[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

DE2829867A1 - Pipe flow divider for particulate materials - uses sectional flow pipes to divide flow fitted directly behind pneumatic hose pipe section - Google Patents

Pipe flow divider for particulate materials - uses sectional flow pipes to divide flow fitted directly behind pneumatic hose pipe section

Info

Publication number
DE2829867A1
DE2829867A1 DE19782829867 DE2829867A DE2829867A1 DE 2829867 A1 DE2829867 A1 DE 2829867A1 DE 19782829867 DE19782829867 DE 19782829867 DE 2829867 A DE2829867 A DE 2829867A DE 2829867 A1 DE2829867 A1 DE 2829867A1
Authority
DE
Germany
Prior art keywords
flow
pipe
particulate materials
divide
directly behind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE19782829867
Other languages
German (de)
Inventor
Ludwig Dipl Ing Schedlbauer
Diethelm Ing Grad Schroer
Christoph Dipl Ing Zillessen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bergwerksverband GmbH
RAG AG
Original Assignee
Ruhrkohle AG
Bergwerksverband GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ruhrkohle AG, Bergwerksverband GmbH filed Critical Ruhrkohle AG
Priority to DE19782829867 priority Critical patent/DE2829867A1/en
Publication of DE2829867A1 publication Critical patent/DE2829867A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G53/00Conveying materials in bulk through troughs, pipes or tubes by floating the materials or by flow of gas, liquid or foam
    • B65G53/34Details
    • B65G53/52Adaptations of pipes or tubes
    • B65G53/56Switches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/08Filling-up hydraulically or pneumatically

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Air Transport Of Granular Materials (AREA)

Abstract

The divider is for the division of a pneumatic pipe conveyor flow into part flow quantities during conveying of particulate materials. This allows the injection of materials permitting dry extrusion in normal or underground construction sites. Each conveyor pipe (1) is divided into at least two sectional flow pipes (3, 4) through at least one hose pipe (2). The dias. (6, 7) of the sectional flow pipes downstream of the hose pipe are chosen so that they form the least possible resistance to the conveyor flow.

Description

Vorrichtung zur Teilung eines pneumatischen FörderstromesDevice for dividing a pneumatic conveying flow

Die Erfindung betrifft eine Vorrichtung zur Teilung eines pneumatischen Förderstromes in Teilstrommengen bei der Förderung pulverförmiger oder körniger Baustoffe zum Einbringen von SpritzmateriaZien nach dem Trockenspritz:'erfahren in unter- und übertagigen baustellen z.B. zum Einbringen eines Saumversatzes im Steinkohlenbergbau.The invention relates to a device for dividing a pneumatic Flow rate in partial flow rates when conveying powdery or granular Building materials for applying spray materials after dry spraying: 'experience in underground and above-ground construction sites, e.g. for introducing a seam offset in the Coal mining.

Es ist bekannt, den Saumversatz innerhalb des im SteinkohZenbergbau üblichen Strebbaus pneumatisch einzubringen. PuZverförmige oder körnige Baustoffe werden von einer zentralen Station über RohrZeitungen mit einer Nennweite zwischen 80 bis 150 mm pneumatisch gefördert. Die Förderleistungen Ziegen je nach der zu überwindenden Förderlänge zwischen 5 und 15 m3/Std.It is known that the seam offset within the coal mining industry conventional longwall mining to be brought in pneumatically. PuZver-shaped or granular building materials are from a central station via pipe lines with a nominal width between 80 to 150 mm conveyed pneumatically. The subsidies goats depending on the too overcoming conveying length between 5 and 15 m3 / h.

Der Baustoff in einem Körnungsbereich bis zu 1C mm wird am Verwendungsort offen in einfache Vorschläge des Streckensaumes oder als Hinterföllmaterial zwischen Streckenausbau und Gebirge ausgetragen. Zur Verarbeitung der trocken geförderten Baustoffe, beispielsweise Anhydrit, wird am Austragsende der Förderleitung dem L1ateriaZ das benötigte Wasser, Anreger-Zösung oder sonstige Zusätze über eine oder mehrere Benetzungsdüsen zugegeben.The building material in a grain size range up to 1C mm is used at the place of use open in simple suggestions of the route hem or as backfill material between Track expansion and mountains carried out. For processing the dry conveyed Building materials, for example anhydrite, is at the discharge end of the delivery line the L1ateriaZ the required water, stimulant solution or other additives via a or more wetting nozzles added.

Aufgrund der vorhandenen Blaseinrichtungen und der großen Leitungsquerschnitte ist es bisher nicht möglich gewesen, aus einer FörderZeitung gleichzeitig ein Anspritzen des Gebirges bzw. des Ausbaus und ein HinterfüZZen durchzuführen.Due to the existing blowing equipment and the large cable cross-sections So far, it has not been possible to simultaneously inject a feed from a newspaper of the mountains or the expansion and a backfeeding to be carried out.

Zur Durchführung dieser Arbei sind mechanisch geführte Hinterfülleinrichtungen erfolderlich.Mechanically guided back-filling devices are used to carry out this work required.

Demgegenüber ist es die Aufgabe der erfindung, eine Vorrichtung zur Teilung eines pneumatischen Förderstromes in Teilstrommengen zu schaffen, die es ermöglicht, unter Verwendung der bisherigen Blaseinrichtungen und Leitumgsquerschnitte und unter Beibehaltung der einer Arbeitskraft zumutbaren BeZastung gleichzeitig sowohZ den Streckenausbau anzuspritzen oder zu hinterfüllen aZs auch das ErsteZZen von Streckenbeg Zeitdämmen durchzuführen, ohne daß es zu einer Verminderung der Förder-Zeistung kommt.In contrast, it is the object of the invention to provide a device for Division of a pneumatic conveying flow into partial flow quantities to create it made possible, using the previous blowing devices and Leitumgsquerschnitte and at the same time while maintaining the workload that is reasonable for a worker as well as injecting the route expansion or backfilling aZs also the first time to carry out time dams from the start of the route without reducing the Funding performance is coming.

Diese Aufgabe wird erfindungsgemäß dadurch gelöst daß jede FörderZeitung über mindestens ein Hosenrohr in mindestens zwei Teilstromleitungen unterteiZbar ausgebildet ist, wobei die Durchmesser der jeweiZs einem Hosenrohr nachgeschalteten Teilstromleitungen derart bemessen sind, daß sie einen geringsmöglichen Förderstromwiderstand bilden.This object is achieved according to the invention in that each delivery newspaper Can be subdivided into at least two partial flow lines via at least one Y-pipe is formed, the diameter of each downstream of a Y-pipe Partial flow lines are dimensioned such that they have the lowest possible flow resistance form.

Je nach der erforderlichen Förderstromaufteilung Zassen sich mehrere Mengen teiler hintereinanderschalten.Depending on the required flow distribution, there are several Connect the divisors one after the other.

AZs besonders vorteilhaft erweist sich im Rahmen der Erfindung, daß innerhalb eines Hosenrohres im Scheitelpunkt der Teilung eine auf den Förderstrom gerichtete verstellbare Mittelzunge vorgesehen ist.AZs proves particularly advantageous in the context of the invention that within a Y-pipe at the apex of the division one on the flow directional adjustable central tongue is provided.

Der technische Fortschritt der Erfindung ist damit begründet, daß zur Durchführung mehrerer gZeiehzeitig anfaZZender Arbeiten der geringere Leitungsdurchmesser einer Teilstromleitung es einer Arbeitskraft ermöglicht, den Austragsschlauch wie beim Trockenspritzverfahren zu führen. Darüber hinaus ist es nunmehr möglich, durch die AuSteiZung in mindestens zwei TeiZ-stromZeitungen die stündliche Leistung, die bisher bei maximal 4 m3/Std. Zag, in etwa auf den doppeZten Betrag zu erhöhen.The technical progress of the invention is based on the fact that the smaller cable diameter for carrying out several work that must be started at the same time a partial flow line enables a worker to like the discharge hose to lead in the dry spray process. In addition, it is now possible to go through the output in at least two TeiZ-stromZeitungen the hourly output, the previously at a maximum of 4 m3 / h. Zag to increase roughly to double the amount.

Größere Forderungen können durch das Hintereinanderschalten mehrerer MengenteiZer erzieZt werden.Larger demands can be made by connecting several Quantities can be achieved.

Ein AusführungsbeispieZ der Erfindung ist in der Zeichnung, die in schematisierter Form die AusbiZdung eines Hosenrohres wiedergibt, dargesteZZt und wird im folgenden näher erläutert.An AusführungsbeispieZ of the invention is shown in the drawing in schematized form shows the design of a Y-pipe, shown and is explained in more detail below.

Mit Hilfe der in der Zeichnung dargestellten Vorrichtung zum Teilen des pneumatischen Förderstromes soZZ dieser am Verbrauchsort in zwei Teilströme bzw. Teilstromleitungen 3, 4 geteilt werden, ohne daß es zur Verminderung einer FörderZeistung kommt. Die durch die Teilstromleitungen 3, 4 geförderten TeiZ-ströme werden durch Schläuche oder starre Leitungen ausgetragen, die von Hand geführt werden können. Der in der FörderZeitung 2 geförderte Förderstrom besteht aus Transport luft 3 und Baustoff einer Fördermenge von beispielsweise 7 -m 3 Baustoff/Std. und wird in zwei Teilströme von je 3, 5 m3 Baustoff/Std. aufgeteiZt. Durch das Hosenrohr 2 kann diese AufteiZung des Förderstromes an jeder beZiebigen SteZZe der Förderleitung 1 vorgenommen werden. Die Durchmesser 6, der Teilstromleitungen 3, 4 werden so gewählt, daß sie von einer Person geführt werden können. Mit HiZfe der zwei Teilstromleitungen 3 und 4 bzw. den nachgeschalteten zwei Austrägen ist es nunmehr möglich, am Verbrauchsort die gesamte Fördermenge in zwei verarbeitungsfähige Mengen aufzuteiZen. Ebenfalls ist es möglich, durch die TeiZung des pneumatischen Förderstromes verschiedene Verbrauchsorte zu beZiefern.With the help of the device for sharing shown in the drawing of the pneumatic conveying flow soZZ this in two partial flows at the point of consumption or partial flow lines 3, 4 are divided without it reducing a Funding performance is coming. The TeiZ flows conveyed through the partial flow lines 3, 4 are discharged through hoses or rigid lines that are guided by hand can. The one in the FörderZeitung 2 funded flow rate exists from transport air 3 and building material a delivery rate of, for example, 7 -m 3 building material / hour. and is divided into two partial flows of 3.5 m3 building material / hour each. split up. Through the downpipe 2 this distribution of the flow rate can be carried out at any given point in the delivery line 1 can be made. The diameter 6 of the partial flow lines 3, 4 are chosen so that they can be guided by one person. With the help of the two partial power lines 3 and 4 or the two downstream discharges, it is now possible at the place of consumption to divide the total delivery rate into two processable quantities. Likewise it is possible to use different places of consumption by dividing the pneumatic conveying flow to be delivered.

Innerhalb des Hosenrohres 2 ist im Scheitelpunkt 8 eine verstellbare Mittelzunge 9 vorgesehen, die auf die durch die PfeiZe gekennzeichnete Förderrichtung ausgerichetet ist. Es ist zweckmäßig,- die Mittelzunge 9 aus einem verschleißfesten Material herzusteZZen, oder sie mit einem entsprechend verschleißfesten BeZag zu versehen. Ebenso ist es aus Gründen des Verschleißten erforderlich, die Mittelzunge 9 auswechselbar mi-t den Hosenrohr 2 zu verbinden. Durch die Verstellbarkeit dieser MitteZzunge 9, die mechanisch oder automatisch durchführbar ist, können die TeiZströme in den Teilstromleitungen 3, 4 in einem beliebigen Verhältnis aufgeteilt werden. Auch ist es möglich, einen Teilstrom durch einen zusätzlichen in die TeiZ-stromleitungen 3, 4 einzubauenden Schieber voZZständig ahzuschalten, ohne den Blasvorgang unterbrechen zu müssen. Voraussetzung für diese Möglichkrit ist, daß die Teilstromleitung 3, 4 fur den Teilstrom einen Durchmesser aufweisen muß, daß auch der Gesamtstrom über die Teilstromleitung 3, 4 abfließen kann, ohne daß der Gegendruck für die Blacmaschine zu groß wird.Within the Y-pipe 2 is an adjustable one at the vertex 8 Central tongue 9 is provided, which points to the conveying direction indicated by the PfeiZe is aligned. It is useful - the central tongue 9 made of a wear-resistant Material to be produced, or to cover them with a suitably wear-resistant cover Mistake. It is also necessary for reasons of wear and tear to remove the central tongue 9 to connect interchangeably with the Y-pipe 2. Due to the adjustability of this Middle tongue 9, which can be carried out mechanically or automatically, can manage the partial currents be divided in the partial flow lines 3, 4 in any ratio. It is also possible to divert a partial flow through an additional one into the TeiZ power lines 3, 4 to be installed completely shut off without interrupting the blowing process to have to. The prerequisite for this possible criterion is that the partial flow line 3, 4 must have a diameter for the partial flow that the total flow over the partial flow line 3, 4 can flow without that the back pressure too big for the blacmachine.

Durch den Einbau weiter, nicht in der Zeichnung dargestellter Hosenrohre 2 ist es möglich, ein Förderleitung 1 in eine beliebige Anzahl von Teilstromleitiungen aufzuteilen.By installing further downpipes not shown in the drawing 2 it is possible to divide a delivery line 1 into any number of partial flow lines to split up.

Der Anwendungsberech bze. die Einsatzmöglichkeit einer derartigen Vrrictung zur Teilung eines pneumatischen Förderstromes kann auf alle pneumatischen Fördersysteme ausgedehnt werden, in denen ein pulverförmiger oder körniger Baustoff gefördert wird.The application area bze. the possibility of using such a The device for dividing a pneumatic flow can be applied to all pneumatic Conveyor systems are expanded in which a powdery or granular building material is promoted.

Claims (2)

Vorrichtung zur Teilung eines pneumatischen Förderstromes Patentansprüche: 1. Vorrichtung zur teilung eines pneumatischen Förderstromes in TeiZstrommengen bei der Förderung pulverförmiger oder körniger Baustoffe zum Einbringen von SpritzmateriaZien nach dem Trockenspritzvefahren in unter- und übertätigen stellen beispielsweise zum Einbringen eines Saumversatzes im Steikohlenleitungen, dadurch gekennzeichnet, daß jede Förherleitung (10 über mindestens ein Hosenrohr (2J in mindestens zwei Teilstromleitungen (3, 4) unterteilbar ausgebildet ist, wobei die Durchmesser (6, 7) der jeweiZs einem Hosenrohr nachgeschalteten Teilstromleitungen (3, 4) derart bemessen sind, daß sie einen geringstmögliehen Förderstromwiderstand bilden.Device for dividing a pneumatic conveying flow Patent claims: 1. Device for dividing a pneumatic conveying flow into partial flow quantities When conveying powdery or granular building materials for the introduction of spray materials after the dry spraying process in under- and over-actuation places, for example for introducing a seam offset in the coal pipeline, characterized in that, that every conveyor line (10 has at least one Y-pipe (2J in at least two Partial flow lines (3, 4) is designed to be divisible, the diameter (6, 7) of the partial flow lines (3, 4) connected downstream of a Y-pipe in this way are dimensioned so that they form the lowest possible flow resistance. 2. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß innerhaZb des Hosenrohres (1) im Scheitelpunkt (8) der Teilung eine auf den Förderstrom gerichtete verstellbare, verschleißarme auswechselbare Zunge (9) vorgesehen ist.2. Apparatus according to claim 1, characterized in that innerhaZb of the Y-pipe (1) at the apex (8) of the division is directed towards the flow adjustable, low-wear replaceable tongue (9) is provided.
DE19782829867 1978-07-07 1978-07-07 Pipe flow divider for particulate materials - uses sectional flow pipes to divide flow fitted directly behind pneumatic hose pipe section Withdrawn DE2829867A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19782829867 DE2829867A1 (en) 1978-07-07 1978-07-07 Pipe flow divider for particulate materials - uses sectional flow pipes to divide flow fitted directly behind pneumatic hose pipe section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19782829867 DE2829867A1 (en) 1978-07-07 1978-07-07 Pipe flow divider for particulate materials - uses sectional flow pipes to divide flow fitted directly behind pneumatic hose pipe section

Publications (1)

Publication Number Publication Date
DE2829867A1 true DE2829867A1 (en) 1980-01-24

Family

ID=6043780

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19782829867 Withdrawn DE2829867A1 (en) 1978-07-07 1978-07-07 Pipe flow divider for particulate materials - uses sectional flow pipes to divide flow fitted directly behind pneumatic hose pipe section

Country Status (1)

Country Link
DE (1) DE2829867A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3039384A1 (en) * 1980-10-18 1982-05-19 Ruhrkohle Ag DEVICE FOR BLOWING (ALPHA) -HALBHYDRATE AND / OR (BETA) -HALBHYDRATE
EP1186397A3 (en) * 2000-09-08 2003-07-16 The Goodyear Tire & Rubber Company Adjustable flow channel for an extruder head

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3039384A1 (en) * 1980-10-18 1982-05-19 Ruhrkohle Ag DEVICE FOR BLOWING (ALPHA) -HALBHYDRATE AND / OR (BETA) -HALBHYDRATE
EP1186397A3 (en) * 2000-09-08 2003-07-16 The Goodyear Tire & Rubber Company Adjustable flow channel for an extruder head

Similar Documents

Publication Publication Date Title
DE3523143C2 (en) Device for the pneumatic application of a hardening building material, in particular a hydraulic shotcrete or mortar, promoted hydromechanically in the dense stream
AT400468B (en) DEVICE FOR APPLYING A SPRAY CONCRETE LAYER
EP0136523B1 (en) Process and device for pneumatic output of hydromechanically transported hydraulic building material in underground mining
EP0698419B1 (en) Installation for spraying dry building material
DE3408007C2 (en) Spray nozzle for foam concrete, foam mortar or the like and method for spraying foam concrete
DE19819660A1 (en) Injection nozzle for homogeneous mixing of water with dry mix material
DE2829867A1 (en) Pipe flow divider for particulate materials - uses sectional flow pipes to divide flow fitted directly behind pneumatic hose pipe section
DE8110556U1 (en) DEVICE FOR WET SPRAYING CONCRETE
DE4234745A1 (en) Method and device for applying mortar or concrete by spraying
DE3333433A1 (en) System for dispensing pasty to milky filling and injection material consisting of hydraulic construction materials in underground operation, preferably for supplying driving works in mining and tunnel construction
DE960797C (en) Method and device for conveying concrete or similar pulpy masses by means of compressed air
DE811341C (en) Method and device for introducing backfill in mining
DE7820440U1 (en) DEVICE FOR DIVIDING A PNEUMATIC CONVEYOR
DE3506679C2 (en)
DE2141727A1 (en) PLANT FOR THE PRODUCTION AND PROCESSING OF WET CONCRETE BY A CONCRETE SPRAYING MACHINE
AT410420B (en) System to convey and dry shotcrete of building material mixtures
DE3705095A1 (en) Method for sealing off the subsoil, especially for sealing off the face, in compressed-air driving by means of a bentonite suspension and apparatus for carrying out the method
DE2912794C2 (en) Device for introducing granular thermal insulation materials
DE2000278A1 (en) Conveyor device for pumpable and sprayable concrete mixes
DE3429010A1 (en) Process and equipment for producing building elements used, for example, as dams parallel to a roadway, in underground operation
DE10310599A1 (en) Spraying concrete spray onto an object via nozzles with addition of carbon dioxide to the concrete useful as a safety measure in tunnel and side wall construction and for construction of mine walls
DE3925639A1 (en) Coal-mine gallery-backfilling system - uses fine granular free-flowing material introduced at roof
DE4106097A1 (en) Pneumatic stowing system installed in centre road terminating in longwall - comprises conveyor and machine with pipes to left and right in longwall, stowing material alternately in two flanking areas
DE2658162C3 (en) Method and device for producing and introducing dam construction material and / or backfill material for routes in mining
DE2548249A1 (en) METHOD AND DEVICE FOR DEGRADABLE MATERIALS, IN PARTICULAR FOSSIL FUELS

Legal Events

Date Code Title Description
OAP Request for examination filed
OD Request for examination
8130 Withdrawal