DE102013019243A1
DE102013019243A1 DE201310019243 DE102013019243A DE102013019243A1 DE 102013019243 A1 DE102013019243 A1 DE 102013019243A1 DE 201310019243 DE201310019243 DE 201310019243 DE 102013019243 A DE102013019243 A DE 102013019243A DE 102013019243 A1 DE102013019243 A1 DE 102013019243A1
Authority
DE
Germany
Prior art keywords
rope
cable
rope brake
tensioning
path
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE201310019243
Other languages
German (de)
Other versions
DE102013019243B4 (en
Inventor
Michael Mayer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SCHOENBERGER GERMANY ENTERPRISES GMBH & CO. KG, DE
Original Assignee
ROLLADEN SCHONBERGER & CO KG ROLLADENFABRIK GmbH
Rolladen-Schonberger & Co KG Rolladenfabrik GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ROLLADEN SCHONBERGER & CO KG ROLLADENFABRIK GmbH, Rolladen-Schonberger & Co KG Rolladenfabrik GmbH filed Critical ROLLADEN SCHONBERGER & CO KG ROLLADENFABRIK GmbH
Priority to DE102013019243.9A priority Critical patent/DE102013019243B4/en
Publication of DE102013019243A1 publication Critical patent/DE102013019243A1/en
Application granted granted Critical
Publication of DE102013019243B4 publication Critical patent/DE102013019243B4/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B9/00Screening or protective devices for wall or similar openings, with or without operating or securing mechanisms; Closures of similar construction
    • E06B9/24Screens or other constructions affording protection against light, especially against sunshine; Similar screens for privacy or appearance; Slat blinds
    • E06B9/26Lamellar or like blinds, e.g. venetian blinds
    • E06B9/28Lamellar or like blinds, e.g. venetian blinds with horizontal lamellae, e.g. non-liftable
    • E06B9/30Lamellar or like blinds, e.g. venetian blinds with horizontal lamellae, e.g. non-liftable liftable
    • E06B9/32Operating, guiding, or securing devices therefor
    • E06B9/322Details of operating devices, e.g. pulleys, brakes, spring drums, drives
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B9/00Screening or protective devices for wall or similar openings, with or without operating or securing mechanisms; Closures of similar construction
    • E06B9/24Screens or other constructions affording protection against light, especially against sunshine; Similar screens for privacy or appearance; Slat blinds
    • E06B9/26Lamellar or like blinds, e.g. venetian blinds
    • E06B9/262Lamellar or like blinds, e.g. venetian blinds with flexibly-interconnected horizontal or vertical strips; Concertina blinds, i.e. upwardly folding flexible screens
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B9/00Screening or protective devices for wall or similar openings, with or without operating or securing mechanisms; Closures of similar construction
    • E06B9/24Screens or other constructions affording protection against light, especially against sunshine; Similar screens for privacy or appearance; Slat blinds
    • E06B9/26Lamellar or like blinds, e.g. venetian blinds
    • E06B9/28Lamellar or like blinds, e.g. venetian blinds with horizontal lamellae, e.g. non-liftable
    • E06B9/30Lamellar or like blinds, e.g. venetian blinds with horizontal lamellae, e.g. non-liftable liftable
    • E06B9/32Operating, guiding, or securing devices therefor
    • E06B9/324Cord-locks
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B9/00Screening or protective devices for wall or similar openings, with or without operating or securing mechanisms; Closures of similar construction
    • E06B9/24Screens or other constructions affording protection against light, especially against sunshine; Similar screens for privacy or appearance; Slat blinds
    • E06B9/26Lamellar or like blinds, e.g. venetian blinds
    • E06B9/28Lamellar or like blinds, e.g. venetian blinds with horizontal lamellae, e.g. non-liftable
    • E06B9/30Lamellar or like blinds, e.g. venetian blinds with horizontal lamellae, e.g. non-liftable liftable
    • E06B9/32Operating, guiding, or securing devices therefor
    • E06B9/326Details of cords, e.g. buckles, drawing knobs
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B9/00Screening or protective devices for wall or similar openings, with or without operating or securing mechanisms; Closures of similar construction
    • E06B9/24Screens or other constructions affording protection against light, especially against sunshine; Similar screens for privacy or appearance; Slat blinds
    • E06B9/26Lamellar or like blinds, e.g. venetian blinds
    • E06B9/28Lamellar or like blinds, e.g. venetian blinds with horizontal lamellae, e.g. non-liftable
    • E06B9/30Lamellar or like blinds, e.g. venetian blinds with horizontal lamellae, e.g. non-liftable liftable
    • E06B9/32Operating, guiding, or securing devices therefor
    • E06B9/327Guides for raisable lamellar blinds with horizontal lamellae
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B9/00Screening or protective devices for wall or similar openings, with or without operating or securing mechanisms; Closures of similar construction
    • E06B9/24Screens or other constructions affording protection against light, especially against sunshine; Similar screens for privacy or appearance; Slat blinds
    • E06B9/26Lamellar or like blinds, e.g. venetian blinds
    • E06B9/262Lamellar or like blinds, e.g. venetian blinds with flexibly-interconnected horizontal or vertical strips; Concertina blinds, i.e. upwardly folding flexible screens
    • E06B2009/2625Pleated screens, e.g. concertina- or accordion-like

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Curtains And Furnishings For Windows Or Doors (AREA)

Abstract

Die vorliegende Erfindung offenbart eine Seilbremse (1) für ein Dekorationselement (101), ein Spannset (10) eingerichtet zum Tragen eines Dekorationselements (101) und ein Vorhangsystem (100). Die Seilbremse (1) gemäß der vorliegenden Erfindung offenbart eine erste Öffnung (2a), eine zweite Öffnung (2b), mindestens einen Seilpfad (4, 4a) und Haltemittel (9a, 9b, 9c, 9d). Der mindestens eine Seilpfad (4, 4a) verbindet die erste Öffnung (2a) und die zweite Öffnung (2b). Die Haltemittel (9a, 9b, 9c, 9d) dienen zum Befestigen der Seilbremse an einer Vorhangschiene (12).The invention relates to a cable brake (1) for a decorative element (101), a tensioning set (10) designed to carry a decorative element (101) and a curtain system (100). The cable brake (1) according to the present invention discloses a first opening (2a), a second opening (2b), at least one cable path (4, 4a) and holding means (9a, 9b, 9c, 9d). The at least one cable path (4, 4a) connects the first opening (2a) and the second opening (2b). The holding means (9a, 9b, 9c, 9d) serve to fasten the cable brake to a curtain rail (12).

Description

Die Vorrichtung betrifft eine Seilbremse für ein Dekorationselement, insbesondere einen Vorhang, einen Sonnenschutz, einen Plisseevorhang und/oder dergleichen. Weiter offenbart die Erfindung ein Spannset eingerichtet zum Tragen eines Dekorationselementes und ein Vorhangsystem umfassend mindestens ein Spannset gemäß der vorliegenden Erfindung.The device relates to a rope brake for a decorative element, in particular a curtain, a sunshade, a pleated curtain and / or the like. Further, the invention discloses a clamping set adapted for supporting a decorative element and a curtain system comprising at least one tensioning set according to the present invention.

Die vorliegende Erfindung liegt auf dem Gebiet von Sonnenschutz- und/oder Blickschutzvorrichtungen, insbesondere Vorhängen, wie zum Beispiel Plisseevorhängen. Derartige Vorhänge sind an gespannten Spannseilen befestigt, wobei das Vorhangelement verschieblich an dem einen oder mehreren Spannseilen beweglich ist. Typischerweise wird das Vorhangelement durch eine Vorhangschiene abgeschlossen. Um ein Feststellen des Vorhangelements auf einer gewünschten Höhenposition entlang der Spannseile zu erreichen, waren im Stand der Technik umfangreiche Mechaniken und Federn erforderlich, die ein Feststellen des Vorhangelements auf einer gewünschten Höhe ermöglichten. Die vorliegende Erfindung hat es sich zur Aufgabe gemacht, die im Stand der Technik bestehenden Nachteile zu überwinden.The present invention is in the field of sunscreen and / or privacy screens, especially curtains, such as pleated blinds. Such curtains are attached to tensioned tensioning cables, wherein the curtain element is slidably movable on the one or more tensioning cables. Typically, the curtain element is closed by a curtain rail. In order to achieve a determination of the curtain element at a desired height position along the tensioning cables, in the prior art extensive mechanisms and springs were required, which made it possible to fix the curtain element at a desired height. The present invention has set itself the task of overcoming the disadvantages existing in the prior art.

Die erfindungsgemäße Seilbremse für ein Dekorationselement umfasst eine erste Öffnung, eine zweite Öffnung und mindestens einen Seilpfad, sowie Haltemittel. Der mindestens eine Seilpfad verbindet die erste Öffnung und die zweite Öffnung der Seilbremse. Die Haltemittel dienen zum Befestigen der Seilbremse an einer Vorhangschiene bzw. zum Festlegen der Vorhangschiene an der Seilbremse.The rope brake according to the invention for a decorative element comprises a first opening, a second opening and at least one cable path, as well as holding means. The at least one cable path connects the first opening and the second opening of the rope brake. The holding means are used to attach the rope brake to a curtain rail or to set the curtain rail on the rope brake.

Unter dem Begriff Seilpfad ist im Folgenden eine Struktur innerhalb der Seilbremse zu verstehen, die ein Spannseil aufnehmen kann. Der Seilpfad kann dabei entlang seiner Länge von der ersten Öffnung zu der zweiten Öffnung durch Wände begrenzt sein. Ebenso ist es ohne Einschränkung möglich, dass der Seilpfad jedoch zu einer oder mehreren Grenzflächen der Seilbremse hin nicht durch eine Seilpfadgrenzfläche begrenzt wird. Ein solcher Seilpfad kann auch als offenliegend bezeichnet werden.The term cable path is to be understood below a structure within the cable brake, which can accommodate a tensioning cable. The cable path can be limited along its length from the first opening to the second opening by walls. Likewise, it is possible without restriction, however, that the cable path is not limited to one or more interfaces of the cable brake through a cable path interface. Such a cable path can also be referred to as being exposed.

Der Begriff Öffnung kann im Folgenden eine Struktur bezeichnen, die einen Umfang eines Spannseils, das durch die Öffnung geführt wird, umschließt. Dadurch wird insbesondere ein Herausgleiten des Spannseils aus der Öffnung in radialer Richtung vermieden. Mit anderen Worten weist die Öffnung eine durchgehende Umrandung auf, durch die das Spannseil führbar ist.The term opening may hereinafter denote a structure which encloses a circumference of a tensioning cable which is guided through the opening. As a result, slipping out of the tensioning cable from the opening in the radial direction is avoided in particular. In other words, the opening has a continuous border, through which the tensioning cable can be guided.

Bevorzugt kann der mindestens eine Seilpfad von einer geraden Verbindung zwischen der ersten Öffnung und der zweiten Öffnung abweichen.Preferably, the at least one cable path may deviate from a straight connection between the first opening and the second opening.

Weiter kann der mindestens eine Seilpfad mindestens einen bogenförmigen Abschnitt und/oder einen gewinkelten Abschnitt umfassen. Unter einem bogenförmigen Abschnitt des Seilpfads ist ein kreis- und/oder ellipsenförmiger Abschnitt zu verstehen, in dem sich keine aufeinander zulaufenden, geraden Seilpfadabschnitte befinden.Furthermore, the at least one cable path may comprise at least one curved section and / or one angled section. An arcuate section of the cable path is to be understood as meaning a circular and / or elliptical section in which there are no convergent, straight cable path sections.

Unter einem gewinkelten Abschnitt ist hingegen ein solcher Abschnitt des Seilpfads zu verstehen, in dem sich zwei Abschnitte des Seilpfads in einem Winkel schneiden bzw. aufeinander treffen.By contrast, an angled section is to be understood as meaning a section of the cable path in which two sections of the cable path intersect at an angle or meet one another.

Die Seilbremse kann weiter einen zweiten Seilpfad umfassen, der die erste Öffnung und die zweite Öffnung zusätzlich zu dem ersten Seilpfad über den zweiten Seilpfad verbindet. Ebenso könnte der zweite Seilpfad auch die erste Öffnung oder die zweite Öffnung mit einer weiteren Öffnung verbinden. Darüber hinaus könnte der zweite Seilpfad auch zwei weitere Öffnungen der Seilbremse miteinander verbinden.The rope brake may further include a second cable path connecting the first opening and the second opening in addition to the first cable path via the second cable path. Likewise, the second cable path could also connect the first opening or the second opening with a further opening. In addition, the second cable path could also connect two further openings of the cable brake.

Weiter kann der zweite Seilpfad einen Querschnitt aufweisen, der verschieden von einem Querschnitt des ersten Seilpfads ist. Eine solche Ausführung hat den Vorteil, dass sich die erfindungsgemäße Seilbremse auch mit Spannseilen unterschiedlicher Stärke verwenden lässt.Further, the second cable path may have a cross section that is different from a cross section of the first cable path. Such a design has the advantage that the rope brake according to the invention can also be used with tensioning cables of different thicknesses.

Die Seilbremse kann weiter in dem mindestens einen Seilpfad ein oder mehrere Verjüngungselemente aufweisen. Die Verjüngungselemente reduzieren einen freien Querschnitt des mindestens einen Seilpfads in einem Abschnitt des Seilpfads.The rope brake may further include one or more taper elements in the at least one rope path. The taper elements reduce a free cross section of the at least one cable path in a section of the cable path.

Unter einem freien Querschnitt soll im Folgenden ein solcher Querschnitt des Seilpfads verstanden werden, der eine Breite des Seilpfads in einer Schnittebene durch die Seilbremse festlegt. Der freie Querschnitt ist dabei jener Querschnitt, in dem sich das Spannseil innerhalb des Seilpfads bewegen kann. Wird der Seilpfad jedoch durch zum Beispiel Verjüngungselemente verkleinert bzw. verjüngt, so steht dem Spannseil in einem entsprechenden Abschnitt nur noch ein verringerter Querschnitt des Seilpfads, der im Folgenden auch als freier Querschnitt des Seilpfads bezeichnet wird, zur Verfügung.In the following, a free cross section is to be understood as meaning a cross section of the cable path which defines a width of the cable path in a sectional plane through the cable brake. The free cross section is that cross section in which the tensioning cable can move within the cable path. However, if the cable path is reduced or narrowed by, for example, tapering elements, the tensioning cable in a corresponding section has only a reduced cross section of the cable path, which is also referred to below as a free cross section of the cable path.

Die Seilbremse kann weiter ein zweites Verjüngungselement aufweisen, das den freien Querschnitt des Seilpfads in einem zweiten Abschnitt reduziert. Die Verwendung von Verjüngungselementen hat den Vorteil, dass nur geringe Bereiche der Spannseile mit einer zusätzlichen Reibung beaufschlagt werden.The rope brake may further comprise a second taper element which reduces the free cross section of the rope path in a second section. The use of taper elements has the advantage that only small portions of the tension cables are subjected to additional friction.

Weiter bevorzugt kann der zweite Abschnitt im Wesentlichen gleich dem ersten Abschnitt sein. Das bedeutet, dass das erste Verjüngungselement und das zweite Verjüngungselement im selben Abschnitt des Seilpfads den freien Querschnitt des Seilpfads reduzieren, daraus ergibt sich eine erhöhte Reibung in dem ersten und/oder dem zweiten Abschnitt. More preferably, the second portion may be substantially equal to the first portion. This means that the first taper element and the second taper element in the same section of the cable path reduce the free cross section of the cable path, resulting in increased friction in the first and / or the second section.

Das mindestens eine Verjüngungselement kann aus elastischem Material gefertigt sein und in einer Ruheposition den freien Querschnitt des ersten Abschnitts und/oder den freien Querschnitt des zweiten Abschnitts reduzieren.The at least one tapering element may be made of elastic material and in a rest position reduce the free cross section of the first section and / or the free cross section of the second section.

Für ein elastisches Verjüngungselement, d. h., für ein Verjüngungselement aus einem elastischen Material, kann eine Ruheposition definiert werden. In dieser Ruheposition reduziert das Verjüngungselement den Seilpfadquerschnitt auf einen an dem Verjüngungselement verfügbaren freien Querschnitt. Dieser ist typischerweise kleiner als der gesamte Querschnitt des Seilpfads. Ein elastisches Verjüngungselement wird in einer Ruheposition den Querschnitt des Seilpfads auf den freien Querschnitt reduzieren. Das heißt mit anderen Worten, das in den Seilpfad hineinragende Verjüngungselement reduziert den für das Spannseil verfügbaren freien Querschnitt des Seilpfads.For an elastic taper element, i. That is, for a taper member of an elastic material, a rest position can be defined. In this rest position, the taper element reduces the cable path cross section to a free cross section available on the taper element. This is typically smaller than the entire cross section of the rope path. An elastic taper element will reduce the cross section of the cable path to the free cross section in a rest position. In other words, the tapering element projecting into the cable path reduces the free cross section of the cable path available for the tensioning cable.

Für ein elastisches Verjüngungselement kann die Reduzierung des freien Querschnitts in der Ruheposition, also ohne weitere Krafteinwirkung auf das Verjüngungselement maximal.For an elastic taper element, the reduction of the free cross section in the rest position, ie without further force on the taper element maximum.

Wird jedoch zusätzlich Kraft auf das elastische Verjüngungselement ausgeübt, so wird das elastische Verjüngungselement dieser Kraft nachgeben, wodurch der freie Querschnitt zunimmt. D. h., die Reibe- und/oder Haltewirkung der Seilbremse an dem Spannseil wird reduziert. Diese zusätzliche Kraft kann zum Beispiel von einem Benutzer der Seilbremse aufgebracht werden, wenn dieser eine Vorhangschiene, die an der Seilbremse angebracht ist, unter entsprechendem Kraftaufwand entlang des Spannseils verschiebt. An einem Fenster also zum Beispiel nach oben oder unten.However, if additional force is exerted on the elastic tapering element, the elastic tapering element will yield to this force, whereby the free cross section increases. D. h., The friction and / or holding action of the rope brake on the tensioning cable is reduced. This additional force can be applied, for example, by a user of the rope brake, if this shifts a curtain rail, which is attached to the rope brake, with corresponding force along the tensioning cable. At a window, for example, up or down.

Das erste Verjüngungselement und/oder das zweite Verjüngungselement sind unter Einwirkung einer Kraft aus einer Ruheposition bringbar. Wenn das erste Verjüngungselement und/oder das zweite Verjüngungselement die Ruheposition verlassen, vergrößert sich der freie Querschnitt in dem jeweiligen Abschnitt, in welchem das erste und/oder zweite Verjüngungselement angeordnet ist. Das bedeutet eine Haltefunktion, die sich aufgrund des Verjüngungselements in der Ruheposition ergibt, wird durch eine geeignete Kraftwirkung auf die Verjüngungselemente aufgehoben oder zumindest reduziert.The first tapering element and / or the second tapering element can be brought under the action of a force from a rest position. When the first taper element and / or the second taper element leave the rest position, the free cross-section in the respective section in which the first and / or second taper element is arranged increases. This means a holding function, which results due to the tapering element in the rest position is canceled by a suitable force on the taper elements or at least reduced.

Die Verjüngungselemente können aus elastischem Kunststoff, Gummi und/oder als Federelement ausgeführt sein.The taper elements may be made of elastic plastic, rubber and / or as a spring element.

Die Haltemittel der Seilbremse können ausgebildet sein, um ein kraftschlüssiges Verbinden mit der Vorhangschiene zu erreichen. D. h., bei einer kraftschlüssigen Verbindung ist kein weiteres Werkzeug zur Montage der Vorhangschiene nötig, und die Vorhangschiene kann unmittelbar auf die Seilbremse geclipst werden. Dadurch wird die Montage der Vorhangschiene an der Seilbremse vereinfacht.The holding means of the rope brake can be designed to achieve a frictional connection with the curtain rail. That is, in a non-positive connection no further tool for mounting the curtain rail is needed, and the curtain rail can be clipped directly to the rope brake. This simplifies the installation of the curtain rail on the rope brake.

Gemäß einer Ausführungsform der Seilbremse können die Haltemittel ausgebildet sein, um ein Hintergreifen eines Profils der Vorhangschiene zu erreichen.According to one embodiment of the cable brake, the holding means may be designed to reach behind a profile of the curtain rail.

Weiter kann der mindestens eine Seilpfad im Inneren der Seilbremse verlaufen. Dadurch wird verhindert, dass ein Benutzer, der die Vorhangschiene verschieben möchte, unangenehmer Reibung durch das sich bewegende Spannseil ausgesetzt ist. Ein Greifen der Seilbremse ist daher erfindungsgemäß möglich, ohne dass an den Außenflächen der Seilbremse – abgesehen von der ersten Öffnung und/oder der zweiten Öffnung ein Kontakt mit dem Spannseil besteht.Furthermore, the at least one cable path can run in the interior of the cable brake. This prevents a user who wants to move the curtain rail from being exposed to unpleasant friction from the moving tensioning cable. A gripping of the rope brake is therefore possible according to the invention, without there being a contact with the tensioning cable on the outer surfaces of the rope brake - apart from the first opening and / or the second opening.

Weiter kann der mindestens eine Seilpfad zwischen der ersten Öffnung und der zweiten Öffnung offen liegen, d. h., der Seilpfad läuft wie ein Kanal durch die Seilbremse, wobei der Kanal hinreichend tief ist, so dass das in den Seilpfad eingeführte Spannseil sich unterhalb jener Grenzflächen der Seilbremse befindet, welche das eingeführte Spannseil nicht schneiden.Further, the at least one cable path between the first opening and the second opening may be open, d. h., The cable path runs like a channel through the rope brake, wherein the channel is sufficiently deep, so that the tensioning cable introduced into the cable path is located below those boundary surfaces of the rope brake, which does not intersect the introduced tensioning cable.

Weiter kann die erfindungsgemäße Seilbremse als ein einstückiges Bauteil ausgeführt werden, dadurch wird insbesondere eine Montage der Seilbremse an dem Spannseil erleichtert.Further, the cable brake according to the invention can be designed as a one-piece component, thereby in particular a mounting of the rope brake on the tensioning cable is facilitated.

Die Erfindung offenbart außerdem ein Spannset, eingerichtet zum Tragen eines Dekorationselements. Das Dekorationselement kann insbesondere ein Vorhangelement sein. Das erfindungsgemäße Spannset umfasst ein erstes Seilspannelement, ein zweites Seilspannelement und ein Spannseil. Erfindungsgemäß ist das Spannseil zwischen dem ersten Seilspannelement und dem zweiten Seilspannelement spannbar. Das erfindungsgemäße Spannset umfasst außerdem mindestens eine Seilbremse gemäß der vorliegenden Erfindung.The invention also discloses a tensioning set adapted for carrying a decorative element. The decorative element may in particular be a curtain element. The tensioning set according to the invention comprises a first rope tensioning element, a second rope tensioning element and a tensioning cable. According to the tensioning cable between the first cable tensioning element and the second cable tensioning element can be tensioned. The tensioning set according to the invention also comprises at least one cable brake according to the present invention.

Das Spannset kann einen Reibschluss zwischen einem Spannseilabschnitt und einem Reibabschnitt des mindestens einen Seilpfads erzeugen, sofern das Spannseil zwischen dem ersten Seilspannelement und dem zweiten Seilspannelement gespannt ist, und das Spannseil, insbesondere das gespannte Spannseil durch die erste Öffnung, den mindestens einen Seilpfad und die zweite Öffnung verläuft. Das bedeutet mit anderen Worten, der Reibschluss zwischen dem Spannseilabschnitt und dem Reibabschnitt des Seilpfads kann sich einstellen, sofern das Spannseil von dem ersten Seilspannelement durch die erste Öffnung der Seilbremse und den mindestens einen Seilpfad läuft, durch die zweite Öffnung tritt und an den zweiten Seilspannelement so festgelegt ist, dass das Spannseil zwischen erstem und zweitem Seilspannelement gespannt ist.The tensioning set can produce a frictional connection between a tensioning cable section and a friction section of the at least one cable path, provided that the tensioning cable between the first cable tensioning element and the second cable tensioning element is stretched, and the tensioning cable, in particular the tensioned tensioning cable through the first opening, the at least one cable path and the second opening extends. This means, in other words, the frictional engagement between the tensioning cable section and the friction section of the cable path can be established, provided that the tensioning cable runs from the first cable tensioning element through the first opening of the cable brake and the at least one cable path, through the second opening and to the second cable tensioning element is set so that the tensioning cable between the first and second rope tensioning element is stretched.

Weiter bevorzugt kann der Reibabschnitt des Spannseils zwischen dem ersten Seilspannelement und dem zweiten Seilspannelement verschiebbar sein.More preferably, the friction portion of the tensioning cable between the first cable tensioning element and the second cable tensioning element can be displaced.

Die Erfindung offenbart weiter ein Vorhangsystem. Das Vorhangsystem umfasst mindestens ein Spannset gemäß der Erfindung, mindestens eine Vorhangschiene, die durch Haltemittel der mindestens einen Seilbremse mit der mindestens einen Seilbremse verbunden ist und ein Vorhangelement, das mit der Vorhangschiene verbunden ist.The invention further discloses a curtain system. The curtain system comprises at least one tensioning set according to the invention, at least one curtain rail which is connected to the at least one rope brake by holding means of the at least one rope brake and a curtain element which is connected to the curtain rail.

Die mindestens eine Seilbremse trägt die Vorhangschiene, wenn das Spannseil zwischen dem ersten Seilspannelement und dem zweiten Seilspannelement des Spannsets gespannt ist und ein Reibschluss zwischen einem Reibabschnitt des gespannten Spannseils und mindestens einem Seilpfad der Seilbremse besteht, sofern das gespannte Spannseil durch den mindestens einen Seilpfad und die erste Öffnung und die zweite Öffnung der ersten Seilbremse verläuft.The at least one cable brake carries the curtain rail when the tensioning cable between the first cable tensioning element and the second cable tensioning element of the tensioning set is tensioned and a frictional engagement between a friction portion of the tensioned tensioning cable and at least one cable path of the cable brake, if the tensioned tensioning cable through the at least one cable path and the first opening and the second opening of the first cable brake runs.

Das Vorhangsystem kann eine zweite Vorhangschiene umfassen, die mit einer zweiten Seilbremse verbunden ist und durch die zweite Seilbremse getragen wird, sofern das gespannte Spannseil durch den mindestens einen Seilpfad, die erste Öffnung und die zweite Öffnung der zweiten Seilbremse verläuft.The curtain system may include a second curtain rail connected to a second rope brake and supported by the second rope brake, as long as the tensioned tensioning rope passes through the at least one rope path, the first opening and the second opening of the second rope brake.

Das Vorhangsystem kann weiter derart ausgebildet sein, dass das Vorhangelement an der ersten und an der zweiten Vorhangschiene befestigt ist.The curtain system may be further configured such that the curtain element is attached to the first and second curtain rails.

Das Vorhangelement kann weiter mindestens eine Durchbrechung aufweisen, durch die das Spannseil des Vorhangsystems geführt ist.The curtain element may further comprise at least one opening through which the tensioning cable of the curtain system is guided.

Das Vorhangsystem kann weiter ein zweites Spannset umfassen, wobei mindestens eine Seilbremse des zweiten Spannsets die erste Vorhangschiene trägt, wenn das Spannseil des zweiten Spannsets zwischen erstem und zweitem Spannabschnitt des zweiten Spannsets gespannt ist, und ein Reibschluss zwischen dem Reibabschnitt des gespannten Spannseils des zweiten Spannsets und dem mindestens einen Seilpfad der mindestens einen Seilbremse des zweiten Spannsets besteht, sofern das gespannte Spannseil des zweiten Spannsets durch den mindestens einen Seilpfad, eine erste Öffnung und eine zweite Öffnung der mindestens einen Seilbremse des zweiten Spannsets verläuft.The curtain system may further comprise a second tensioning set, wherein at least one rope brake of the second tensioning set carries the first curtain rail when the tensioning cable of the second tensioning set is tensioned between first and second tensioning portions of the second tensioning set, and a frictional engagement between the friction portion of the tensioned tensioning rope of the second tensioning set and the at least one cable path of the at least one cable brake of the second tension set, if the tensioned tensioning cable of the second tensioning set passes through the at least one cable path, a first opening and a second opening of the at least one cable brake of the second tensioning set.

Die Erfindung wird im Zusammenhang mit den beigefügten Zeichnungen näher erläutert und für den Fachmann verständlich. Dabei zeigtThe invention will be explained in more detail in connection with the accompanying drawings and will be understood by those skilled in the art. It shows

1a eine Draufsicht einer Seilbremse, 1a a top view of a rope brake,

1a eine Seitenansicht der Seilbremse und 1a a side view of the rope brake and

1c eine Ansicht der Seilbremse von oben, 1c a view of the rope brake from above,

1d zeigt eine dreidimensionale Darstellung der Seilbremse gemäß 1a bis 1c, 1d shows a three-dimensional view of the rope brake according to 1a to 1c .

2a zeigt eine weitere Ausführungsform der Seilbremse, 2a shows a further embodiment of the rope brake,

2b zeigt eine zweite Ausführungsform der Seilbremse, 2 B shows a second embodiment of the rope brake,

2c zeigt eine weitere Ausführungsform der Seilbremse, 2c shows a further embodiment of the rope brake,

2d zeigt eine Ausführungsform der Seilbremse, 2d shows an embodiment of the rope brake,

2e zeigt noch eine weitere Ausführungsform der Seilbremse, 2e shows yet another embodiment of the rope brake,

2f zeigt eine weitere Ausführungsform der Seilbremse mit verschieden starken Seilpfaden, 2f shows a further embodiment of the rope brake with different strong rope paths,

2g zeigt eine Schnittdarstellung der Seilbremse aus 2f entlang der Schnittlinie AA', 2g shows a sectional view of the rope brake 2f along the section line AA ',

2h zeigt eine Seilbremse mit einem Verjüngungselement, 2h shows a rope brake with a taper element,

2i zeigt eine Seilbremse mit zwei gegenüberliegenden Verjüngungselementen, 2i shows a rope brake with two opposing taper elements,

2j zeigt eine Seilbremse mit gewinkeltem Seilpfad und Verjüngungselementen, 2y shows a rope brake with angled rope path and rejuvenation elements,

2k zeigt eine dreidimensionale Darstellung einer Seilbremse mit Verjüngungselementen, 2k shows a three-dimensional representation of a rope brake with taper elements,

3a zeigt eine Seilbremse an einer Vorhangschiene und einem gespannten Spannseil, 3a shows a cable brake on a curtain rail and a tensioned tensioning cable,

3b zeigt ein Spannseil, das durch einen Seilpfad der Seilbremse verläuft, 3b shows a tensioning cable that passes through a rope path of the rope brake,

4a zeigt ein Spannset eines Vorhangssystems, an dem über die Seilbremse ein Vorhangelement zwischen zwei Vorhangschienen befestigt ist, und 4a shows a tensioning set of a curtain system to which the rope brake a curtain element between two curtain rails is attached, and

4b zeigt ein Vorhangssystem mit zwei Spannsets, zwischen denen mittels Seilbremsen zwei Vorhangschienen und ein Vorhangelement befestigt sind. 4b shows a curtain system with two tension sets, between which by means of rope brakes two curtain rails and a curtain element are attached.

zeigt eine Draufsicht auf eine Ausführungsform einer Seilbremse 1 gemäß der vorliegenden Erfindung. In 1a ist zu erkennen, dass entlang eines viereckigen Mittelstücks ein erster Seilpfad 4 und ein zweiter Seilpfad 4a von einer ersten Öffnung 2a (in der Zeichnung oben) zu einer zweiten Öffnung 2b (in der Zeichnung unten) verlaufen. Ein Spannseil 14 (nicht gezeigt) kann wahlweise über den ersten Seilpfad 4 oder den zweiten Seilpfad 4a geführt werden. Aufgrund des gewinkelten Verlaufs des in 1a beispielhaft gezeigten ersten Seilpfads 4 oder des zweiten Seilpfads 4a ergibt sich entlang des Seilpfads 4, 4a ausreichend Reibung, so dass die Seilbremse 1 an einem gespannten Spannseil (nicht gezeigt) an einer gewünschten Position gehalten wird. shows a plan view of an embodiment of a rope brake 1 according to the present invention. In 1a It can be seen that along a square centerpiece a first cable path 4 and a second rope path 4a from a first opening 2a (in the drawing above) to a second opening 2 B (in the drawing below). A tensioning rope 14 (not shown) optionally over the first cable path 4 or the second rope path 4a be guided. Due to the angled course of the in 1a exemplified first rope path 4 or the second cable path 4a arises along the rope path 4 . 4a sufficient friction, so that the rope brake 1 held on a tensioned tensioning cable (not shown) at a desired position.

1b zeigt eine Seitenansicht der Seilbremse aus 1a. Gut zu erkennen sind in 1a die Haltemittel 9a, 9b, 9c, 9d. Die Haltemittel 9a, 9b, 9c, 9d sind in 1a bis 1c beispielhaft als Haken ausgebildet und eingerichtet, um an einer Vorhangschiene 12 (nicht gezeigt) befestigt zu werden. Die in 1a bis 1c gezeigten Haltemittel 9a, 9b, 9c, 9d sind geeignet zum Hintergreifen eines Profils einer Vorhangschiene. Gut zu erkennen ist in 1a, dass der Seilpfad im Inneren der erfindungsgemäßen Seilbremse 1 verläuft. 1c zeigt eine Ansicht der erfindungsgemäßen Seilbremse 1 von oben. Es ist gut zu erkennen, wie sich die beiden Seilpfade 4, 4a in der oberen Öffnung 2a treffen und die Öffnungen 2a, 2b durch einen durchgehenden Rand begrenzt sind. 1b shows a side view of the rope brake 1a , Good to see in 1a the holding means 9a . 9b . 9c . 9d , The holding means 9a . 9b . 9c . 9d are in 1a to 1c exemplified as a hook and adapted to a curtain rail 12 (not shown) to be attached. In the 1a to 1c shown holding means 9a . 9b . 9c . 9d are suitable for engaging behind a profile of a curtain rail. Good to see in 1a in that the cable path is inside the cable brake according to the invention 1 runs. 1c shows a view of the rope brake according to the invention 1 from above. It is good to see how the two rope paths 4 . 4a in the upper opening 2a meet and the openings 2a . 2 B are bounded by a continuous edge.

Im Zusammenhang mit den in 1a bis 1c gezeigten Befestigungsmitteln 9a, 9b, 9c, 9d handelt es sich bei der gezeigten Ausführungsform lediglich um eine beispielhafte Ausführungsform. Der Fachmann wird ohne weiteres verstehen, dass anstelle oder zusätzlich zu den gezeigten, hakenförmigen Haltemitteln 9a, 9b, 9c, 9d auch Stege verwendet werden könnten, die durch einen Reibschluss und/oder Kraftschluss an der Vorhangschiene 12 (nicht gezeigt) festlegbar sind. Im Prinzip ist jede Form eines Befestigungsmittels denkbar, das es erlaubt, eine Vorhangschiene 12 zuverlässig an der Seilbremse 1 zu befestigen. In Betracht kommt eine Schraubverbindung, eine Steckverbindung, eine Klebeverbindung oder dergleichen. Im Falle einer Klebeverbindung kann es nützlich sein, diese lösbar auszuführen, um zum Beispiel das Spannseil 14 (nicht gezeigt) von dem ersten Seilpfad 4 zu entfernen und durch den zweiten Seilpfad 4a zu führen. Bei der in 1a bis 1c gezeigten Ausführungsform der Seilbremse 1 ist es von Vorteil, dass der Seilpfad 4, 4a offen liegt.In connection with in 1a to 1c shown fasteners 9a . 9b . 9c . 9d the embodiment shown is merely an exemplary embodiment. The person skilled in the art will readily understand that instead of or in addition to the hook-shaped holding means shown 9a . 9b . 9c . 9d Also webs could be used, which by a friction fit and / or traction on the curtain rail 12 (not shown) can be fixed. In principle, any form of fastener is conceivable that allows a curtain rail 12 Reliable on the rope brake 1 to fix. A screw connection, a plug connection, an adhesive connection or the like may be considered. In the case of an adhesive bond, it may be useful to perform this releasably, for example, the tension cable 14 (not shown) from the first cable path 4 remove and through the second rope path 4a respectively. At the in 1a to 1c shown embodiment of the rope brake 1 it is an advantage that the rope path 4 . 4a is open.

Dadurch wird es möglich, ein Spannseil 14, das einmal durch die erste Öffnung 2a und die zweite Öffnung 2b geführt ist, und durch zum Beispiel den ersten Seilpfad 4 läuft, so anzuordnen, dass es weiterhin durch die erste Öffnung 2a und die zweite Öffnung 2b sowie den zweiten Seilpfad 4a läuft. Dadurch kann ohne ein komplettes vollständiges Lösen des Spannseils 14 aus der Seilbremse 1 ein Wechsel des Seilpfads 4, 4a und damit des Reibungsabschnitts bzw. Reibabschnitt, über den das Spannseil 14 läuft, gewählt werden. Dadurch erhöht sich die Lebensdauer der Seilbremse 1, wie im Folgenden noch ausgeführt wird. Die in 1a bis 1c gezeigte Seilbremse weist einen Seilpfad 4, 4a mit glatten Kanten auf. Ebenso wäre es ohne Einschränkung möglich, an zumindest Abschnitten der einzelnen Seilpfade 4, 4a eine Profilierung (nicht gezeigt) vorzusehen, wodurch eine Reibung zwischen dem Spannseil 14 und einem Flächenabschnitt entlang des ersten Seilpfads 4 und/oder des zweiten Seilpfads 4a weiter erhöht wird, wodurch sich die Seilbremse 1 an einem gespannten Spannseil 14 besser festlegen lässt, und damit ebenfalls auf einer gewünschten Position entlang des gespannten Spannseiils 14 besser festlegbar ist.This will make it possible, a tensioning cable 14 Once through the first opening 2a and the second opening 2 B guided, and by, for example, the first cable path 4 runs, arrange so that it continues through the first opening 2a and the second opening 2 B as well as the second rope path 4a running. This can be done without a complete complete release of the tensioning cable 14 from the rope brake 1 a change of rope path 4 . 4a and thus the friction section or friction section over which the tensioning cable 14 is running, to be elected. This increases the service life of the rope brake 1 , as will be explained below. In the 1a to 1c shown rope brake has a rope path 4 . 4a with smooth edges. Likewise, it would be possible without restriction, at least sections of the individual rope paths 4 . 4a to provide a profiling (not shown), whereby a friction between the tensioning cable 14 and a surface portion along the first cable path 4 and / or the second cable path 4a is further increased, causing the rope brake 1 on a tensioned tension rope 14 set better, and thus also at a desired position along the tensioned Spannseiils 14 is better fixable.

Anstelle der in 1a bis 1c gezeigten Ausführungsform der Seilpfade 4, 4a wäre es ebenso denkbar, die beiden Seilpfade mit einer Deckfläche zu versehen, so dass die Seilpfade 4, 4a eben nicht mehr offen liegend sind, und das in den Seilpfaden 4, 4a verlaufende Spannseil 14 (nicht gezeigt) nicht mehr unmittelbar zugänglich wäre.Instead of in 1a to 1c shown embodiment of the rope paths 4 . 4a It would also be conceivable to provide the two rope paths with a top surface, so that the rope paths 4 . 4a just not lying open anymore, and that in the rope paths 4 . 4a running tensioning rope 14 (not shown) would no longer be directly accessible.

1d zeigt eine beispielhafte dreidimensionale Darstellung der Ausführungsform der Seilbremse 1 gemäß 1a bis 1c. 1d shows an exemplary three-dimensional representation of the embodiment of the rope brake 1 according to 1a to 1c ,

2a zeigt eine weitere Ausführungsform der erfindungsgemäßen Seilbremse 1. Gleiche Elemente der Seilbremse 1 werden mit entsprechenden Bezugszeichen gekennzeichnet. Die Seilbremse 1 in 2a zeichnet sich durch einen bogenförmigen Seilpfad 4 aus. D. h., entlang des Seilpfads 4 findet sich – abgesehen von dem Bereich nahe der Öffnungen 2, 2a keine Position, an der einzelne Abschnitte des Seilpfads in einem spitzen Winkel aufeinander treffen. Vorteilhaft an einer solchen Ausführungsform des Seilpfads 4 kann sein, dass sich die Beanspruchung des Spannseils 14 aufgrund der entstehenden Reibung auf die gesamte Länge des Seilpfads 4 im Wesentlichen gleichmäßig verteilt. Dadurch kann insgesamt eine Beanspruchung des Spannseils 14 (nicht gezeigt) und/oder des Materials entlang des Seilpfads 4 reduziert werden. Wenngleich in 2a nur ein Seilpfad gezeigt ist, wird der Fachmann verstehen, dass es ohne Einschränkung möglich wäre, einen zweiten Seilpfad 4a und/oder weitere Seilpfade vorzusehen, die ebenfalls von der ersten Öffnung 2a zu der zweiten Öffnung 2b verläuft oder alternativ durch zusätzliche Öffnungen verlaufen. 2a shows a further embodiment of the cable brake according to the invention 1 , Same elements of the rope brake 1 are marked with corresponding reference numerals. The rope brake 1 in 2a is characterized by an arcuate rope path 4 out. That is, along the rope path 4 is found - apart from the area near the openings 2 . 2a no position where individual sections of the rope path meet at an acute angle. Advantageous to such an embodiment of the cable path 4 may be that the strain of the tensioning rope 14 due to the resulting friction on the entire length of the rope path 4 distributed substantially evenly. This can total a stress on the tensioning cable 14 (not shown) and / or the material along the rope path 4 be reduced. Although in 2a Only one cable path is shown, the skilled person will understand that it would be possible without any restriction, a second cable path 4a and / or provide further cable paths, also from the first opening 2a to the second opening 2 B runs or alternatively run through additional openings.

2b zeigt eine weitere Ausführungsform der erfindungsgemäßen Seilbremse 1. In dieser verläuft ein bogenförmiger Seilpfad 4 von einer Kante der Seilbremse 1 (in 2b oben) zu einer benachbarten Kante (in 2b links). Die beiden Öffnungen 2a und 2b liegen also an benachbarten Kanten der Seilbremse 1. Benachbarte Kanten der Seilbremse 1 sind solche Kanten, die in einem Winkel aufeinander treffen. 2 B shows a further embodiment of the cable brake according to the invention 1 , In this runs a curved cable path 4 from an edge of the rope brake 1 (in 2 B above) to an adjacent edge (in 2 B Left). The two openings 2a and 2 B So lie on adjacent edges of the rope brake 1 , Adjacent edges of the rope brake 1 are such edges that meet at an angle to each other.

Der Fachmann wird verstehen, dass obwohl sämtliche Seilbremsen, wie sie im Folgenden beispielhaft erläutert werden, nicht zwangsläufig viereckig sein müssen. Stattdessen könnten sie ebenso gut mehreckig, dreieckig, rund oder elliptisch sein.It will be understood by those skilled in the art that although all cable brakes, as exemplified below, do not necessarily have to be quadrangular. Instead, they might as well be polygonal, triangular, round, or elliptical.

Weiterhin könnte ohne Einschränkung anstatt der jeweils vier gezeigten Haltemittel 9a, 9b, 9c, 9d nur ein Haltemittel 9a, sowie ein Paar von Haltemitteln 9a, 9b vorgesehen sein.Furthermore, without limitation, instead of the four retaining means shown in each case 9a . 9b . 9c . 9d only a holding means 9a , as well as a pair of holding means 9a . 9b be provided.

Auch für die in 2a und 2b gezeigten Ausführungsformen der Seilbremse könnten zwei oder mehr Seilpfade 4, 4a vorgesehen sein, die zum Beispiel jeweils in der ersten Öffnung 2a, 2b enden, oder in weiteren Öffnungen 2c, 2d (nicht gezeigt) münden.Also for the in 2a and 2 B shown embodiments of the rope brake could have two or more rope paths 4 . 4a be provided, for example, each in the first opening 2a . 2 B ends, or in other openings 2c . 2d (not shown).

2c zeigt eine Ausführungsform der Seilbremse 1, in der ein Seilpfad 4 von einer ersten Öffnung in einem doppelten Bogen zu der zweiten Öffnung 2b verläuft. Anstelle der zwei gezeigten Bögen könnten auch mehr Bögen innerhalb des Seilpfads 4 vorgesehen sein. Die erste Öffnung 2a und die zweite Öffnung 2b liegen beispielhaft an gegenüberliegenden Seitenkanten der Seilbremse 1. Alternativ und/oder zusätzlich könnte ein Seilpfad 4, 4a jedoch auch von einer ersten Kante der Seilbremse 1 zu einer benachbarten Kante der Seilbremse 1 verlaufen, wie dies zum Beispiel in 2b gezeigt war. 2c shows an embodiment of the rope brake 1 in which a rope path 4 from a first opening in a double arc to the second opening 2 B runs. Instead of the two bows shown, more bows could also be inside the rope path 4 be provided. The first opening 2a and the second opening 2 B are exemplary on opposite side edges of the rope brake 1 , Alternatively and / or additionally, a cable path could 4 . 4a but also from a first edge of the rope brake 1 to an adjacent edge of the rope brake 1 run, as for example in 2 B was shown.

2d zeigt eine weitere Ausführungsform der erfindungsgemäßen Seilbremse 1. In dieser verläuft der Seilpfad 4 bogenförmig, im Wesentlichen entlang einer Kontur eines C, wodurch sich eine Kontaktfläche zwischen einem Spannseil 14 (nicht gezeigt), das in der Seilbremse 1 läuft, und den Seitenflächen des Seilpfads 4 erhöht. Ohne Einschränkung könnte in einer Seilbremse 1 auch mehr als ein Seilpfad 4 in Form eines C vorgesehen sein. Darüber hinaus könnte der Seilpfad 4, wie in 2d gezeigt, auch an einer ersten Öffnung 2a und einer zweiten Öffnung 2b enden, die nicht an gegenüberliegenden Kanten der Seilbremse 1, sondern an benachbarten Kanten der Seilbremse 1 angeordnet sind. Ebenso könnte der zweite C-förmige Seilpfad 4a die erste Öffnung 2a, die zweite Öffnung 2b, und/oder weitere Öffnungen der Seilbremse 1 untereinander verbinden. 2d shows a further embodiment of the cable brake according to the invention 1 , In this the rope path runs 4 arcuate, substantially along a contour of a C, creating a contact surface between a tensioning cable 14 (not shown) in the rope brake 1 runs, and the side surfaces of the rope path 4 elevated. Without limitation could be in a rope brake 1 also more than a rope path 4 be provided in the form of a C. In addition, the rope path could 4 , as in 2d shown, even at a first opening 2a and a second opening 2 B ends that are not on opposite edges of the rope brake 1 but at adjacent edges of the rope brake 1 are arranged. Likewise, the second C-shaped cable path could 4a the first opening 2a , the second opening 2 B , and / or further openings of the rope brake 1 connect with each other.

2e zeigt eine weitere Ausführungsform der erfindungsgemäßen Seilbremse 1. Darin verläuft der erste Seilpfad 4 von der ersten Öffnung 2a zu der zweiten Öffnung 2b im Wesentlichen gewinkelt. Im Gegensatz zu der in 1a bis 1c gezeigten Ausführungsform der Seilbremse 1 ist der Winkel jedoch mit einer abgerundeten Kontur versehen. Ohne Einschränkung könnte eine Seilbremse 1 auch zwei oder mehr der in 2e gezeigten Seilpfade 4 aufweisen. Wie zuvor könnte der Seilpfad 4, 4a mit einer Kontur bzw. Profilierung versehen sein, um die Reibung mit dem Spannseil 14 weiter zu erhöhen. 2e shows a further embodiment of the cable brake according to the invention 1 , Therein runs the first rope path 4 from the first opening 2a to the second opening 2 B essentially angled. Unlike the in 1a to 1c shown embodiment of the rope brake 1 However, the angle is provided with a rounded contour. Without limitation, a rope brake could 1 also two or more of in 2e shown rope paths 4 exhibit. As before, the rope path could 4 . 4a be provided with a contour or profiling to the friction with the tensioning cable 14 continue to increase.

2f zeigt eine weitere Ausführungsform einer erfindungsgemäßen Seilbremse 1. Darin sind ein erster Seilpfad 4 und ein zweiter Seilpfad 4a vorgesehen, die jedoch einen unterschiedlich großen Querschnitt aufweisen. Eine derartige Ausführung der Seilpfade 4, 4a ist insbesondere von Interesse, wenn die Seilbremse 1 mit unterschiedlich starken Spannseilen 14 (nicht gezeigt) verwendbar sein soll. Kommt ein dünnes Spannseil 14 zum Einsatz, so kann der erste Seilpfad 4 verwendet werden: Soll hingegen ein stärkeres Spannseil 14 verwendet werden, so kann auf den zweiten Seilpfad 4a ausgewichen werden. Damit lässt sich die Tragkraft der Seilbremse an Erfordernisse anpassen. Soll nur ein leichter Vorhang verwendet werden, so bietet sich ein dünnes Spannseil und die Verwendung des Seilpfads 4 an. Soll hingegen ein starker Vorhang von der Seilbremse 1 getragen werden, so bietet sich die Verwendung eines stärkeren Spannseils 14 und des zweiten Seilpfads 4a für das stärkere Spannseil 14 an. 2f shows a further embodiment of a cable brake according to the invention 1 , This is a first rope path 4 and a second rope path 4a provided, however, have a different sized cross-section. Such an embodiment of the rope paths 4 . 4a is of particular interest when the rope brake 1 with different strong tension cables 14 (not shown) should be usable. Come a thin tensioning rope 14 to use, so can the first cable path 4 used: On the other hand, should a stronger tensioning rope 14 can be used, so on the second rope path 4a to be avoided. This allows the load capacity of the rope brake to adapt to requirements. If only a light curtain is to be used, then a thin tensioning cable and the use of the rope path are available 4 at. If you want a strong curtain from the rope brake 1 worn, so offers the use of a stronger tensioning cable 14 and the second rope path 4a for the stronger tension cable 14 at.

2g zeigt eine Schnittdarstellung der Seilbremse 1 aus 2f entlang der Schnittlinie A-A' in der durch Pfeile angedeuteten Blickrichtung. Es ist deutlich zu erkennen, dass der erste Seilpfad 4 einen geringeren Querschnitt als der zweite Seilpfad 4a aufweist. Ebenso ist zu erkennen, dass die beiden Seilpfade 4, 4a in der Ausführungsform der 2f offenliegend sind. 2g shows a sectional view of the rope brake 1 out 2f along the section line AA 'in the direction indicated by arrows. It can be clearly seen that the first rope path 4 a smaller cross section than the second cable path 4a having. It can also be seen that the two rope paths 4 . 4a in the embodiment of the 2f are exposed.

2h zeigt eine weitere Ausführungsform der erfindungsgemäßen Seilbremse 1. Entlang des Seilpfads 4 ist ein Verjüngungselement 6 angeordnet. Das Verjüngungselement 6 reduziert einen freien Querschnitt zumindest entlang eines Abschnitts des Seilpfads 4. Der freie Querschnitt ist in 2g deutlich für den ersten Seilpfad 4 und den zweiten Seilpfad 4a der Seilbremse aus 2f zu erkennen. Der Fachmann wird verstehen, dass bei Verwendung eines Verjüngungselementes 6 auch ein gerader Seilpfad 4 verwendet werden kann, der keine gewinkelten oder gebogenen Abschnitte umfasst. Entlang des Verjüngungselements 6 reduziert sich der freie Querschnitt des Seilpfads 4, um die Stärke, mit der das Verjüngungselement 6 in den Seilpfad 4 hineinragt. 2h shows a further embodiment of the cable brake according to the invention 1 , Along the rope path 4 is a rejuvenating element 6 arranged. The rejuvenating element 6 reduces a free cross section at least along a portion of the cable path 4 , The free cross section is in 2g clearly for the first rope path 4 and the second cable path 4a the rope brake off 2f to recognize. The person skilled in the art will understand that when using a taper element 6 also a straight rope path 4 can be used, which does not include angled or bent sections. Along the rejuvenation element 6 reduces the free cross-section of the rope path 4 to the strength with which the taper element 6 in the rope path 4 protrudes.

2i zeigt eine weitere Ausführungsform der erfindungsgemäßen Seilbremse 1. In dieser ist ein erstes Verjüngungselement 6 entlang des Seilpfads 4 angeordnet, wodurch sich der freie Querschnitt des Seilpfads 4 an der Stelle des ersten Verjüngungselements 6 reduziert. Darüber hinaus ist im Wesentlichen gegenüberliegend zu dem ersten Verjüngungselement 6 ein zweites Verjüngungselement 6a angeordnet. Das zweite Verjüngungselement 6a reduziert ebenfalls den freien Querschnitt des Seilpfads 4 entlang der Position des zweiten Verjüngungselements 6a. Die in 2i gezeigten gegenüberliegenden Verjüngungselemente 6, 6a schränken den freien Querschnitt des Seilpfads 4, 4a, in dem Abschnitt, in dem die beiden Verjüngungselemente 6, 6a positioniert sind, noch weiter ein, als dies für die Ausführungsform in 2h der Fall ist. 2i shows a further embodiment of the cable brake according to the invention 1 , In this is a first rejuvenating element 6 along the rope path 4 arranged, resulting in the free cross section of the rope path 4 at the location of the first taper element 6 reduced. Moreover, it is substantially opposite the first taper element 6 a second taper element 6a arranged. The second rejuvenation element 6a also reduces the free cross section of the rope path 4 along the position of the second taper element 6a , In the 2i shown opposite taper elements 6 . 6a restrict the free cross-section of the rope path 4 . 4a , in the section where the two taper elements 6 . 6a are even further than this for the embodiment in 2h the case is.

Der Fachmann wird verstehen, dass die Verjüngungselemente 6, 6a als elastische Elemente ausgeführt sein können, die in den Seilpfad 4 hineinragen. So können zum Beispiel das erste und/oder das zweite Verjüngungselement 6, 6a als ein elastisches Element ausgeführt sein. In einer Ruheposition des ersten bzw. des zweiten Verjüngungselements 6, 6a reduziert sich der freie Querschnitt des Seilpfads 4 auf Höhe der Verjüngungselemente 6, 6a. Sofern das Verjüngungselement elastisch ausgeführt ist, kann dieses unter einer Krafteinwirkung nachgeben, so dass sich der freie Querschnitt des Seilpfads 4 an der Position des ersten Verjüngungselements 6 und/oder des zweiten Verjüngungselements 6a wieder erhöht. Durch einen zunehmenden freien Querschnitt des Seilpfads auf Höhe der Verjüngungselemente 6, 6a wird eine Beweglichkeit des Spannseils (nicht gezeigt) innerhalb des Seilpfads 4 erhöht, wodurch die Seilbremse 1 leichter entlang des gespannten Spannseils 14 verschiebbar wird. Sofern die in die Verjüngungselemente 6, 6a keiner zusätzlichen Kraft, wie sie zum Beispiel ein Benutzer ausübt, ausgesetzt sind, kehren diese wieder in ihre Ruheposition zurück, wodurch sich der freie Querschnitt des Seilpfads 4 wieder reduziert, so dass, bei geeigneter Dimensionierung von Spannseil 14 und/oder den Verjüngungselementen 6, 6a eine Festlegung der Seilbremse 1 entlang des Spannseils 14 ergibt.The person skilled in the art will understand that the taper elements 6 . 6a can be designed as elastic elements in the cable path 4 protrude. For example, the first and / or the second taper element 6 . 6a be designed as an elastic element. In a rest position of the first and the second taper element 6 . 6a reduces the free cross-section of the rope path 4 at the height of the rejuvenation elements 6 . 6a , If the taper element is made elastic, this can yield under a force, so that the free cross section of the cable path 4 at the position of the first taper element 6 and / or the second tapering element 6a raised again. Due to an increasing free cross-section of the rope path at the level of the taper elements 6 . 6a is a mobility of the tensioning cable (not shown) within the cable path 4 increases, causing the rope brake 1 easier along the tensioned tensioning rope 14 becomes displaceable. Unless in the rejuvenation elements 6 . 6a no additional force, such as is exerted by a user, are exposed, they return back to their rest position, resulting in the free cross section of the rope path 4 again reduced, so that, with suitable dimensioning of tensioning cable 14 and / or the rejuvenating elements 6 . 6a a determination of the rope brake 1 along the tensioning rope 14 results.

2j zeigt eine weitere Ausführungsform der erfindungsgemäßen Seilbremse 1. In dieser ist zu erkennen, dass ohne Einschränkung die Verjüngungselemente 6, 6a sowie ein weiteres Verjüngungselement 6b entlang eines gewinkelten Seilpfads 4 angeordnet sein können. Ebenso wird der Fachmann verstehen, dass die Verjüngungselemente auch in einem zweiten Seilpfad 4a entsprechend angeordnet sein können. Es ist von Vorteil, die Verjüngungselemente 6, 6a, 6b als elastische Elemente auszuführen, um einen allgemeinen Abrieb des Spannseils 14 (nicht gezeigt) und/oder Abrieb entlang des Seilpfads 4, 4a zu reduzieren. Für den Benutzer kann die Verwendung der Verjüngungselemente 6, 6a, 6b den Vorteil haben, dass eine leichtere Verschiebbarkeit der Seilbremse 1 erreicht werden kann. 2y shows a further embodiment of the cable brake according to the invention 1 , In this it can be seen that without restriction, the rejuvenation elements 6 . 6a as well as another rejuvenating element 6b along an angled rope path 4 can be arranged. Likewise, those skilled in the art will understand that the taper elements also in a second cable path 4a can be arranged accordingly. It is beneficial to the rejuvenating elements 6 . 6a . 6b as elastic elements to perform a general abrasion of the tensioning cable 14 (not shown) and / or abrasion along the rope path 4 . 4a to reduce. For the user, the use of the rejuvenation elements 6 . 6a . 6b have the advantage that a lighter displaceability of the rope brake 1 can be achieved.

Dem Fachmann ist bekannt, wie ein elastisches und/oder bewegliches Verjüngungselement 6, 6a, 6b auszuführen sind, um mit einem gewählten Spannseil 14 einer vorgegebenen Stärke so zu korrespondieren, dass die Seilbremse 1 entlang des gespannten Spannseils 14 festlegbar wird.The skilled person is aware of how an elastic and / or movable taper element 6 . 6a . 6b are to perform with a chosen tensioning rope 14 a predetermined strength to correspond so that the rope brake 1 along the tensioned tension rope 14 becomes definable.

2k zeigt eine Ausführungsform der erfindungsgemäßen Seilbremse 1, wobei erste und zweite Verjüngungselemente 6a, 6b jeweils als gegenüberliegende Verjüngungselemente an zwei Positionen bzw. Abschnitten entlang des Seilpfads 4 angeordnet sind. Gut zu erkennen ist, dass, sofern die elastischen und/oder beweglichen Verjüngungselemente 6a, 6b in ihrer Ruheposition sind, (wie gezeigt), diese einen Druck auf das Spannseil 14 ausüben und so für eine Reibung sorgen, wodurch die Seilbremse 1 in der gewählten Position relativ zu dem Spannseil 14 gehalten ist. Der Fachmann wird verstehen, dass die Verjüngungselemente 6, 6a, 6b aus elastischem Material, zum Beispiel elastischem Kunststoff, Gummi und/oder dergleichen ausgeführt sein können. Ebenso ist es möglich, die Verjüngungselemente als Federelemente auszuführen, wodurch diese in ihrer Ruheposition eine ausreichende Reibung mit dem Spannseil 14 erzeugen, so dass die Seilbremse 1 an einer gewünschten Position des gespannten Spannseils 14 festlegbar ist. 2k shows an embodiment of the cable brake according to the invention 1 , wherein first and second taper elements 6a . 6b each as opposite taper elements at two positions or sections along the cable path 4 are arranged. Good to see is that, provided the elastic and / or movable taper elements 6a . 6b in their rest position, they are (as shown) a pressure on the tensioning cable 14 exercise and so provide friction, causing the rope brake 1 in the selected position relative to the tensioning cable 14 is held. The person skilled in the art will understand that the taper elements 6 . 6a . 6b may be made of elastic material, for example elastic plastic, rubber and / or the like. It is also possible to carry out the taper elements as spring elements, whereby these in their rest position sufficient friction with the tensioning cable 14 generate, so the rope brake 1 at a desired position of the tensioned tensioning cable 14 is determinable.

Der Fachmann wird verstehen, dass die in den Figuren gezeigten sowie die in dieser Beschreibung offenbarten Ausführungsformen der erfindungsgemäßen Seilbremse 1 und damit auch die gezeigten Ausführungsformen der Seilpfade 4, 4a, der Öffnungen 2a, 2b und/oder der Verjüngungselemente 6, 6a, 6b untereinander kombinierbar sind.The person skilled in the art will understand that the embodiments of the cable brake according to the invention shown in the figures and disclosed in this description 1 and thus also the embodiments of the rope paths shown 4 . 4a , the openings 2a . 2 B and / or the rejuvenating elements 6 . 6a . 6b can be combined with each other.

In 3a ist ein gespanntes Spannseil 14 zu sehen als Ausschnitt eines erfindungsgemäßen Spannsets 10 bzw. eines erfindungsgemäßen Vorhangssystems 100. An dem gespannten Spannseil 14 ist eine erfindungsgemäße Seilbremse 1, wie zuvor beschrieben, angeordnet, indem das gespannte Spannseil 14 durch die erste Öffnung 2a, mindestens einen der Seilpfade 4, 4a und die zweite Öffnung 2b verläuft (gut zu sehen in 3b). Aufgrund der entstehenden Reibung zwischen einem Reibabschnitt 14a des Spannseils 14 (siehe 3b) zwischen der ersten Öffnung 2a und der zweiten Öffnung 2b entlang des jeweils verwendeten Seilpfads 4, 4a, ist die Seilbremse 1 an einer gewünschten Position entlang des gespannten Spannseils 14 festlegbar.In 3a is a tight tensioning rope 14 to see as a section of a tension set according to the invention 10 or a curtain system according to the invention 100 , At the tensioned tensioning rope 14 is a rope brake according to the invention 1 , as described above, arranged by the tensioned tensioning cable 14 through the first opening 2a , at least one of the rope paths 4 . 4a and the second opening 2 B runs (easy to see in 3b ). Due to the resulting friction between a friction section 14a of the tensioning cable 14 (please refer 3b ) between the first opening 2a and the second opening 2 B along the rope path used 4 . 4a , is the rope brake 1 at a desired position along the tensioned tensioning cable 14 fixable.

Gut zu erkennen ist in 3a, dass die Haltemittel 9a, 9b, 9c, 9d der Seilbremse 1 ein Profil einer Vorhangschiene 12 hintergreifen können, wodurch die Vorhangschiene 12 an der Seilbremse 1 festlegbar ist, sofern das Spannseil 14 gespannt ist. Ebenso zu erkennen ist in 3a ein Vorhangelement 101, das an der Vorhangschiene 12 festgelegt ist, und insbesondere als ein Plisseevorhang ausgeführt ist, der mehrfach von dem Spannseil 14 durchbrochen wird.Good to see in 3a that the holding means 9a . 9b . 9c . 9d the rope brake 1 a profile of a curtain rail 12 can engage behind, reducing the curtain rail 12 at the rope brake 1 is fixable, provided the tensioning cable 14 is curious. It can also be seen in 3a a curtain element 101 hanging on the curtain rail 12 is set, and in particular is designed as a pleated curtain, the multiple of the tension cable 14 is broken.

Durch die Verwendung der erfindungsgemäßen Seilbremse 1 in Verbindung zum Beispiel mit einer Vorhangschiene 12, wie gezeigt, kann das eine Ende des Vorhangelements 101 auf einer gewünschten Höhenposition entlang des Spannseils 14 festgelegt werden, dadurch lässt sich eine gewünschte Blickschutz- und/oder Sichtschutzposition der Vorhangschiene 12 und damit des Vorhangelements 101 entlang des gespannten Spannseils 14 erreichen.By using the rope brake according to the invention 1 in connection for example with a curtain rail 12 As shown, this can be one end of the curtain element 101 at a desired height position along the tensioning cable 14 be set, thereby leaves a desired privacy and / or privacy position of the curtain rail 12 and thus the curtain element 101 along the tensioned tension rope 14 to reach.

Der Fachmann wird verstehen, dass in 3a ein Spannseil 14 von oben nach unten gespannt ist. Ohne Einschränkung könnte das Spannseil 14 jedoch auch von links nach rechts, d. h., also horizontal gespannt sein. Dann wäre die Vorhangschiene 12 an einer gewünschten Horizontalposition entlang des gespannten Spannseils 14 festlegbar.The skilled person will understand that in 3a a tension rope 14 is stretched from top to bottom. Without restriction, the tensioning cable could 14 but also from left to right, ie, to be horizontally stretched. Then the curtain rail would be 12 at a desired horizontal position along the tensioned tensioning cable 14 fixable.

3b zeigt ein Spannseil 14, das durch den offenliegenden Seilpfad 4 einer erfindungsgemäßen Seilbremse 1 läuft. Aufgrund der gewählten Form des ersten Seilpfads 4 ergibt sich entlang eines Reibabschnitts 14a des Spannseils 14 eine erhöhte mechanische Reibung mit den Wänden des Seilpfads 4, 4a. In 3b ist weiter zu erkennen, dass die Haltemittel 9a, 9b, 9c, 9d an den Verlauf der beiden Seilpfade 4, 4a anpassbar sind. Durch die in 3b gezeigte Ausführungsform der Haltemittel 9a, 9b, 9c, 9d wird bequem erreicht, dass die beiden Seilpfade 4, 4a offenliegend sind, und außerdem eine möglichst große Fläche geboten, um die Seilbremse 1 durch die Haltemittel 9a, 9b, 9c, 9d an, zum Beispiel der Vorhangschiene 12 (vgl. 3a), festzulegen. Eine solche Ausführungsform der Haltemittel 9a, 9b, 9c, 9d ist von Vorteil, wenn ein schweres Vorhangelement und/oder eine schwere Vorhangschiene 12 durch die Seilbremse 1 an dem gespannten Spannseil 14 festlegbar sein soll. 3b shows a tensioning cable 14 passing through the open rope path 4 a rope brake according to the invention 1 running. Due to the chosen shape of the first rope path 4 results along a friction section 14a of the tensioning cable 14 an increased mechanical friction with the walls of the rope path 4 . 4a , In 3b is further to realize that the holding means 9a . 9b . 9c . 9d to the course of the two rope paths 4 . 4a are customizable. By the in 3b shown embodiment of the holding means 9a . 9b . 9c . 9d is easily reached that the two rope paths 4 . 4a are exposed, and also offered the largest possible area to the rope brake 1 through the holding means 9a . 9b . 9c . 9d on, for example, the curtain rail 12 (see. 3a ). Such an embodiment of the holding means 9a . 9b . 9c . 9d is beneficial if a heavy curtain element and / or a heavy curtain rail 12 through the rope brake 1 on the tensioned tensioning rope 14 should be definable.

4a zeigt ein erstes Spannset 10 bzw. ein erfindungsgemäßes Vorhangssystem 100, das an einem Fensterrahmen befestigt ist. Das erfindungsgemäße Spannset 10 besteht aus einem ersten Seilspanner bzw. Seilspannelement 11a (in 4a oben), und einem zweiten Seilspannelement 11b (in der Figur unten). Zwischen dem ersten Seilspannelement 11a und dem zweiten Seilspannelement 11b ist ein Spannseil 14 gespannt. Das Spannseil 14 verläuft durch eine erste Seilbremse 1 der vorliegenden Erfindung, genau genommen durch die erste Öffnung 2a, in einem der Seilpfade 4, 4a zu der zweiten Öffnung 2b, wie z. B. in 3b gezeigt. Aufgrund eines Reibschlusses zwischen dem Reibabschnitt 14a des Spannseils 14 und einem Reibabschnitt 15 des mindestens einen Seilpfads 4, 4a, wie in 3b gezeigt, sind die erste Seilbremse 1 und die zweite Seilbremse 1a entlang des gespannten Spannseils 14 festlegbar. 4a shows a first tensioning set 10 or a curtain system according to the invention 100 which is attached to a window frame. The tensioning set according to the invention 10 consists of a first cable tensioner or rope tensioning element 11a (in 4a above), and a second rope tensioning element 11b (in the figure below). Between the first rope tensioning element 11a and the second rope tensioning element 11b is a tension rope 14 curious; excited. The tensioning rope 14 passes through a first rope brake 1 of the present invention, strictly speaking through the first opening 2a , in one of the rope paths 4 . 4a to the second opening 2 B , such as In 3b shown. Due to a frictional connection between the friction section 14a of the tensioning cable 14 and a friction section 15 the at least one rope path 4 . 4a , as in 3b shown are the first rope brake 1 and the second rope brake 1a along the tensioned tension rope 14 fixable.

Der Fachmann wird verstehen, dass damit Positionen entlang des gespannten Spannseils 14 für die Vorhangschienen 12, die jeweils an der ersten Seilbremse 1 und/oder der zweiten Seilbremse 1a festgelegt sind, wählbar sind. Der Fachmann wird weiter verstehen, dass ohne Einschränkung auch nur die obere Vorhangschiene 12 vorgesehen sein könnte und auf die zweite Vorhangschiene 12, (im Bild unten), verzichtet werden könnte. Vorteilhaft an der Verwendung zweier Vorhangschienen 12, die das Vorhangelement 101 begrenzen, ist jedoch, dass ein Benutzer wählen kann, an welcher Höhenposition (bzw. Vertikalposition bei vertikal gespanntem Spannseil 14) das Vorhangelement 101 beginnen soll und/oder an welcher zweiten Höhenposition (bzw. Vertikalposition) das Vorhangelement 101 enden soll. Als Seilspannelement bzw. Spannelemente 11a, 11b können bekannte Spannelemente oder Klemmhalter verwendet werden, wie sie zum Beispiel aus DE 10 2012 111 170.7 oder DE 20 2013 100 640.8 der Anmelderin bekannt sind.The skilled person will understand that with it positions along the tensioned tensioning cable 14 for the curtain rails 12 , each at the first rope brake 1 and / or the second rope brake 1a are fixed, are selectable. The skilled person will further understand that without limitation, only the upper curtain rail 12 could be provided and on the second curtain rail 12 , (in the picture below), could be dispensed with. Advantageous to the use of two curtain rails 12 holding the curtain element 101 limit, however, is that a user can choose at which height position (or vertical position with vertically tensioned tension cable 14 ) the curtain element 101 should begin and / or at which second height position (or vertical position) the curtain element 101 should end. As a rope tensioning element or clamping elements 11a . 11b For example, known clamping elements or clamping holders can be used DE 10 2012 111 170.7 or DE 20 2013 100 640.8 the applicant are known.

4b zeigt ein erfindungsgemäßes Vorhangssystem 100 mit einem ersten Spannset 10 und einem zweiten Spannset 10a. Für das Vorhangssystem 100 in 4b ist das Vorhangelement 101 zwischen einer ersten Vorhangschiene 12 und einer zweiten Vorhangschiene 12a angeordnet. Weiter wird jede der Vorhangschienen 12, 12a durch erfindungsgemäße Seilbremsen 1a, 1c bzw. 1a, 1d getragen. Je nach Größe des Vorhangelements 101 können mit dem Vorhangssystem 100 das erste Spannset 10, das zweite Spannset 10a und/oder weitere Spannsets (nicht gezeigt) verwendet werden, um die Vorhangschienen 12, 12a zu tragen. 4b shows a curtain system according to the invention 100 with a first clamping set 10 and a second tensioning set 10a , For the curtain system 100 in 4b is the curtain element 101 between a first curtain rail 12 and a second curtain track 12a arranged. Next is each of the curtain rails 12 . 12a by rope brakes according to the invention 1a . 1c respectively. 1a . 1d carried. Depending on the size of the curtain element 101 Can with the curtain system 100 the first clamping set 10 , the second clamping set 10a and / or other tensioning sets (not shown) used to support the curtain rails 12 . 12a to wear.

Der Fachmann wird weiter verstehen, dass, sofern das erste Spannset 10 und/oder das zweite Spannset 10a an einem Fensterrahmen angebracht sind, die Position der ersten Vorhangschiene 12 und/oder der zweiten Vorhangschiene 12a entlang der gespannten Spannseile 14 bzw. 14a festgelegt werden kann, wodurch sich gezielt eine Verschattungs- und/oder Blickschutzsituation einstellen lässt, wie sie ein Benutzer wünscht.The person skilled in the art will further understand that, provided the first clamping set 10 and / or the second tensioning set 10a attached to a window frame, the position of the first curtain rail 12 and / or the second curtain rail 12a along the tensioned tension cables 14 respectively. 14a can be set, which specifically targeted a shading and / or or to set privacy protection as a user desires.

Die Seilbremse 1, das Spannset 10 und das Vorhangssystem 100 der vorliegenden Erfindung wurden anhand von Fenstern erläutert bzw. Fensterrahmen, an denen das erfindungsgemäße Spannset 10, und/oder das Vorhangssystem 100 festgelegt sind. Ebenso könnte das erfindungsgemäße Spannset 10 und/oder das Vorhangssystem 100 mit der erfindungsgemäßen Seilbremse 1 auch an einem Mauerdurchbruch, an einem Türrahmen und/oder an einer Türe verwendet werden.The rope brake 1 , the clamping set 10 and the curtain system 100 The present invention was explained with reference to windows or window frames, where the tension set according to the invention 10 , and / or the curtain system 100 are fixed. Likewise, the clamping set according to the invention 10 and / or the curtain system 100 with the rope brake according to the invention 1 also be used on a wall opening, on a door frame and / or on a door.

In einem weiteren Aspekt der Erfindung ist ein Spannset 10 offenbart, das eingerichtet ist zum Tragen eines Dekorationselements, insbesondere eines Vorhangelements 101. Das erfindungsgemäße Spannset 10 umfasst:

  • ein erstes Seilspannelement 11a gemäß der Erfindung,
  • ein zweites Seilspannelement 11b gemäß der Erfindung,
  • ein Spannseil 14, das zwischen dem ersten Seilspannelement 11a und dem zweiten Seilspannelement 11b spannbar ist; und
  • – mindestens eine Seilbremse gemäß der vorliegenden Erfindung.
In a further aspect of the invention is a tensioning set 10 disclosed, which is adapted for carrying a decorative element, in particular a curtain element 101 , The tensioning set according to the invention 10 includes:
  • - A first rope tensioning element 11a according to the invention,
  • - A second rope tensioning element 11b according to the invention,
  • - a tensioning cable 14 that between the first rope tensioning element 11a and the second rope tensioning element 11b is tensionable; and
  • - At least one rope brake according to the present invention.

Für das erfindungsgemäße Spannset kann ein Reibschluss zwischen einem Spannseilabschnitt und einem Reibabschnitt 15 des mindestens einen Seilpfads 4, 4a erzeugbar sein, sofern das Spannseil 14 zwischen dem ersten Seilspannelement 11a und dem zweiten Seilspannelement 11b gespannt ist, und das Spannseil 14 durch die erste Öffnung 2, den mindestens einen Seilpfad 4, 4a und die zweite Öffnung 2a der mindestens einen Seilbremse 1 verläuft.For the tension set according to the invention, a frictional engagement between a tension cable section and a friction section 15 the at least one rope path 4 . 4a be produced, provided the tensioning cable 14 between the first rope tensioning element 11a and the second rope tensioning element 11b is curious, and the tension cable 14 through the first opening 2 , the at least one rope path 4 . 4a and the second opening 2a the at least one rope brake 1 runs.

Für das Spannset 10 kann das gespannte Spannseil 14 durch die erste Öffnung 2, den mindestens einen Seilpfad 4, 4a und die zweite Öffnung 2a der mindestens einen Seilbremse 1 verlaufen.For the clamping set 10 can the tensioned tension rope 14 through the first opening 2 , the at least one rope path 4 . 4a and the second opening 2a the at least one rope brake 1 run.

Für das Spannset 10 kann der Reibabschnitt 14a des Spannseils 14 zwischen dem ersten Seilspannelement 11a und dem zweiten Seilspannelement 11b verschiebbar sein.For the clamping set 10 can the friction section 14a of the tensioning cable 14 between the first rope tensioning element 11a and the second rope tensioning element 11b be displaceable.

In einem weiteren Aspekt offenbart die Erfindung ein Vorhangssystem 100 umfassend:

  • mindestens ein Spannset 10 gemäß der Erfindung,
  • mindestens eine Vorhangschiene 12, die durch die Haltemittel 9a, 9b, 9c, 9d der mindestens einen Seilbremse 1 mit der mindestens einen Seilbremse 1 verbunden ist, und
  • ein Vorhangelement 101, das mit der Vorhangschiene 12 verbunden ist.
In another aspect, the invention discloses a curtain system 100 full:
  • - at least one clamping set 10 according to the invention,
  • - at least one curtain rail 12 passing through the retaining means 9a . 9b . 9c . 9d the at least one rope brake 1 with the at least one rope brake 1 is connected, and
  • - a curtain element 101 That with the curtain rail 12 connected is.

Für das Vorhangsystem 100 kann die mindestens eine Seilbremse 1 die Vorhangschiene 12 tragen, wenn das Spannseil 14 zwischen dem ersten Seilspannelement 11a und dem zweiten Seilspannelement 11b gespannt ist, und ein Reibschluss zwischen einem Reibabschnitt 14a des gespannten Spannseils 14 und mindestens einem Seilpfad 4, 4a der Seilbremse 1 besteht, sofern das gespannte Spannseil 14 durch den mindestens einen Seilpfad 4, 4a, die erste Öffnung 2a und die zweite Öffnung 2b der mindestens einen Seilbremse 1 verläuft.For the curtain system 100 Can the at least one rope brake 1 the curtain rail 12 Wear when the tension cable 14 between the first rope tensioning element 11a and the second rope tensioning element 11b is tensioned, and a frictional engagement between a friction section 14a of the tensioned tension rope 14 and at least one rope path 4 . 4a the rope brake 1 exists, provided the tensioned tension cable 14 through the at least one rope path 4 . 4a , the first opening 2a and the second opening 2 B the at least one rope brake 1 runs.

Das Vorhangsystem 100 kann, weiter eine zweite Vorhangschiene 12a umfassen, die mit einer zweiten Seilbremse 1a verbunden ist, und durch die zweite Seilbremse 1a getragen wird, sofern das gespannte Spannseil 14 durch den mindestens einen Seilpfad 4, 4a, die erste Öffnung 2a und die zweite Öffnung 2b der zweiten Seilbremse 1a verläuft.The curtain system 100 can, continue a second curtain track 12a include that with a second rope brake 1a connected, and by the second rope brake 1a is worn, provided the tensioned tension cable 14 through the at least one rope path 4 . 4a , the first opening 2a and the second opening 2 B the second rope brake 1a runs.

Das Vorhangsystem 100 kann derart ausgestaltet sein, dass das Vorhangelement 101 an der ersten Vorhangschiene 12 und/oder der zweiten Vorhangschiene 12a befestigt ist.The curtain system 100 can be configured such that the curtain element 101 at the first curtain rail 12 and / or the second curtain rail 12a is attached.

Das Vorhangelement 101 kann mindestens eine Durchbrechung aufweisen, durch die das Spannseil geführt ist.The curtain element 101 can have at least one opening through which the tensioning cable is guided.

Das Vorhangsystem 100 kann weiter ein zweites Spannset 10a umfassen, wobei mindestens eine Seilbremse 1c des zweiten Spannsets 10a die erste Vorhangschiene 12 trägt, wenn das Spannseil 14a des zweiten Spannsets 10a zwischen erstem und zweiten Seilspannabschnitt 11c, 11d des zweiten Spannsets 10a gespannt ist, wobei ein Reibschluss zwischen einem Reibabschnitt 15 des gespannten Spannseils 14a des zweiten Spannsets 10a und dem mindestens einen Seilpfad 4, 4a der mindestens einen Seilbremse 1c des zweiten Spannsets 10a besteht, sofern das gespannte Spannseil 14a des zweiten Spannsets 10a durch den mindestens einen Seilpfad 4, 4a, eine erste Öffnung 2, und eine zweite Öffnung 2a der mindestens einen Seilbremse 1c des zweiten Spannsets 10a verläuft.The curtain system 100 can continue a second tension set 10a include, wherein at least one rope brake 1c of the second tension set 10a the first curtain rail 12 carries when the tension cable 14a of the second tension set 10a between the first and second rope tensioning section 11c . 11d of the second tension set 10a is tensioned, with a frictional engagement between a friction section 15 of the tensioned tension rope 14a of the second tension set 10a and the at least one cable path 4 . 4a the at least one rope brake 1c of the second tension set 10a exists, provided the tensioned tension cable 14a of the second tension set 10a through the at least one rope path 4 . 4a , a first opening 2 , and a second opening 2a the at least one rope brake 1c of the second tension set 10a runs.

Wenngleich die vorliegende Erfindung anhand von bevorzugten Ausführungsformen beschrieben wurde, ist die Erfindung darauf nicht beschränkt. Vielmehr können einzelne Aspekte unterschiedlicher Ausführungsformen kombiniert werden, wie dies für den Fachmann nützlich erscheint.Although the present invention has been described in terms of preferred embodiments, the invention is not limited thereto. Rather, individual aspects of different embodiments may be combined as would appear to one of ordinary skill in the art.

BezugszeichenlisteLIST OF REFERENCE NUMBERS

1, 1a, 1b, 1c, 1d1, 1a, 1b, 1c, 1d
Seilbremsecable brake
2a2a
erste Öffnungfirst opening
2b2 B
zweite Öffnungsecond opening
44
erster Seilpfadfirst rope path
4a4a
zweiter Seilpfadsecond rope path
6 6
erstes Verjüngungselementfirst rejuvenation element
6a6a
zweites Verjüngungselementsecond rejuvenation element
6b6b
weiteres Verjüngungselementanother rejuvenating element
1010
erstes Spannsetfirst clamping set
10a10a
zweites Spannsetsecond clamping set
11a11a
erstes Seilspannelementfirst rope tensioning element
11b11b
zweites Seilspannelementsecond rope tensioning element
12, 12a12, 12a
Vorhangschienecurtain rail
1414
Spannseiltether
14a14a
Reibabschnitt des SpannseilsFriction section of the tensioning cable
1515
Reibabschnitt des SeilpfadsFriction section of the rope path
100100
Vorhangssystemcurtain system
101101
Vorhangelementcurtain member

ZITATE ENTHALTEN IN DER BESCHREIBUNG QUOTES INCLUDE IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant has been generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.

Zitierte PatentliteraturCited patent literature

  • DE 102012111170 [0084] DE 102012111170 [0084]
  • DE 202013100640 [0084] DE 202013100640 [0084]

Claims (16)

Seilbremse (1) für ein Dekorationselement, insbesondere einen Vorhangelement (101), die Seilbremse (1) umfassend: – eine erste Öffnung (2a), – eine zweite Öffnung (2b), – mindestens ein Seilpfad (4, 4a), der die erste Öffnung (2a) und die zweite Öffnung (2b) verbindet, und – Haltemittel (9a, 9b, 9c, 9d) zum Befestigen der Seilbremse (1) an einer Vorhangschiene (12).Rope brake ( 1 ) for a decorative element, in particular a curtain element ( 101 ), the rope brake ( 1 ) comprising: - a first opening ( 2a ), - a second opening ( 2 B ), - at least one cable path ( 4 . 4a ), the first opening ( 2a ) and the second opening ( 2 B ), and - holding means ( 9a . 9b . 9c . 9d ) for attaching the rope brake ( 1 ) on a curtain rail ( 12 ). Seilbremse (1) gemäß Anspruch 1, wobei der mindestens eine Seilpfad (4, 4a) von einer geraden Verbindung zwischen der ersten Öffnung (2a) und der zweiten Öffnung (2b) abweicht.Rope brake ( 1 ) according to claim 1, wherein the at least one cable path ( 4 . 4a ) of a straight connection between the first opening ( 2a ) and the second opening ( 2 B ) deviates. Seilbremse (1) gemäß einem der vorhergehenden Ansprüche, wobei der mindestens eine Seilpfad (4, 4a) mindestens einen bogenförmigen Abschnitt und/oder einen gewinkelten Abschnitt umfasst.Rope brake ( 1 ) according to one of the preceding claims, wherein the at least one cable path ( 4 . 4a ) comprises at least one arcuate portion and / or an angled portion. Seilbremse (1) gemäß einem der vorhergehenden Ansprüche, weiter umfassend einen zweiten Seilpfad (4a), der die erste Öffnung (2a) und die zweite Öffnung (2b) verbindet.Rope brake ( 1 ) according to one of the preceding claims, further comprising a second cable path ( 4a ), the first opening ( 2a ) and the second opening ( 2 B ) connects. Seilbremse (1) gemäß Anspruch 4, wobei der zweite Seilpfad (4a) einen Querschnitt hat, der von einem Querschnitt des ersten Seilpfads (4) verschieden ist.Rope brake ( 1 ) according to claim 4, wherein the second cable path ( 4a ) has a cross section which is of a cross section of the first cable path ( 4 ) is different. Seilbremse (1) gemäß einem der vorhergehenden Ansprüche, wobei in dem mindestens einen Seilpfad (4, 4a) mindestens ein Verjüngungselement (6, 6a) angeordnet ist, das einen freien Querschnitt des mindestens einen Seilpfads (4, 4a) in zumindest einem Abschnitt reduziert.Rope brake ( 1 ) according to one of the preceding claims, wherein in the at least one cable path ( 4 . 4a ) at least one rejuvenating element ( 6 . 6a ), which has a free cross-section of the at least one cable path ( 4 . 4a ) reduced in at least one section. Seilbremse (1) nach Anspruch 6, wobei in dem mindestens einen Seilpfad (4, 4a) ein zweites Verjüngungselement (6a) angeordnet ist, das den freien Querschnitt des mindestens einen Seilpfads (4, 4a) in einem zweiten Abschnitt reduziert.Rope brake ( 1 ) according to claim 6, wherein in the at least one cable path ( 4 . 4a ) a second rejuvenation element ( 6a ) is arranged, which is the free cross-section of the at least one cable path ( 4 . 4a ) reduced in a second section. Seilbremse (1) gemäß Anspruch 7, wobei der zweite Abschnitt im Wesentlichen gleich dem ersten Abschnitt ist.Rope brake ( 1 ) according to claim 7, wherein the second portion is substantially equal to the first portion. Seilbremse (1) gemäß einem der Ansprüche 6–8, wobei das mindestens eine Verjüngungselement (6, 6a) aus elastischem Material gefertigt ist, und in einer Ruheposition den freien Querschnitt des ersten Abschnitts und/oder den freien Querschnitt des zweiten Abschnitts reduziert.Rope brake ( 1 ) according to any one of claims 6-8, wherein the at least one rejuvenating element ( 6 . 6a ) is made of elastic material, and reduced in a rest position, the free cross section of the first portion and / or the free cross section of the second portion. Seilbremse (1) gemäß Anspruch 9, wobei das erste Verjüngungselement (6) und/oder das zweite Verjüngungselement (6a) unter Einwirkung einer Kraft aus einer Ruheposition bringbar ist, wodurch sich der freie Querschnitt in dem ersten Abschnitt und/oder dem zweiten Abschnitt vergrößert.Rope brake ( 1 ) according to claim 9, wherein the first tapering element ( 6 ) and / or the second rejuvenation element ( 6a ) can be brought under the action of a force from a rest position, whereby the free cross-section increases in the first section and / or the second section. Seilbremse (1) gemäß einem der Ansprüche 6–10, wobei das erste Verjüngungselement (6) und/oder das zweite Verjüngungselement (6a) aus elastischem Kunststoff, Gummi, und/oder als Federelement gebildet sind.Rope brake ( 1 ) according to any one of claims 6-10, wherein the first tapering element ( 6 ) and / or the second rejuvenation element ( 6a ) made of elastic plastic, rubber, and / or are formed as a spring element. Seilbremse (1) gemäß einem der vorhergehenden Ansprüche, wobei die Haltemittel (9a, 9b, 9c, 9d) eingerichtet sind zum kraftschlüssigen Verbinden mit der Vorhangschiene (12).Rope brake ( 1 ) according to one of the preceding claims, wherein the holding means ( 9a . 9b . 9c . 9d ) are arranged for non-positive connection with the curtain rail ( 12 ). Seilbremse (1) gemäß einem der vorhergehenden Ansprüche, wobei die Haltemittel (9a, 9b, 9c, 9d) eingerichtet sind zum Hintergreifen eines Profils der Vorhangschiene (12).Rope brake ( 1 ) according to one of the preceding claims, wherein the holding means ( 9a . 9b . 9c . 9d ) are arranged for engaging behind a profile of the curtain rail ( 12 ). Seilbremse (1) gemäß einem der vorhergehenden Ansprüche, wobei der mindestens eine Seilpfad (4, 4a) im Inneren der Seilbremse (1) verläuft.Rope brake ( 1 ) according to one of the preceding claims, wherein the at least one cable path ( 4 . 4a ) inside the rope brake ( 1 ) runs. Seilbremse (1) gemäß einem der vorhergehenden Ansprüche, wobei die Seilbremse (1) als einstückiges Bauteil ausgeführt ist.Rope brake ( 1 ) according to one of the preceding claims, wherein the rope brake ( 1 ) is designed as a one-piece component. Seilbremse (1) gemäß einem der vorhergehenden Ansprüche, wobei der mindestens eine Seilpfad (4, 4a) zwischen der ersten Öffnung (2) und der zweiten Öffnung (2a) offenliegt.Rope brake ( 1 ) according to one of the preceding claims, wherein the at least one cable path ( 4 . 4a ) between the first opening ( 2 ) and the second opening ( 2a ) is exposed.
DE102013019243.9A 2012-11-16 2013-11-15 Rope brake, tensioning set and curtain system Active DE102013019243B4 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE102013019243.9A DE102013019243B4 (en) 2012-11-16 2013-11-15 Rope brake, tensioning set and curtain system

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
CN201220610785.0 2012-11-16
CN 201220610785 CN202850827U (en) 2012-11-16 2012-11-16 Curtain rod limiter
DE201320103831 DE202013103831U1 (en) 2012-11-16 2013-08-23 Rope brake, tensioning set and curtain system
DE202013103831.8 2013-08-23
DE102013019243.9A DE102013019243B4 (en) 2012-11-16 2013-11-15 Rope brake, tensioning set and curtain system

Publications (2)

Publication Number Publication Date
DE102013019243A1 true DE102013019243A1 (en) 2014-05-22
DE102013019243B4 DE102013019243B4 (en) 2016-02-18

Family

ID=47982038

Family Applications (3)

Application Number Title Priority Date Filing Date
DE201320103831 Expired - Lifetime DE202013103831U1 (en) 2012-11-16 2013-08-23 Rope brake, tensioning set and curtain system
DE102013019243.9A Active DE102013019243B4 (en) 2012-11-16 2013-11-15 Rope brake, tensioning set and curtain system
DE202013012127.0U Expired - Lifetime DE202013012127U1 (en) 2012-11-16 2013-11-15 Rope brake, tensioning set and curtain system

Family Applications Before (1)

Application Number Title Priority Date Filing Date
DE201320103831 Expired - Lifetime DE202013103831U1 (en) 2012-11-16 2013-08-23 Rope brake, tensioning set and curtain system

Family Applications After (1)

Application Number Title Priority Date Filing Date
DE202013012127.0U Expired - Lifetime DE202013012127U1 (en) 2012-11-16 2013-11-15 Rope brake, tensioning set and curtain system

Country Status (2)

Country Link
CN (1) CN202850827U (en)
DE (3) DE202013103831U1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102019132564A1 (en) * 2019-11-29 2021-06-02 SAM Design & Concepts GmbH & Co. Kommanditgesellschaft Positioning device, and sun or privacy protection device with such a positioning device

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH707200A2 (en) * 2012-11-09 2014-05-15 Beat Guhl Guide assembly for a hanging.

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202013100640U1 (en) 2012-08-02 2013-11-04 Rolladen-Schönberger GmbH & Co. KG Rolladenfabrik Cable tensioning device and tensioning set for a tensioning cable for supporting a curtain element

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1408692A (en) * 1973-05-07 1975-10-01 Silverflex Int Nv Brake for a cord
US4687041A (en) * 1983-12-19 1987-08-18 Hunter Douglas Inc. Guided cord system for a retractable slatted blind assembly
DE8813751U1 (en) * 1988-11-03 1989-01-05 Ophüls, Harald, Dipl.-Ing., 2000 Hamburg Fastening device
DE202005007068U1 (en) * 2005-05-01 2005-09-29 Bauer, Renate Double-chamber cord stopper with three-point pressure combination has leaf springs applying pressure to clamping blocks to lock and release cords
DE202012100650U1 (en) * 2012-02-27 2013-05-28 Nodeko Gmbh Sliding curtain and associated adhesive attachment

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202013100640U1 (en) 2012-08-02 2013-11-04 Rolladen-Schönberger GmbH & Co. KG Rolladenfabrik Cable tensioning device and tensioning set for a tensioning cable for supporting a curtain element
DE102012111170A1 (en) 2012-08-02 2014-02-06 Rolladen-Schönberger GmbH & Co. KG Rolladenfabrik Tool holders

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102019132564A1 (en) * 2019-11-29 2021-06-02 SAM Design & Concepts GmbH & Co. Kommanditgesellschaft Positioning device, and sun or privacy protection device with such a positioning device
DE102019132564B4 (en) 2019-11-29 2022-10-20 SAM Design & Concepts GmbH & Co. Kommanditgesellschaft Positioning device and sun or privacy protection device with such a positioning device

Also Published As

Publication number Publication date
CN202850827U (en) 2013-04-03
DE202013012127U1 (en) 2015-04-29
DE202013103831U1 (en) 2014-02-17
DE102013019243B4 (en) 2016-02-18

Similar Documents

Publication Publication Date Title
DE69807438T3 (en) UNIVERSAL MOUNTING AND PARALLEL GUIDE FOR WINDOW SHIELDING
EP2216485A2 (en) Cord tensioning device and curtain assembly with same
DE102011011113B4 (en) Frame system of a particle protection grid
DE102012003591A1 (en) Guide rail for a vertical awning and vertical awning
EP1848604B1 (en) Shading device comprising a roller blind that can be manually actuated and assume several positions
DE102011053648A1 (en) Cord tensioner for tensioning cord to e.g. pleaded blind, has sliding bearing element that is inserted and pulled by spring so as to stretch cord around deflecting roller and tension roller
DE102009033885A1 (en) Vehicle roof-roller blind arrangement, has guide device with guide insert projecting into lower sliding groove and bent part between insertion parts to press bent part transverse to fabric blind and in lower sliding groove
EP2826943A1 (en) Pleated curtain
DE102013019243B4 (en) Rope brake, tensioning set and curtain system
AT509815B1 (en) ROLLER SHUTTER SYSTEM FOR A MOTOR VEHICLE ASSEMBLY
DE102009025120A1 (en) Guide device for a curtain darkening device
EP2272406A2 (en) Window clip for window hanging
DE102013003012A1 (en) Panel curtain system
EP3655612B1 (en) Pleated blind with telescopic guide rail
DE102012210584A1 (en) sliding door system
EP3293841A1 (en) Pivoting anchor for securing conductors
DE102007002857B4 (en) Roller blind arrangement with guide element
DE102016202077A1 (en) Luggage rack module for building a luggage rack in a rail vehicle
DE102016208896B4 (en) Shading device for a vehicle window
DE102017218088B4 (en) Protective device for a vehicle interior
DE202008004434U1 (en) Device for holding a flexible sheet-like element, in particular a print
DE102016101563A1 (en) Furniture panel and sliding door
DE10320638A1 (en) Curtain holding apparatus for hanging curtains, has at least two support rails that extend in one line since facing sides of support rails are connected to form joint that is clamped by at least one mounting device
DE69906043T2 (en) A BRAKE DEVICE AND A WINDOW SHIELDING ARRANGEMENT WITH SUCH A BRAKE DEVICE
DE102016000238A1 (en) A rail slide and assembly comprising a rail slider and a suspension rail

Legal Events

Date Code Title Description
R138 Derivation of utility model

Ref document number: 202013012127

Country of ref document: DE

R082 Change of representative

Representative=s name: KEGLER, CHRISTIAN, DIPL.-PHYS. (UNIV) DR. RER., DE

R081 Change of applicant/patentee

Owner name: SCHOENBERGER GERMANY ENTERPRISES GMBH & CO. KG, DE

Free format text: FORMER OWNER: ROLLADEN-SCHOENBERGER GMBH & CO. KG ROLLADENFABRIK, 82069 HOHENSCHAEFTLARN, DE

Effective date: 20140603

R082 Change of representative

Representative=s name: KEGLER, CHRISTIAN, DIPL.-PHYS. (UNIV) DR. RER., DE

Effective date: 20140603

R012 Request for examination validly filed
R016 Response to examination communication
R018 Grant decision by examination section/examining division
R020 Patent grant now final