DE102011014469B4
DE102011014469B4 DE102011014469.2A DE102011014469A DE102011014469B4 DE 102011014469 B4 DE102011014469 B4 DE 102011014469B4 DE 102011014469 A DE102011014469 A DE 102011014469A DE 102011014469 B4 DE102011014469 B4 DE 102011014469B4
Authority
DE
Germany
Prior art keywords
power
inverter
energy
reactive power
supply network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
DE102011014469.2A
Other languages
German (de)
Other versions
DE102011014469A1 (en
Inventor
Bernhard Beck
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bob Holding De GmbH
Original Assignee
BOB HOLDING GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BOB HOLDING GmbH filed Critical BOB HOLDING GmbH
Priority to DE102011014469.2A priority Critical patent/DE102011014469B4/en
Priority to EP14002050.4A priority patent/EP2802014A1/en
Priority to EP12735085.8A priority patent/EP2689462A2/en
Priority to PCT/EP2012/001198 priority patent/WO2012126601A2/en
Publication of DE102011014469A1 publication Critical patent/DE102011014469A1/en
Application granted granted Critical
Publication of DE102011014469B4 publication Critical patent/DE102011014469B4/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/26Arrangements for eliminating or reducing asymmetry in polyphase networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/28The renewable source being wind energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/50Arrangements for eliminating or reducing asymmetry in polyphase networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Control Of Electrical Variables (AREA)

Abstract

Verfahren zur Optimierung der Einspeiseleistung und der Stabilität in einem öffentlichen Stromversorgungsnetz (13) mit mehreren Energielieferanten (7, 9, 11) von regenerativer Energie, wobei jeder Energielieferant einen auf der Basis elektronischer Bauelemente arbeitenden Wechselrichter hat, wobei jeder Wechselrichter seine momentan frei verfügbare Kapazität zur Lieferung oder zum Bezug von Blindleistung an eine Systemsteuerung (15) meldet, die aus den eingegangenen Daten zur freien Blindleistungskapazität einen Beitrag für jeden Energielieferanten ermittelt, den dieser über seinen Wechselrichter als Blindleistung in das Versorgungsnetz einspeist oder aus dem Versorgungsnetz bezieht, dadurch gekennzeichnet, dass sowohl die frei verfügbare Kapazität zur Lieferung oder zum Bezug von Blindleistung, die geographische Lage der Energielieferanten als auch die Zuordnung der Energielieferanten zu einem Netzbereich in die Ermittlung einbezogen werden.Method for optimizing the feed-in power and the stability in a public power supply network (13) with several energy suppliers (7, 9, 11) of renewable energy, wherein each energy supplier has an inverter operating on the basis of electronic components, wherein each inverter reports its currently freely available capacity for supplying or purchasing reactive power to a system controller (15) which, from the received data on the free reactive power capacity, determines a contribution for each energy supplier which it feeds into the supply network as reactive power via its inverter or which it purchases from the supply network, characterized in that both the freely available capacity for supplying or purchasing reactive power, the geographical location of the energy suppliers and the allocation of the energy suppliers to a network area are included in the determination.

Description

Die Erfindung bezieht sich auf ein Verfahren zur Optimierung der Einspeiseleistung und der Stabilität in einem öffentlichen Stromversorgungsnetz mit mehreren Energielieferanten von regenerativer Energie, wobei jeder Energielieferant einen auf der Basis elektronischer Bauelemente arbeitenden Wechselrichter aufweist.The invention relates to a method for optimizing the feed-in power and the stability in a public power supply network with several energy suppliers of renewable energy, wherein each energy supplier has an inverter operating on the basis of electronic components.

Einleitend soll kurz auf die Praxis der öffentlichen Stromversorgung eingegangen werden. Je nach Versorgungsebene werden von den Energieversorgungsunternehmen mehr oder weniger enge Grenzen für den Blindleistungsbezug oder die Blindleistungslieferung der Stromlieferanten und der Stromverbraucher gesetzt. In den meisten Ländern beträgt der zulässige Wert für einen sanktionslosen Blindleistungsbezug oder - einspeisung bei einem cos phi von 0,95. Diese Maßnahme dient der Stabilisierung der Netze, um eine Überspannung, die zu einer Zerstörung von angeschlossenen Verbrauchern führen kann, und eine Unterspannung, die zu einem Versagen von Verbrauchern führen kann, zu vermeiden. Als Regulativ zur Einhaltung der gesetzten cos phi Werte dient der Preis. So wird eine Einspeisung oder ein Bezug von Blindleistung außerhalb der von dem Energieversorger oder Obernetzbetreiber vorgegebenen Bandbreite für den cos phi mit erheblichen Aufzahlungen belegt.To begin with, we will briefly look at the practice of public electricity supply. Depending on the supply level, the energy supply companies set more or less strict limits on the reactive power purchase or supply of electricity suppliers and consumers. In most countries, the permissible value for a penalty-free reactive power purchase or feed-in is a cos phi of 0.95. This measure serves to stabilize the networks in order to avoid overvoltage, which can lead to the destruction of connected consumers, and undervoltage, which can lead to consumer failure. The price serves as a regulator for compliance with the set cos phi values. For example, feeding in or purchasing reactive power outside the cos phi range specified by the energy supplier or main grid operator is subject to considerable surcharges.

Anlagen zur Erzeugung regenerativer Energie sind vielfältig bekannt. Jede Photovoltaikanlage erzeugt in ihrem PV-Generator einen Gleichstrom, der mittels eines Wechselrichters in einen Wechselstrom umgewandelt wird. Als Wechselrichter können sowohl rein elektronische Geräte als auch elektromechanische Umformer eingesetzt werden. Unter Wechselrichter sind dabei alle Vorrichtungen anzusehen, welche aus einer Gleichspannung eine Wechselspannung erzeugen können. So erzeugen Windkraftanlagen zwar unmittelbar einen Wechselstrom, der aber über einen Frequenzumformer an die Verhältnisse des öffentlichen Versorgungsnetzes anzupassen ist. Diese Frequenzumformer umfassen ebenfalls Wechselrichter und sollen mit umfasst sein, wenn auf Wechselrichter Bezug genommen wird.There are many different types of systems for generating renewable energy. Every photovoltaic system generates a direct current in its PV generator, which is converted into an alternating current using an inverter. Both purely electronic devices and electromechanical converters can be used as inverters. Inverters are all devices that can generate an alternating voltage from a direct voltage. For example, wind turbines generate an alternating current directly, but this must be adapted to the conditions of the public supply network using a frequency converter. These frequency converters also include inverters and should be included when reference is made to inverters.

Die elektronischen Komponenten eines Wechselrichter, ebenso wie auch die Kombination einer Gleichstrommaschine mit einem Synchrongenerator als mechanischen Wechselrichter, erlauben die Einstellung eines gewünschten cos phi Wertes in Bezug zur Leistung. Dies geschieht bei den meisten PV-Anlagen durch einen cos phi - Zeiger, über den ein festes Verhältnis von eingespeister Leistung zu eingespeister oder bezogener Blindleistung eingestellt werden kann. So wird der Regeleinheit z. B. vorgeschrieben, jegliche in das Netz eingespeiste Leistung mit einem cos phi von 0,97 einzustellen. Bei größeren und modernen Anlagen ist man dazu übergegangen, den cos phi Wert nicht starr als Zeiger vorzugeben, sondern nach dem Diagramm entsprechend der 1 einzustellen. Dort ist ein einzustellender cos phi-Wert am Ausgang des Wechselrichters über die Netzspannung aufgetragen. Die Ausgangsspannung UNetz zur Einspeisung in das Netz darf nur innerhalb eines minimalen Werts Umin und eines maximalen Werts Umax variieren. Außerhalb dieses vom Energieversorger zugelassenen Bereichs der Einspeisung ins Netz mit einem cos phi von z.B. maximal 0,95 sollte die Photovoltaikanlage nicht betrieben werden. Innerhalb dieses zulässigen Bereichs liegt ein engerer Bereich zwischen einer minimalen Regelspannung Uregel min und einer maximalen Regelspannung Uregel max, in welchem reine Leistung ohne eine Blindleistungskomponente an das Netz abgegeben werden kann. In der Mitte dieses engeren Bereichs liegt die Sollspannung Usoll.The electronic components of an inverter, as well as the combination of a DC machine with a synchronous generator as a mechanical inverter, allow the setting of a desired cos phi value in relation to the power. In most PV systems, this is done by means of a cos phi indicator, which can be used to set a fixed ratio of fed-in power to fed-in or drawn-in reactive power. For example, the control unit is instructed to set any power fed into the grid with a cos phi of 0.97. In larger and modern systems, the cos phi value is not rigidly specified as an indicator, but is calculated according to the diagram in accordance with the 1 to be set. There, a cos phi value to be set is plotted against the grid voltage at the output of the inverter. The output voltage U grid for feeding into the grid may only vary within a minimum value U min and a maximum value U max . The photovoltaic system should not be operated outside of this range of feed-in to the grid permitted by the energy supplier with a cos phi of e.g. maximum 0.95. Within this permitted range there is a narrower range between a minimum control voltage U control min and a maximum control voltage U control max in which pure power can be fed into the grid without a reactive power component. In the middle of this narrower range is the target voltage U target .

In der Regel sind Energieversorger vor allem in ihrem Vertragsverhältnis zum Obernetzbetreiber (e.g. Atomkraftwerk, Kohlekraftwerk etc. als Energielieferant) vertraglich dazu verpflichtet einen Blindleistungsbezugswert von cos phi 0,95 nicht zu überschreiten, um die Spannungsstabilität in dem überregionalen Obernetz sicher zu stellen. Das bedeutet, dass in dem Zahlenbeispiel ein cos phi Wert von 0,94 eine Überschreitung des Bezugs darstellt, wohingegen eine cos phi Wert von 0,96 eine Unterschreitung, dass heißt ein nicht Ausnutzen des maximal erlaubten Bezugs, darstellt. Ein Bezug oder die Lieferung von Blindleistung ist aber oftmals in den unteren Netzen erforderlich, um einen Spannungsanstieg durch die Einspeisung von Solar- und Windkraftstrom zu kompensieren bzw. um einen Spannungsabfall durch ausfallende Lieferung von alternativ erzeugter Energie oder das Anfahren von Maschinen zu kompensieren.As a rule, energy suppliers are contractually obliged, especially in their contractual relationship with the main grid operator (e.g. nuclear power plant, coal-fired power plant, etc. as energy supplier), not to exceed a reactive power reference value of cos phi 0.95 in order to ensure voltage stability in the supra-regional main grid. This means that in the numerical example, a cos phi value of 0.94 represents an excess of the reference, whereas a cos phi value of 0.96 represents an undershoot, i.e. not using the maximum permitted reference. However, a reference or supply of reactive power is often necessary in the lower grids in order to compensate for a voltage increase caused by the feed-in of solar and wind power or to compensate for a voltage drop caused by the failure to supply alternatively generated energy or the starting up of machines.

Es ist bekannt, dass elektronische Wechselrichter durch entsprechende Ansteuerung ihrer IGBT's von sich aus Blindleistung erzeugen können, die sie in das angeschlossene Versorgungsnetz einspeisen können. Ebenso können sie so angesteuert werden, dass sie Blindleistung aus dem Netz beziehen. Der Bezug von Blindleistung wirkt dabei netzseitig spannungsreduzierend und das Einspeisen von Blindleistung spannungserhöhend.It is known that electronic inverters can generate reactive power by controlling their IGBTs accordingly, which they can feed into the connected supply network. They can also be controlled in such a way that they draw reactive power from the network. Drawing reactive power reduces the voltage on the network side and feeding in reactive power increases the voltage.

Aus der US 2010 / 0 067 271 A1 ist ein Verfahren zur Bereitstellung von Blindleistungsunterstützung offenbart. Das Verfahren umfasst die Erfassung mindestens eines von mehreren Netzparametern in einem verteilten Solarstromerzeugungssystem. Das Erzeugungssystem umfasst eine Vielzahl von Photovoltaikmodulen, die über Wechselrichter mit einem Netz verbunden sind. Das Verfahren umfasst ferner das Erfassen eines Zustands der mit dem verteilten Solarstromerzeugungssystem verbundenen Photovoltaikmodule und das Bestimmen eines Blindleistungsmaßes auf der Grundlage des erfassten Zustands und der erfassten Netzparameter. Das Blindleistungsmaß wird verwendet, um einen Blindleistungsbefehl zu erzeugen. Der Blindleistungsbefehl wird ferner zur Kompensation der Blindleistung im verteilten Solarstromerzeugungssystem verwendet.From the US 2010 / 0 067 271 A1 discloses a method for providing reactive power support. The method includes detecting at least one of a plurality of grid parameters in a distributed solar power generation system. The generation system includes a plurality of photovoltaic modules connected to a grid via inverters. The method further includes detecting a state of the photovoltaic modules connected to the distributed solar power generation system. voltaic modules and determining a reactive power measure based on the sensed state and the sensed grid parameters. The reactive power measure is used to generate a reactive power command. The reactive power command is further used to compensate the reactive power in the distributed solar power generation system.

In der US 2007 / 0 135 970 A1 ist ein Blindleistungskompensationssystem beschrieben, welches eine verteilte Energiequelle, die sich an einem lokalen Standort befindet und so konfiguriert ist, dass sie auch Strom von einem entfernten Standort über eine Verteilerleitung empfängt, umfasst. Die verteilte Energiequelle umfasst einen Wechselrichter mit Leistungshalbleiter-Schaltvorrichtungen und einen Wechselrichter-Controller, der so konfiguriert ist, dass er die Leistungshalbleiter-Schaltvorrichtungen steuert, um die Verteilerleitung mit Blindleistung zu versorgen.In the US 2007 / 0 135 970 A1 describes a reactive power compensation system that includes a distributed energy source located at a local location and configured to also receive power from a remote location via a distribution line. The distributed energy source includes an inverter having power semiconductor switching devices and an inverter controller configured to control the power semiconductor switching devices to supply reactive power to the distribution line.

Die nachveröffentlichte DE 10 2011 012 695 A1 offenbart ein Verfahren zum Einhalten der Netzstabilität in einem elektrischen Versorgungsnetz. An das Versorgungsnetz sind über einen ersten Netzverknüpfungspunkt ein Energielieferant, über einen zweiten Netzverknüpfungspunkt ein im Übersetzungsverhältnis veränderlicher Transformator zu einem Obernetz und über eine Vielzahl weiterer Netzverknüpfungspunkte jeweils zugeordnete Verbraucher angeschlossen. An dem ersten, dem zweiten und an einem Teil der weiteren Netzverknüpfungspunkte wird die aktuell herrschende Spannung gemessen und mit der jeweiligen geographischen Position der Netzverknüpfungspunkte korreliert. Aus den gewonnenen Daten wird ein Blindleistungsbezug oder eine Blindleistungslieferung des Energielieferanten in Abhängigkeit der gemessenen Spannungsmesswerte unter Berücksichtigung der geographischen Lage der Messstellen berechnet.The republished DE 10 2011 012 695 A1 discloses a method for maintaining grid stability in an electrical supply network. An energy supplier is connected to the supply network via a first network connection point, a transformer with a variable transformation ratio to a main network via a second network connection point and associated consumers via a large number of other network connection points. The current voltage is measured at the first, second and some of the other network connection points and correlated with the respective geographical position of the network connection points. From the data obtained, a reactive power consumption or a reactive power supply of the energy supplier is calculated depending on the measured voltage values, taking into account the geographical location of the measuring points.

Es ist die Aufgabe vorliegender Erfindung, die zuvor genannte Eigenschaft von Wechselrichtern zur Stabilisierung der Netzspannung zu nutzen, ohne eine Reduktion der Wirkleistung in Kauf nehmen zu müssen oder eine Einspeisung dieser gegebenenfalls sogar zu steigern.It is the object of the present invention to use the aforementioned property of inverters to stabilize the grid voltage without having to accept a reduction in the active power or possibly even increasing the feed-in of this.

Nach einer ersten Ausführungsform wird die Aufgabe erfindungsgemäß dadurch gelöst, dass jeder Wechselrichter seine momentan frei verfügbare Blindleistungskapazität an eine Systemsteuerung meldet, die aus den eingegangenen Daten zur Blindleistungskapazität einen Beitrag für jeden Energielieferanten ermittelt, den dieser über seinen Wechselrichter als Blindleistung in das Versorgungsnetz einspeist oder aus dem Versorgungsnetz bezieht.According to a first embodiment, the object is achieved according to the invention in that each inverter reports its currently freely available reactive power capacity to a system controller, which uses the received data on the reactive power capacity to determine a contribution for each energy supplier that it feeds into the supply network as reactive power or draws from the supply network via its inverter.

Die Aufgabe wird gemäß einer zweiten Ausführungsform erfindungsgemäß dadurch gelöst, dass jeder Wechselrichter seine momentan in das Versorgungsnetz eingespeiste Leistung an eine Systemsteuerung meldet, die aus den eingegangenen Daten zur Leistung einen Beitrag für jeden Energielieferanten ermittelt, den dieser über seinen Wechselrichter als Blindleistung in das Versorgungsnetz einspeist oder aus dem Versorgungsnetz bezieht. Obwohl das Ziel des Verfahrens die Stabilisierung des Versorgungsnetzes mittels der Aufteilung und Verteilung der Blindleistungsbeiträge auf die beteiligten Lieferanten alternativer Energie ist, kann auch eine Meldung der momentanen Leistung zum Ziel führen. Dann nämlich, wenn die Steuer- und Regeleinheit des betreffenden Energielieferanten den Wechselrichter auf einen festen cos phi Wert fährt, womit aus der Kenntnis der Leistung ein Rückschluss auf die momentane Blindleistung gezogen werden kann. Bei Kenntnis der Nennleistung der einzelnen Energielieferanten kann dann die frei verfügbare Blindleistungskapazität ermittelt werden.According to a second embodiment, the object is achieved in that each inverter reports the power it is currently feeding into the supply network to a system controller, which uses the power data received to determine a contribution for each energy supplier that it feeds into the supply network as reactive power via its inverter or draws from the supply network. Although the aim of the method is to stabilize the supply network by dividing and distributing the reactive power contributions among the alternative energy suppliers involved, reporting the current power can also achieve the goal. This is the case when the control and regulation unit of the energy supplier in question drives the inverter to a fixed cos phi value, whereby a conclusion can be drawn about the current reactive power from the knowledge of the power. If the nominal power of the individual energy suppliers is known, the freely available reactive power capacity can then be determined.

Der Vorteil der oben genannten Maßnahmen soll kurz an einem Beispiel erläutert werden. Dabei wird die folgende Begriffsbildung verwendet: Eine Photovoltaikanlage besteht aus einem PV-Generator und einem Wechselrichter. Es sind drei größere Photovoltaikanlagen an das öffentliche Versorgungsnetz angeschlossen. Das Netz selber ist aus welchen Gründen auch immer in einem Betriebszustand, der zur Sicherstellung der Stabilität Maßnahmen erfordert. Mögliche Gründe können dabei der Ausfall eines Transformators wegen Wartungsarbeiten, das Anfahren von Induktionsöfen, die Einspeisung von zahlreichen Photovoltaikanlagen auf Dächern mit einer jeweils einhergehenden kleinen flukturierenden Spannungserhöhungen etc. sein.The advantage of the above measures will be briefly explained using an example. The following terminology is used: A photovoltaic system consists of a PV generator and an inverter. Three large photovoltaic systems are connected to the public supply network. For whatever reason, the network itself is in an operating state that requires measures to ensure stability. Possible reasons could be the failure of a transformer due to maintenance work, the start-up of induction furnaces, the feeding in of numerous photovoltaic systems on roofs with an associated small fluctuating voltage increase, etc.

Die drei Photovoltaikanlagen befinden sich an unterschiedlichen Orten, die so weit auseinanderliegen, dass ein vorliegendes Wolkenbild zu jeweils unterschiedlicher Sonneneinstrahlung auf die einzelnen PV-Generatoren führt, was unweigerlich zu einer unterschiedlichen Einspeisung von Energie durch die Wechselrichter in das Stromnetz führt. Die erste Photovoltaikanlage wird z.B. unter Volllast betrieben, das heißt, ihr zugehöriger Wechselrichter arbeitet mit seiner Nennleistung, um elektrische Energie in das Versorgungsnetz einzuspeisen. Die beiden andern PV-Anlagen erzeugen zur selben Zeit lediglich 70%, beziehungsweise 80% ihrer Nennleistung, die von den zugordneten Wechselrichtern in das Versorgungsnetz eingespeist wird.The three photovoltaic systems are located in different places, which are so far apart that the presence of clouds leads to different levels of sunlight on the individual PV generators, which inevitably leads to different levels of energy being fed into the power grid by the inverters. The first photovoltaic system, for example, is operated at full load, i.e. its associated inverter is working at its rated output to feed electrical energy into the grid. At the same time, the other two PV systems only generate 70% and 80% of their rated output, respectively, which is fed into the grid by the associated inverters.

Erfindungsgemäß werden der- oder diejenigen Wechselrichter zum Bezug oder zur Einspeisung von Blindleistung herangezogen, die freie Blindleistungskapazitäten haben, deren Nennleistung also momentan nicht ausgeschöpft ist, um anderen Energielieferanten zu ermöglichen, zusätzliche Wirkleistung in das Versorgungsnetz einzuspeisen. Bei obigem Beispiel sind die zweite und die dritte Photovoltaikanlage in der Lage, Spannungs-stabilisierende Blindleistungsbeiträge zu leisten. Da der Wechselrichter der ersten Photovoltaikanlage auf Volllast arbeitet und keine weitere Leistung mehr verarbeiten kann, ohne seine Blindleistungsverpflichtung gegenüber dem Netzbetreiber zu missachten, kann sein Blindleistungsanteil zurückgenommen werden, wenn der mit dem Blindleistungsanteil einhergehende Stabilisierungseffekt von einer anderen Photovoltaikanlage mit übernommen wird. Der bei der ersten Photovoltaikanlage durch die Zurücknahme der Blindleistung frei werdende Beitrag kann zur Erhöhung der Einspeisung von Wirkleistung genutzt werden. Vorliegende Erfindung erlaubt also eine Optimierung der Blindleistungseinspeisung oder deren Bezug zwischen verschiedenen Energielieferanten mit dem Ziel, gemeinsam die maximale Leistung beziehungsweise die maximale Anzahl an Kilowattstunden in das Versorgungsnetz einzuspeisen unter gemeinsamer Betrachtung aller Energielieferanten und nicht isoliert nur eines einzigen Energielieferanten. Hierbei ist es sinnvoll, wenn Geräte mit temporär niedriger vorliegender Leistung und freier VAr Regelkapazität mehr zur Netzstützung beitragen als Energielieferanten mit einer zum selben Zeitpunkt hohen vorliegenden Leistung und niedriger Blindleistungsregelkapazität. Das entspricht einer Übernahme von VAr Regelanforderungen durch Energieerzeuger die momentan dazu in der Lage sind, ohne ihre Leistung reduzieren zu müssen. Es werden quasi wie an einer Börse freie VAr - Kapazitäten verschoben, um eine Nachfrage und ein Angebot zum Nutzen einer maximal möglichen Leistung bei Einhaltung der Netzspannung innerhalb eines vorgebbaren Bereichs auszutarieren. Die erfindungsgemäße Zuordnung von Energielieferanten in Netzbereiche, Spannungsebenen und die Einbeziehung ihrer geographischen Lage zueinander ermöglichen einen sicheren Betrieb der oben genannten Erfindung und optimiert den Wirkeffekt von Blindleistungseinspeisung oder -bezug hinsichtlich der Spannungsstabilisierung im Netz unter gleichzeitiger Optimierung des Gesamtsystems aller Energielieferanten, die maximale Anzahl der kWh in das Netz einzuspeisen.According to the invention, the inverter(s) that have free reactive power capacities, i.e. whose nominal power is not currently exhausted, are used to purchase or feed in reactive power in order to supply other energy to enable energy suppliers to feed additional active power into the supply network. In the above example, the second and third photovoltaic systems are able to make voltage-stabilizing reactive power contributions. Since the inverter of the first photovoltaic system is operating at full load and can no longer process any more power without violating its reactive power obligation to the grid operator, its reactive power share can be reduced if the stabilization effect associated with the reactive power share is also taken over by another photovoltaic system. The contribution released by the first photovoltaic system by reducing the reactive power can be used to increase the feed-in of active power. The present invention therefore allows optimization of the reactive power feed-in or its procurement between different energy suppliers with the aim of jointly feeding the maximum power or the maximum number of kilowatt hours into the supply network, taking all energy suppliers into account together and not just one energy supplier in isolation. It is sensible here if devices with temporarily low available power and free VAr control capacity contribute more to grid support than energy suppliers with a high available power and low reactive power control capacity at the same time. This corresponds to the assumption of VAr control requirements by energy producers who are currently able to do so without having to reduce their output. Free VAr capacities are shifted, as on a stock exchange, in order to balance demand and supply in order to benefit from the maximum possible power while maintaining the grid voltage within a predefined range. The inventive allocation of energy suppliers to grid areas, voltage levels and the inclusion of their geographical location in relation to one another enables safe operation of the above-mentioned invention and optimises the effect of reactive power feed-in or draw-in with regard to voltage stabilisation in the grid while simultaneously optimising the overall system of all energy suppliers to feed the maximum number of kWh into the grid.

Weitere Vorteile und Ausgestaltungen der Erfindung ergeben sich aus der Beschreibung eines Ausführungsbeispiels anhand der Figuren. Es zeigen:

  • 1 ein Regelschema eines Wechselrichters einer Solaranlage zur Einstellung eines cos phi Werts über die Ausgangsspannung; und
  • 2 eine schematische Darstellung eines Versorgungsnetzes.
Further advantages and embodiments of the invention will become apparent from the description of an embodiment based on the figures. They show:
  • 1 a control scheme of an inverter of a solar system for setting a cos phi value via the output voltage; and
  • 2 a schematic representation of a supply network.

In der 2 ist ein Teil eines öffentlichen Versorgungsnetzes 1 gezeigt, welches einen ersten und einen zweiten Transformator 3 bzw. 5, drei Photovoltaikanlagen 7, 9, 11, ein Stadtnetz 13 und eine Leitwarte 15 beinhaltet. Die Photovoltaikanlagen 7, 9, 11 sind der Übersichtlichkeit halber außerhalb des Stadtnetzes 13 gezeigt, werden aber von dem Versorgungsunternehmen der Stadt betrieben. Die Transformatoren 3, 5 sind auf ihrer Primärseite mit einem 20 kV Kabel verbunden und ihre Sekundärseite versorgt das Stadtnetz 13 auf der 400 Volt Ebene. Die primärseitigen Kabel der Transformatoren 3, 5 wiederum führen zu weiteren, nicht gezeigten Transformatoren, die die Transformatoren 3, 5 aus einer 110 kV Ebene heraus mit Spannung versorgen.In the 2 a part of a public supply network 1 is shown, which includes a first and a second transformer 3 and 5, respectively, three photovoltaic systems 7, 9, 11, a city network 13 and a control room 15. The photovoltaic systems 7, 9, 11 are shown outside the city network 13 for the sake of clarity, but are operated by the city's utility company. The transformers 3, 5 are connected on their primary side to a 20 kV cable and their secondary side supplies the city network 13 at the 400 volt level. The primary-side cables of the transformers 3, 5 in turn lead to further transformers, not shown, which supply the transformers 3, 5 with voltage from a 110 kV level.

Neben den Transformatoren 3, 5 speisen noch die erste, die zweite und die dritte Photovoltaikanlage 7, 9, 11 auf der 20 kV - Ebene Leistung in das Stadtnetz 13 ein. Die drei PV-Anlagen 7, 9, 11 bestehen in ihren wesentlichen Elementen jeweils aus einem Photovoltaikgenerator, der eine Vielzahl von Photovoltaikmodulen umfasst, deren Photovoltaikzellen einen Gleichstrom erzeugen, und aus einem Wechselrichter, der den erzeugten Gleichstrom in einen Wechselstrom umsetzt.In addition to the transformers 3, 5, the first, second and third photovoltaic systems 7, 9, 11 also feed power into the city grid 13 at the 20 kV level. The three PV systems 7, 9, 11 essentially consist of a photovoltaic generator, which comprises a large number of photovoltaic modules whose photovoltaic cells generate a direct current, and an inverter, which converts the generated direct current into an alternating current.

Der Wechselrichter hat eine an die Nennleistung des PV-Generators angepasste Leistung. Die Anpassung sieht so aus, dass von der maximal erzeugbaren Leistung ein Abschlag erfolgt, der berücksichtigt, dass für die wenige Zeit im Jahr, an der die Sonne mit der höchstmöglichen Intensität auf die PV-Module einstrahlt, es sich wirtschaftlich nicht rechnet, den Wechselrichter auf diese Höchstleistung auszulegen. Desweiteren wird in der Dimensionierung des Wechselrichters ein Blindleistungsanteil berücksichtigt, den der Energieerzeuger in die Versorgungsebene zur Spannungsstabilisierung einbringen muss. Eine solche Verpflichtung ergibt sich aus den Verträgen des örtlichen Betreibers des Stadtnetzes mit den Betreibern der übergeordneten Versorgungsebene, wie es im einleitenden Teil näher ausgeführt ist.The inverter has an output that is adapted to the nominal output of the PV generator. The adjustment is made in such a way that a discount is made on the maximum output that can be generated, which takes into account that for the few times of the year when the sun shines on the PV modules with the highest possible intensity, it is not economically viable to design the inverter for this maximum output. Furthermore, the dimensioning of the inverter takes into account a reactive power component that the energy generator must introduce into the supply level to stabilize the voltage. Such an obligation arises from the contracts between the local operator of the city grid and the operators of the higher-level supply level, as explained in more detail in the introductory section.

Bei einem Zahlenbeispiel wird für die erste Photovoltaikanlage 7 von einer maximal erzeugbaren Leistung von 1,55 Megawatt ausgegangen, die als Wirkleistung beim höchst möglichen Sonnenstand im Sommer und klarem Himmel erreichbar ist. Da diese Konstellation nur wenige Stunden im Jahr auftritt, wird für die Auslegung des Wechselrichters ein Abstrich gemacht und es wird von einer Maximalleistung von 1,5 Megawatt ausgegangen. Der übergeordnete Energieversorger hat dem Stadtnetzbetreiber mit seinen drei PV-Anlagen 7, 9, 11 zur Auflage gemacht, einen cos phi Wert von 0,95 an den Transformatoren 3, 5 und an den PV-Anlagen 7, 9, 11 nicht zu überschreiten.In a numerical example, the first photovoltaic system 7 is assumed to have a maximum output of 1.55 megawatts, which is achievable as active power at the highest possible position of the sun in summer and under clear skies. Since this constellation only occurs for a few hours a year, a compromise is made in the design of the inverter and a maximum output of 1.5 megawatts is assumed. The higher-level energy supplier has required the city network operator with its three PV systems 7, 9, 11 not to exceed a cos phi value of 0.95 on transformers 3, 5 and on PV systems 7, 9, 11.

Die Einspeisung der Leistung der PV-Anlagen 7, 9, 11 wirkt tendenziell spannungserhöhend, so dass von den 1,5 Megawatt eine Vorratshaltung für den Blindleistungsbezug von 5% gemacht wird, was bei einer Leistungsauslegung des Wechselrichters 5 auf 1,5 Megawatt zu einer maximal möglichen Leistungseinspeisung von 1,5 x 0,95 = 1,425 Megawatt führt. Die beiden anderen Photovoltaikanlagen 9, 11 sollen beim Zahlenbeispiel auf jeweils 1 Megawatt Nennleistung ausgelegt sein, von denen 5 % für den Blindleistungsbezug vorzuhalten sind, so dass sie 0,95 Megawatt Leistung erbringen können.The feed-in of the power from PV systems 7, 9, 11 tends to increase the voltage, so that 5% of the 1.5 megawatts is kept in reserve for the reactive power supply, which, if the inverter 5 is designed for 1.5 megawatts, leads to a maximum possible power feed-in of 1.5 x 0.95 = 1.425 megawatts. In the numerical example, the other two photovoltaic systems 9, 11 should each be designed for 1 megawatt of nominal power, of which 5% should be kept in reserve for the reactive power supply so that they can produce 0.95 megawatts of power.

Ein bewölkter Himmel ist eine alltägliche Situation, in welcher weder eine geschlossene Wolkendecke herrscht, noch wolkenloser Himmel vorliegt. Bei einer solchen Wetterlage soll davon ausgegangen werden, dass die erste Photovoltaikanlage 7 mit voller Leistung arbeitet, wegen des 5 prozentigen cos phi Abschlags aber trotzdem lediglich 1,425 Megawatt Wirkleistung einspeist, also 0,075 (1,5 MW - 1,425 MW) Megawatt unterhalb ihrer Nennleistung. Zur selben Zeit ist die zweite Photovoltaikanlage 9 teilweise abgeschattet und speist lediglich 0,7 Megawatt in das Stadtnetz 13 ein, wobei in den 0,7 MW der Blindleistungsanteil bereits berücksichtigt sein soll.A cloudy sky is an everyday situation in which there is neither a closed cloud cover nor a cloudless sky. In such a weather situation, it should be assumed that the first photovoltaic system 7 is working at full power, but due to the 5 percent cos phi discount, it is still only feeding in 1.425 megawatts of active power, i.e. 0.075 (1.5 MW - 1.425 MW) megawatts below its nominal power. At the same time, the second photovoltaic system 9 is partially shaded and is only feeding in 0.7 megawatts into the city grid 13, whereby the reactive power component is already taken into account in the 0.7 MW.

Hier setzt die Erfindung an, indem beide PV-Anlagen 7, 9 ihre Blindleistungsreserven an die Leitwarte 15 melden. Die erste Photovoltaikanlage 7 meldet also null verfügbare Blindleistungskapazität und die zweite Photovoltaikanlage 9 meldet 0,3 Megawatt (1 MW Nennleistung - 0,7 MW momentane Leistung) verfügbare Blindleistungskapazität. Die Leitwarte 15 sendet daraufhin ein Steuersignal an die zweite Photovoltaikanlage 9, welches den Betrieb deren Wechselrichters so abändert, dass er zusätzlich zu den 0,7 Megawatt Leistung, die die zweite Photovoltaikanlage 9 selber generiert, noch weitere 0,075 Megawatt Blindleistung bezieht. Der Wechselrichter der zweiten Photovoltaikanlage 9 wird dann insgesamt mit 0,775 Megawatt betrieben, was unterhalb seiner Nennleistung von 1 MW liegt. Der von der Leitwarte 15 zusätzlich angeforderte Blindleistungsbezug von 0,075 MW entspricht dem von der ersten Photovoltaikanlage 7 vertragsbedingt abverlangten Blindleistungsbezug, der also nicht mehr von dieser erbracht werden muss, sondern von der zweiten Photovoltaikanlage 9 übernommen wird. Anschließend oder gleichzeitig sendet die Leitwarte 15 an die erste Photovoltaikanlage 7 ein Steuersignal, dass deren Wechselrichter keinen Blindleistungsbezug mehr vornehmen muss, worauf hin dort ohne Rücksicht auf einen Blindleistungsvorbehalt die Einspeisung der sonnengenerierten Wirkleistung bis hin zur Nennleistung von 1,5 MW vorgenommen werden kann. Der Austausch der Daten zwischen den PV-Anlagen und der Leitwarte kann drahtlos oder drahtgebunden erfolgen. Ebenso ist frei wählbar, welches Bauelement der Photovoltaikanlage 7, 9, 11 die Meldung an die Leitwarte abgibt.This is where the invention comes in, with both PV systems 7, 9 reporting their reactive power reserves to the control room 15. The first photovoltaic system 7 therefore reports zero available reactive power capacity and the second photovoltaic system 9 reports 0.3 megawatts (1 MW nominal power - 0.7 MW current power) available reactive power capacity. The control room 15 then sends a control signal to the second photovoltaic system 9, which changes the operation of its inverter so that it draws a further 0.075 megawatts of reactive power in addition to the 0.7 megawatts of power that the second photovoltaic system 9 generates itself. The inverter of the second photovoltaic system 9 is then operated with a total of 0.775 megawatts, which is below its nominal power of 1 MW. The additional reactive power consumption of 0.075 MW requested by the control room 15 corresponds to the reactive power consumption contractually required by the first photovoltaic system 7, which therefore no longer has to be provided by the latter, but is taken over by the second photovoltaic system 9. Subsequently or simultaneously, the control room 15 sends a control signal to the first photovoltaic system 7 that its inverter no longer has to consume reactive power, whereupon the solar-generated active power can be fed in up to the nominal power of 1.5 MW without taking any reactive power reservation into account. The exchange of data between the PV systems and the control room can be wireless or wired. It is also freely selectable which component of the photovoltaic system 7, 9, 11 sends the message to the control room.

In der vorgenommenen Aufteilung der PV-Anlagen 7, 9, 11 in einen PV-Generator und einen Wechselrichter, ist es der Wechselrichter im weitesten Sinne der die Meldung der verfügbaren Kapazität übernimmt. So kann der Wechselrichter eine Kommunikationsschnittstelle umfassen, die den Betriebszustand der Ansteuerung der IGBTs im Wechselrichter meldet, die eine Meldung im Klartext absetzt, usw.In the division of the PV systems 7, 9, 11 into a PV generator and an inverter, it is the inverter in the broadest sense that takes over the reporting of the available capacity. The inverter can therefore include a communication interface that reports the operating status of the control of the IGBTs in the inverter, which sends a message in plain text, etc.

Bei der obigen beispielhaft geschilderten Situation ist ein Eingriff in den Betrieb des Wechselrichters der dritten Photovoltaikanlage 11 nicht nötig. Es ist aber ersichtlich, wie das Verfahren arbeitet: Es werden die freien Blindleistungskapazitäten mehrerer, vorzugsweise aller, auf der betrachteten Versorgungsebene zusammenarbeitenden alternativen Energieerzeuger an die Leitwarte 15 gemeldet, die dann ggf. auch unter der Berücksichtigung der geographischen Lage der Energieerzeuger im elektrischen Netz den Blindleistungsbezug und/oder die Blindleistungslieferung des- oder derjenigen Energieerzeuger so modifiziert, dass eine maximale Leistungsausbeute in der Gesamtschau aller beteiligten Energieerzeuger vorliegt.In the situation described above as an example, it is not necessary to intervene in the operation of the inverter of the third photovoltaic system 11. However, it is clear how the process works: the free reactive power capacities of several, preferably all, alternative energy producers working together at the supply level under consideration are reported to the control room 15, which then modifies the reactive power consumption and/or the reactive power supply of the energy producer or producers, if necessary also taking into account the geographical location of the energy producers in the electrical network, so that a maximum power yield is achieved in the overall view of all energy producers involved.

Bezugszeichenlistelist of reference symbols

11
öffentliches Versorgungsnetzpublic utility network
3, 53, 5
Transformatortransformer
77
erste Photovoltaikanlagefirst photovoltaic system
99
zweite Photovoltaikanlagesecond photovoltaic system
1111
dritte Photovoltaikanlagethird photovoltaic system
1313
Stadtnetzcity network
1515
Leitwarte, Systemsteuerungcontrol room, system control

Claims (9)

Verfahren zur Optimierung der Einspeiseleistung und der Stabilität in einem öffentlichen Stromversorgungsnetz (13) mit mehreren Energielieferanten (7, 9, 11) von regenerativer Energie, wobei jeder Energielieferant einen auf der Basis elektronischer Bauelemente arbeitenden Wechselrichter hat, wobei jeder Wechselrichter seine momentan frei verfügbare Kapazität zur Lieferung oder zum Bezug von Blindleistung an eine Systemsteuerung (15) meldet, die aus den eingegangenen Daten zur freien Blindleistungskapazität einen Beitrag für jeden Energielieferanten ermittelt, den dieser über seinen Wechselrichter als Blindleistung in das Versorgungsnetz einspeist oder aus dem Versorgungsnetz bezieht, dadurch gekennzeichnet, dass sowohl die frei verfügbare Kapazität zur Lieferung oder zum Bezug von Blindleistung, die geographische Lage der Energielieferanten als auch die Zuordnung der Energielieferanten zu einem Netzbereich in die Ermittlung einbezogen werden.Method for optimizing the feed-in power and the stability in a public power supply network (13) with several energy suppliers (7, 9, 11) of renewable energy, each energy supplier having an inverter operating on the basis of electronic components, each inverter reporting its currently freely available capacity for supplying or purchasing reactive power to a system controller (15), which uses the received data on the free reactive power capacity to determine a contribution for each energy supplier that it feeds into the supply network as reactive power or that it purchases from the supply network via its inverter, characterized in that both the freely available capacity for supplying or purchasing reactive power, the geographical The physical location of the energy suppliers as well as the allocation of the energy suppliers to a network area must be taken into account in the determination. Verfahren zur Optimierung der Einspeiseleistung und der Stabilität in einem öffentlichen Stromversorgungsnetz (13) mit mehreren Energielieferanten (7, 9, 11) von regenerativer Energie, wobei jeder Energielieferant einen auf der Basis elektronischer Bauelemente arbeitenden Wechselrichter hat, wobei jeder Wechselrichter seine momentan in das Versorgungsnetz eingespeiste Leistung an eine Systemsteuerung (15) meldet, die aus den eingegangenen Daten zur Leistung einen Beitrag für jeden Energielieferanten ermittelt, den dieser über seinen Wechselrichter als Blindleistung in das Versorgungsnetz einspeist oder aus dem Versorgungsnetz bezieht, dadurch gekennzeichnet, dass sowohl die frei verfügbare Kapazität zur Lieferung oder zum Bezug von Blindleistung, die geographische Lage der Energielieferanten als auch die Zuordnung der Energielieferanten zu einem Netzbereich in die Ermittlung einbezogen werden.Method for optimizing the feed-in power and the stability in a public power supply network (13) with several energy suppliers (7, 9, 11) of renewable energy, each energy supplier having an inverter operating on the basis of electronic components, each inverter reporting its current power fed into the supply network to a system controller (15) which, from the received data on the power, determines a contribution for each energy supplier which it feeds into the supply network as reactive power via its inverter or draws from the supply network, characterized in that both the freely available capacity for supplying or drawing reactive power, the geographical location of the energy suppliers and the allocation of the energy suppliers to a network area are included in the determination. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass jeder Wechselrichter die momentan eingespeiste Leistung als Prozentwert seiner Nennleistung meldet.procedure according to claim 1 , characterized in that each inverter reports the currently fed-in power as a percentage of its rated power. Verfahren nach Anspruch 2, dadurch gekennzeichnet, dass jeder Wechselrichter die momentan eingespeiste oder bezogene Blindleistung als Prozentwert seiner Nennleistung meldet.procedure according to claim 2 , characterized in that each inverter reports the reactive power currently fed in or consumed as a percentage of its rated power. Verfahren nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, dass die Systemsteuerung in einem der Wechselrichter integriert ist oder sich in einer Leitwarte (15) befindet.Method according to one of the Claims 1 until 4 , characterized in that the system control is integrated in one of the inverters or is located in a control room (15). Verfahren nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass in der Systemsteuerung (15) die Nennleistung der Wechselrichter der beteiligten Energielieferanten (7, 9, 11) hinterlegt ist.Method according to one of the Claims 1 until 5 , characterized in that the rated power of the inverters of the participating energy suppliers (7, 9, 11) is stored in the system control (15). Verfahren nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass zusätzlich zu den Daten der Kapazität die freie Reserve bis zum Erreichen der Nennleistung des Wechselrichters an die Systemsteuerung (15) gemeldet wird.Method according to one of the Claims 1 until 5 , characterized in that in addition to the capacity data, the free reserve is reported to the system control (15) until the rated power of the inverter is reached. Verfahren nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, dass die Wechselrichter der mehreren Energielieferanten Netzbereichen und Spannungsebenen zugeordnet werden.Method according to one of the Claims 1 until 7 , characterized in that the inverters of the several energy suppliers are assigned to grid areas and voltage levels. Verfahren nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, dass die geographische Lage der Energielieferanten in die Ermittlung mit einbezogen wird.Method according to one of the Claims 1 until 8 , characterized in that the geographical location of the energy suppliers is included in the determination.
DE102011014469.2A 2011-03-18 2011-03-18 VAr supply line according to inverter capacity Active DE102011014469B4 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
DE102011014469.2A DE102011014469B4 (en) 2011-03-18 2011-03-18 VAr supply line according to inverter capacity
EP14002050.4A EP2802014A1 (en) 2011-03-18 2012-03-16 Photovoltaic system
EP12735085.8A EP2689462A2 (en) 2011-03-18 2012-03-16 Photovoltaic system
PCT/EP2012/001198 WO2012126601A2 (en) 2011-03-18 2012-03-16 Photovoltaic system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102011014469.2A DE102011014469B4 (en) 2011-03-18 2011-03-18 VAr supply line according to inverter capacity

Publications (2)

Publication Number Publication Date
DE102011014469A1 DE102011014469A1 (en) 2012-09-20
DE102011014469B4 true DE102011014469B4 (en) 2024-10-24

Family

ID=46756865

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102011014469.2A Active DE102011014469B4 (en) 2011-03-18 2011-03-18 VAr supply line according to inverter capacity

Country Status (1)

Country Link
DE (1) DE102011014469B4 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110990424B (en) * 2019-11-22 2023-05-09 中国三峡新能源(集团)股份有限公司 Photovoltaic inverter running state analysis method based on new energy centralized control system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070135970A1 (en) 2005-12-08 2007-06-14 General Electric Company System and method for providing reactive power support with distributed energy resource inverter
US20100067271A1 (en) 2008-09-15 2010-03-18 General Electric Company Reactive power compensation in solar power system
US20100332047A1 (en) 2009-06-24 2010-12-30 Tigo Energy, Inc. Systems and methods for distributed power factor correction and phase balancing
DE102011012695A1 (en) 2011-03-01 2012-09-06 Adensis Gmbh Geographically influenced reactive power management

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070135970A1 (en) 2005-12-08 2007-06-14 General Electric Company System and method for providing reactive power support with distributed energy resource inverter
US20100067271A1 (en) 2008-09-15 2010-03-18 General Electric Company Reactive power compensation in solar power system
US20100332047A1 (en) 2009-06-24 2010-12-30 Tigo Energy, Inc. Systems and methods for distributed power factor correction and phase balancing
DE102011012695A1 (en) 2011-03-01 2012-09-06 Adensis Gmbh Geographically influenced reactive power management

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
NOBILE, E.; BOSE, A.: An area-wise voltage control scheme suitable for setting up a Var ancillary market. In: 2004 International Conference on Power System Technology, 2004. PowerCon 2004, 2, Nov. 2004, S. 1948- 1953. - ISSN 0-7803-8610-8

Also Published As

Publication number Publication date
DE102011014469A1 (en) 2012-09-20

Similar Documents

Publication Publication Date Title
Safayet et al. Reactive power management for overvoltage prevention at high PV penetration in a low-voltage distribution system
EP2495838B1 (en) Method and device for stabilising the power supply operation of an energy supply network
EP2826121B1 (en) Method for controlling an arrangement for supplying electric current to a power supply system
EP2463980B1 (en) Operation of an energy producer in an energy supply network
US9081407B2 (en) Voltage regulation system and method
DE102015101738B4 (en) Method for operating a power generation plant and power generation plant
EP3031112B1 (en) System and method for controlling the transmission grid frequency and/or voltage from the distribution network
DE102011090141A1 (en) Method and device for using electrical energy of a device connected to a household power network for generating renewable electrical energy
EP2084801A1 (en) Method for operating a low-voltage electrical system
DE102010047652A1 (en) Photovoltaic system with inverter operation depending on the mains voltage
WO2012037989A2 (en) Method for the computer-aided control of the electrical energy distribution in a decentralized energy network
EP3780305A1 (en) Inverter arrangement for wind turbines and photovoltaic installations
Nowak et al. Comparison of voltage control methods in distribution systems using QV based PI and droop controls of solar inverters
DE102011122580B4 (en) Method for operating an electrical supply network and associated control unit
DE102011014469B4 (en) VAr supply line according to inverter capacity
DE102013011427A1 (en) Electrical arrangement with an inverter and intermediate switching device for the electrical arrangement
EP3010106B1 (en) Electrical distribution network and method for operating an electrical distribution network
AT514766B1 (en) Method for stabilizing an energy distribution network
WO2023057141A1 (en) Method for operating an electrolyser and a fuel cell by means of a common converter, apparatus and electrolysis system
EP2689462A2 (en) Photovoltaic system
Perpinias et al. Design principles of low voltage distributed generation units with increased fault ride through capability
EP3861521A1 (en) Control of a local network sector for implementing a local energy community with a timetable
DE102012017631A1 (en) Method for controlling power consumption network, involves controlling loads, and executing prioritization and component-regulating algorithms for maintaining target-criterion of power balance of network in different operating conditions
DE102018113129A1 (en) Technical decoupling of a micro-grid
DE102011014468A1 (en) Inverter used in wind-power plant, supplies predetermined amount of unbalanced reactive power of generator into three-phase power supply networks, based on request of control signal

Legal Events

Date Code Title Description
R012 Request for examination validly filed
R016 Response to examination communication
R081 Change of applicant/patentee

Owner name: BOB HOLDING GMBH, DE

Free format text: FORMER OWNER: ADENSIS GMBH, 01129 DRESDEN, DE

R016 Response to examination communication
R016 Response to examination communication
R016 Response to examination communication
R016 Response to examination communication
R018 Grant decision by examination section/examining division