METHOD AND DEVICE FOR MANUFACTURING SAND PILESInfo
- Publication number
- DE2428870A1 DE2428870A1 DE19742428870 DE2428870A DE2428870A1 DE 2428870 A1 DE2428870 A1 DE 2428870A1 DE 19742428870 DE19742428870 DE 19742428870 DE 2428870 A DE2428870 A DE 2428870A DE 2428870 A1 DE2428870 A1 DE 2428870A1
- Authority
- DE
- Germany
- Prior art keywords
- screw conveyor
- sand
- shaft
- screw
- conveyor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/10—Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
- E02D3/106—Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains by forming sand drains containing only loose aggregates
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Soil Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Agronomy & Crop Science (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Screw Conveyors (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Earth Drilling (AREA)
Description
Verfahren und Vorrichtung zur Herstellung von "SandpfählenMethod and device for the production of "sand piles
Die Erfindung betrifft ein Verfahren und eine Vorrichtung zur Herstellung von Sandpfählen durch Anwendung einer Förderschnecke.The invention relates to a method and a device for production of sand piles by using a screw conveyor.
Es ist bekannt, für die Herstellung eines Lochs in dem Boden, in mehr oder weniger zusammenhängendem Material eine in ein Bohr eingeschlossene Förderschnecke zu gebrauchen. Auch ist es bekannt, eine Förderschnack· zu gebrauchen, um mehrere Stoffe mehr oder weniger intensiv zu vermischen.It is known for making a hole in the ground in more or less coherent material one enclosed in a drilling To use screw conveyor. It is also known to use a conveyor snack in order to mix several substances more or less intensively.
Die Erfindung bezweckt ein verbessertes Verfahren und eine Vorrichtung der eingangs erwähnten Art,, durch die in einfacher Weise und vollkommen zuverlässig ein Schacht hergestellt und mit Sand ausgefüllt werden kann, und unter allen Umständen die gute Entwässerungs- und gegebenenfalls Stützfunktion des Sandpfahls gewährleistet ist.The invention aims to provide an improved method and apparatus of the kind mentioned at the beginning, through which in a simple and complete manner a shaft can be reliably constructed and filled with sand, and the good drainage and, if necessary, supporting function of the sand pile is guaranteed under all circumstances.
Zu diesem Zweck wird vorgeschlagen, bei der Herstellung eines Sandpfahle zuerst den Schacht oder das Loch mittels der Förderschnecke herzustallenFor this purpose it is suggested when making a sand pile first to cut the shaft or the hole by means of the screw conveyor
409883/1224409883/1224
.und anschliessend dem Schacht Sand zuzuführen mittels der Förderschnecke, die entgegen "der Richtung, in der sie das Loch oder den Schacht hergestellt hat, angetrieben und aus dem in den Schacht niedergelassenen Stand allählich nach oben versetzt wird. Wenn die freie Förderschnecke schnell genug dreht, wird das Loch hergestellt und wenn man die Förderschnecke in einer Richtung antreibt, die der Richtung, in der das Loch gebohrt wurde, entgegengesetzt ist, und dem Oberende Sand zuführt, wird der Sandpfahl von unten nach oben vollkommen ausgefüllt. Dabei ist es nicht notwendig, Sand zusammen mit zusätzlichem Wasser in den Schacht zu pressen. Wasser, das sich gegebenenfalls schon in dem Schacht befindet, kann z.B. durch eine Hohlachse der Schnecke nach oben abfliessen. Wenn der Schacht allmählich gefüllt wird, wird sich die Schnecke selber nach oben drücken, obwohl man dazu gegebenenfalls auch eine Hebewinde benutzen kann..and then to feed sand into the shaft by means of the screw conveyor, the opposite "to the direction in which they made the hole or manhole has, driven and is gradually moved upwards from the position settled in the shaft. When the free auger fast turns enough, the hole is made and if you drive the auger in a direction that is the same as the direction in which the hole was drilled, is opposite, and supplies sand to the top, the sand pile is completely filled from bottom to top. It is not necessary to To press sand together with additional water into the shaft. Water, Anything that may already be in the shaft can, for example, flow upwards through a hollow axis of the screw. When the well gradually is filled, the auger will push itself up, although you can use a windlass if necessary.
Das erfundene Verfahren ist dazu geeignet, schnell und mechanisch Sandpfahlschächte herzustellen und auszufüllen. Der Sand kann z.B. in einem Silo auf der Oberfläche dem Förderer zugeführt werden. Wenn man den Sand mit der Förderschnecke einfuhrt, wird ausserdem gewährleistet, dass der Sandpfahl nahezu gerade gebildet und ganz mit Sand gefüllt wird. Es hat sich herausgestellt, dass die Förderleistung bei einer normalen Förderschnecke mit dem für Sandpfahlschächte üblichen Durchmesser bei 100 Umdrehungen pro Minute fasst null ist. Eine gute Grab- und Füllwirkung erhalt man bei 200-250 Umdrehungen pro Minute, vorzugsweise bei mehr als 300 Umdrehungen pro Hinute. Wenn man den Förderer mit einer bestimmten Mindestdrehzahl, die auch von der seitlichen Stütze, wie z.B. der Lochwandung abhangt, drehen lässt, wird verhindert, dass das Bodenmaterial oder der Sand nur mit der Förderschnecke mitgedreht werden. Die gebildeten Wände des Schachts wirken als Führungsrinnen, wodurch das Bodenmaterial oder der Sand in Achsenrichtung des Förderers versetzt werden, In Abhängigkeit von der Drehzahl der Förderschnecke und dem Gewicht, mit dem diese auf den Sand druckt, kann auch die Dichte des herzustellenden Pfahls innerhalb gewisser Grenzen variiert werden.The invented method is suitable for quickly and mechanically producing and filling sand pile shafts. The sand can, for example, be fed to the conveyor in a silo on the surface. If the sand is fed in with the screw conveyor, it is also ensured that the sand pile is formed almost straight and completely filled with sand. It has been found that the conveying capacity of a normal screw conveyor with the usual diameter for sand pile shafts is almost zero at 100 revolutions per minute. A good digging and filling effect is obtained at 200-250 revolutions per minute, preferably at more than 300 revolutions per minute. If you leave the conveyor at a certain minimum speed, which depends also on the lateral support, such as the hole wall turn, prevents the soil or sand are rotated with the auger. The walls of the shaft that are formed act as guide troughs, whereby the soil material or the sand are displaced in the axial direction of the conveyor.Depending on the speed of the conveyor screw and the weight with which it presses on the sand, the density of the pile to be produced can also be within certain limits Limits can be varied.
Wenn dies notwendig ist, können am dem Ende der Förderschnecke Mittel vorgesehen sein, die Schmierschicht auf der Innenwand des Schachts zu If this is necessary, means can be provided at the end of the screw conveyor to close the lubricating layer on the inner wall of the shaft
409883/1224409883/1224
losen, welche Mittel dazu eingerichtet sind, bei der Aufwärtsbevegung der Förderschnecke, beim Füllen mit Sand, wirksam zu sein.Lose what means are set up in the upward movement of the Conveyor screw to be effective in filling with sand.
Zur Erläuterung der Erfindung wird unter Hinweis auf die Zeichnung ein Ausführungsbeispiel beschrieben.'To explain the invention, with reference to the drawing, a Embodiment described. '
Es zeigen:Show it:
Fig. 1 schematisch einen Löffelbagger mit einer Forderschnecke;1 schematically shows a backhoe with a screw conveyor;
Fig. 2 eine mit einem Spritzkopf versehene Förderschnecke;2 shows a screw conveyor provided with an extrusion head;
Fig. 3 in Seitenansicht das Ende einer mit Schneidemessern versehenen Förderschnecke undFig. 3 is a side view of the end of a provided with cutting knives Screw conveyor and
Fig. U eine Stirnansicht gemäss Fig. 3.FIG. U shows an end view according to FIG. 3.
Ein im allgemeinen mit T bezeichneter Löffelbagger trägt an einem AuslegerA backhoe, generally designated T, carries on a boom
2 eine vertikale Führung 3, die an dem Unterende durch einen Stützbalken U in bezug auf den Löffelbagger gestützt wird, An der vertikalen Führung2 a vertical guide 3 attached to the lower end by a support beam U is supported in relation to the backhoe, on the vertical guide
3 entlang ist eine.Antriebseinheit 5 vertikal bewegbar. Diese wird durch ein Hebekabel 6 auf ihrem Platz gehalten. Unten an der Antriebseinheit befindet sich eine Förderschnecke 7· Mit der Förderschnecke ist in dem Boden ein Loch 8 hergestellt. Ueber diesem Loch befindet sich ein Fülltrichter 9» Nach der Herstellung des Lochs befindet sich das-Ende der Förderschnecke 7 auf dem Boden des Lochs, worauf Sand in den Fülltrichter 9 geschüttet wird. Wenn man die Förderschnecke in entgegengesetzter Richtung, jeweils mit einer Geschwindigkeit von mehr als 100 Umdrehungen pro Minute, vorzugsweise mehr als 300 Umdrehungen pro Minute antreibt, wird der Sand durch die Förderschnecke in derselben Weise, wie das Erdreich beim Graben des Schachts nach oben abgeführt wurde, nach unten befördert, wobei die Wände des Schachts 8 als Führung der Förderschnecke und des mit dieser versetzten Erdreichs und Sands dienen. Bei einer niedrigen Umdrehungsgeschwindigkeit der Förderschnecke wird der Sand nur mit der Förderschnecke umdrehen. Bei einer grösseren Geschwindigkeit wird der Sand durch3 is a drive unit 5 vertically movable. This is through a lifting cable 6 is held in place. At the bottom of the drive unit there is a screw conveyor 7 · With the screw conveyor, a hole 8 is made in the bottom. A filling funnel is located above this hole 9 »After the hole has been made, the end of the Auger 7 at the bottom of the hole, whereupon sand is poured into the hopper 9. If you move the screw conveyor in the opposite direction, each at a speed of more than 100 revolutions per minute, preferably more than 300 revolutions per minute, is the sand is conveyed downwards by the screw conveyor in the same way as the soil was removed upwards when digging the shaft, wherein the walls of the shaft 8 serve as a guide for the screw conveyor and the soil and sand offset with it. At a low speed of rotation the screw conveyor will only turn the sand with the screw conveyor. At a higher speed, the sand will pass through
409883/1224409883/1224
die Zentrifugalkraft gegen die Schachtvand gedrückt, wodurch vermieden vird, dass der Sand mitumdreht, vährend der Sand wohl allmählich unter Einfluss der Steigung der Schnecke nach unten versetzt wird. Sobald der Teil des Schachts unter der Fördersehnecke ganz mit Sand gefüllt ist, vird die Förderschnecke allmählich nach oben versetzt werden, wobei in Abhängigkeit von einer gegebenenfalls auf das Hebekabel 6 ausgeübten Zugkraft die Dichte des gebildeten Sandpfahls variiert werden kann.the centrifugal force pressed against the shaft wall, thereby avoiding It is possible that the sand rotates with it, while the sand is gradually shifted downwards under the influence of the pitch of the screw. Once the Part of the shaft under the conveyor auger is completely filled with sand, v the screw conveyor will gradually be moved upwards, whereby in Depending on any tensile force exerted on the lifting cable 6, the density of the sand pile formed can be varied.
Gemäss Fig. 2 ist das Ende der Forderschnecke mit Düsen versehen und ist die Achse der Schnecke hohl ausgebildet, so dass das Ganze als Spülkopf arbeiten kann.According to FIG. 2, the end of the screw conveyor is provided with nozzles and is the axis of the screw is hollow so that the whole thing can work as a flushing head.
Die Förderschnecke 7 ist mit einem umkehrbaren Antrieb versehen, so dass der Förderer zum Bohren des Lochs 8 in einer Richtung angetrieben wird, worauf Sand zugeführt wird, wenn die gewünschte Tiefe erreicht und alles Material aus dem Loch entfernt ist, indem man den Förderer in entgegengesetzter Richtung antreibt.The screw conveyor 7 is provided with a reversible drive so that the conveyor is driven in one direction for drilling the hole 8, whereupon sand is added when the desired depth is reached and all material has been removed from the hole by moving the conveyor in opposite directions Direction drives.
Obwohl der Füllsand, wenn die Förderschnecke mit verhaltnismassig groscer Geschwindigkeit dreht, hinausgeschleuert wird, wodurch eine etwaige Schmierschicht auf der Wand des Schachts 8 zur Förderung der Entwässerung gelöst werden wird, kann gemäss den Fig. 3 und k an dem Ende der Förderschnecke ein Messerkopf 1U gelagert sein. In diesem Messerkopf 11* sind sich diametral gegenüberliegende Messer 15 angeordnet, die um vertikale Achsen lenkbar sind. Wenn die Förderschnecke in Fig. k nach links dreht, also in der Drehrichtung, in der der Schacht 8 hergestellt wird, werden die Messer einen zurückgezogenen Stand einnehmen, wie rechts in Fig. U wiedergegeben ist. Wenn anschliessend die Drehrichtung umgekehrt wird, um Sand unten in den Pfahlschacht 8 zuzuführen, werden die Messer nach aussen klappen^ wie links in Fig. h dargestellt wird. Die Förderschnecke dreht dann nach reclros in Fig. k. Die Enden der Messer werden dann schraubenförmige Nuten in die Wand des Schachts 8 schneiden, wodurch eine gegebenenfalls auf dieser Wand befindliche Schmierschicht durchgeschnitten wird.Although the filling sand is thrown out when the screw conveyor rotates at a relatively high speed, which loosens any smear layer on the wall of the shaft 8 to promote drainage, a cutter head 1U can, according to FIGS. 3 and k, at the end of the screw conveyor be stored. In this cutter head 11 * diametrically opposite knives 15 are arranged, which can be steered about vertical axes. If the screw conveyor rotates to the left in FIG. K , that is, in the direction of rotation in which the shaft 8 is produced, the knives will assume a retracted position, as shown on the right in FIG. If the direction of rotation is then reversed in order to feed sand down into the pile shaft 8, the knives will fold outwards ^ as shown on the left in Fig. H. The screw conveyor then rotates according to reclros in Fig. K. The ends of the knives will then cut helical grooves in the wall of the shaft 8, as a result of which a layer of smear which may be located on this wall is cut through.
409883/1224409883/1224
Claims (8)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NL7308371A NL171608C (en) | 1973-06-15 | 1973-06-15 | METHOD FOR MANUFACTURING A SAND POLE WITH A SCREW CONVEYOR WHICH MAKES THE HOLE AND FILLS WITH SAND |
Publications (1)
Publication Number | Publication Date |
---|---|
DE2428870A1 true DE2428870A1 (en) | 1975-01-16 |
Family
ID=19819091
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19742428870 Ceased DE2428870A1 (en) | 1973-06-15 | 1974-06-14 | METHOD AND DEVICE FOR MANUFACTURING SAND PILES |
Country Status (6)
Country | Link |
---|---|
AT (1) | AT343549B (en) |
BE (1) | BE816323A (en) |
DE (1) | DE2428870A1 (en) |
FR (1) | FR2233447B3 (en) |
GB (1) | GB1466885A (en) |
NL (1) | NL171608C (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4790689A (en) * | 1986-07-17 | 1988-12-13 | Bauer Spezialtiefbau Gmbh | Method and apparatus for producing a support element in the ground |
DE19509054A1 (en) * | 1995-03-14 | 1996-09-26 | Coplan Ing Gmbh | Device for producing stabilising posts in soft ground |
DE10335366A1 (en) * | 2003-08-01 | 2005-03-10 | Bauer Spezialtiefbau | Installing stabilization column in the ground, by measuring rotation speed and feed rate of conveyor screw driven into ground |
CN103104136A (en) * | 2013-01-29 | 2013-05-15 | 中国水产科学研究院东海水产研究所 | Simply-equipped rapid mud flat enclosure mesh arrangement method |
CN105113494A (en) * | 2015-08-09 | 2015-12-02 | 刘玉秋 | N-shaped retaining pile forming machine |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ATE188528T1 (en) * | 1995-03-14 | 2000-01-15 | Bauer Spezialtiefbau | METHOD AND DEVICE FOR STABILIZING COHESIVE SOILS WITH INADEQUATE BEARING CAPACITY |
BE1010918A3 (en) * | 1997-02-12 | 1999-03-02 | Coelus Gaspar Jozef | Method for inserting granular material into the ground |
-
1973
- 1973-06-15 NL NL7308371A patent/NL171608C/en not_active IP Right Cessation
-
1974
- 1974-06-13 BE BE7000533A patent/BE816323A/en not_active IP Right Cessation
- 1974-06-14 AT AT489374A patent/AT343549B/en not_active IP Right Cessation
- 1974-06-14 GB GB2658674A patent/GB1466885A/en not_active Expired
- 1974-06-14 DE DE19742428870 patent/DE2428870A1/en not_active Ceased
- 1974-06-17 FR FR7420990A patent/FR2233447B3/fr not_active Expired
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4790689A (en) * | 1986-07-17 | 1988-12-13 | Bauer Spezialtiefbau Gmbh | Method and apparatus for producing a support element in the ground |
DE19509054A1 (en) * | 1995-03-14 | 1996-09-26 | Coplan Ing Gmbh | Device for producing stabilising posts in soft ground |
DE19509054C2 (en) * | 1995-03-14 | 1998-01-29 | Coplan Ing Gmbh | Device for the production of stabilizing piles in cohesive soils with insufficient load-bearing capacity |
DE10335366A1 (en) * | 2003-08-01 | 2005-03-10 | Bauer Spezialtiefbau | Installing stabilization column in the ground, by measuring rotation speed and feed rate of conveyor screw driven into ground |
DE10335366B4 (en) * | 2003-08-01 | 2005-06-16 | Bauer Spezialtiefbau Gmbh | Method and device for producing a stabilizing column in the soil |
CN103104136A (en) * | 2013-01-29 | 2013-05-15 | 中国水产科学研究院东海水产研究所 | Simply-equipped rapid mud flat enclosure mesh arrangement method |
CN103104136B (en) * | 2013-01-29 | 2016-03-30 | 中国水产科学研究院东海水产研究所 | A kind of beach enclosure of simple and fast establishes network method |
CN105113494A (en) * | 2015-08-09 | 2015-12-02 | 刘玉秋 | N-shaped retaining pile forming machine |
Also Published As
Publication number | Publication date |
---|---|
NL7308371A (en) | 1974-12-17 |
NL171608C (en) | 1983-04-18 |
BE816323A (en) | 1974-12-13 |
FR2233447B3 (en) | 1977-04-15 |
ATA489374A (en) | 1977-09-15 |
NL171608B (en) | 1982-11-16 |
GB1466885A (en) | 1977-03-09 |
AT343549B (en) | 1978-06-12 |
FR2233447A1 (en) | 1975-01-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE10308538C5 (en) | Method of making a trench wall in the ground, trench wall cutter and trench wall cutter | |
EP1895090B1 (en) | Method and apparatus for creating a borehole in the ground | |
DE2343519B2 (en) | Drainage pipe to prevent landslides, slides and a device for driving the same into the ground | |
DE2942304C2 (en) | Order for the removal of marine sediments | |
DE68908288T2 (en) | Method and device for drilling a hole in the ground. | |
DE3718480C2 (en) | Drilling device for a high pressure injection drilling method and drilling method using the drilling device | |
DE2428870A1 (en) | METHOD AND DEVICE FOR MANUFACTURING SAND PILES | |
DE69002583T2 (en) | Cleaner for augers. | |
DE3141763C2 (en) | Partial cut cutting machine | |
DE69710275T2 (en) | Excavator for digging deep trenches | |
DE1082107B (en) | Device for removing digested fiber material from a pressure vessel | |
EP0819819A1 (en) | Milling head,drilling device and method for underwater drilling | |
DE69911865T2 (en) | twist drill | |
DE3544017A1 (en) | DEVICE FOR PRODUCING CIRCULAR BORES WITH A LARGE DIAMETER IN THE GROUND FLOOR | |
DE69010862T2 (en) | Method and device for manufacturing shafts and tunnels. | |
DE2545594C2 (en) | Method and device for consolidating a soft soil layer | |
EP0837190A2 (en) | Process and device for the controlled in-ground realisation of piles and bulkheads | |
DE2608665A1 (en) | Suction head of pneumatic underwater dredger - has inclined cutting head with cutter plane under inlet | |
EP2666911B1 (en) | Method for producing a floor mortar wall in the floor | |
DE602004003418T2 (en) | The threading equipment | |
DE2905794A1 (en) | METHOD AND DEVICE FOR CONSOLIDATING AND COMPACTING SOIL CONTAINING SLUDGE AND DIRT | |
DE3440002C1 (en) | Drilling appliance for making relief bores on the surface | |
DE3012198A1 (en) | Fermentation gas reactor - with revolving fluid spray pipe for floating scum layer removal | |
DE1942857B2 (en) | EARTH DRILLING MACHINE FOR MAKING GROUND SLITS | |
DE2040286C3 (en) | Full-cut tunneling machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8110 | Request for examination paragraph 44 | ||
8131 | Rejection |