DE202015002934U1 - Formwork tie, in particular for edge cap formwork of bridge caps, in particular with slightly inclined formwork levels - Google Patents
Formwork tie, in particular for edge cap formwork of bridge caps, in particular with slightly inclined formwork levels Download PDFInfo
- Publication number
- DE202015002934U1 DE202015002934U1 DE202015002934.5U DE202015002934U DE202015002934U1 DE 202015002934 U1 DE202015002934 U1 DE 202015002934U1 DE 202015002934 U DE202015002934 U DE 202015002934U DE 202015002934 U1 DE202015002934 U1 DE 202015002934U1
- Authority
- DE
- Germany
- Prior art keywords
- formwork
- support
- base
- adjusting device
- tie according
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/06—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Moulds, Cores, Or Mandrels (AREA)
Abstract
Schalungsriegel (10), insbesondere für Randkappenschalungen von Brückenkappen mit einer leicht geneigten Schalungsebenen, umfassend – einen ersten länglichen Schalungsgrundträger (12) zur Aufnahme stehender erster Betonschalungselemente (22), – einen mit dem ersten Schalungsgrundträger (12) gekoppelten zweiten länglichen Schalungsgrundträger (14) zur Aufnahme liegender zweiter Betonschalungselemente (24), – eine, zwischen dem ersten und zweiten Schalungsgrundträger (12, 14) wirksame Verstelleinrichtung (30), bei dem – der zweite Schalungsgrundträger (14) an dem ersten Schalungsgrundträger (12) hebbar, insbesondere schwenkbar, gehalten und abgestützt ist und – die Verstelleinrichtung (30) ein Absenken des zweiten Schalungsgrundträgers (14) bezüglich des ersten Schalungsgrundträgers (12) gestattendes entriegelbares Verriegelungsorgan aufweist.Formwork tie (10), in particular for edge cap formwork of bridge caps with a slightly inclined formwork levels, comprising - a first elongated formwork support (12) for receiving standing concrete formwork elements (22), - a second elongated formwork support (14) coupled to the first formwork support (12) for accommodating second concrete formwork elements (24), - one, between the first and second formwork base support (12, 14) effective adjusting device (30), in which - the second formwork base support (14) on the first formwork base support (12) liftable, in particular pivotable, is held and supported and - the adjusting device (30) has a lowering of the second formwork basic carrier (14) with respect to the first formwork basic carrier (12) gestattendes unlockable locking member.
Description
GEBIET DER ERFINDUNGFIELD OF THE INVENTION
Die Erfindung betrifft einen Schalungsriegel, wie er insbesondere für die Randkappenschalung von Brückenkappen benötigt wird, um, insbesondere horizontale oder leicht geneigte, Schalungsebenen zu verwirklichen.The invention relates to a shuttering bar, as is required in particular for the edge cap formwork of bridge caps in order to realize, in particular horizontal or slightly inclined formwork levels.
TECHNOLOGISCHER HINTERGRUNDTECHNOLOGICAL BACKGROUND
Die Herstellung von Betonierschalungen für horizontale oder in einem Winkel zu zur Horizontale geneigten Betonoberflächen erfordert regelmäßig einen erhöhten handwerklichen und zeitmäßigen Aufwand, wenn unterhalb der Schalungsebene nur beschränkter Platz verfügbar ist. Insbesondere ist es bei Schalungen für die Unterseite von im Wesentlichen horizontal angeordneten Betonbauteilen bei zueinander abgewinkelten Flächen erforderlich, gesonderte Unterbauten für zumindest eine der beiden zueinander geneigten Flächen vorzunehmen. Um die Unterbauten beim Entschalen zu entfernen, ist die gesamte Schalungsunterkonstruktion zunächst zu entfernen. Besonders schwierig ist die Situation beim Randkappenbeschalen für Brückenkappen, weil die Brückenkappen von ihrer Stützkonstruktion weit auskragen und sich oft in erheblicher Höhe über dem Untergrund befinden. Es ist deshalb gewünscht, die für die Randkappenschalung benötigte, an dem Brückenbauwerk unterseitig aufgehängte Basisschalung zunächst noch nicht entfernen zu müssen, wenn die eigentliche Randkappenschalung auf der Unterseite der Randkappe entfernt wird. Insbesonders zueinander leicht geneigte Betonunterseiten der zu schalenden Randkappen verhindern bis jetzt die Verwirklichung dieser Zielsetzung.The production of concrete formwork for horizontal or inclined at an angle to the horizontal concrete surfaces regularly requires an increased manual and time-consuming, if below the formwork level only limited space is available. In particular, in formwork for the underside of substantially horizontally arranged concrete components in mutually angled surfaces is required to make separate substructures for at least one of the two mutually inclined surfaces. In order to remove the substructures during demoulding, the entire substructure of the formwork must first be removed. The situation is particularly difficult for edge caps for bridge caps, because the bridge caps protrude far from their support structure and are often located at a considerable height above the ground. It is therefore desirable that the required for the edge cap formwork, on the bridge structure suspended underside base formwork initially not yet have to remove when the actual edge cap formwork on the underside of the edge cap is removed. Particularly to each other slightly inclined concrete undersides of the edge caps to be prevented until now the achievement of this objective.
DARSTELLUNG DER ERFINDUNGPRESENTATION OF THE INVENTION
Zur Lösung dieser Schalungsproblematik schlägt die Erfindung Schalungsriegel gemäß Anspruch 1 vor. Demnach weist ein erfindungsgemäßer Schalungsriegel einen ersten länglichen Schalungsgrundträger zur Aufnahme stehender Betonschalungselemente auf. Ein mit dem ersten Schalungsgrundträger gekoppelter zweiter länglicher Schalungsgrundträger dient zur Aufnahme liegender zweiter Betonschalungselemente. Eine zwischen dem ersten und zweiten Schalungsgrundträger wirksame Verstelleinrichtung gestattet es, die beiden Schalungsgrundträger in einem gewünschten Winkel zueinander zu halten, so dass die Betonschalungselemente für die zu betonierende Schalungsebenen ohne Zwischenfügung von zusätzlichen Stützelementen auf den mit Abstand nebeneinander angeordneten Grundschalungsträgern zu verlegen sind. Der zweite Grundschalungsträger ist an dem ersten Grundschalungsträger schwenkbar gehalten und abgestützt. Eine Verstelleinrichtung gestattet das Absenken des zweiten Grundschalungsträgers bezüglich des ersten Grundschalungsträgers, wenn die Betonschalungselemente entfernt werden sollen. Hierzu weißt die Verstelleinrichtung ein entriegelbares Verriegelungsorgan auf.To solve this formwork problem, the invention proposes formwork latch according to claim 1. Accordingly, a shuttering bar according to the invention has a first elongate shuttering base support for receiving concrete shuttering elements. A coupled to the first formwork base second elongate formwork base support serves to receive lying second Betonschalungselemente. An effective between the first and second formwork base support adjustment allows to hold the two formwork base support to each other at a desired angle, so that the concrete formwork elements are to be laid for the concrete layers to be concreted without the interposition of additional support elements on the spaced side by side basic formwork beams. The second basic formwork support is pivotally supported and supported on the first base formwork support. An adjusting device allows the lowering of the second basic formwork carrier with respect to the first basic formwork support when the concrete formwork elements are to be removed. For this purpose, the adjusting device has an unlockable locking member.
Durch die Erfindung ist es möglich, den Schalungsriegel unter den liegenden Betonschalungselementen herauszuziehen und dann den frei werdenden Raum unterhalb der Betonschalungselemente zum Herausziehen der Betonschalungselemente zu nutzen. Der den Schalungsriegel tragende Unterbau, wie eine Basisschalung muss nicht mehr entfernt werden.By the invention it is possible to extract the formwork latch under the lying Betonschalungselementen and then to use the space becoming free below the concrete formwork elements for pulling out the concrete formwork elements. The substructure supporting the shuttering block, such as a basic formwork, no longer needs to be removed.
Es ist nun auf verschiedene Weise möglich, die Erfindung auszuführen, was anhand der beispielhaften Zeichnungen noch erläutert werden wird.It is now possible in various ways to carry out the invention, which will be explained with reference to the exemplary drawings.
Die vorgenannten sowie die beanspruchten und in den Ausführungsbeispielen beschriebenen erfindungsgemäß zu verwendenden Bauteile unterliegen in ihrer Größe, Formgestaltung, Materialauswahl und technischen Konzeption keinen besonderen Ausnahmebedingungen, so dass die in dem Anwendungsgebiet bekannten Auswahlkriterien uneingeschränkt Anwendung finden könnenThe above-mentioned and the claimed components to be used according to the invention described in the exemplary embodiments are not subject to special conditions in terms of their size, shape, material selection and technical design, so that the selection criteria known in the field of application can be used without restriction
Weitere Einzelheiten, Merkmale und Vorteile des Gegenstandes der Erfindung ergeben sich aus den Unteransprüchen, sowie aus der nachfolgenden Beschreibung und der zugehörigen Zeichnung, in der – beispielhaft – ein Ausführungsbeispiel eines Schalungsriegels dargestellt ist. Auch einzelne Merkmale der Ansprüche oder der Ausführungsformen können mit anderen Merkmalen anderer Ansprüche und Ausführungsformen kombiniert werden.Further details, features and advantages of the subject matter of the invention will become apparent from the subclaims, as well as from the following description and the accompanying drawings, in which - by way of example - an embodiment of a shuttering bolt is shown. Also, individual features of the claims or of the embodiments may be combined with other features of other claims and embodiments.
KURZBESCHREIBUNG DER FIGURENBRIEF DESCRIPTION OF THE FIGURES
In der Zeichnung zeigenIn the drawing show
DETAILLIERTE BESCHREIBUNG VON AUSFÜHRUNGSBEISPIELENDETAILED DESCRIPTION OF EMBODIMENTS
Aus
Wie aus
Zwischen den ersten und zweiten Schalungsgrundträgern
Um eine stirnseitige Abstützung des Schalungsriegels
Um den Schalungsriegel – etwa an einer Basisschalung
Wie aus
BezugszeichenlisteLIST OF REFERENCE NUMBERS
- 1010
- Schalungsriegelformwork tie
- 1111
- Seitenstützenside supports
- 1212
- erster Schalungsgrundträgerfirst formwork foundation
- 12A12A
- LanglochLong hole
- 12B12B
- Bohrungendrilling
- 1414
- zweiter Schalungsgrundträgersecond formwork basic carrier
- 14A14A
- Stützplattesupport plate
- 14B14B
- Armepoor
- 14C14C
- Bolzenbolt
- 1616
- Endstützeend support
- 16A16A
- Schwenkbolzenpivot pin
- 1818
- Längeneinstellelementlength adjusting
- 18A18A
- InnengewindeteilFemale threaded portion
- 18B18B
- Gewindebolzenthreaded bolt
- 18C18C
- Endstützeend support
- 2020
- Basisschalungbasic formwork
- 2222
- stehende Betonschalungselementestanding concrete formwork elements
- 2424
- liegende Betonschalungselementelying concrete formwork elements
- 3030
- Verstelleinrichtungadjustment
- 3232
- Stützelementsupport element
- 32A32A
- Schwenkbolzenpivot pin
- 32B32B
- Verdickungthickening
- 3434
- Schiebeelementsliding element
- 34A34A
- FeststellbolzenLocking bolt
- 34B34B
- Bohrungendrilling
- 34C34C
- Handhabehandle
- 3636
- AufgleitebeneAufgleitebene
- 4040
- Brückenkappebridge cap
- 40A40A
- BrückenrandkappeBridge edge cap
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE202015002934.5U DE202015002934U1 (en) | 2015-04-22 | 2015-04-22 | Formwork tie, in particular for edge cap formwork of bridge caps, in particular with slightly inclined formwork levels |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE202015002934.5U DE202015002934U1 (en) | 2015-04-22 | 2015-04-22 | Formwork tie, in particular for edge cap formwork of bridge caps, in particular with slightly inclined formwork levels |
Publications (1)
Publication Number | Publication Date |
---|---|
DE202015002934U1 true DE202015002934U1 (en) | 2015-06-10 |
Family
ID=53485261
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE202015002934.5U Active DE202015002934U1 (en) | 2015-04-22 | 2015-04-22 | Formwork tie, in particular for edge cap formwork of bridge caps, in particular with slightly inclined formwork levels |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE202015002934U1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106150088A (en) * | 2016-08-11 | 2016-11-23 | 上海嘉实(集团)有限公司 | Large cantilever beam slab combined type formwork system and construction method |
WO2023053087A1 (en) * | 2021-09-30 | 2023-04-06 | Peri Se | Striking element and method |
US11834852B2 (en) | 2020-08-07 | 2023-12-05 | Peri Se | Striking tool and method |
-
2015
- 2015-04-22 DE DE202015002934.5U patent/DE202015002934U1/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106150088A (en) * | 2016-08-11 | 2016-11-23 | 上海嘉实(集团)有限公司 | Large cantilever beam slab combined type formwork system and construction method |
CN106150088B (en) * | 2016-08-11 | 2019-07-26 | 上海嘉实(集团)有限公司 | Large cantilever beam slab combined type formwork system and construction method |
US11834852B2 (en) | 2020-08-07 | 2023-12-05 | Peri Se | Striking tool and method |
WO2023053087A1 (en) * | 2021-09-30 | 2023-04-06 | Peri Se | Striking element and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE102006026201A1 (en) | Self Climbing System | |
DE102006046887B4 (en) | Universal support frame | |
EP2458111A2 (en) | Ceiling boarding element and ceiling boarding system | |
DE102012211384A1 (en) | Length adjustable support for trench sheeting, concreting formwork and scaffold of hall or grandstand, has coupling sleeve and adjusting sleeve with inner threading that is in engagement with outer threading section of supporting section | |
EP3712352A1 (en) | Connection strip for ceiling shuttering | |
EP2573269A1 (en) | Cantilever for producing a bridge structure | |
DE202015002934U1 (en) | Formwork tie, in particular for edge cap formwork of bridge caps, in particular with slightly inclined formwork levels | |
WO2018233993A1 (en) | Support head having a lowerable support height for a formwork support | |
EP2940227B1 (en) | Planar component, shearing force reinforcement element and reinforced concrete/prestressed concrete component with a shearing force reinforcement made of such shearing force reinforcement elements | |
DE2126254A1 (en) | Device for concreting building elements | |
DE102009056332A1 (en) | Connection element for supports, has spring element and pin arranged such that connection element is fastened at joint by insertion of support on connection element and locking receiving device corresponding to spring element and pin | |
DE102017104344B3 (en) | Limitation for a raised bed | |
DE10242670A1 (en) | Formwork table, adapter for a formwork table and combination with a formwork table or an adapter | |
EP0668953A1 (en) | Process and devices for changing the vertical distance between the roof truss and the top ceiling of a building. | |
DE3246725A1 (en) | Suspension device for wall-covering panels and panel anchorages constructed using such suspension devices | |
EP3848532A1 (en) | Formwork plate holder assembly and method for positioning same on a bracket | |
DE202016101397U1 (en) | Base element for load-bearing receiving a housing module of a self-service machine | |
DE20319861U1 (en) | Fastening device for flexible installation of fences or screen walls has rail rigidly connected to ground and in which are fitted holding elements for support posts, with adjusting elements for fastening of holding elements along rail | |
DE102019117190B4 (en) | Device for the front end of a trench shoring unit | |
DE102006000816B3 (en) | Guide rail for deflection fitting of safety belt of motor vehicle, has slots to create rest positions of rail spaced from one another in moving direction, pointing outward in assembled state of rail and holding outer side of rail | |
DE1684266B1 (en) | Device for fastening ceilings to supports in a building made by the lifting ceiling process | |
DE8623761U1 (en) | Masonry gauge | |
DE3025672C2 (en) | ||
DE202018001956U1 (en) | Mounting aid for frames | |
DE202005003790U1 (en) | Mobile scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R021 | Search request validly filed | ||
R207 | Utility model specification | ||
R163 | Identified publications notified | ||
R150 | Utility model maintained after payment of first maintenance fee after three years | ||
R151 | Utility model maintained after payment of second maintenance fee after six years | ||
R152 | Utility model maintained after payment of third maintenance fee after eight years |