, wobei gleichzeitig zur Abstützung des darüber befindlichen Erdbodens fortlaufend mit der Herstellung der Bohrlöcher in diese eine Verrohrung eingeschoben wird, durch welche hindurch vor der Verrohrung ausgebrochenes Bodenmaterial herausbefördert wird, daß die zwischen den verrohrten Bohrlöchern verbleibenden Erdschichten durch von den Bohrlöchern aus erfolgendes Injizieren mit Dichtungsmasse abgedichtet werden und daß dann die Verrohrung durch Eindrücken von im wesentlichen flüssigkeitsdichtem Füllmaterial gefüllt und anschließend aus den Bohrlöchern entfernt wird.2. Process for the subsequent production of a underground sealing sole under one on the Landfill dumped by dumping a liquid-tight, approximately horizontal layer in the ground,  characterized in that from the side of the Landfill going out under the landfill extending essentially horizontally, parallel to each other at a lateral distance from each other adjacent holes are drilled, while simultaneously supporting the above existing soil continuously with the Production of the boreholes in this one piping is inserted through which in front of the Piping of broken soil material is conveyed out that between the cased Boreholes remaining through the layers of earth Drill holes from injecting with Sealant are sealed and then that Piping by pushing in essentially filled with liquid-tight filling material and is then removed from the holes. 3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß durch den Fülldruck des Füllmaterials die Verrohrung aus den Bohrlöchern herausgeschoben wird.3. The method according to claim 1 or 2, characterized characterized in that by the filling pressure of the Filler the piping from the drill holes is pushed out. 4. Verfahren nach Anspruch 3, dadurch gekennzeichnet, daß an das vordere Ende der Verrohrung eine Trennwand dicht angeschlossen wird, hinter welcher das Füllmaterial mit einem so großen Überdruck eingedrückt wird, daß die Trennwand unter Mitnahme der Verrohrung aus dem Bohrloch herausgedrückt wird.4. The method according to claim 3, characterized in that at the front end of the piping a partition is tightly connected, behind which the Filling material with such a large overpressure is pressed in that the partition with entrainment the piping is pushed out of the borehole. 5. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß zur Herstellung des in die Bohrlöcher einzubringenden Füllmaterials das mit einem Dichtungsmittel vermengte ausgebrochene Bodenmaterial, ggfs. unter Aussortierung von größeren Steinen, verwendet wird.5. The method according to claim 1 or 2, characterized characterized in that to produce the in the  Filling material to be drilled with the broken out blended with a sealant Soil material, possibly with the sorting out of larger ones Stones, is used. 6. Verfahren nach Anspruch 5, dadurch gekennzeichnet, daß als Dichtungsmittel eine aus einem mehlartigen Stoff, beispielsweise Tonmehl oder dgl., gebildete Suspension verwendet wird.6. The method according to claim 5, characterized in that as a sealant one from a flour-like Fabric, such as clay flour or the like Suspension is used. 7. Verfahren nach Anspruch 6, dadurch gekennzeichnet, daß die Vermengung des Dichtungsmittels mit dem ausgebrochenen Bodenmaterial während des Herausbeförderns erfolgt.7. The method according to claim 6, characterized in that that the mixing of the sealant with the excavated soil material during the Is carried out. 8. Verfahren nach Anspruch 7, dadurch gekennzeichnet, daß das Dichtungsmittel in das herauszubefördernde Bodenmaterial injiziert und anschließend mit diesem durch mechanische Quirlbewegung vermengt wird.8. The method according to claim 7, characterized in that that the sealant to be conveyed out Soil material injected and then with this is mixed by mechanical agitation. 9. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß das Herausfördern des Bodenmaterials aus einer Grube, einem Schacht oder einem Stollen vorgenommen wird, die bzw. der seitlich der Mülldeponie angeordnet wird.9. The method according to claim 1 or 2, characterized characterized in that the extraction of the Soil material from a pit, a shaft or a tunnel is made, the or the side the landfill is arranged. 10. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß jeweils das Material zweier dicht nebeneinanderliegender Bohrungen hintereinander herausgefördert und durch im wesentlichen flüssigkeitsdichtes Material ersetzt wird, und zwar derart, daß das in die zweite Bohrung eingebrachte Material sich im wesentlichen dicht an das in die erste Bohrung eingebrachte Material anschließt. 10. The method according to claim 1, characterized in that the material of two is dense adjacent holes in a row promoted and by essentially liquid-tight material is replaced, namely such that that is introduced into the second hole Material is essentially close to that in the first hole inserted material connects.   11. Verfahren nach Anspruch 10, dadurch gekennzeichnet, daß beim Herausfördern des ausgebrochenen Bodenmaterials der zweiten Bohrung der diesem zugewandte Rand der das ausgebrochene Bodenmaterial der ersten Bohrung ersetzenden Materialfüllung mit herausgefördert und anschließend durch einen Teil des das ausgebrochene Bodenmaterial der zweiten Bohrung ersetzenden Materials ersetzt wird.11. The method according to claim 10, characterized in that when extracting the broken out Soil material of the second hole of this facing edge of the excavated soil material material filling replacing the first hole promoted and then through part of the the excavated soil from the second hole replacing material is replaced. 12. Vorrichtung zur Durchführung eines der Verfahren nach einem oder mehreren der Ansprüche 1 bis 11, gekennzeichnet durch eine zum Lösen und Herausfördern des ausgebrochenen Bodenmaterials ausgebildete Schildkonstruktion mit einem Schildmantel (8) und einer an dessen Frontseite befindlichen Ausbrecheinrichtung (5), hinter welcher sich eine an den Schildmantel (8) dicht angeschlossene Trennwand (6) mit einer verschließbaren Öffnung (13) für das Abfördern des Ausbruchmaterials durch das mit der Schildkonstruktion hergestellte Bohrloch hindurch befindet.12. An apparatus for performing one of the methods according to one or more of claims 1 to 11, characterized by a shield construction designed for loosening and conveying out the excavated soil material with a shield jacket ( 8 ) and a stripping device ( 5 ) located on the front side thereof, behind which a partition ( 6 ) which is tightly connected to the shield casing ( 8 ) and has a closable opening ( 13 ) for the removal of the excavated material through the borehole made with the shield construction. 13. Vorrichtung nach Anspruch 12, dadurch gekennzeichnet, daß durch die Öffnung (13) ein Förderorgan (12) für die Abförderung des Ausbruchmaterials hindurchragt.13. The apparatus according to claim 12, characterized in that through the opening ( 13 ) projects through a conveying member ( 12 ) for the removal of the excavated material. 14. Vorrichtung nach Anspruch 12, dadurch gekennzeichnet, daß neben der verschließbaren Öffnung (13) für die Abförderung des Ausbruchmaterials eine weitere verschließbare Öffnung (11) in der Trennwand (6) vorgesehen ist, an welche dichtend eine vorzugsweise schlauchförmige Leitung für die Zufuhr des Füllmaterials (14) in den Raum (7) vor der Trennwand (6) anschließbar ist. 14. The apparatus according to claim 12, characterized in that in addition to the closable opening ( 13 ) for the removal of the excavated material, a further closable opening ( 11 ) in the partition ( 6 ) is provided, to which a preferably tubular line for the supply of the sealing Filling material ( 14 ) in the room ( 7 ) in front of the partition ( 6 ) can be connected. 15. Vorrichtung nach Anspruch 12, dadurch gekennzeichnet, daß an das rückwärtige Stirnende des Schildmantels (8) Teile der Verrohrung bildende Rohrschüsse (10) ansetzbar sind.15. The apparatus according to claim 12, characterized in that at the rear end of the shield shell ( 8 ) parts of the piping forming pipe sections ( 10 ) can be used.
DE19843409591 1984-03-15 1984-03-15 Process for the subsequent production of an underground sealing sole Expired - Fee Related DE3409591C3 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19843409591 DE3409591C3 (en) 1984-03-15 1984-03-15 Process for the subsequent production of an underground sealing sole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19843409591 DE3409591C3 (en) 1984-03-15 1984-03-15 Process for the subsequent production of an underground sealing sole

Publications (3)

Publication Number Publication Date
DE3409591A1 DE3409591A1 (en) 1985-09-19
DE3409591C3 DE3409591C3 (en) 1993-11-18
DE3409591C2 true DE3409591C2 (en) 1993-11-18

Family

ID=6230635

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19843409591 Expired - Fee Related DE3409591C3 (en) 1984-03-15 1984-03-15 Process for the subsequent production of an underground sealing sole

Country Status (1)

Country Link
DE (1) DE3409591C3 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0482405A1 (en) * 1990-10-26 1992-04-29 Alfred Kunz GmbH & Co. Method for secondary construction of an underground sealing-base under a consisting dump

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3415883A1 (en) * 1984-04-28 1985-10-31 Karl Bräuer Spezial Tief- und Bergbautechnik, 6541 Ellern Method of sealing off contaminated waste disposal bodies from their depository
DE3424545A1 (en) * 1984-07-04 1986-01-16 Wayss & Freytag Ag, 6000 Frankfurt Method of inserting an underground concrete slab of closed construction
DE3511548C3 (en) * 1985-03-29 1993-12-23 Bilfinger Berger Bau Process for the subsequent production of a sealing layer under an existing landfill
DE3617956A1 (en) * 1985-05-28 1987-12-03 Hans Richter METHOD AND DEVICE FOR THE INNOVATIVE PUTTING IN OF A LIQUID-IMPERPERABLE LAYER IN EXPANDED LANDFILLS AND CONTAMINATED LOCATIONS FOR PROTECTING THE GROUNDWATER
DE3534173A1 (en) * 1985-09-25 1987-03-26 Niederberg Chemie Sealing of landfill sites
DE3536990A1 (en) * 1985-10-17 1987-04-23 Niederberg Chemie REMOVAL UNDER DEPOSITS
DE3545207A1 (en) * 1985-12-20 1987-06-25 Walter Ignaz METHOD AND DEVICE FOR PUTING A WATERPROOF LAYER INTO THE GROUND
EP0233979B1 (en) * 1986-02-18 1990-06-20 Hüls Troisdorf Aktiengesellschaft Sealing of dumps
DE3607499A1 (en) * 1986-03-07 1987-09-10 Lehn Eckhard Vom Method of sealing the soil surface area of an old or operating landfill site in a gastight and watertight manner
EP0461472A3 (en) * 1990-06-12 1992-04-08 Friedrich Wilhelm Paurat Construction for sealing a waste dump and method for making said construction
EP0461471A3 (en) * 1990-06-12 1992-04-08 Friedrich Wilhelm Paurat Method and apparatus for sealing a waste dump
DE4031713A1 (en) * 1990-10-06 1992-04-09 Licentia Gmbh High temperature battery - has neighbouring cells arranged pref. in zigzag to minimise potential difference between adjacent cells
DE4209714A1 (en) * 1992-03-25 1993-09-30 Rohrbau Nord Oldenburg Gmbh & Process for sealing the base of a landfill
DE4216473C2 (en) * 1992-05-15 1994-02-24 Ver Mitteldeutsche Braunkohlen Process for sealing liquid-permeable floor layers or fissures and crevices under or next to contamination sources
US8926238B1 (en) * 2009-09-29 2015-01-06 The Boeing Company Cutting tool sleeve for tool holders

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE938119C (en) * 1952-03-27 1956-01-19 Dyckerhoff & Widmann Ag Method and device for the production of a waterproofing apron in the subsurface
DE961609C (en) * 1952-08-17 1957-04-11 Dyckerhoff & Widmann Ag Process for the production of a waterproofing apron in the subsurface using thixotropic liquid
CH642416A5 (en) * 1978-02-21 1984-04-13 Frankignoul Pieux Armes METHOD OF CONSTRUCTING UNDERGROUND WORKS WITH VERTICAL WALLS, DEVICE FOR EXECUTING THE METHOD AND UNDERGROUND WORK.
NL8100879A (en) * 1981-02-23 1982-09-16 Tno METHOD FOR REMOVING UNDESIRABLE INGREDIENTS FROM THE GROUND.
DE3330897C2 (en) * 1983-08-26 1986-09-11 Gkn Keller Gmbh, 6050 Offenbach Method and device for the watertight and pollutant-tight enclosure of old deposits deposited on the ground
DE3407382C2 (en) * 1984-02-29 1994-08-04 Zueblin Ag Process for producing an approximately horizontal sealing layer and device for carrying out the process

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0482405A1 (en) * 1990-10-26 1992-04-29 Alfred Kunz GmbH & Co. Method for secondary construction of an underground sealing-base under a consisting dump

Also Published As

Publication number Publication date
DE3409591C3 (en) 1993-11-18
DE3409591A1 (en) 1985-09-19

Similar Documents

Publication Publication Date Title
DE3409591C2 (en)
DE3330897A1 (en) Method and device for the subsequent treatment of dumps for the protection of the environment
DE3404455C2 (en) Process for underground gasification of coal seams
DE3535320A1 (en) METHOD AND DEVICE FOR SETTING A ROD, WIRE OR TUBULAR INSTALLATION COMPONENT IN A FLOOR INFORMATION WITH PRESSING WATER
DE2915483A1 (en) PROCEDURES FOR DETERMINING MATERIALS IN POWERFUL FLOECES
DE3439858A1 (en) Method and arrangement for sealing off subterranean soil masses, in particular for subsequent treatment of disposal sites or the like
DE3120479A1 (en) METHOD FOR HYDRAULICLY FRACTURING A GEOLOGICAL FORMATION AFTER A PREDICTED DIRECTION
EP0483110A2 (en) Method and device for making a well
DE3415883A1 (en) Method of sealing off contaminated waste disposal bodies from their depository
DE19806923C1 (en) Sealing water well
DE1934170C3 (en) Process for containing and removing mineral oil that has penetrated the soil
DE3605062A1 (en) Sealing of landfill sites
EP0250606B1 (en) Method and apparatus for the posterior mounting of construction elements on an extended floor in the soil at drift mining operations
DE2547712C2 (en) Process for the extraction of coal in longwall mining
DE3511548C2 (en)
EP0225963B1 (en) Apparatus for putting an impervious layer in the ground
DE4441835A1 (en) Preventing escape of harmful substances from waste disposal site
DE4022897C2 (en) Process for sealing landfills or other contaminated areas
DE10258300B4 (en) Method and device for stabilizing abandoned mine shafts
EP0273441B1 (en) Process for discharging spoils
DE4225121A1 (en) Method of supporting tunnel face during shield driving excavation - involves bulkhead with high level shuttered opening and vertical partition next to face forming air pocket in between
DE3542313A1 (en) Method and apparatus for forming a sealing wall in the ground
DE3735170A1 (en) Method of constructing pile foundations
EP0233979B1 (en) Sealing of dumps
DE3431233C2 (en)

Legal Events

Date Code Title Description
OM8 Search report available as to paragraph 43 lit. 1 sentence 1 patent law
OP8 Request for examination as to paragraph 44 patent law
D2 Grant after examination
8363 Opposition against the patent
8366 Restricted maintained after opposition proceedings
8305 Restricted maintenance of patent after opposition
D4 Patent maintained restricted
8339 Ceased/non-payment of the annual fee