DE1943367B - Tubing and tubing lining for lining tunnels, routes, shafts or the like Anm Center de Recherches de Pont a Mousson, Pont a Mousson, Meurthe et Moselle (France) - Google Patents
Tubing and tubing lining for lining tunnels, routes, shafts or the like Anm Center de Recherches de Pont a Mousson, Pont a Mousson, Meurthe et Moselle (France)Info
- Publication number
- DE1943367B DE1943367B DE1943367B DE 1943367 B DE1943367 B DE 1943367B DE 1943367 B DE1943367 B DE 1943367B
- Authority
- DE
- Germany
- Prior art keywords
- tubbing
- segment
- jacket
- bar
- lining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007789 sealing Methods 0.000 claims description 22
- 239000011324 bead Substances 0.000 claims description 16
- 230000000875 corresponding Effects 0.000 claims description 11
- 230000035515 penetration Effects 0.000 claims description 10
- 210000000614 Ribs Anatomy 0.000 description 15
- 210000001503 Joints Anatomy 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 229910001141 Ductile iron Inorganic materials 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- OKTJSMMVPCPJKN-UHFFFAOYSA-N carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 150000001768 cations Chemical class 0.000 description 1
- 238000005253 cladding Methods 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 229920001971 elastomer Polymers 0.000 description 1
- 239000000806 elastomer Substances 0.000 description 1
- 239000000789 fastener Substances 0.000 description 1
- 238000005755 formation reaction Methods 0.000 description 1
- 229910002804 graphite Inorganic materials 0.000 description 1
- 239000010439 graphite Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006011 modification reaction Methods 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 230000000149 penetrating Effects 0.000 description 1
Description
Die Erfindung betrifft einen Tübbing zum ringweisen Auskleiden von Tunnels, Strecken, Schächten od. dgl. mit einem Tübbingmantel, der von zum Bauwerksinneren weisenden, einen etwa rechteckigen Rahmen bildenden Flanschen begrenzt ist und der in seinem die Bauwerkslängsachse enthaltenden Querschnitt profiliert ist.The invention relates to a segment for lining tunnels, sections and shafts in rings od. The like. With a segment jacket, the one facing the building interior, an approximately rectangular Frame forming flanges is limited and the one containing the longitudinal axis of the building Cross-section is profiled.
Bei bekannten Tübbings dieser Art, deren Tübbingmantel im Querschnitt gewellt ist, liegen nach dem Zusammenbau der Tübbings zur Tübbingauskleidung die Flansche benachbarter Tübbings sowohl in Umfangsrichtung wie auch in Bauwerkslängsrichtung dicht aneinander und sind miteinander verschraubt, so daß man eine im wesentlichen starre Tübbingauskleidung erhält. Krümmungen des Bauwerks bezüglich seiner Längsachse lassen sich nur bei der Montage herbeiführen und auch dabei nur dann, wenn Tübbingringe aus besonderen Paßtübbings eingebaut werden, die über den Ringumfang eine unterschiedliche Breite aufweisen.In known tubbings of this type, the tubbing jacket of which is corrugated in cross section, are behind the assembly of the segments for the lining of the segment as well as the flanges of adjacent segments in the circumferential direction as well as in the longitudinal direction of the building close to each other and are screwed together, so that a substantially rigid segment lining is obtained. Curvatures of the structure with respect to its longitudinal axis can only be brought about during assembly and also only in the process when segment rings made of special fitting segments are installed over the circumference of the ring have a different width.
Der Erfindung liegt demgegenüber die Aufgabe zugrunde, einen Tübbing der eingangs angegebenen Art zu schaffen, mit dem sich Tübbingauskleidungen herstellen lassen, die an den Ausbruchsraum angepaßt und mit denen Krümmungen der Bauwerkslängsachse ausgeführt werden können, ohne daß hierzu besondere Paßtübbings unterschiedlicher Breite erforderlich sind.In contrast, the invention is based on the object of providing a segment of the type specified at the beginning To create a way with which segment linings can be produced that are adapted to the excavated area and with which curvatures of the building's longitudinal axis can be carried out without this special pass segments of different widths are required.
Diese Aufgabe wird erfindungsgemäß dadurch gelöst, daß der Tübbingmantel im Querschnitt nach außen ausgebaucht ist und auf einer Seite in Bauwerkslängsrichtung durch eine über den Flansch vorstehende, im Querschnitt schräg nach außen verlaufende Leiste verlängert ist, die beim Zusammenbau den anschließenden Tübbing übergreift.This object is achieved according to the invention in that the tubbing jacket in cross section according to is bulged on the outside and on one side in the longitudinal direction of the building by a protruding over the flange, obliquely outwardly extending bar in cross section is extended during assembly overlaps the subsequent segment.
Vorteilhaft hat die Ausbauchung des Tübbingmantels im Querschnitt die Form eines Trapezes ohne Grundlinie. Sie kann aber auch im Querschnitt die Form eines Kreisbogens aufweisen.The bulging of the segment jacket advantageously has the shape of a trapezoid in cross section without a baseline. However, it can also have the shape of an arc in cross section.
Auf der Außenseite des Tübbingmantels ist in weiterer Ausbildung der Erfindung in jenem Bereich, der von der Leiste des anschließenden Tübbings übergriffen wird, eine in Umfangsrichtung verlaulaufende Dichtschnur vorgesehen.On the outside of the segment jacket is in a further embodiment of the invention in that area which is overlapped by the bar of the subsequent tubbing, one running in the circumferential direction Sealing cord provided.
Zum Verbinden der in Umfangsrichtung benachbarten Tübbings trägt in weiterer Ausbildung der Erfindung der eine der parallel zur Bauwerkslängsachse verlaufenden Flansche mindestens eine Verbindungszunge, während der andere dieser Flansche zur Aufnahme der Verbindungszunge des benachbarten Tübbings mit einer ihr entsprechenden Abstützfläche versehen ist.To connect the adjacent segments in the circumferential direction, the carries in a further development Invention of one of the flanges running parallel to the longitudinal axis of the building at least one connecting tongue, while the other of these flanges for receiving the connecting tongue of the neighboring one Tubbing is provided with a corresponding support surface.
Bei einer bevorzugten Ausführungsform ist die Verbindungszunge durch eine durchlaufende Rippe und die zugeordnete Abstützfläche durch eine durchlaufende Nut gebildet.In a preferred embodiment, the connecting tongue is formed by a continuous rib and the associated support surface by a continuous one Groove formed.
Die Verbindungszunge und die Abstützfläche können aber in Abänderung der Erfindung auch durch in radialer Richtung gegeneinander versetzt angeordnete Wülste gebildet sein, die sich mit den Wülsten benachbarter Tübbings über- oder untergreifen.The connecting tongue and the support surface can, however, in a modification of the invention also through be formed in the radial direction offset from one another arranged beads, which are connected to the beads reach over or under neighboring segments.
Im Bereich der Verbindungszunge ist dabei vorteilhaft mindestens eine etwa parallel zu der Verbindungszunge verlaufende Dichtschnur vorgesehen.In the area of the connecting tongue, there is advantageously at least one approximately parallel to the connecting tongue running sealing cord provided.
Der erfindungsgemäße Tübbing ermöglicht auch ein Ausziehen in Umfangsrichtung, wenn er in weiterer Ausbildung der Erfindung aus zwei gegeneinander verschieblichen Tübbingteilen besteht, deren Tübbingmäntel einander übergreifen und die durch Befestigungsmittel gegeneinander festgelegt werden können.The tubbing according to the invention also enables an extension in the circumferential direction when it is in further Formation of the invention consists of two mutually displaceable tubbing parts, whose Tubbing jackets overlap each other and are fixed against each other by fasteners be able.
Dabei weist der innere Tübbingteil vorteilhaft auf seiner äußeren Gleitfläche eine Dichtschnur auf.The inner tubbing part advantageously has a sealing cord on its outer sliding surface.
Die Leiste des äußeren Tübbingteiles ist an ihrem freien Rand und der Mantel des inneren Tübbingteils an seinem der Leiste gegenüberliegenden Rand vorteilhaft mit Wülsten versehen, welche nach innen ίο bzw. außen gerichtet sind und sich bis über den Rand der Leiste des inneren Tübbingteils bzw. den Mantelrand des äußeren Tübbingteils erstrecken.The bar of the outer tubbing part is at its free edge and the jacket of the inner tubbing part at its edge opposite the bar advantageously provided with beads which inward ίο or facing outwards and extending over the edge the bar of the inner tubbing part or the outer edge of the outer tubbing part.
Dabei kann vorteilhaft zwischen dem Wulst jedes Tübbingteils und dem zugeordneten Rand der Leiste bzw. dem Mantel des anderen Tübbingteils ein Zwischenraum gebildet sein, der den Sitz für eine Dichtung bildet, die derart vorsteht, daß sie mit dem Mantel bzw. der Leiste des in Bauwerkslängsrichtung anschließenden Tübbings dichtende Berührung hat. Eine Tübbingauskleidung mit Kreisquerschnitt aus Tübbings nach der Erfindung ist erfindungsgemäß dadurch gekennzeichnet, daß aus in Umfangsrichtung des Bauwerks aneinandergefügten Tübbings gebildete Ringe längs einer über den gesamten Umfang gleichmäßigen oder variierenden Eindringtiefe ineinander gesteckt sind.It can be advantageous between the bead of each segment part and the associated edge of the bar or the jacket of the other tubbing part, an intermediate space can be formed, which is the seat for a seal forms, which protrudes in such a way that it with the jacket or the bar of the building in the longitudinal direction subsequent tubbing has sealing contact. A segment lining with a circular cross-section Tubbing according to the invention is characterized according to the invention in that in the circumferential direction of the structure joined segments formed rings along one over the entire circumference uniform or varying depth of penetration are plugged into one another.
In der Zeichnung sind Ausführungsbeispiele der Erfindung dargestellt, und zwar zeigtIn the drawing, embodiments of the invention are shown, namely shows
F i g. 1 eine schematische perspektivische Ansicht eines Tübbings nach der Erfindung,F i g. 1 is a schematic perspective view of a tubbing according to the invention,
F i g. 2 in vergrößertem Maßstab einen Schnitt durch die Verbindung zwischen zwei in einem Tübbingring aufeinanderfolgenden Tübbings,F i g. 2 shows, on an enlarged scale, a section through the connection between two in a segment ring successive segments,
F i g. 3 eine perspektivische Schnittdarstellung eines ausziehbaren Tübbings,F i g. 3 shows a perspective sectional view of an extendable segment,
F i g. 4 einen Querschnitt durch einen Tübbingring,F i g. 4 a cross section through a segment ring,
F i g. 5 eine Teilaufsicht auf F i g. 4 gemäß der Pfeile 5-5,F i g. 5 a partial supervision of F i g. 4 according to arrows 5-5,
F i g. 6 eine perspektivische Ansicht eines Teiles einer Auskleidung aus Tübbings gemäß der Erfindung,F i g. 6 is a perspective view of part of a lining made of segments according to the invention;
F i g. 7 einen Längsschnitt durch einen Teil der Auskleidung,F i g. 7 shows a longitudinal section through part of the lining,
F i g. 8 einen Schnitt durch die Verbindung zweier in einem Tübbingring aufeinanderfolgender Tübbings, F i g. 9 eine Seitenansicht eines Tübbings gemäß der Erfindung,F i g. 8 shows a section through the connection of two segments following one another in a segment ring, F i g. 9 is a side view of a tubbing according to the invention;
Fig. 10 die Aufsicht auf einen ausziehbaren Tübbing, 10 shows the top view of an extendable segment,
Fig. 11 einen Schnitt längs der Linie 11-11 der Fig. 10,11 shows a section along the line 11-11 of FIG. 10,
F i g. 12 eine perspektivische Darstellung im Teilschnitt längs der Linie 12-12 der F i g. 10,F i g. 12 is a perspective illustration in partial section along line 12-12 of FIG. 10,
F i g. 13 einen Schnitt längs der Linie 13-13 der Fig. 12;F i g. 13 is a section along line 13-13 of FIG. 12;
Fig. 14 einen Schnitt längs der Linie 14-14 der Fig. 12.FIG. 14 is a section along line 14-14 of FIG. 12.
Nach den F i g. 1 und 2 besteht der Tübbing P aus einem bogenförmigen Körper aus Kugelgraphitguß. Er weist einen Tübbingmantel 1 (Fig. 2) auf, dessen Krümmungsradius dem des zylindrischen Querschnitts der gewünschten Auskleidung entspricht. Dieser Tübbingmantel 1 wird von geraden, zur Bauwerkslängsachse parallelen Flanschen 2 und von gebogenen Flanschen 3 begrenzt, die mit den Flansehen 2 einen etwa rechteckigen Rahmen bilden. Der Bogen des Tübbingmantels 1 beträgt einen Bruchteil von 360°, und zwar 360°/n, wenn η Tübbings P für einen vollständigen Tübbingring erforderlich sind.According to the F i g. 1 and 2, the tubbing P consists of an arched body made of spheroidal graphite cast iron. It has a segment jacket 1 (FIG. 2), the radius of curvature of which corresponds to that of the cylindrical cross section of the desired lining. This segment jacket 1 is delimited by straight flanges 2, parallel to the longitudinal axis of the building, and by curved flanges 3 which, with the flanges 2, form an approximately rectangular frame. The curve of the segment jacket 1 is a fraction of 360 °, namely 360 ° / n, if η segments P are required for a complete segment ring.
3 43 4
Der Mantel 1 des Tübbings P weist in dem die sehen zwei normalen Tübbings P zum Schließen des Bauwerkslängsachse enthaltenden Querschnitt eine Tübbingringes montiert. Durch die teleskopartige Ausbauchung auf, die von zwei Flächen 4 und 5 und Ausbildung der Teile 13 und 14 kann der Teil 14 in einer teilzylindrischen Fläche 6 gebildet wird, nach das Innere des Teils 13 eindringen, um die noch außen gerichtet ist und einen trapezförmigen Quer- 5 freie Bogenlänge zwischen den beiden normalen Endschnitt besitzt. tubbings zu überspannen, die größer, aber auchThe jacket 1 of the tubbing P has in which the see two normal tubbing P to close the Structural longitudinal axis containing cross section of a segment ring mounted. Through the telescopic Bulge on, formed by two surfaces 4 and 5 and forming the parts 13 and 14, the part 14 can be in a part-cylindrical surface 6 is formed, after penetrating the interior of the part 13 to the still is directed outwards and has a trapezoidal transverse 5 free arc length between the two normal end cuts owns. tubbings to span the bigger, as well
Der Tübbingmantel 1 ist ferner auf einer Seite in kleiner als die Bogenlänge eines normalen Tübbings P Bauwerksrichtung durch eine Leiste 7 verlängert, die sein kann. Mit Hilfe eines Druckmittelzylinders V, frei tragend an die Flanschen 2 und 3 anschließt. der zwischen dem Flansch 2 des Tübbingteils 13 und Diese Leiste weist eine nach außen weisende Fläche 10 dem Flansch 2 a des Tübbingteils 14 eingesetzt wird, von gleicher Schräge wie die Fläche 4 auf und schließt erfolgt der Anschluß der Verbindungsrippe 8 a des an die benachbarte Fläche 5 an. Die Fläche 5 und Tübbingteils 14 an der Nut 9 des benachbarten nordie Leiste 7 bilden daher zwischen sich eine äußere malen Tübbings P. Man kann also durch das ZuRingnut, sammenziehen oder Strecken des Tübbings P1 Fabri-The tubbing jacket 1 is also lengthened on one side in less than the arc length of a normal tubbing P building direction by a bar 7, which can be. With the help of a pressure cylinder V, it connects to the flanges 2 and 3 in a cantilevered manner. between the flange 2 of the tubbing part 13 and this bar has an outwardly facing surface 10 the flange 2 a of the tubbing part 14 is used, of the same slope as the surface 4 and closes the connection of the connecting rib 8 a of the adjacent surface 5 at. Therefore, the area 5 and Tübbingteils 14 form at the groove 9 of the adjacent Nordie strip 7 between them an outer paint tubbing P. One can thus through the ZuRingnut, Pucker or stretching of the tubbing P 1 Fabri-
Der Tübbing P weist eine Verbindungszunge in 15 kationstoleranzen und auch Toleranzen bei der Her-Form einer Rippe 8 an einem der geraden Flan- stellung der Wandung des Tunnels od. dgl. ohne sehen 2 des Rahmens auf. Die Verbindungszunge Schwierigkeiten ausgleichen. Nach dem Einstellen folgt dem trapezförmigen Profil des Mantels 1 bis an des ausziehbaren Tübbings P1 werden die beiden die Kante der Leiste 7. Der gegenüberliegende gerade Tübbingteile 13 und 14 mittels Schrauben 17 (F i g. 4) Flansch 2 weist eine Nut 9 auf, welche der Rippe 8 20 aneinander befestigt, welche in die gebogenen entspricht und dem Zweck einer Verbindung benach- Flansche 3 eingesetzt werden. Selbstverständlich kann barter Tübbings (F i g. 2) dient. man sich statt der Befestigung mittels SchraubenThe tubbing P has a connecting tongue with cation tolerances and also tolerances in the shape of a rib 8 on one of the straight flanges of the wall of the tunnel or the like without seeing 2 of the frame. The connecting tongue compensate for difficulties. After adjustment, the trapezoidal profile of the shell 1 follows the pull-out segment P 1 , the two become the edge of the bar 7. The opposite straight segment parts 13 and 14 by means of screws 17 (FIG. 4) flange 2 has a groove 9 which fasten to one another the rib 8 20 which corresponds to the curved flanges 3 which are inserted adjacent to the purpose of a connection. Of course, barter segments (FIG. 2) can be used. instead of fastening with screws
Dichtschnüre 10, z. B. aus einem Elastomer, um- auch mit dem Ersatz des Druckzylinders V durchSealing cords 10, e.g. B. made of an elastomer, in order to replace the pressure cylinder V by
geben zu beiden Seiten die Rippe 8. Eine weitere einen entsprechenden Keil begnügen.give the rib 8 on both sides. Another one satisfied with a corresponding wedge.
Dichtschnur 11 ist an die Fläche 4 nahe des benach- 25 Eine vollständige ringförmige Auskleidung wirdSealing cord 11 is attached to surface 4 near the adjacent 25 A complete annular liner will be
barten gebogenen Flansches 3 angelegt. Die Dicht- mit Hilfe der Tübbings P und P1 in folgender Weisebeard curved flange 3 created. The sealing with the help of the segments P and P 1 in the following way
schnur 11 ist entsprechend der Krümmung des Tüb- hergestellt, wobei insbesondere auf die F i g. 2, 4,6cord 11 is made in accordance with the curvature of the tubing, with particular reference to FIG. 2, 4.6
bings gekrümmt und verläuft senkrecht zu den bei- und 7 verwiesen wird:bings and runs perpendicular to the two and 7 is referenced:
den Dichtschnüren 10. Die Dichtschnüre 10 und 11 Zwei Tübbings P werden derart verbunden, daßthe sealing cords 10. The sealing cords 10 and 11 Two segments P are connected in such a way that
sind auf der unbearbeiteten Gußfläche des Tübbings 30 die Verbindungsrippe 8 in die entsprechende Nut 9are on the unmachined cast surface of the tubbing 30, the connecting rib 8 in the corresponding groove 9
angeheftet oder angeklebt. Die Querschnitte der eingreift. Die geraden Querflanschen 2 des Rahmenspinned or glued on. The cross sections of the engages. The straight cross flanges 2 of the frame
Dichtschnüre 10 und 11 sind so gewählt, daß sie sind nicht exakt radial, sondern so ausgerichtet, daßSealing cords 10 and 11 are chosen so that they are not exactly radial, but aligned so that
abdichtend gegen die entsprechenden Flächen der sie mit einer den Mantel 1 berührenden Ebene einensealing against the corresponding surfaces of them with a plane touching the jacket 1
benachbarten Tübbings gequetscht werden, wie dies Winkel χ kleiner als 90° bilden (F i g. 4) Zwischenadjacent segments are squeezed, as this form angle χ smaller than 90 ° (F i g. 4) between
z. B. in der F i g. 2 für die Schnüre 10 dargestellt ist. 35 den beiden benachbarten Flanschen 2 wird ein Spielz. B. in FIG. 2 for the cords 10 is shown. 35 the two adjacent flanges 2 will be a game
Schließlich sind Aussteifungsrippen 12 vorgesehen, belassen, und die Verbindungsrippe 8 bildet mit ihrerFinally, stiffening ribs 12 are provided, left, and the connecting rib 8 forms with it
die den Mantel 1 gegen die quer verlaufenden Nut 9 ein Gelenk, um welches die benachbartenwhich the jacket 1 against the transverse groove 9 a joint around which the neighboring
Flansche 2 abstützen und damit den Rahmen ver- Tübbings P im Verlaufe der Montage verschwenktSupport the flanges 2 and thus pivot the frame between the segments P in the course of assembly
steifen. werden können. Dieses Gelenk wird am Ende derstiff. can be. This joint will be at the end of the
Nach den F i g. 4, 6 und 7 ist ferner ein auszieh- 40 Montage der Tübbings durch den zuletzt einzuset-According to the F i g. 4, 6 and 7, a pull-out 40 assembly of the segments by the last to be inserted
barer Tübbing P1 zur Vervollständigung eines Tüb- zenden ausziehbaren Tübbing P1 blockiert. Even-Barer segment P 1 to complete a segment, extendable segment P 1 blocked. Even-
bingringes vorgesehen, welcher somit aus n—l Tüb- tuelle wechselseitige Schrägstellungen der fertigenbingringes are provided, which is thus made up of n-1 Tüb- tual alternating inclinations of the finished
bingen P und einem Tübbing P1 besteht. Tübbingringe und die daraus resultierende Spaltebingen P and a segment P 1 . Segment rings and the resulting gaps
Der Tübbing P1 ist in Umfangsrichtung ausziehbar. werden durch die Leisten 7 überdeckt.The segment P 1 can be pulled out in the circumferential direction. are covered by the strips 7.
Zu diesem Zweck besteht er aus zwei übereinander- 45 Die Verbindung der n—l Tübbings P mit einerFor this purpose, it consists of two übereinander- 45 The compound of the n-l tubbing with a P
greifenden Tübbingteilen 13 und 14, die gegenein- Bogenlänge 360°/n und eines ausziehbaren Tüb-gripping tubbing parts 13 and 14, the opposite arc length 360 ° / n and an extendable tubbing
ander verschiebbar sind. Der Teil 13 weist einen bings P1 führt zu einem vollständigen Tübbingring,other are movable. The part 13 has a bings P 1 leads to a complete segment ring,
einzigen querverlaufenden Flansch 2 auf, während von dem ein Teil in F i g. 4 wiedergegeben ist. Imsingle transverse flange 2, while part of which in FIG. 4 is reproduced. in the
der gegenüberliegende Querflansch weggelassen ist. Zuge der Verbindung der einzelnen Tübbings werdenthe opposite transverse flange is omitted. During the connection of the individual segments
Der Teil 14 weist zwei gerade Querflansche 2 α auf, 50 die Dichtschnüre 10 zwischen den Flanschen 2 be-The part 14 has two straight transverse flanges 2 α, 50 the sealing cords 10 between the flanges 2
von denen einer im Inneren des Teiles 13 sitzt und nachbarter Tübbings zusammengedrückt und dichtenone of which sits inside the part 13 and compresses neighboring segments and seals them
ohne Nut 9 und Rippe 8 ist, während der andere so in radialer Richtung ab.without groove 9 and rib 8, while the other is so in the radial direction.
Flansch 2 α zur Verbindung mit einem normalen Tüb- Zwei benachbarte Tübbingringe werden dadurchFlange 2 α for connection with a normal segment Two adjacent segment rings are thereby
bing P eine Verbindungsrippe 8 α aufweist. verbunden, daß die Schrägflächen 4 des einen Ringesbing P has a connecting rib 8 α . connected that the inclined surfaces 4 of a ring
Die Flansche 2 α sind weniger hoch als die Flan- 55 unter die Leisten 7 des benachbarten Ringes geschosche 2 der normalen Tübbings P, so daß die Innen- ben werden (F i g. 7). Für die Abdichtung sorgt die kante des Rahmens in radialer Richtung mit den Dichtschnur 11, welche zwischen der Leiste 7 und Innenkanten der Rahmen der anderen normalen der Fläche 4 zusammengedrückt wird. Ist die EinTübbings fluchtet und nicht nach innen vorsteht. dringtiefe ρ (F i g. 7) der Fläche 4 unter die Leiste 7 Außerdem ist eine Dichtschnur 15 (F i g. 4 und 5) 60 längs des gesamten Kreisumfanges des Tübbingringes parallel zu den Flanschen 2a auf dem Mantel la des gleich groß, dann erhält man eine Verbindung mit Tübbingteiles 14 angeordnet. Sie wird gegen die gerader Achse X-X. Ist jedoch eine Auskleidung mit Innenfläche 16 des Tübbingteiles 14 gedrückt und geknickter Achse X-X-Y erwünscht, so wird die Eindichtet mit der Gleitbahn ab. Wenn die Länge eines dringtiefe der Fläche 4 unter die Leiste 7 über dem Tübbings P 360°/n beträgt, dann kann die Länge 65 Kreisumfang verändert, wobei die maximale Eindringeines ausziehbaren Tübbings P1 in den Grenzen tiefe der minimalen Eindringtiefe diametral gegen-360/« + L und 360/n — L variieren. überliegt. Im Bereich der minimalen EindringtiefeThe flanges 2 are α less high than the flanges 55 with the bars 7 of the adjacent ring geschosche 2 normal tubbing P, so that the interior will ben (F i g. 7). The edge of the frame with the sealing cord 11, which is compressed between the strip 7 and the inner edges of the frame of the other normal surface 4, ensures the seal in the radial direction. If the segment is aligned and not protruding inward. penetration depth ρ (Fig. 7) of the surface 4 under the bar 7 In addition, a sealing cord 15 (Fig. 4 and 5) 60 is the same size along the entire circumference of the segment ring parallel to the flanges 2a on the shell la, then a connection with segment part 14 is obtained. It is against the straight axis XX. If, however, a lining with the inner surface 16 of the tubbing part 14 is pressed and a kinked axis XXY is desired, then the seal is removed with the slide. If the length of a penetration depth of the surface 4 under the strip 7 above the tubbing P is 360 ° / n, then the length 65 circumference can be changed, with the maximum penetration of an extendable tubbing P 1 within the limits of the minimum penetration depth diametrically opposite-360 / « + L and 360 / n - L vary. overrides. In the area of the minimum penetration depth
Der ausziehbare Tübbing P1 wird zuletzt zwi- wird zweckmäßig ein Keil 19 eingesetzt, um die Ver-The pull-out segment P 1 is last between a wedge 19 is expediently used in order to
bindung zu versteifen. Ke Verbindung läßt sich dann durch Schrauben 20 fixieren, weiche die benachbarten gebogenen Flansche und den zwischen diesen eingeführten Keil 19 durchdringen.stiffen bond. No connection can then be made fix by screws 20, soft the adjacent curved flanges and those inserted between them Penetrate wedge 19.
In der Praxis erfolgt die Montage einer solchen Ringauskleidung wie folgt:In practice, such a ring lining is assembled as follows:
Sobald der Tunnel od. dgl. im Erdreich oder Gebirge in im wesentlichen zylindrischer Form vorgetrieben worden ist, werden die Tübbings P und P1 mit ihren Dichtschnüren versehen und wie folgt montiert:As soon as the tunnel or the like has been driven in an essentially cylindrical shape in the ground or mountains, the segments P and P 1 are provided with their sealing cords and assembled as follows:
Auf dem unteren Teil des Tunnels oder der Strecke od. dgl. wird ein erster Tübbing P direkt auf der Sohle angeordnet. Sodann werden die nachfolgenden Tübbings P eingebracht, indem man die Verbindungsrippen 8 in die Nuten 9 einführt und die Tübbings in geeigneter Weise gegen das Gebirge anlegt, wobei sie abgestützt werden. Auf diese Weise entsteht ein Tübbingring, dessen letzten Teil der ausziehbare Tübbing P1 bildet. Bei einem Tunnel wird der Raum für den ausziehbaren Tübbing im Scheitel vorgesehen. Der Tübbing P1 wird so weit wie möglich zusammengeschoben und zwischen die beiden benachbarten, aber eine Lücke zwischen sich frei lassenden Tübbings P eingeführt und dann mit Hilfe des Druckmittelzylinders V so weit wie möglich gespreizt, wobei der Tübbing P1 mit den benachbarten Tübbings verbunden und gegen die Ausbruchswandung angelegt wird. Der ausziehbare Tübbing P1 wird dann in seiner Endlänge, beispielsweise mit Hilfe der Schrauben 17 (F i g. 4), fixiert. Die von den Verbindungsrippen 8 und den Nuten 9 gebildeten Gelenke zwischen den Tübbings werden nach vollständiger Montage des Tübbingringes und der benachbarten Tübbingringe infolge der Verkeilung längs der Stoßfugen 18 nach F i g. 7 blockiert.On the lower part of the tunnel or the route or the like, a first segment P is arranged directly on the floor. The subsequent segments P are then introduced by inserting the connecting ribs 8 into the grooves 9 and placing the segments against the rock in a suitable manner, whereby they are supported. In this way, a segment ring is created, the last part of which is formed by the extendable segment P 1 . In the case of a tunnel, the space for the pull-out segment is provided in the apex. The segment P 1 is pushed together as far as possible and inserted between the two adjacent, but a gap between the segments P, which are left free, and then spread as far as possible with the help of the pressure cylinder V , the segment P 1 being connected to the adjacent segments and is applied against the excavated wall. The pull-out segment P 1 is then fixed in its final length, for example with the aid of the screws 17 (FIG. 4). The joints formed by the connecting ribs 8 and the grooves 9 between the segments are after complete assembly of the segment ring and the adjacent segment rings due to the wedging along the butt joints 18 according to FIG. 7 blocked.
Zur Montage des nächsten Tübbingringes wird dessen erster Tübbing P auf der Sohle des Tunnels od. dgl. aufgesetzt, wobei die Fläche 4 auf die Leiste 7 des benachbarten Tübbings des ersten Tübbingringes gelegt wird. Zweckmäßig wird dabei der erste Tübbing des zweiten Tübbingringes gegenüber dem entsprechenden Tübbing des ersten Tübbingringes derart längs des Umfanges verschoben, daß die Stoßfugen 18 an aufeinanderfolgenden Tübbingringen nicht fluchten, sondern gegeneinander versetzt sind. Dann werden die Tübbings, wie oben angegeben, weiter eingebaut. Sobald der zweite Tübbingring fertig ist, wird er gegenüber dem ersten Tübbingring mit Hilfe von Keilen 19 mit längs des gesamten Umfanges gleicher Eindringtiefe der Flächen 4 unter die Leisten 7 oder aber mit abweichender Eindringtiefe, wie im Teil X-Y nach F i g. 7, verkeilt. Mit Hilfe der Schrauben 20, die eingeschraubt und gekontert werden, wird ein Auseinanderfallen der Ringe verhindert.To assemble the next segment ring, its first segment P is placed on the floor of the tunnel or the like, with the surface 4 being placed on the bar 7 of the adjacent segment of the first segment ring. The first tubbing of the second tubbing ring is expediently displaced along the circumference with respect to the corresponding tubbing of the first tubbing ring in such a way that the butt joints 18 on successive tubbing rings are not aligned, but offset from one another. Then the segments are installed further as indicated above. As soon as the second tubbing ring is finished, it is compared to the first tubbing ring with the help of wedges 19 with the same penetration depth of the surfaces 4 under the strips 7 along the entire circumference or with a different penetration depth, as in part XY according to FIG. 7, wedged. With the help of the screws 20, which are screwed in and locked, the rings are prevented from falling apart.
Infolge der Ausbauchung des Tübbingmantels 1 weisen die Tübbings P und P1 eine große Steifigkeit auf und bieten dem Erddruck großen Widerstand. Sie können deshalb wesentlich leichter gehalten werden.As a result of the bulging of the segment jacket 1, the segments P and P 1 have great rigidity and offer great resistance to the earth pressure. They can therefore be held much more easily.
Infolge der Kegelfläche 4 und der entsprechenden Fläche an der Leiste 7 fügen sich die Tübbings benachbarter Tübbingringe leicht ineinander und bilden während der Montage eine biegsame Verbindung, die jedoch am Ende der Montage völlig starr wird.As a result of the conical surface 4 and the corresponding surface on the bar 7, the tubbings of adjacent ones fit together Tubbing rings easily interlock and form a flexible connection during assembly however, at the end of assembly it becomes completely rigid.
Außerdem ist durch die obenerwähnte verschiedene Eindringtiefe von Ring zu Ring die Erstellung gekrümmter Auskleidung möglich. So kann man beispielsweise bei einem Innendurchmesser eines Tübbingringes von mehr als 6 m eine Krümmung der Auskleidung in beliebiger Richtung erzielen, deren Mindestradius 100 m beträgt.In addition, due to the above-mentioned different penetration depths from ring to ring, the creation curved lining possible. So you can, for example, with an inner diameter of a segment ring achieve a curvature of the lining in any direction of more than 6 m, their The minimum radius is 100 m.
Durch das Versetzen der Stoßfugen 18 übergreift jede Leiste 7 zwei Tübbings des anschließenden Tübbingringes, wodurch sichergestellt ist, daß die Verbindung nach der Montage vollständig steif ist, jedoch im Verlauf der Montage eine gewisse Flexibilität aufweist. By moving the butt joints 18, each bar 7 overlaps two segments of the adjoining segment ring, thereby ensuring that the connection is completely stiff after assembly, however has a certain flexibility in the course of assembly.
ίο Durch die ausziehbaren und zusammenschiebbaren Tübbings P1 ist das Erstellen eines Tübbingringes sehr einfach, weil zuletzt ein Tübbing P1 verwendet werden kann, um die Durchmessertoleranzen des in das Gebirge vorgetriebenen Tunnels od. dgl. sowie auch die Herstellungstoleranzen der Tübbings P auszugleichen. ίο Due to the extendable and collapsible segments P 1 , the creation of a segment ring is very easy because a segment P 1 can be used last to compensate for the diameter tolerances of the tunnel driven into the rock or the like, as well as the manufacturing tolerances of the segments P.
Durch die Verbindungsrippen 8 und die entsprechenden Nuten 9 sind die Tübbings eines Tübbingringes untereinander gewissermaßen gelenkig verbunden, so daß sie sich dem Gebirge anpassen, an die Ausbruchswandung anschmiegen und nur ein schmaler Ringraum zwischen Ausbruchswandung und Auskleidung verbleibt, der verfüllt werden muß. Außerdem ist die Verbindung der einzelnen Tübbings hinreichend genau, um eine fast durchgehende Außenfläche des Tübbingringes zu verwirklichen.The tubbings of a tubbing ring are formed by the connecting ribs 8 and the corresponding grooves 9 articulated to one another, so to speak, so that they adapt to the mountains cling to the breakout wall and only a narrow annular space between the breakout wall and lining remains to be filled. In addition, the connection between the individual segments sufficiently accurate to achieve an almost continuous outer surface of the segment ring.
Da Dichtschnüre vorgesehen sind, kann kein Wasser in das Innere der Auskleidung eindringen.Since sealing cords are provided, no water can penetrate into the interior of the liner.
Die Tübbings P und P1 sind in ihrer Form so gewählt, daß sie im Guß hergestellt werden können und nach dem Gießen nicht mehr weiter bearbeitet werden müssen.The shape of the segments P and P 1 is chosen so that they can be cast and no longer have to be processed after casting.
Infolge der Verbindungsrippen 8, der Nuten 9 und der Leisten 7 können die Tübbings ohne Irrtum und leicht miteinander verbunden werden.As a result of the connecting ribs 8, the grooves 9 and the strips 7, the segments can without error and can be easily connected to each other.
Läßt man die Keile 19 und die Schrauben 20 weg und ersetzt sie durch Klammern 21 (Fig. 7) zum Versperren der gebogenen Flansche 3 benachbarter Tübbingringe, so lassen sich solche Verbindungen noch schneller ausführen.If the wedges 19 and the screws 20 are omitted and they are replaced by brackets 21 (FIG. 7) for locking the curved flanges 3 of adjacent segment rings, such connections can still be made run faster.
Auch können die Verbindungsrippen 8 und die zugeordneten Nuten 9 durch Wülste 22 und 23 an den Tübbings P2 und P3 (F i g. 8) ersetzt werden, welche sich gegenseitig überlappen und abstützen, wobei diese Wülste an Flansche 2 b angeordnet sind, deren Rückseiten mit Vorsprüngen und Ausnehmungen zur Anpassung an die Form der Wülste 22 und 23 versehen sind.Also, the connecting ribs 8 and the associated grooves 9 (g F i. 8) by beads 22 and 23 on the tubbing P 2 and P 3 are replaced, which overlap each other and are supported, said beads are disposed b of flanges 2, the rear sides of which are provided with projections and recesses to adapt to the shape of the beads 22 and 23.
Die Wülste können absatzweise und abgestuft ausgebildet sein, wie es bei den Bezugszeichen 22", 22ft, 21C und 23", 23" und 23e in F i g. 9 dargestellt ist. Die Wülste 22 gehören zum Tübbing P4 und die gestrichelt gezeichneten Wülste 23 zu einem nicht gezeichneten benachbarten Tübbing.The beads may be intermittently formed and graded as "ft, 22, 21 C and 23" at reference numerals 22 g, 23 "and 23 e in F i. 9 is shown. The beads 22 are part of the tubbing P 4 and the Dotted bulges 23 to an adjacent tubbing, not shown.
Bei dem Ausführungsbeispiel nach den Fig. 11 und 14 besteht der ausziehbare Tübbing P1', wie bei der Ausführungsform nach den F i g. 3 und 4 aus zwei übereinander sitzenden Tübbingteilen 13 und 14. Beide sind aus Kugelgraphitgußeisen hergestellt.In the embodiment according to FIGS. 11 and 14, the pull-out segment P 1 ' consists, as in the embodiment according to FIGS. 3 and 4 from two tubbing parts 13 and 14 sitting one above the other. Both are made of spheroidal graphite cast iron.
Sie weisen einen gebogenen Mantel 1 und 1 α auf, der von quer verlaufenden Flanschen 2 bzw. 2 a begrenzt ist, wobei der untere Teil zwei gebogene Längsflansche 3β aufweist. Die Mäntel 1, la sind gebogen. Ihre Querschnitte längs einer Radialebene 12-12 (F i g. 10) durch die Achse der zylindrischen Auskleidung senkrecht zur Krümmung der Tübbings sind etwa trapezförmig.They have a curved shell 1 and α 1, which is bounded by transverse flanges 2 and 2 a, the lower part having two curved longitudinal flanges 3β. The jackets 1, la are curved. Their cross-sections along a radial plane 12-12 (FIG. 10) through the axis of the cylindrical lining perpendicular to the curvature of the tubbing are approximately trapezoidal.
Der Tübbingmantel des äußeren Tübbingteiles 13The segment jacket of the outer segment part 13
weist, wie bei den vorhergehenden Ausführungsbeispielen, einen zylindrischen Teil 6 auf, der von zwei Schrägflächen 4 und 5 begrenzt ist, welche gegen die Achse der Verkleidung in zueinander entgegengesetzten Richtungen konvergieren und der Versteifung der Tübbings dienen. Die Fläche 4 greift unter die zugeordnete Leiste T eines benachbarten Tübbings P3 eines anschließenden Tübbingringes. Die Fläche 5 ist durch eine Leiste 7 verlängert, welche die gleiche Schräge wie die Fläche 4 aufweist und legt sich über eine Fläche 4' eines benachbarten Tübbings P6 des folgenden Tübbingringes.has, as in the previous embodiments, a cylindrical part 6 which is bounded by two inclined surfaces 4 and 5 which converge towards the axis of the cladding in mutually opposite directions and serve to stiffen the tubbings. The surface 4 engages under the assigned strip T of an adjacent segment P 3 of an adjoining segment ring. The surface 5 is extended by a strip 7, which has the same slope as the surface 4 and lies over a surface 4 'of an adjacent segment P 6 of the following segment ring.
In gleicher Weise weist der Tübbingmantel 1 a des unteren Tübbingteiles 14 einen zylindrischen Teil 6 a, Schrägflächen Aa, 5 a und eine Leiste la auf, wobei die Schrägfläche 4 α unter die Leiste des benachbarten Tübbings greift und die Leiste la sich über die entsprechende Fläche eines weiteren benachbarten Tübbings legt.In the same way, the tubbing shell 1 a of the lower tubbing part 14 has a cylindrical part 6 a, inclined surfaces Aa, 5 a and a bar la , the inclined surface 4 α engages under the bar of the adjacent tubbing and the bar la extends over the corresponding surface another adjacent segment.
Die Leiste 7 des Tübbingteiles 13 ist von einem nach innen vorspringenden Wulst 24 begrenzt. Der Wulst springt um ungefähr die Dicke der entsprechenden Leiste la des inneren Tübbingteiles 14 derart vor, daß er in einer Ebene mit der Fläche S1 liegt. Die Anordnung ist dabei so getroffen, daß ein Sitz für eine Dichtung 25 entsteht, die aus einer elastischen Leiste hergestellt ist, welche in unbelastetem Zustand über die Fläche S1 vorsteht.The bar 7 of the segment part 13 is delimited by an inwardly projecting bead 24. The bead protrudes by approximately the thickness of the corresponding strip la of the inner tubbing part 14 in such a way that it lies in a plane with the surface S 1. The arrangement is such that a seat is created for a seal 25 which is made from an elastic strip which protrudes beyond the surface S 1 in the unloaded state.
Die Schrägfläche 4 α ist von einem nach außen vorstehenden Wulst 26 begrenzt, der ein der Dicke des Mantels 1 des oberen Tübbingteiles 13 entsprechendes Stück derart vorsteht, daß er in einer Ebene mit der Fläche S2 liegt und mit der Außenkante der Fläche 4 einen Sitz für eine Dichtung 27 bildet.The inclined surface 4 α is limited by an outwardly protruding bead 26, which protrudes a piece corresponding to the thickness of the shell 1 of the upper tubbing part 13 in such a way that it lies in a plane with the surface S 2 and with the outer edge of the surface 4 a seat for a seal 27 forms.
Die Dichtungen 25 und 27 dichten die Verbindungsstellen mit den benachbarten Tübbings P5 und P6 ab.The seals 25 and 27 seal the connection points with the adjacent segments P 5 and P 6 .
Der untere Tübbingteil 14 ist mit Hilfe von durch Löcher 29 im Tübbingmantel 1 gesteckten Schrauben 28 und mit Hilfe von Langlöchern 30 im Tübbingmantel 1 α am oberen Tübbingteil 13 befestigt.The lower tubbing part 14 is secured with the aid of screws inserted through holes 29 in the tubbing jacket 1 28 and fastened to the upper tubbing part 13 with the help of elongated holes 30 in the tubbing jacket 1 α.
Gegenüber den Löchern 29 und 30 in den Tübbingmänteln 1 und la ist eine innere Abdichtplatte 31 dicht an der Innenseite des Tübbingteiles 14 unterhalb des Mantels la und parallel zu diesem mittels Schrauben 32 befestigt.Compared with the holes 29 and 30 in the Tübbingmänteln 1 and la an inner sealing plate 31 is fixed tightly to the inside of Tübbingteiles 14 below the shell la and parallel thereto by means of screws 32nd
In Umfangsrichtung weisen die Tübbingteile 13 und 14, wie Fig. 11 zeigt, Wülste 22 und 23 auf, welche den Wülsten nach F i g. 8 entsprechen und zum Anschluß an die benachbarten Tübbings P2 und P3 des gleichen Tübbingringes unter Verwendung einer ähnlichen Dichtung 10 dienen.In the circumferential direction, the tubbing parts 13 and 14, as FIG. 11 shows, bulges 22 and 23, which correspond to the bulges according to FIG. 8 and serve to connect to the adjacent segments P 2 and P 3 of the same segment ring using a similar seal 10.
Wie die Fig. 13 und 14 zeigen, werden die Flächen S1 und S2 kontinuierlich auf den Flächen der benachbarten Tübbings P5 und P6 eingestellt. Auf diese Weise sollte auch das Ausziehen des ausziehbaren Tübbing Pl, erfolgen.As FIGS. 13 and 14 show, the surfaces S 1 and S 2 are continuously adjusted on the surfaces of the adjacent tubbings P 5 and P 6. The pull-out segment Pl should also be pulled out in this way.
Man erhält eine vollkommene Abdichtung gegenüber eindringendem Wasser, da für den ausziehbaren Tübbing P1' außer den bereits erwähnten Dichtungen 25 und 27 zwischen den Tübbingteilen 13 und 14 weitere Dichtungen 33 im Tübbingteil 14 vorgesehen sind, welche sich gegen die Unterfläche des Tübbingteiles 13 legen. Ferner ist eine Dichtung 10 α in der Fläche 4 vorgesehen, welche die Leiste T des Tübbings P5 neben der Dichtung 27 berührt, sowie eine Dichtung 34 unter der Leiste la, welche die Fläche 4' des Tübbings P6 neben der Dichtung 25 berührt. Diese vollständige Abdichtung gegenüber einem Eindringen von Wasser von außen her erfolgt ausschließlich durch die Dichtungen, die auf den Tübbingteilen im Zuge ihrer Fabrikation in der Fabrik angebracht, im allgemeinen angeklebt werden. Sie ist auch wirksam, wenn der Tübbing P1' ausgezogen ist.A complete seal against ingress of water is obtained, since for the pull-out tubbing P 1 'apart from the already mentioned seals 25 and 27 between the tubbing parts 13 and 14, further seals 33 are provided in the tubbing part 14, which lie against the lower surface of the tubbing part 13. Further, a seal 10 is α in the surface 4 provided that the strip T of the tubbing P 5 touches in addition to the seal 27 and a seal 34 of the strip la which contacts the surface 4 'of the tubbing P 6 adjacent the seal 25th This complete sealing against the ingress of water from the outside takes place exclusively through the seals, which are generally affixed to the segment parts in the course of their manufacture in the factory. It is also effective when the segment P 1 'is pulled out.
Die auf diese Weise bewirkte vollständige Abdichtung erlaubt auch das Einspritzen von Beton zwischen die Auskleidung und das Gebirge, ohne daß dieser Beton in die Auskleidung eindringen kann.The complete sealing effected in this way also allows concrete to be injected between the lining and the mountains without this concrete being able to penetrate into the lining.
Man kann auch Dichtungen vorsehen, welche in die übergreifenden Verbindungsflächen der Tübbings P5 und P6 eingepaßt sind.It is also possible to provide seals which are fitted into the overlapping connecting surfaces of the segments P 5 and P 6.
Der Tübbingmantel des Tübbings kann im Querschnitt statt Trapezform auch eine Kreisbogenform haben. In diesem Falle ist das gekrümmte Profil ein Teil einer bezüglich der Achse X-X der Auskleidung zentrierten Kugel und berührt die innere kegelstumpfförmige Fläche der Leiste 7 eines benachbarten Tübbings.The tubbing jacket of the tubbing can also have a circular arc shape in cross section instead of a trapezoidal shape. In this case, the curved profile is part of a ball centered with respect to the axis XX of the lining and touches the inner frustoconical surface of the strip 7 of an adjacent tubbing.
Statt aus Kugelgraphit gegossen zu sein, können die Tübbings auch aus Blech gefalzt oder geschweißt sein.Instead of being cast from spheroidal graphite, the segments can also be folded or welded from sheet metal being.
Obwohl nur die Schrauben 20 oder die Klammern 21 (F i g. 7) unerläßlich sind, um das Auseinanderrutschen der Tübbingringe zu verhindern, können auch noch Schrauben vorgesehen werden, um die Tübbings jeden Ringes zu verbinden, indem man die geraden Flansche 2 miteinander versperrt. Die Anwendung von Schrauben kann im Fall von großen Biegemomenten sehr nützlich sein.Although only the screws 20 or the brackets 21 (Fig. 7) are essential to prevent it from slipping apart To prevent the segment rings, screws can also be provided to secure the To connect segments of each ring by locking the straight flanges 2 together. The application of screws can be very useful in the case of large bending moments.
Schließlich kann ein ausziehbarer Tübbing P l/P/ auch durch einen sogenannten Schlußtübbing bekannter Bauart ersetzt werden, dessen Flansche parallel statt radial verlaufen. Ein solcher Schlußtübbing bietet jedoch nicht die Vorteile des ausziehbaren Tübbings Pl.Finally, an extendable segment P l / P / can also be known as a so-called final segment Design are replaced, the flanges of which run parallel instead of radial. Such a final segment does not, however, offer the advantages of the extendable segment Pl.
Claims (13)
Family
ID=
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3000763A1 (en) * | 1979-01-15 | 1980-07-24 | Pont A Mousson | METHOD AND DEVICE FOR ASSEMBLING TUBES OF A TUNNEL EXPANSION |
DE3433014A1 (en) * | 1984-09-07 | 1986-03-20 | Gerhard Dipl.-Ing. Philipp | Method and assembly aid for temporarily connecting support segments and support rings |
DE3442501A1 (en) * | 1984-11-22 | 1986-05-28 | Hochtief Ag Vorm. Gebr. Helfmann, 4300 Essen | Yielding support for tunnels and roadways |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3000763A1 (en) * | 1979-01-15 | 1980-07-24 | Pont A Mousson | METHOD AND DEVICE FOR ASSEMBLING TUBES OF A TUNNEL EXPANSION |
DE3433014A1 (en) * | 1984-09-07 | 1986-03-20 | Gerhard Dipl.-Ing. Philipp | Method and assembly aid for temporarily connecting support segments and support rings |
DE3442501A1 (en) * | 1984-11-22 | 1986-05-28 | Hochtief Ag Vorm. Gebr. Helfmann, 4300 Essen | Yielding support for tunnels and roadways |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2613032C2 (en) | Water pressure-retaining joint construction for expansion joints of underground channels or similar. | |
DE2555317A1 (en) | SHELVING SIGN FOR DRIVING TUNNELS, DRIVES AND THE LIKE AS WELL AS LIFTING KNIFE FOR A SHIELD SIGN | |
DE2833345A1 (en) | Tunnel tubbing joint sealing profile ring - has internal ribs meeting in continuous flat form, on complementary different sections | |
DE1943367A1 (en) | Formwork panel and formwork process | |
EP0257287B1 (en) | Pressure-sealed pipe joint for a driving pipe made of steel | |
DE2637726B2 (en) | Track expansion frame | |
DE69316529T2 (en) | Flexible tunnel expansion segments and method using these segments to expand tunnels | |
EP0348870B1 (en) | Constructions composed of several precast reinforced-concrete elements for use in the prestressed concrete construction method | |
DE2637738B2 (en) | Steel lining of tunnels for roads, subways and the like | |
DE1932107B2 (en) | ||
DE1943367C (en) | Tubbing and lining for lining tunnels, routes, shafts or the like | |
DE1943367B (en) | Tubing and tubing lining for lining tunnels, routes, shafts or the like Anm Center de Recherches de Pont a Mousson, Pont a Mousson, Meurthe et Moselle (France) | |
EP1243753B1 (en) | Tubing segment for lining a tunnel | |
DE2118034C3 (en) | Expansion for routes, tunnels, tunnels or shafts made of precast reinforced concrete | |
DE2642104C3 (en) | Metal segments for lining tunnels | |
DE2558670C3 (en) | Jacking knife for a shoring shield and method for introducing an in-situ concrete lining when driving tunnels, tunnels or the like. by means of a shoring sign | |
DE3125274C2 (en) | Process for the construction of curved tunnels according to the pipe pre-pressing process and pipes suitable for this | |
DE2613854C3 (en) | Tubbing segment for tunnel lining with joint sealing | |
EP0690198A1 (en) | Sealing element, in particular for door and window openings | |
DE3404074A1 (en) | Method of making a concrete trench wall | |
EP0640744B1 (en) | Reinforced steel concrete section tube | |
DE3017428A1 (en) | Mine gallery or tunnel composite support system - has stretched filled textile support tubes lying full face against steel segments | |
AT395342B (en) | Tunnel lining of prefabricated sections | |
DE2510234C2 (en) | Sealing ring for pipe couplings | |
DE4443046A1 (en) | Tubbing arrangement for lining tunnels |