[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

DE2062564C3 - Procedure for creating an underpass - Google Patents

Procedure for creating an underpass

Info

Publication number
DE2062564C3
DE2062564C3 DE19702062564 DE2062564A DE2062564C3 DE 2062564 C3 DE2062564 C3 DE 2062564C3 DE 19702062564 DE19702062564 DE 19702062564 DE 2062564 A DE2062564 A DE 2062564A DE 2062564 C3 DE2062564 C3 DE 2062564C3
Authority
DE
Germany
Prior art keywords
concrete
ceiling
foundations
underpass
concrete ceiling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE19702062564
Other languages
German (de)
Other versions
DE2062564A1 (en
DE2062564B2 (en
Inventor
Herbert Dipl.-Ing.; Frank Anton Dipl.-Ing.; 8000 München Schmidbauer
Original Assignee
Held & Francke, Bauaktiengesellschaft, 8000 München
Filing date
Publication date
Application filed by Held & Francke, Bauaktiengesellschaft, 8000 München filed Critical Held & Francke, Bauaktiengesellschaft, 8000 München
Priority to DE19702062564 priority Critical patent/DE2062564C3/en
Priority to AT1047971A priority patent/AT312664B/en
Priority to GB5783571A priority patent/GB1363685A/en
Priority to NL7117175A priority patent/NL7117175A/xx
Priority to CA130,214A priority patent/CA954315A/en
Priority to IT5481571A priority patent/IT945500B/en
Priority to FR7145431A priority patent/FR2118746A5/fr
Publication of DE2062564A1 publication Critical patent/DE2062564A1/en
Publication of DE2062564B2 publication Critical patent/DE2062564B2/en
Application granted granted Critical
Publication of DE2062564C3 publication Critical patent/DE2062564C3/en
Expired legal-status Critical Current

Links

Description

Die Erfindung betrifft ein Verfahren zur Her- rungswänden aufgelagert werden. Eine Spannbetonstellung einer Unterfahrung, die aus im Abstand an- 40 decke trägt wegen ihrer verhältnismäßig kleinen geordneten Unterfahrungswänden und einer bewehr- Durchbiegung zur Verringerung der Setzungen bei, ten Betondecke besteht, die sich auf den Unterfah- während die Kunststofflager eine zwängungsfreie Verrungswänden abstützt und die abzufangenden Fun- formung der Spannbetondecke zulassen,
damente trägt, bei dem zunächst Preßbetonbohrpfähle In der Zeichnung ist die Durchführung des Verlängs der Ränder der Fundamente gebohrt werden, 45 fahrens in den aufeinanderfolgenden Verfahrensstudanach auf den Pfahlköpfen gelagerte und die fen dargestellt. Es zeigt
The invention relates to a method for supporting walls. A pre-stressed concrete position of an underpass, which consists of ceilings at a distance due to its relatively small, orderly underpass walls and a reinforced deflection, contributes to the reduction of settlement allow the formation of the prestressed concrete ceiling to be supported,
In the drawing, the implementation of the extension of the edges of the foundations is drilled, 45 driving in the successive procedural study after which the pile heads are stored and the fen is shown. It shows

Fundamente schubsicher fassende Streichbalken aus F i g. 1 die schematische Darstellung eines Grund-Stahlbeton hergestellt werden, danach unter den ab- risses, der die Fundamente des zu unterfahrenden zufangenden Fundamenten zwischen dem oberen Teil Gebäudes und den Verlauf der Unterfahrungswände der Preßbetonbohrpfähle der Aushub des Erdreiches 50 erkennen läßt,
für die herzustellende bewehrte Betondecke erfolgt. F i g. 2 die Abfangung eines Streifenfundaments
Foundations with shear-proof coating beams from FIG. 1 the schematic representation of a basic reinforced concrete is produced, then under the demolition, which shows the foundations of the foundation to be driven under, between the upper part of the building and the course of the underpass walls of the press-concrete bored piles, the excavation of the soil 50,
for the reinforced concrete ceiling to be produced. F i g. 2 the support of a strip foundation

Bei diesem bekannten Verfahren besteht die Beton- im Schnitt,In this known method, the concrete consists in the cut,

decke aus einzelnen vorgespannten Abfangträgern, Fig.3 die Abfangung eines Streifenfundaments inceiling made of individual prestressed support girders, Fig. 3 the support of a strip foundation in

und die Preßbetonbohrpfähle sind gruppenweise in der Seitenansicht undand the pressed concrete bored piles are in groups in the side view and

den Zwischenräumen zwischen den Abfangträgern 55 Fig.4 einen Schnitt durch die fertiggestellte Unangeordnet. Nach dem Freilegen der vorgespannten terfahrung nach der Linie IV-IV in der Fig. 1.
Abfangträger werden die Preßbetonbohrpfähle in Das zu unterfahrende Gebäude weist mehrere Einbestimmter, auf eine allmähliche und restlose Kraft- zelfundamente und streifenförmige Fundamente 5 umlagerung abzielender Reihenfolge abgebrochen, auf, deren zugehörige Gebäudelasten abgefangen worauf der Aushub der Baugrube bis zur Sohle der 60 werden sollen. Ferner ist die Grundrißanordnung der Unterfahrung erfolgt. Dieses bekannte Verfahren Preßbetonbohrpfähle 4 und Stahlbeton-Streichbalweist den Nachteil auf, daß die Lage der Bohrpfähle ken 7 für die Abfangung der Fundamente 5 dargenicht frei wählbar ist, wodurch bei der erzwungenen stellt.
the spaces between the support beams 55 Figure 4 a section through the completed disordered. After uncovering the pre-tensioned experience according to the line IV-IV in Fig. 1.
The precast concrete bored piles are broken off in the building to be driven under in the order of gradual and complete power cell foundations and strip-shaped foundations. Furthermore, the ground plan of the underpass has been made. This known method Preßbetonbohrpfähle 4 and reinforced concrete Streichbal shows the disadvantage that the position of the bored piles ken 7 for the support of the foundations 5 is not freely selectable, whereby in the forced is.

Anordnung von Bohrpfählen an ungünstigen Stellen F i g. 2 und 3 zeigen im Schnitt und in der Seiten-Schwierigkeiten entstehen. 65 ansicht die Abfangung eines Fundamentes 5 durchArrangement of bored piles in unfavorable places F i g. 2 and 3 show in section and in the side difficulties develop. 65 view of the support of a foundation 5

Die Erfindung geht von der Aufgabe aus, insbe- beidseitig angeordnete Preßbetonbohrpfahle 4 und sondere bei schwerbelasteten Fundamenten, die unter- nach Herstellung dieser Preßbetonbohrpfähle herfahren werden sollen, Setzungen zu vermeiden bzw. gestellte Stahlbeton-Streichbalken 7. Die Wandla-The invention is based on the object, pressed concrete bored piles 4 and 4 arranged on both sides especially with heavily loaded foundations that drive under after these press concrete bored piles have been produced should be to avoid subsidence or provided reinforced concrete coating beams 7. The wall slat

sten werden über Abfangträger 6 und Stahlbeton- der Betondecke erreicht wird. Die Betondecke 8 ist Streichbalken? in die Preßbetonbohrpfähle4 einge- bewehrt, vorzugsweise mit einer vorgespannten Beleitet. Die Zeichnung zeigt überdies in Fig.2 die wehruDg.Most of them are reached via support girders 6 and reinforced concrete - the concrete ceiling. The concrete ceiling 8 is Doctor bar? Reinforced in the pressed concrete bored piles4, preferably with a prestressed one. The drawing also shows the defense in FIG.

seitliche Abschrägung der Fundamente 5. Die Ab- Fig.4 zeigt die fertiggestellte Unterfahrung nach fangträger 6 werden durch in der Wand hergestellte 5 dem Aushub für den Tunnelquerschnitt 17 und nach Öffnungen durchgezogen und übertragen somit einen dem Wegschneiden der Preßbetonbohrpfähle. Auf Anteil der Wandlasten unmittelbar auf die StreicLbal- der Innenseite der Pfahlwand 10 ist eine Stahlbeken7. Waagrecht durchgezogene Anker tragen zur ton-Gurtung 14 vorgesehen. Die Pfahlwand 10 ist Schubsicheruüg zwischen den Fundamenten 5 und durch Injektionszuganker 11 im Erdreich verankert, den Streichbalken 7 bei. Nach der Herstellung der 10 Die Köpfe der Preßbetonbohrpfähle 12 münden in Preßbetonbohrpfähle 4 wird unterhalb der Funda- einen Stahlbetonträger 13 ein, der als Auflagerbalken mente5 und der Streichbalken 7 der Raum für eine für die Betondecke 8 dient. Die Betondecke 8 ruht Betondecke 8 freigelegt, die später die Übertragung auf der einen Seite auf dem Stahlbetonträger 13 der der Fundamentauflasten auf die Unterfahrungswände Pffihlwand 10 und auf der anderen Seite auf der übernimmt. Eine Unterfahrungswand ist als Schlitz- *5 Schlitzwand 9 auf, wobei die Last durch Kunststoffwand 9 und die andere Unterfahrungswand ist als lager 15, 16 übertragen wird. Die Betondecke 8 ist Pfahlwand 10 aus Preßbetonbohrpfählea 12 ausge- im Bereich des dargestellten Schnittes durch ein Einbildet. Auch läßt die Darstellung in Fi g. 2 und 3 die zelfundament mit einer Gebäudestütze und durch das pilzkopfförmige Verbreiterung der Preßbetonbohr- streifenförmige Fundaments belastet. Die Unterfanpfähle 4 erkennen, durch die eine zusätzliche Schub- a° gung der Einzelfundamente ist nicht Gegenstand der sicherung zwischen den Preßbetonbohrpf ählen 4 und Erfindung und deshalb nicht näher erläutert.lateral bevel of the foundations 5. The Ab- Fig.4 shows the completed undercutting after catch girders 6 are pulled through the excavation for the tunnel cross-section 17 and openings made in the wall 5 and thus transfer one of the cutting away of the pressed concrete bored piles. On the portion of the wall loads directly on the StreicLbal- the inside of the pile wall 10 is a steel beam7. Anchors drawn through horizontally contribute to the ton-girdle 14 provided. The pile wall 10 is Schubsicheruüg between the foundations 5 and anchored by injection tie rods 11 in the ground, the molding beam 7 at. After the production of the 10 the heads of the Preßbetonbohrpfätze 12 open into Preßbetonbohrpfähle 4, a reinforced concrete girder 13 is below the foundation, which serves as a support beam mente5 and the stroking beam 7, the space for a concrete ceiling 8. The concrete ceiling 8 rests exposed concrete ceiling 8, which later takes over the transfer on the one side of the reinforced concrete girder 13 of the foundation loads to the underpass walls Pffihlwand 10 and on the other side on the. An underpass wall is designed as a slit wall 9, the load being transmitted through the plastic wall 9 and the other underpass wall as a bearing 15, 16. The concrete ceiling 8 is pile wall 10 made of pressed concrete bored pile a 12 in the area of the section shown through a picture. The representation in Fi g. 2 and 3 the cell foundation with a building support and loaded by the mushroom head-shaped widening of the pressed concrete drill strip-shaped foundation. Recognize the lower piles 4, through which an additional shear a ° supply of the individual foundations is not the subject of securing between the pressed concrete bored piles 4 and the invention and is therefore not explained in more detail.

Hierzu 3 Blatt ZeichnungenFor this purpose 3 sheets of drawings

Claims (3)

zu verringern, (die Durchbiegungen der tragenden Patentansprüche: Stahlbetonplatte auf ein möglichst geringes Maß zu F beschränken und Schwierigkeiten bei der Anordnungto reduce (the deflections of the load-bearing patent claims: Reinforced concrete slab to the smallest possible size to F and difficulties in the arrangement 1. Verfahren zur Herstellung einer Unterfah- der Preßbetonbohrpfähle zu vermeiden.1. To avoid a method of producing an underpass- the press-concrete bored piles. rung, die aus im Abstand angeordneten Unter- 5 Das Verfahren nach der Erfindung beseitigt diese fahrungswänden und einer bewehrten Betondecke Nachteile und besteht darm, daß die bewehrte Betonbesteht, die sich auf den Unterfahrungswänden decke unter Einschluß des obersten Teils jedes Preßabstützt und die abzufangenden Fundamente betonbohrpfahls hergestellt wird und die Preßbetonträgt, bei dem zunächst Preßbetonbohrpfähle bohrpfähle danach unter der Betondecke;abgeschnitlängs der Ränder der Fundamente gebohrt wer- 10 ten werden und schließlich in an sich bekannter den, danach auf den Pfahlköpfen gelagerte und Weise der Aushub der Baugrube bis zur^ Sohle der die Fundamente schubsicher fassende Streich- Unterfahrung erfolgt Der Vorteil dieses Verfahrens balken aus Stahlbeton hergestellt werden, danach besteht darin, daß bei der Unterfahrung die Bohrunter den abzufangenden Fundamenten und zwi- pfähle ohne Rücksicht auf die Betondecke entspreschen dem oberen Teil der Preßbetonbohrpfähle 15 chend der Lage der Fundamente verteilt werden der Aushub des Erdreiches für die herzustellende können uad daß zum Umsetzen der Last von der bewehrte Betondecke erfolgt, dadurch ge- Unterfahrungskonstruktion auf die Betondecke keine kennzeichnet, daß die bewehrte Betondecke weiteren Schritte erforderlich sind, wodurch eine (8) unter Einschluß des obersten Teils jedes Quelle für Setzungen ausgeschaltet ist. Schließlich ist Preßbetonbohrpfahls (4) hergestellt wird und die ao bei Anwendung des Verfahrens nach der Erfindung Preßbetonbohrpfähle (4) danach unter der Beton- in einer monolithisch herstellbaren Betondecke im decke (8) abgeschnitten werden und schließlich Gegensatz zu einer aus einzelnen Trägern mit Zwiin an sich bekannter Weise der Aushub der Bau- schenräumen hergestellten Betondecke die Queryergrube bis zur Sohle der Unterfahrung erfolgt. teilung der abzufangenden Lasten besser. Bei einertion consisting of spaced apart sub- 5 The method according to the invention eliminates this landing walls and a reinforced concrete ceiling have disadvantages and insists that the reinforced concrete exists, which cover itself on the underpass walls, including the uppermost part of each press-supported and the foundations to be supported are made of concrete bored pile and the pressed concrete supports, In the case of the first press-concrete bored piles, then bored piles under the concrete ceiling; the edges of the foundations are to be drilled and finally in a known per se the, then stored on the pile heads and way the excavation of the construction pit up to the ^ bottom of the the foundations shear-proof undercutting takes place The advantage of this procedure beams are made of reinforced concrete, then consists in the fact that the Bohrunter underpass Rush out of the foundations and intermediate piles to be supported regardless of the concrete ceiling the upper part of the pressed concrete bored piles 15 are distributed accordingly the location of the foundations the excavation of the earth for the to be produced can uad that to relocate the load of the Reinforced concrete ceiling is carried out, so there is no underpass construction on the concrete ceiling indicates that the reinforced concrete floor requires further steps, whereby a (8) including the uppermost part of any source of subsidence is eliminated. Finally is Preßbetonbohrpfahls (4) is produced and the ao when using the method according to the invention Pressed concrete bored piles (4) then under the concrete in a monolithic concrete ceiling in the ceiling (8) are cut off and, finally, contrast to one made of individual girders with Zwiin in a manner known per se, the excavation of the construction spaces, the concrete ceiling, the query pit to the bottom of the underpass. sharing of the loads to be intercepted better. At a 2. Verfahren nach Anspruch 1, dadurch ge- 95 bevorzugten Ausführungsform der fZrfindung erhalkennzeichnet, daß die Preßbetonbohrpfähle (4) ten die Preßbetonbohrpfähle im Bereich der Betonim Bereich der Betondecke (8) eine pilzkopfar- decke eine pilzkopfartige Verbreiterung. Hierdurch tige Verbreiterung erhalten. wird eine absolut sichere Abstützung der schwer2. The method according to claim 1, characterized in the preferred embodiment of the invention, that the Preßbetonbohrpfähle (4) th the Preßbetonbohrpfäle in the area of Betonim Area of the concrete ceiling (8) a mushroom cover a mushroom-like widening. Through this received widening. becomes an absolutely secure support of the heavy 3. Verfahrennach Anspruch 1 oder 2, dadurch belasteten Fundamente im Bauzustand auf den gekennzeichnet, daß die Bewehrung der Beton- 30 Bohrpfählen erreicht. Wenn nach der Herstellung decke (8) vorgespannt wird und die Betondecke der Betondecke die Pfähle abgeschnitten werden, (8) mittels Kunststofflager (IS, 16) auf den Un- ist eine absolut sichere Abstützung der Fundamente terfahrungswänden aufgelagert wird. über die in der Betondecke verbleibenden Pfahlabschnitte gewährleistet. Nach der Erfindung kann3. Verfahrennach claim 1 or 2, thereby loaded foundations in the construction state on the characterized in that the reinforcement of the concrete 30 bored piles reached. If after making ceiling (8) is prestressed and the concrete ceiling of the concrete ceiling the piles are cut off, (8) by means of plastic bearings (IS, 16) on the Un- is an absolutely safe support of the foundations experience walls is supported. over the pile sections remaining in the concrete ceiling guaranteed. According to the invention can 35 ferner die Bewehrung der Betondecke, wenn nach35 also the reinforcement of the concrete ceiling, if after der Herstellung der Betondecke die Pfähle abgeschnitten werden, vorgespannt werden und die Betondecke mittels Kunststofflager auf den Unterfah-In the manufacture of the concrete ceiling the piles are cut off, prestressed and the concrete ceiling by means of plastic bearings on the lower
DE19702062564 1970-12-18 1970-12-18 Procedure for creating an underpass Expired DE2062564C3 (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
DE19702062564 DE2062564C3 (en) 1970-12-18 Procedure for creating an underpass
AT1047971A AT312664B (en) 1970-12-18 1971-12-06 Procedure for creating an underpass
GB5783571A GB1363685A (en) 1970-12-18 1971-12-13 Method for producing undercuttings under buildings
CA130,214A CA954315A (en) 1970-12-18 1971-12-15 Method for producing undercuttings
NL7117175A NL7117175A (en) 1970-12-18 1971-12-15
IT5481571A IT945500B (en) 1970-12-18 1971-12-17 PROCEDURE FOR THE CONSTRUCTION OF A SUB-FOUNDATION
FR7145431A FR2118746A5 (en) 1970-12-18 1971-12-17

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19702062564 DE2062564C3 (en) 1970-12-18 Procedure for creating an underpass

Publications (3)

Publication Number Publication Date
DE2062564A1 DE2062564A1 (en) 1972-07-06
DE2062564B2 DE2062564B2 (en) 1974-02-28
DE2062564C3 true DE2062564C3 (en) 1976-07-15

Family

ID=

Similar Documents

Publication Publication Date Title
AT393398B (en) WALL, IN PARTICULAR SOUND PROTECTIVE WALL
EP1712696B1 (en) Insulated prefabricated wall with pin shaped anchors
DE69108246T2 (en) METHOD FOR ESTABLISHING A FOUNDATION STRUCTURE FOR A BUILDING SUB-CONSTRUCTION.
DE1947249A1 (en) Foundation or civil engineering structure and process for its production
DE2700594A1 (en) LAYING FOR A PIT WALL AND METHOD OF MANUFACTURING
DE2821340A1 (en) METHOD AND DEVICE FOR SUPPORTING A BUILDING CONSTRUCTION
CH676015A5 (en)
DE2062564C3 (en) Procedure for creating an underpass
DE2062612C3 (en) Procedure for creating an underpass
DE2923370A1 (en) Reinforced concrete vault structure - has shell on prefab arched pieces prestressed in bend line direction
DE2917994C2 (en) Process for the production of a construction pit sheeting or retaining wall made of reinforced concrete for terrain cuts
DE1963852A1 (en) Method of erecting a structure that is at least partially submerged in a body of water
DE1299838B (en) Prefabricated assembly skeleton construction made of prestressed concrete
DE820068C (en) Process for the production of monolithic masonry between removable formwork and formwork supports for this purpose
DE2126010A1 (en) METHOD OF MAKING A TUNNEL
EP1964978B1 (en) Method for erecting a wharfage and wharfage
DE856215C (en) Process for the production of structures from prefabricated parts and prefabricated parts for the implementation of the process
AT317092B (en) Process for the production of a trough arranged in the ground below the groundwater level and for this purpose prefabricated reinforced concrete girders for their production
DE2051002C3 (en) Frame construction, consisting of prefabricated reinforced concrete parts
AT357328B (en) LOST FORMWORK FOR A FOUNDATION OF A SUPPORTING COMPONENT
DE1684265A1 (en) Method for moving a heavy body step by step over or through the ground
DE867828C (en) Process for the production and installation of a permanent concrete coating, open at the top and bottom, for foundation pillars or the like.
DE2062564B2 (en) Procedure for creating an underpass
DE2403364A1 (en) PRECAST CEILING
DE1952031A1 (en) Process for the production of prestressed concrete walls for buildings