DE102013005276A1 - Process for refurbishing the substructure material under the track of a railway line - Google Patents
Process for refurbishing the substructure material under the track of a railway line Download PDFInfo
- Publication number
- DE102013005276A1 DE102013005276A1 DE201310005276 DE102013005276A DE102013005276A1 DE 102013005276 A1 DE102013005276 A1 DE 102013005276A1 DE 201310005276 DE201310005276 DE 201310005276 DE 102013005276 A DE102013005276 A DE 102013005276A DE 102013005276 A1 DE102013005276 A1 DE 102013005276A1
- Authority
- DE
- Germany
- Prior art keywords
- work
- substructure material
- refurbishment
- track
- substructure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B27/00—Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
- E01B27/06—Renewing or cleaning the ballast in situ, with or without concurrent work on the track
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B27/00—Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2203/00—Devices for working the railway-superstructure
- E01B2203/04—Cleaning or reconditioning ballast or ground beneath
- E01B2203/045—Cleaning or reconditioning ballast or ground beneath the ballast having been taken up
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
- Disintegrating Or Milling (AREA)
Abstract
Ein Verfahren zum Aufarbeiten des unter dem Gleis 1 einer Bahnstrecke befindlichen Unterbaumaterials sieht einen Ausbau-Arbeitswagen 3 sowie mehrere modulartige sowie diesem Ausbau-Arbeitswagen 3 nachgeordnete Aufarbeitungs-Arbeitswagen 8, 9 vor. In diesen Aufarbeitungs-Arbeitswagen 8, 9 wird das ausgebaute Unterbaumaterial 2 sukzessive unterschiedlich fraktioniert und aufgearbeitet.A method for refurbishing the substructure material located under the track 1 of a railway line provides for a removal work trolley 3 and a plurality of refurbishment work trolleys 8, 9 arranged downstream of this removal work trolley 3. In this refurbishment work car 8, 9, the dismantled substructure material 2 is successively fractionated and refurbished.
Description
Die Erfindung betrifft ein Verfahren zum Aufarbeiten des unter dem Gleis einer Bahnstrecke befindlichen Unterbaumaterials.The invention relates to a method for refurbishing the substructure material located under the track of a railway track.
Die Unterbaumaterialien sind dabei im allgemeinsten Sinne zu verstehen. Insbesondere handelt es sich bei den Unterbaumaterialien um Schotter, Bodenmaterial, Erdmassen etc.The substructure materials are to be understood in the most general sense. In particular, the substructure materials are gravel, soil material, earth masses, etc.
Gleichermaßen ist auch das Aufarbeiten dieses Unterbaumaterials im allgemeinsten Sinne zu verstehen. Insbesondere wird das Unterbaumaterial im Sinne der erfindungsgemäßen Aufarbeitung fraktioniert, separiert, gereinigt, aufgearbeitet etc.Likewise, the working up of this substructure material is to be understood in the most general sense. In particular, the substructure material is fractionated in the sense of the workup according to the invention, separated, purified, worked up, etc.
Die Unterbaumaterialien bei Bahnstrecken unterliegen im Laufe der Jahre aufgrund mechanischer Beanspruchung dem Verschleiß. So erfährt der ursprüngliche Neuschotter durch Belastungen in seiner Korngröße sowie in seiner Kornzusammensetzung durch Zermahlen und Zertrümmern Veränderungen. Hierbei wächst der Feinanteil, und zwar in Verbindung mit einer natürlichen organischen und chemischen Verschmutzung. Dies bedeutet, daß das Schottergemisch regelmäßig einem Reinigungsvorgang unterzogen werden muß. So wird in der Regel der Schotter bei einem erreichten Feinanteil von 20 bis 30% einer maschinellen Bettungsreinigung unterzogen. Konkret bedeutet dies Folgendes: Wenn der Feinanteil der Körnung (kleiner als ca. 22 mm) 20 bis 30% der Gesamtschotterfraktion beträgt, wird eine Bettungsreinigung erforderlich. Der Feinanteil von 20 bis 30% ist dabei Verlustschotter, welcher durch die nicht wieder verwendbaren Schottermassen in der Bettungsreinigung entsteht. Dieser Verlustschotter muß durch Zuführung von Neuschotter ausgeglichen werden.The substructure materials in railway lines are subject to wear over the years due to mechanical stress. Thus, the original Neophyte undergoes changes in its grain size and in its grain composition by grinding and smashing changes. This increases the fines content, in conjunction with a natural organic and chemical pollution. This means that the ballast mixture must be regularly subjected to a cleaning process. Thus, the ballast is subjected to a mechanical fines cleaning at a achieved fine fraction of 20 to 30% in the rule. In concrete terms, this means that if the fine fraction of the grain (less than about 22 mm) is 20 to 30% of the total ballast fraction, a ballast cleaning is required. The fine fraction of 20 to 30% is lost ballast, which is caused by the non-reusable ballast masses in the ballast cleaning. This loss gravel must be compensated by supplying Neuschotter.
Bei den üblichen Bettungsreinigungsmaßnahmen, bei welchen nur der Schotter gereinigt und ersetzt wird, wird der vorbeschriebene Feinanteil immer entsorgt. Die Feinanteile werden dabei mittels Bahnwagen oder mittels LKWs zu einer Entsorgungsstelle oder einer Aufarbeitungsstelle außerhalb des Gleisbereiches verbracht. Die Feinanteile müssen dann in einer nach den Umweltrichtlinien genehmigten Anlage aufgearbeitet oder entsorgt werden.In the usual ballast cleaning measures, in which only the ballast is cleaned and replaced, the above fine fraction is always disposed of. The fines are spent by means of rail cars or trucks to a disposal point or a refurbishment outside the track area. The fines must then be worked up or disposed of in a facility approved under the environmental guidelines.
Grundsätzlich gibt es am Markt die sogenannten MFS-Wagen/MT-Wagen, welche Materialien auf Baustellen im Gleisbausektor zwischenbunkern und transportieren können. Die Wagen dienen dann dazu, Material auf der Gleisachse in einer Arbeitsrichtung oder in verschiedene Arbeitsrichtungen zu transportieren, ohne das Gleiseinschränkungsprofil (Lichtraumprofil) mit dem Material verlassen zu müssen.Basically, there are the so-called MFS cars / MT cars on the market, which can bunker and transport materials on construction sites in the track construction sector. The carriages then serve to transport material on the track axis in one working direction or in different working directions without having to leave the track restriction profile (clearance gauge) with the material.
Es gibt auf dem Markt weiterhin Gleisbaumaschinen, welche den auszubauenden Schotter aufnehmen, reinigen und wieder einbauen können. Bei diesen marktüblichen Bettungsreinigungsmaschinen wird das Material innerhalb der Gesamtmaschine auf ein und demselben Arbeitswagen ausgebaut, gereinigt sowie das gereinigte Gleisschottermaterial wieder dem vorhandenen Gleiskörper zugeführt. Das Abfallmaterial in Form von Unterkorn und Schutz wird in sogenannten MFS-Wagen für den Abtransport übergeben.There are still track-laying machines on the market that can pick up, clean and re-install the ballast to be excavated. In these commercially available ballast cleaning machines, the material within the overall machine is removed on one and the same work cart, cleaned and the cleaned track ballast material fed back to the existing track body. The waste material in the form of undersize and protection is transferred to so-called MFS cars for transport.
Wie ausgeführt, wird bei den bekannten Bettungsreinigungsmaschinen der Feinanteil an die sogenannten MFS-/MT-Wagen zur finalen Verwertung und Entsorgung übergeben. Dies bedeutet, daß eine bestimmte, nicht als Gleisschotter wieder einbaubare Feinfraktion (Kleinkörnungen sowie Schmutz und organische Stoffe) der Bettungsreinigungsmaschine als Abfall zur Entsorgung anfällt. Dieser Abfall beinhaltet jedoch an und für sich für anderweitige Bauzwecke verwendbare Kornfraktionen in seinem angefallenen Feinfraktionsgemisch.As stated, in the known ballast cleaning machines, the fine fraction is transferred to the so-called MFS / MT cars for final recycling and disposal. This means that a certain, not reinstallable as track ballast fine fraction (small grains and dirt and organic matter) of the ballast cleaning machine is obtained as waste for disposal. However, this waste, in and of itself, for use in other construction purposes, includes grain fractions in its resulting fine fraction mixture.
Dies bedeutet insgesamt, daß das bei der Bettungsreinigung anfallende Feinfraktionsgemisch zum einen absolut nicht mehr verwertbare Feinbestandteile wie beispielsweise organische Bestandteile (Humus, Abriebstoffe, Verunreinigungen etc.) enthält, zum anderen aber auch theoretisch wieder verwendbare Stoffe wie Gesteinsfraktionen, die in der Körnung unterhalb der gemäß DIN wieder einzubauenden Schotterfraktion liegt. Dies bedeutet im Ergebnis, daß bei der Bettungsreinigung mit marktüblichen Systemen die Feinfraktion mit Körnungen kleiner als ca. 22 mm als Abfall behandelt wird.This means in total that the resulting in the ballast cleaning fine fraction mixture for a absolutely no longer usable fine components such as organic ingredients (humus, abrasives, impurities, etc.), on the other hand, theoretically reusable substances such as rock fractions, the grain below the according to DIN again to be installed ballast fraction. This means in the result that in the ballast cleaning with commercially available systems, the fine fraction with grain sizes smaller than about 22 mm is treated as waste.
Davon ausgehend liegt der Erfindung die Aufgabe zugrunde, ein Verfahren zum Aufarbeiten des unter dem Gleis einer Bahnstrecke befindlichen Unterbaumaterials mit höherer Effektivität in dem Sinne zu schaffen, daß mehr Anteile des ursprünglichen Unterbaumaterials nach der Aufarbeitung wiederverwendet werden können.Based on this, the object of the invention is to provide a method for working up the substructure material under the track of a railway track with higher efficiency in the sense that more parts of the original substructure material can be reused after the workup.
Die technische Lösung ist gekennzeichnet durch die Merkmale des Anspruchs 1.The technical solution is characterized by the features of
Dadurch ist ein Verfahren zum Aufarbeiten des unter dem Gleis einer Bahnstrecke befindlichen Unterbaumaterials geschaffen, welches sich durch eine hohe Effektivität im Sinne einer größtmöglichen Wiederverwendung des aufgearbeiteten Unterbaumaterials auszeichnet. Das erfindungsgemäße Verfahren ist dabei durch die Verwendung eines gleisgebundenen und vor allem modularen Arbeitswagensystems gekennzeichnet. Unter dem Modulsystem ist dabei zu verstehen, daß jeder Arbeitswagen ein individuelles Aufarbeitungsmodul definiert, ohne daß dieser Arbeitswagen andere Aufgaben besitzt. Neben der individuellen Aufarbeitung des Unterbaumaterials können die entsprechenden Arbeitswagen selbstverständlich darüber hinaus das Material zwischenspeichern und/oder weitertransportieren.As a result, a method for refurbishing the under-track subway material is created, which is characterized by a high degree of effectiveness in the sense of maximum reuse of the refurbished substructure material. The inventive method is characterized by the use of a track-bound and above all modular work vehicle system. Under the modular system is to be understood that each work car defines an individual work-up module, without this work car has other tasks. Next Of course, in addition to the individual work-up of the substructure material, the corresponding work trolleys can temporarily store and / or transport the material.
Die Grundidee des erfindungsgemäßen Verfahrens zum Aufarbeiten des unter dem Gleis einer Bahnstrecke befindlichen Unterbaumaterials besteht darin, daß hintereinander mehrere unterschiedliche Aufarbeitungs-Arbeitswagen vorgesehen sind, welche das Unterbaumaterial im Sinne der erfindungsgemäße Aufarbeitung in unterschiedliche Fraktionen separieert. Dies bedeutet, daß bei den hintereinander aufgestellten Aufarbeitungs-Arbeitswagen die separierte Fraktionsgröße immer größer wird. Dies bedeutet weiterhin, daß der modulare Verband aus Einzelmaschinen ohne Unterbrechung des gleisgebundenen Arbeitsflusses zur Aufarbeitung und zur erfindungsgemäßen Weiterverarbeitung der bei der Bettungsreinigung anfallenden Feinanteile zum Einsatz kommt. Dies bedeutet insgesamt eine einfache und zielgerichtete Aufarbeitung, Separierung und Reinigung der bei der Bettungsreinigung anfallenden Feinanteile, welche ansonsten der Entsorgung zugeführt werden müßten. Konkret bedeutet dies, daß die bei der Bettungsreinigung anfallenden Fraktionen von beispielsweise kleiner als 22 mm in einem gleisgebundenen Arbeitsprozeß aufgearbeitet werden. Es sind genau diejenigen Feinfraktionen, welche üblicherweise entsorgt werden müssen oder die einer Aufarbeitung in einer genehmigten Anlage außerhalb des Gleisbereichs zugeführt werden müssen. Dabei werden erfindungsgemäß die vorbeschriebenen Schotteranteile nacheinander separiert und aufgearbeitet. Hierbei werden nach der erfindungsgemäßen Aufarbeitung die wiederverwendbaren Feinanteilen wie beispielsweise die natürliche Gesteinskörnung unterhalb der Fraktion von 22 mm separiert und gereinigt und für andere Zwecke zur Verfügung gestellt, während die nicht mehr verwertbaren Feinanteilstoffe wie beispielsweise Boden, Humus, Schmutz etc. final entsorgt werden. Dadurch entfällt die Entsorgung oder die Aufarbeitung der Feinanteilfraktion kleiner als beispielsweise 22 mm an einer gleisunabhängigen Entsorgungs- bzw. Aufarbeitungsstelle. Nur die nicht wiederverwendbaren Feinanteile wie beispielsweise Schmutz, Humus, organische Bodenstoffe und Bestandteile, chemische Verunreinigungen etc. müssen – wie ausgeführt – über eine finale Entsorgung beseitigt werden. Die bereits beim Ausbau auf diese Art gewonnenen, wieder verwendbaren Feinanteile können einer direkten Verwertung im Gleisbereich oder einer Verwertung außerhalb des Gleisbereichs zugeführt werden. Die Menge des belasteten Feinanteils ohne qualitative Verwertbarkeit wird hierdurch stark reduziert. So können beispielsweise natürliche Gesteinsfraktionen der Feinanteilkörnung bis zur Schottergrenze von 22 mm wieder als Randwegmaterial, als Drainagematerial oder als Unterbaumaterial oder sonstiges Auffüllmaterial zum Einsatz kommen. Im ungünstigsten Fall können die verwertbaren Feinanteile aus der Gleisbaumaßnahme aber auch einer gezielten Verwertung außerhalb des Gleises zugeführt werden. Somit entfällt eine Verbringung und stationäre Aufarbeitung an zentralen Plätzen für die gewonnen Rohstoffe gänzlich. Da die Entsorgungskosten direkt von der Belastungsklasse einer Entsorgungsfraktion abhängen, ergeben sich hier unmittelbare Einsparungen im Bauprozeß.The basic idea of the method according to the invention for refurbishing the substructure material located under the track of a railway track is that a plurality of different refurbishment work trolleys are provided in succession, which separates the substructure material into different fractions in the context of the workup according to the invention. This means that in the consecutively prepared work-up trolley, the separated fraction size is always larger. This also means that the modular assembly of individual machines is used without interruption of the track-bound workflow for processing and for further processing according to the invention of the fine fractions obtained during the ballast cleaning. This means a total of a simple and targeted workup, separation and purification of incurred in the ballast cleaning fines, which would otherwise be supplied to the disposal. In concrete terms, this means that the fractions obtained in the ballast cleaning are worked up, for example, smaller than 22 mm in a track-bound working process. It is precisely those fine fractions which usually have to be disposed of or which have to be supplied to a work-up in an approved plant outside the track area. In this case, according to the invention, the above-described gravel shares are separated and processed one after the other. Here are the reworkable fines, such as the natural aggregate below the fraction of 22 mm separated and cleaned and made available for other purposes, while the no longer usable fines such as soil, humus, dirt, etc. are finally disposed of. This eliminates the disposal or processing of fine fraction fraction smaller than, for example, 22 mm at a track independent disposal or refurbishment. Only the non-reusable fines such as dirt, humus, organic soil and components, chemical contaminants, etc. must - as stated - be eliminated via a final disposal. The reusable fines already obtained during the removal in this way can be supplied to a direct utilization in the track area or a utilization outside of the track area. The amount of contaminated fines without qualitative usability is thereby greatly reduced. Thus, for example, natural rock fractions of the fine grained fraction up to the ballast boundary of 22 mm can again be used as marginal material, as drainage material or as substructure material or other filling material. In the worst case, the usable fines from the track construction measure but also a targeted utilization outside the track can be supplied. Thus, a shipment and stationary processing at central places for the raw materials obtained completely eliminated. Since the disposal costs depend directly on the load class of a disposal group, this results in immediate savings in the construction process.
Insgesamt liegt somit der Kerngedanke des erfindungsgemäßen Verfahrens in einer variablen Aufarbeitung des Unterbaumaterials mit einer Fraktionierung und/oder Aufarbeitung von Schotter oder Bodenmaterialien innerhalb des Ablaufprozesses der Abraumförderung.Overall, therefore, the core idea of the method according to the invention in a variable processing of the substructure material with a fractionation and / or processing of ballast or soil materials within the process of overburden excavation.
Gemäß der Weiterbildung in Anspruch 2...According to the development in
Dies bedeutet, daß die erhaltenen einzelnen Fraktionen auf vielfältigste Weise weiterbehandelt werden können.This means that the individual fractions obtained can be further treated in a variety of ways.
Eine vorteilhafte Weiterbildung schlägt gemäß Anspruch 3 vor, daß am Ende des Aufarbeitungs-Arbeitswagens ein Aufarbeitungsmodul angeordnet ist. Dies bedeutet, daß das Aufarbeitungsmodul der Erfindung sich am Ende des jeweiligen Arbeitswagens befindet. Dies bedeutet weiterhin, daß an dem Aufgabeende des Arbeitswagens das Aufarbeitungsmodul innerhalb der Förderstraße angeordnet ist. Bei herkömmlichen Arbeitswagen wird das Material über Förderbänder im Dachbereich durchtransportiert oder von Förderbändern des Nachbarwagens aufgegeben. Durch die erfindungsgemäße Verwendung eines Aufarbeitungsmoduls am Aufgabepunkt eines MFS-Wagens/MT-Wagens wird somit mit geringem technischen Aufwand eine zusätzliche Fraktionierung und Aufarbeitung der vorhandenen Feinanteile ohne Unterbrechung des Arbeitsflusses ermöglicht.An advantageous development proposes according to
Vorzugsweise ist gemäß der Weiterbildung in Anspruch 4 das Aufarbeitungsmodul im Dachbereich des Aufarbeitungs-Arbeitswagens angeordnet.Preferably, according to the embodiment of
Eine weitere Weiterbildung schlägt gemäß Anspruch 5 vor, daß das Aufarbeitungsmodul Teil eines bezüglich des eigentlichen Aufarbeitungs-Arbeitswagens separaten Dachgestells ist, welches bedarfsweise auf dem eigentlichen Aufarbeitungs-Arbeitswagen angeordnet wird. Die Grundidee hier besteht darin, daß das komplette Dachgestell mit seinem Aufarbeitungsmodul abnehmbar und gegen ein anderes Dachgestell mit einem anderen Aufarbeitungsmodul des Arbeitswagens ausgetauscht werden kann. Bei diesem Dachgestell kann es sich alternativ auch um ein Dachgestell ohne Aufarbeitungsmodul handeln, welches lediglich Standardförderbänder aufweist. Dies bedeutet, daß der Basis-Arbeitswagen als solcher universell eingesetzt werden kann. Er kann somit als normaler Arbeitswagen zum Bunkern von Materialien und/oder zum Durchtransport von Materialien verwendet werden, aber auch im erfindungsgemäßen Sinne durch Austausch des Dachgestells derart eingesetzt werden, daß damit eine Aufarbeitung des Unterbaumaterials im erfindungsgemäßen Sinne möglich ist.A further development proposes according to
Die Weiterbildung gemäß Anspruch 6 schlägt vor, daß zum Aufbereiten des Unterbaumaterials dieses fraktioniert und ggf. zusätzlich noch gereinigt wird. Dadurch ist eine einfache und zielgerichtete Separierung, Reinigung sowie Aufarbeitung der bei der Aufbereitung anfallenden Feinanteile möglich, welche üblicherweise der Entsorgung zugeführt werden. Optional ist – wie ausgeführt – eine Waschung, Reinigung oder anderweitige Aufarbeitung des Feinfraktionsanteils möglich.The development according to
Gemäß der Weiterbildung in Anspruch 7 wird zum Fraktionieren des Unterbaumaterials ein Sieb verwendet. Dies bedeutet, daß die Aufarbeitungsmodule im Regelfall eine Sieb- und Fraktionierungseinheit unter Verwendung eines Siebrostes zur Abtrennung des gewünschten Korns besitzen. Die Siebroste können hierbei auch als Rollenroste ausgebildet sein. Die Lochweite der Maschenroste bzw. die Rollenrostweite ist dabei für die Fraktionsgröße maßgeblich. Grundsätzlich können die Maschenroste gewechselt werden, um die Lochweite der Absiebung und somit die gewünschte Siebkörnung zu variieren.According to the embodiment in claim 7, a sieve is used for fractionating the substructure material. This means that the workup modules usually have a sieving and fractionating unit using a sieve grate to separate the desired grain. The sieve grates can also be designed as roller grates. The hole width of the mesh grates or the roller grate size is decisive for the fraction size. Basically, the mesh grids can be changed to vary the hole size of the screening and thus the desired Siebkörnung.
Schließlich schlägt die Weiterbildung gemäß Anspruch 8 vor, daß die Arbeitswagen Bodenförderbänder, Dachförderbänder sowie endseitige Übergabeförderbänder aufweisen. Dabei können sowohl die Bodenförderbänder als auch die Dachförderbänder endseitige Übergabeförderbänder aufweisen. Dies bedeutet, daß mittels Förderbänder des Arbeitswagens ein universeller Materialtransport von Arbeitswagen zu Arbeitswagen möglich ist.Finally, the development proposes according to
Ausführungsbeispiele des erfindungsgemäßen Verfahrens zum Aufarbeiten des unter dem Gleis einer Bahnstrecke befindlichen Unterbaumaterials werden nachfolgend anhand der Zeichnungen beschrieben. In diesen zeigt:Exemplary embodiments of the method according to the invention for refurbishing the substructure material located under the track of a railway track are described below with reference to the drawings. In these shows:
Der Arbeitszug weist zunächst einen gleisgebundenen Ausbau-Arbeitswagen
Es schließen sich dann die erfindungsgemäßen Aufarbeitungs-Arbeitswagen
Die Funktionsweise ist wie folgt:
Das mittels des Ausbau-Arbeitswagens
The by means of the
Das ausgebaute Unterbaumaterial
Die Schotterfraktion, welche die Siebeinrichtung
In
BezugszeichenlisteLIST OF REFERENCE NUMBERS
- 11
- Gleistrack
- 22
- UnterbaumaterialSupport material
- 33
- Ausbau-ArbeitswagenConstruction working car
- 44
- Übergabe-ArbeitswagenPassing trolley
- 55
- Zwischenbunker-ArbeitswagenIntermediate bunker working car
- 66
- Zusatz-ArbeitswagenAdditional working car
- 77
- Reinigungs-ArbeitswagenCleaning trolley
- 88th
- Aufarbeitungs-ArbeitswagenReconditioning working car
- 99
- Aufarbeitungs-ArbeitswagenReconditioning working car
- 1010
- Aufarbeitungsmodulworkup module
- 1111
- Siebeinrichtungscreening
- 1212
- BodenförderbandFloor conveyor
- 1313
- DachförderbandRoof conveyor belt
- 1414
- ÜbergabeförderbandTransfer conveyor belt
- 1515
- Wascheinrichtungwash
- 1616
- Dachgestellroof rack
Claims (8)
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE201310005276 DE102013005276A1 (en) | 2013-03-26 | 2013-03-26 | Process for refurbishing the substructure material under the track of a railway line |
PL14400021T PL2787121T3 (en) | 2013-03-26 | 2014-03-19 | Method for processing the substructure located under the track of a railway section |
EP14400021.3A EP2787121B1 (en) | 2013-03-26 | 2014-03-19 | Method for processing the substructure located under the track of a railway section |
DK14400021.3T DK2787121T3 (en) | 2013-03-26 | 2014-03-19 | Process for making foundation material which is under the track of a railway line. |
ES14400021.3T ES2613143T3 (en) | 2013-03-26 | 2014-03-19 | Procedure for reconditioning the subgrade material that is under the track of a railway track |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE201310005276 DE102013005276A1 (en) | 2013-03-26 | 2013-03-26 | Process for refurbishing the substructure material under the track of a railway line |
Publications (1)
Publication Number | Publication Date |
---|---|
DE102013005276A1 true DE102013005276A1 (en) | 2014-10-02 |
Family
ID=50479166
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE201310005276 Withdrawn DE102013005276A1 (en) | 2013-03-26 | 2013-03-26 | Process for refurbishing the substructure material under the track of a railway line |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP2787121B1 (en) |
DE (1) | DE102013005276A1 (en) |
DK (1) | DK2787121T3 (en) |
ES (1) | ES2613143T3 (en) |
PL (1) | PL2787121T3 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3282055A1 (en) | 2016-08-08 | 2018-02-14 | Zuercher Holding GmbH | Work trolley combination, and method for treating the ballast of a railway track |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10128374B4 (en) * | 2001-04-23 | 2011-04-21 | Gsg Knape Gleissanierung Gmbh | Method for supplying a line construction site with building materials and associated transport or conveyor chain, as well as applicable classifying and fractionating |
-
2013
- 2013-03-26 DE DE201310005276 patent/DE102013005276A1/en not_active Withdrawn
-
2014
- 2014-03-19 PL PL14400021T patent/PL2787121T3/en unknown
- 2014-03-19 EP EP14400021.3A patent/EP2787121B1/en active Active
- 2014-03-19 ES ES14400021.3T patent/ES2613143T3/en active Active
- 2014-03-19 DK DK14400021.3T patent/DK2787121T3/en active
Also Published As
Publication number | Publication date |
---|---|
EP2787121A3 (en) | 2014-11-12 |
ES2613143T3 (en) | 2017-05-22 |
EP2787121A2 (en) | 2014-10-08 |
EP2787121B1 (en) | 2016-11-09 |
DK2787121T3 (en) | 2017-02-20 |
PL2787121T3 (en) | 2017-09-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2231927B1 (en) | Rail vehicle for renovating the substructure of a track | |
DE202007011501U1 (en) | Track rehabilitation machine with triple separated excavation | |
DE102009041237B4 (en) | Method for rehabilitating the track substructure of a railway line | |
EP3755842B1 (en) | Cleaning machine | |
EP2787121B1 (en) | Method for processing the substructure located under the track of a railway section | |
EP2428611B1 (en) | Refurbishment method for the multi-layer substructure of rail sections and vehicle assembly | |
DE10139765B4 (en) | Process for material preparation and / or material washing and / or clay discharge regarding bulk material, in particular in connection with construction work on a line construction site and corresponding rail or road system | |
EP2708647B1 (en) | Maintenance vehicle for the rail construction on railway lines | |
DE29703454U1 (en) | Movable track construction machine | |
EP2791418B1 (en) | Method for repairing a subgrade | |
EP3721012B1 (en) | System for cleaning ballast of a track | |
EP2166152B1 (en) | Method and device for improving or repairing track systems | |
EP2559812B1 (en) | Method and device for improving or repairing track systems | |
EP2374931B1 (en) | Refurbishment method for multi-layer substructure of rail sections | |
DE102012017997A1 (en) | Method for creating and / or rehabilitating a railway line | |
EP2159323A1 (en) | Method for reconditioning track sections for train transport | |
EP3523477B1 (en) | Machine and method for cleaning track ballast | |
DE102015013142A1 (en) | Device for cleaning vehicle tires | |
EP2811072A1 (en) | Rail bed refurbishing machine with processing of the base grade protection layer | |
DE102011014266B4 (en) | Between trolley | |
DE102012019361B4 (en) | Work car for track construction on railway lines | |
DE819224C (en) | Device for separating the debris from sand, moertel u. like | |
DE102012013442A1 (en) | Movable device for cleaning gravel located below railroad track ballast bed, has cleaning device with shell that has perforation whose size is selected such that residue from screening drum is conveyed to return device by conveyors | |
DD148894A3 (en) | METHOD FOR THE TRACKED UNDERGROUND PURIFICATION OF RAILWAY RAILS | |
EP2159324A1 (en) | Method for reconditioning track sections for train transport |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R012 | Request for examination validly filed | ||
R016 | Response to examination communication | ||
R082 | Change of representative |
Representative=s name: MEHL-MIKUS, CLAUDIA, DR., DE |
|
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |