[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

DE102009035399A1 - Circuit arrangement for current steering - Google Patents

Circuit arrangement for current steering Download PDF

Info

Publication number
DE102009035399A1
DE102009035399A1 DE102009035399A DE102009035399A DE102009035399A1 DE 102009035399 A1 DE102009035399 A1 DE 102009035399A1 DE 102009035399 A DE102009035399 A DE 102009035399A DE 102009035399 A DE102009035399 A DE 102009035399A DE 102009035399 A1 DE102009035399 A1 DE 102009035399A1
Authority
DE
Germany
Prior art keywords
phase
consumers
circuit arrangement
power
supply network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE102009035399A
Other languages
German (de)
Inventor
Martin Loeffler
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE102009035399A priority Critical patent/DE102009035399A1/en
Priority to PCT/EP2010/004526 priority patent/WO2011012272A2/en
Publication of DE102009035399A1 publication Critical patent/DE102009035399A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/28The renewable source being wind energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/123Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving renewable energy sources

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

Eine Schaltungsanordnung zur Stromlenkung zwischen mindestens einer verbraucherseitigen Stromquelle (G1), einem elektrischen Versorgungsnetz (11) und elektrischen Verbrauchern (V1 bis V4), wobei alle Phasen (L1, L2, L3) der Stromquellen (G1 bis Gn) über ansteuerbare Schalter (S7 bis S15) mit den elektrischen Verbrauchern (V1 bis V4) und über ansteuerbare Schalter (S1, S2, S3) und einen Stromzähler (Z1) mit dem Versorgungsnetz (11) verbunden sind und wobei die elektrischen Verbraucher (V1 bis V4) über ansteuerbare Schalter (S4, S5, S6) und einen Stromzähler (Z2) mit dem Versorgungsnetz (11) verbunden sind.A circuit arrangement for current control between at least one consumer-side current source (G1), an electrical supply network (11) and electrical consumers (V1 to V4), with all phases (L1, L2, L3) of the current sources (G1 to Gn) via controllable switches (S7 to S15) are connected to the electrical consumers (V1 to V4) and via controllable switches (S1, S2, S3) and an electricity meter (Z1) to the supply network (11) and the electrical consumers (V1 to V4) via controllable switches (S4, S5, S6) and an electricity meter (Z2) are connected to the supply network (11).

Description

In Deutschland ist es bisher aufgrund gesetzlicher Vorgaben möglich, eigenen Strom zu erzeugen, beispielsweise über eine Fotovoltaikanlage, und den erzeugten Strom in das öffentliche Versorgungsnetz einzuspeisen. Der eingespeiste Strom wird vom Versorgungsunternehmen vergütet. Den Strom, den der Kunde des Versorgungsunternehmens für seine elektrischen Geräte benötigt, bezieht er nach wie vor vom Versorgungsunternehmen.In Germany is so far possible due to legal requirements, own Generate electricity, for example via a photovoltaic system, and the electricity generated in the public Supply network. The electricity fed in is provided by the utility company hardened and tempered. The electricity that the customer of the utility company for his electric equipment needed he still refers to the utility company.

Außerdem sind so genannte Insellösungen bekannt, bei denen der Verbraucher vollständig vom öffentlichen Netz getrennt ist und seinen benötigten Strom ausschließlich selbst erzeugt. Geschieht dies über eine Fotovoltaikanlage, so wird der von dieser erzeugte Strom, soweit er nicht direkt verbraucht wird, in einem Akku zwischengespeichert.Besides, they are known as isolated solutions, where the consumer is complete from public Network is disconnected and its needed power exclusively self generated. This happens a photovoltaic system, so the electricity generated by this, so far he is not consumed directly, cached in a battery.

Aufgrund gesetzlicher Änderungen wird es nun vom Gesetzgeber gefördert, wenn Kunden von öffentlichen Versorgungsunternehmen, die selbst Strom generieren, diesen auch selbst verbrauchen. Denjenigen Strom, den der Kunde nicht verbraucht, kann er nach wie vor ins Netz einspeisen. Sollte der selbst produzierte Strom nicht ausreichend sein, so kann der Kunde nach wie vor Strom aus dem öffentlichen Versorgungsnetz beziehen.by virtue of legal changes it is now being promoted by lawmakers, if customers by public Utilities that generate electricity themselves, too consume yourself. The electricity that the customer does not use can be he continues to feed into the grid. Should the self-produced Electricity is insufficient, so the customer can still electricity from the public Obtain supply network.

Der Erfindung liegt die Aufgabe zugrunde, eine Schaltungsanordnung zur Stromlenkung zu schaffen, die den neuen gesetzlichen Regelungen Rechnung trägt und sowohl einen Eigenverbrauch des vom Stromkunden selbst erzeugten Stroms als auch eine Einspeisung in das öffentliche Versorgungsnetz erlaubt, wobei sämtliche Phasen des selbst erzeugten Stroms den elektrischen Verbrauchern aufgeschaltet werden können.Of the Invention is based on the object, a circuit arrangement for Power steering to meet the new legislation wears and both self-consumption of the electricity customer itself generated Electricity as well as a feed into the public supply network allowed, with all Phases of self-generated electricity to the electrical consumers can be switched.

Die Aufgabe wird gelöst mit einer Schaltungsanordnung zur Stromlenkung zwischen mindestens einer verbraucherseitigen Drehstrom- und/oder Wechselstromquelle, insbesondere einer Fotovoltaikanlage mit Wechselrichter, einem elektrischen Versorgungsnetz und elektrischen Drehstrom- und/oder Wechselstromverbrauchern, die dadurch gekennzeichnet ist, dass alle Phasen der mindestens einen Drehstrom- und/oder Wechselstromquelle über ansteuerbare Schalter mit den Drehstrom- und/oder Wechselstromverbrauchern und über ansteuerbare Schalter und einen Stromzähler für jede Phase mit dem Versorgungsnetz verbunden sind und dass die Drehstrom- und/oder Wechselstromverbraucher über ansteuerbare Schalter und einen Drehstromzähler oder einen Wechselstromzähler für jede Phase mit dem Versorgungsnetz verbunden sind.The Task is solved with a circuit arrangement for power steering between at least a consumer-side three-phase and / or alternating current source, in particular a photovoltaic system with inverter, an electric Supply network and electrical three-phase and / or AC consumers, which is characterized in that all phases of the at least one Three-phase and / or AC power source via controllable Switch with three-phase and / or AC consumers and via controllable switches and an electricity meter for every Phase are connected to the supply network and that the three-phase and / or AC consumers via controllable switches and a three-phase meter or an AC meter for every Phase are connected to the supply network.

Die Verbindung zwischen den Stromquellen des Kunden und dessen elektrischen Verbrauchern ermöglicht einen direkten Eigenverbrauch des selbst erzeugten Stroms durch den Kunden. Hat der Kunde keine elektrischen Geräte in Betrieb, so können die kundenseitigen Stromquellen über die ansteuerbaren Schalter mit dem Versorgungsnetz verbunden werden und ihren Strom dort einspeisen. Die vorgesehenen Stromzähler erfassen dabei für jede Phase die Menge des in das Netz eingespeisten Stroms.The Connection between the power sources of the customer and its electrical Allows consumers a direct self-consumption of self-generated electricity The customers. If the customer has no electrical equipment in operation, so can the customer Power sources over the controllable switches are connected to the supply network and feed their electricity there. Record the planned electricity meters for each phase the amount of electricity fed into the grid.

Liefern die eigenen Stromquellen beim Kunden dagegen keinen oder zu wenig Strom für seine elektrischen Geräte, so können diese Geräte über die dafür vorgesehenen Schalter mit dem Versorgungsnetz verbunden werden und daraus ihren Strom teilweise oder auch vollständig beziehen. Dieser Strombezug aus dem Versorgungsnetz wird wieder über Stromzähler erfasst, sodass seitens der Versorgungsunternehmen eine korrekte Abrechnung mit dem Kunden durchgeführt werden kann.Deliver the own power sources at the customer, however, little or no Electricity for his electrical appliances, so can these devices over the designated Switch can be connected to the utility network and from it their Electricity partially or completely Respectively. This electricity supply from the supply network is again recorded by electricity meters, so that a proper billing by the utilities carried out with the customer can be.

Da die neuen gesetzlichen Regelungen in Deutschland sogar eine Vergütung des selbst produzierten und selbst verbrauchten Stroms für den Endkunden vorsehen, ist es außerdem zweckmäßig, wenn zwischen der mindestens einen Drehstrom- und/oder Wechselstromquelle und den Drehstrom- und/oder Wechselstromverbrauchern ein Drehstromzähler oder ein Wechselstromzähler für jede Phase angeordnet ist. Es lässt sich damit auch der selbst verbrauchte Anteil des selbst produzierten Stroms exakt erfassen und mit dem Versorgungsunternehmen abrechnen.There the new legal regulations in Germany even a remuneration of the self-produced and self-consumed electricity for the end customer It is also intended appropriate if between the at least one three-phase and / or alternating current source and the three-phase and / or AC loads a three-phase meter or an AC meter for every Phase is arranged. It leaves thus also the self-consumed portion of self-produced Capture electricity exactly and settle it with utility.

Um den selbst erzeugten Strom sämtlichen Phasen des Hausanschlusses und damit sämtlichen elektrischen Verbrauchern zur Verfügung stellen zu können, kann jede Phase der mindestens einen Drehstrom- und/oder Wechselstromquelle über einen ansteuerbaren Schalter mit jeder Phase der Drehstrom- und/oder Wechselstromverbraucher verbunden sein.Around the self-generated electricity of all phases the house connection and thus all electrical Available to consumers to be able to Each phase of the at least one three-phase and / or alternating current source can be controlled via a controllable Switch with each phase of the three-phase and / or AC consumers be connected.

Weiter ist es vorteilhaft, wenn die Schaltungsanordnung eine Steuereinrichtung aufweist, die mit für jede Phase der mindestens einen Drehstrom- und/oder Wechselstromquelle und jede Phase der Drehstrom- und/oder Wechselstromverbraucher vorgesehenen Strommesseinrichtungen und sämtlichen ansteuerbaren Schaltern verbunden ist. Diese Steuereinrichtung kann vollautomatisch oder aber auch frei programmierbar die gewünschten Stromlenkungen vornehmen. Über die Strommesseinrichtungen kann zu jedem Zeitpunkt der von der oder den Stromquellen erzeugte Strom und der von den Verbrauchern verbrauchte Strom exakt gemessen werden und dementsprechend die Schalter betätigt werden.Further it is advantageous if the circuit arrangement is a control device that with with for each phase of the at least one three-phase and / or alternating current source and each phase of the three-phase and / or AC consumers provided current measuring devices and all controllable Switches is connected. This control device can be fully automatic or also freely programmable make the desired current steering. About the Current measuring equipment can be used at any time by or Electricity generated by power sources and consumed by consumers Current can be measured accurately and accordingly the switches are operated.

So können mit der Steuereinrichtung die zwischen der mindestens einem Drehstrom- und/oder Wechselstromquelle und den Drehstrom- und/oder Wechselstromverbrauchern angeordneten Schalter teilweise oder alle gemeinsam schließbar sein, wenn die Drehstrom- und/oder Wechselstromverbraucher Strom verbrauchen und die mindestens eine Drehstrom- und/oder Wechselstromquelle Strom liefert. Dazu wird die von den Stromquellen gelieferte Stromstärke mit der Stromstärke der Verbraucher in der Steuereinrichtung verglichen. Entsprechend dem Vergleichsergebnis werden eine oder mehrere Phasen der Stromverbraucher durch Schließen der entsprechenden Schalter mit einer oder mehreren Phasen der mindestens einen Stromquelle verbunden. Gleichzeitig kann zweckmäßigerweise durch Öffnen der zugehörigen Schalter eine Phase des Verbrauchsstromkreises, die mit den kundenseitigen Stromquellen verbunden ist, vom öffentlichen Netz getrennt werden.Thus, with the control device between the at least one three-phase and / or AC power source and the three-phase and / or Switches may be partially or all jointly closable when AC and / or AC loads consume power and the at least one three-phase and / or AC power source provides power. For this purpose, the current intensity supplied by the current sources is compared with the current intensity of the consumers in the control device. According to the comparison result, one or more phases of the power consumers are connected by closing the corresponding switches with one or more phases of the at least one power source. At the same time can be conveniently separated by opening the associated switch a phase of the power circuit, which is connected to the customer's power sources from the public network.

Weiter können mit der Steuereinrichtung die zwischen der mindestens einen Drehstrom- und/oder Wechselstromquelle und dem Versorgungsnetz angeordneten Schalter geschlossen werden, wenn die mindestens eine Drehstrom- und/oder Wechselstromquelle mehr Strom liefert, als die Drehstrom- und/oder Wechselstromverbraucher benötigen. Auch dieses Schließen der Schalter zum Versorgungsnetz kann nur für einzelne Schalter oder für alle gemeinsam erfolgen.Further can with the control device which between the at least one three-phase and / or alternating current source and the supply network arranged Switches are closed when the at least one three-phase and / or AC power source provides more power than the AC and / or AC consumers need. Also this closing the switch to the utility grid can only be common for individual switches or for all respectively.

Außerdem ist es möglich, mit der Steuereinrichtung die zwischen dem Versorgungsnetz und den Drehstrom- und/oder Wechselstromverbrauchern angeordneten Schalter für eine oder mehrere Phasen zu schließen, wenn die Drehstrom- und/oder Wechselstromverbraucher mehr Strom benötigen, als die mindestens eine Drehstrom- und/oder Wechselstromquelle liefert.Besides that is it is possible with the control device which between the supply network and the three-phase and / or AC consumers arranged switches for one or to close several phases, when the three-phase and / or AC consumers more power need, as the at least one three-phase and / or alternating current source supplies.

Bei einer bevorzugten Ausführungsform kann außerdem vorgesehen sein, dass die zwischen der mindestens einen Drehstrom- und/oder Wechselstromquelle und den Drehstrom- und/oder Wechselstromverbrauchern angeordneten Schalter manuell betätigbar sind. Dies ermöglicht es dem Kunden, den Eigenverbrauch des selbst erzeugten Stroms abzuschalten und diesen komplett ins Netz einzuspeisen, sofern er dies wünscht.at a preferred embodiment Furthermore be provided that between the at least one three-phase and / or AC power source and AC and / or AC loads arranged switches are manually operated. This allows it the customer to switch off the self-consumption of self-generated electricity and to feed this completely into the net, if he so wishes.

Nachfolgend wird ein bevorzugtes Ausführungsbeispiel einer erfindungsgemäßen Schaltungsanordnung anhand der Zeichnung näher erläutert.following becomes a preferred embodiment a circuit arrangement according to the invention closer to the drawing explained.

Die einzige Figur zeigt ein schematisches Schaltbild einer möglichen Ausgestaltung einer erfindungsgemäßen Schaltungsanordnung.The single figure shows a schematic diagram of a possible Embodiment of a circuit arrangement according to the invention.

Es sind durch strichpunktierte Linien abgegrenzt ein hausinternes elektrisches Netz 10 sowie ein öffentliches Versorgungsnetz 11 dargestellt. Das öffentliche Versorgungsnetz weist drei Phasen L1, L2, L3 sowie einen Neutralleiter N auf. Im hausinternen Stromnetz ist eine Schaltungsanordnung 12 zur Stromlenkung zwischen verbraucherseitigen Stromquellen G1, G2, G3, G4 bis Gn, dem Versorgungsnetz 11 und elektrischen Stromverbrauchern V1, V2, V3, V4. Bei der Stromquelle G1 handelt es sich um eine Drehstromquelle, bei den Stromquellen G2 bis Gn um Wechselstromquellen. Die einzelnen Stromquellen können Fotovoltaikanlagen mit Wechselrichtern oder aber auch Windkraftanlagen oder andere Generatoren sein. Bei den elektrischen Verbrauchern ist der Verbraucher V1 ein Drehstromverbraucher (400 V) und die Verbraucher V2, V3, V4 Wechselstromverbraucher, die jeweils mit einer der Phasen L1, L2, L3 verbunden sind.It is delimited by dotted lines an internal electrical network 10 as well as a public supply network 11 shown. The public utility network has three phases L1, L2, L3 and a neutral conductor N. In the in-house power grid is a circuit arrangement 12 for current control between consumer-side current sources G1, G2, G3, G4 to Gn, the supply network 11 and electric power consumers V1, V2, V3, V4. The current source G1 is a three-phase current source, and the current sources G2 to Gn are AC sources. The individual power sources can be photovoltaic systems with inverters or even wind turbines or other generators. In the electrical consumers, the consumer V1 is a three-phase load (400 V) and the consumers V2, V3, V4 AC consumers, which are each connected to one of the phases L1, L2, L3.

Die Schaltungsanordnung 12 schafft zunächst eine Verbindung zwischen den Stromquellen G1 bis Gn und dem Versorgungsnetz 11. Die Stromquellen G1 bis Gn sind dazu über Schalter S1, S2, S3 sowie einen Zähler Z1 mit den Phasen L1, L2, L3 des Versorgungsnetzes 11 verbunden. Bei geschlossenen Schaltern S1, S2, S3 wird der von den Stromquellen G1 bis Gn erzeugte Strom ins Versorgungsnetz 11 eingespeist.The circuit arrangement 12 first creates a connection between the current sources G1 to Gn and the supply network 11 , The current sources G1 to Gn are to switch S1, S2, S3 and a counter Z1 with the phases L1, L2, L3 of the supply network 11 connected. When the switches S1, S2, S3 are closed, the power generated by the current sources G1 to Gn becomes the supply network 11 fed.

Weiter stellt die Schaltungsanordnung 12 eine Verbindung zwischen dem Versorgungsnetz 11 und den Verbrauchern V1 bis V4 her. Die drei Phasen L1, L2, L3 sind dazu über einen Zähler Z2 sowie Schalter S4, S5, S6 mit den Verbrauchern V1, V2, V3 und V4 verbunden. Sind die Schalter S4, S5 und S6 zumindest teilweise geschlossen, so können die Verbraucher V1, V2, V3, V4 zumindest zum Teil ihren Strom aus dem Versorgungsnetz 11beziehen. Die Menge des bezogenen Stroms wird dabei vom Zähler Z2 erfasst.Next, the circuit arrangement 12 a connection between the supply network 11 and the consumers V1 to V4 ago. The three phases L1, L2, L3 are connected to the consumers V1, V2, V3 and V4 via a counter Z2 and switches S4, S5, S6. If the switches S4, S5 and S6 are at least partially closed, then the consumers V1, V2, V3, V4 can at least partially receive their power from the supply network 11 Respectively. The amount of the current drawn is detected by the counter Z2.

Um auch einen Eigenverbrauch des durch die Stromquellen G1 bis Gn erzeugten Stroms durch die Verbraucher V1 bis V4 zu ermöglichen, sind außerdem die Phasen L1, L2, L3 der Stromquellen G1 bis Gn über Schalter S7 bis S15 mit jeder der Phasen L1, L2, L3 der Verbraucher V1 bis V4 verbunden. Außerdem ist ein Zähler Z3 vorgesehen, der die Menge des auf die Phasen L1, L2, L3 der Verbraucher V1 bis V4 abgegebenen, selbst erzeugten Stroms misst. Damit ist auch eine Vergütung des selbst erzeugten und selbst verbrauchten Stroms möglich.Around also a self-consumption of the generated by the current sources G1 to Gn Streams to allow through the consumers V1 to V4, are also the Phases L1, L2, L3 of the current sources G1 to Gn via switches S7 to S15 with each of the phases L1, L2, L3 of the consumers V1 to V4 connected. Furthermore is a counter Z3 provided the quantity of the on the phases L1, L2, L3 of the consumer V1 to V4 emitted self-generated current. This is also a remuneration self-generated and self-consumed electricity possible.

Weiter zeigt die Schaltungsanordnung 12 eine Steuereinrichtung 20, die mit sämtlichen ansteuerbaren Schaltern S1 bis S15 verbunden ist. Die Steuereinrichtung 20 ist außerdem mit Strommesseinrichtungen I1, I2, I3 in den Phasenleitungen der Stromquellen G1 bis Gn und mit Strommesseinrichtungen I4, I5, I6 in den Phasenleitungen der Stromverbraucher V1 bis V4 verbunden.Next shows the circuit arrangement 12 a control device 20 which is connected to all controllable switches S1 to S15. The control device 20 is also connected to current measuring devices I1, I2, I3 in the phase lines of the current sources G1 to Gn and to current measuring devices I4, I5, I6 in the phase lines of the current consumers V1 to V4.

Zeigen die Strommesseinrichtungen I4 bis I6 an, dass die Verbraucher V1 bis V4 über zumindest eine der Phasen L1, L2, L3 Strom benötigen und liefern gleichzeitig die Stromquellen G1 bis Gn zumindest teilweise und über zumindest eine der Phasen L1, L2, L3 einen Strom, so kann die Steuereinrichtung 20 mindestens eine der Phasen L1, L2, L3 der Stromquellen G1 bis Gn mit mindestens einer der Phasen L1, L2, L3 der Stromverbraucher V1 bis V4 durch Schließen der entsprechenden Schalter S7 bis S15 verbinden. Gleichzeitig kann die Steuereinrichtung 20 diejenige Phase L1, L2, L3, die ihren Strom von den Stromquellen G1 bis Gn erhält, durch Öffnen des zugehörigen Schalters S4 bis S6 vom öffentlichen Netz abkoppeln. Auch diejenigen Phasen L1, L2, L3 der Stromquellen G1 bis Gn, die ihren Strom an die Verbraucher V1 bis V4 liefern, werden durch Öffnen der zugehörigen Schalter S1 bis S3 vom öffentlichen Netz 11 getrennt, sodass diese Phasen ihren Strom vollständig an die Verbraucher V1 bis V4 abgeben und nicht in das Netz 11 einspeisen.Show the current measuring devices I4 to I6 that the consumers V1 to V4 via at least one of the phases L1, L2, L3 require power and at the same time supply the power sources G1 to Gn at least partially and at least one of the phases L1, L2, L3 a current, so the controller 20 connect at least one of the phases L1, L2, L3 of the current sources G1 to Gn with at least one of the phases L1, L2, L3 of the power consumers V1 to V4 by closing the corresponding switches S7 to S15. At the same time, the control device 20 that phase L1, L2, L3, which receives its current from the current sources G1 to Gn, decouple by opening the associated switch S4 to S6 from the public network. Also, those phases L1, L2, L3 of the current sources G1 to Gn, which supply their current to the consumers V1 to V4, are opened by opening the associated switches S1 to S3 from the public grid 11 disconnected so that these phases deliver their power completely to the consumers V1 to V4 and not into the grid 11 feed.

Was von den Stromquellen G1 bis Gn an überschüssigem Strom produziert wird, wird weiterhin in das öffentliche Netz 11 eingespeist. Sollte der von den Stromquellen G1 bis Gn erzeugte Strom nicht ausreichen, die Verbraucher V1 bis V4 zu versorgen, so kann ein Teil des benötigten Stroms durch Schließen der entsprechenden Schalter S4, S5, S6 vom öffentlichen Netz 11 bezogen werden.What is produced by the power sources G1 to Gn on excess electricity will continue to be in the public grid 11 fed. If the power generated by the current sources G1 to Gn is insufficient to supply the consumers V1 to V4, then part of the required current can be obtained by closing the corresponding switches S4, S5, S6 from the public grid 11 be obtained.

Die Stromlenkung kann dabei vollautomatisch erfolgen in Abhängigkeit vom benötigten Strom und von der Menge des selbst erzeugten Stroms. Außerdem kann vorgesehen sein, dass die Schalter S7 bis S15 zumindest manuell geöffnet werden können, sofern der selbst erzeugte Strom der Stromquellen G1 bis Gn vollständig in das Netz eingespeist werden soll. In dieser Betriebsart sind natürlich dann auch sämtliche Schalter S4 bis S6 geschlossen, sodass der von den Verbrauchern V1 bis V4 benötigte Strom aus dem öffentlichen Netz 11 bezogen werden kann.The power steering can be done fully automatically depending on the required power and the amount of self-generated electricity. In addition, it can be provided that the switches S7 to S15 can be opened at least manually if the self-generated current of the current sources G1 to Gn is to be completely fed into the network. In this mode, of course, then all switches S4 to S6 are closed, so that the current required by the consumers V1 to V4 from the public network 11 can be obtained.

Claims (8)

Schaltungsanordnung zur Stromlenkung zwischen mindestens einer verbraucherseitigen Drehstrom- und/oder Wechselstromquelle (G1 bis Gn), insbesondere einer Fotovoltaikanlage mit Wechselrichter, einem elektrischen Versorgungsnetz (11) und elektrischen Drehstrom- und/oder Wechselstromverbrauchern (V1 bis V4), dadurch gekennzeichnet, dass alle Phasen (L1, L2, L3) der mindestens einen Drehstrom- und/oder Wechselstromquelle (G1 bis Gn) über ansteuerbare Schalter (S7 bis S15) mit den Drehstrom- und/oder Wechselstromverbrauchern (V1 bis V4) und über ansteuerbare Schalter (S1, S2, S3) und einen Drehstromzähler oder einen Wechselstromzähler (Z1) für jede Phase (L1, L2, L3) mit dem Versorgungsnetz (11) verbunden sind und dass die Drehstrom- und/oder Wechselstromverbraucher (V1 bis V4) über ansteuerbare Schalter (S4, S5, S6) und einen Drehstromzähler oder einen Wechselstromzähler (Z2) für jede Phase mit dem Versorgungsnetz (11) verbunden sind.Circuit arrangement for current control between at least one consumer-side three-phase and / or alternating current source (G1 to Gn), in particular a photovoltaic system with an inverter, an electrical supply network ( 11 ) and electrical three-phase and / or AC consumers (V1 to V4), characterized in that all phases (L1, L2, L3) of the at least one three-phase and / or alternating current source (G1 to Gn) via controllable switch (S7 to S15) with the three-phase and / or AC consumers (V1 to V4) and via controllable switches (S1, S2, S3) and a three-phase counter or an alternating current counter (Z1) for each phase (L1, L2, L3) with the supply network ( 11 ) and that the three-phase and / or AC consumers (V1 to V4) via controllable switches (S4, S5, S6) and a three-phase meter or an AC meter (Z2) for each phase with the supply network ( 11 ) are connected. Schaltungsanordnung nach Anspruch 1, dadurch gekennzeichnet, dass zwischen der mindestens einen Drehstrom- und/oder Wechselstromquelle (G1 bis Gn) und den Drehstrom- und/oder Wechselstromverbrauchern (V1 bis V4) ein Drehstromzähler oder ein Wechselstromzähler (Z3) für jede Phase (L1, L2, L3) angeordnet ist.Circuit arrangement according to Claim 1, characterized that between the at least one three-phase and / or alternating current source (G1 to Gn) and the three-phase and / or AC consumers (V1 to V4) a three-phase meter or an AC meter (Z3) for each phase (L1, L2, L3) is arranged. Schaltungsanordnung nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass jede Phase (L1, L2, L3) der mindestens einen Drehstrom- und/oder Wechselstromquelle (G1 bis Gn) über einen ansteuerbaren Schalter (S7 bis S15) mit jeder Phase (L1, L2, L3) der Drehstrom- und/oder Wechselstromverbraucher (V1 bis V4) verbunden ist.Circuit arrangement according to claim 1 or 2, characterized characterized in that each phase (L1, L2, L3) of the at least one Three-phase and / or AC power source (G1 to Gn) via a controllable switch (S7 to S15) with each phase (L1, L2, L3) the three-phase and / or AC consumers (V1 to V4) connected is. Schaltungsanordnung nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass sie eine Steuereinrichtung (12) aufweist, die mit für jede Phase (L1, L2, L3) der mindestens einen Drehstrom- und/oder Wechselstromquelle (G1 bis Gn) und jede Phase (L1, L2, L3) der Drehstrom- und/oder Wechselstromverbraucher (V1 bis V4) vorgesehenen Strommesseinrichtungen (I1 bis I6) und sämtlichen ansteuerbaren Schaltern (S1 bis S15) verbunden ist.Circuit arrangement according to one of the preceding claims, characterized in that it comprises a control device ( 12 ) having, for each phase (L1, L2, L3) of the at least one three-phase and / or alternating current source (G1 to Gn) and each phase (L1, L2, L3) of the three-phase and / or AC consumers (V1 to V4 ) provided current measuring devices (I1 to I6) and all controllable switches (S1 to S15) is connected. Schaltungsanordnung nach Anspruch 4, dadurch gekennzeichnet, dass mit der Steuereinrichtung (12) einige oder alle der zwischen der mindestens einen Drehstrom- und/oder Wechselstromquelle (G1 bis Gn) und den Drehstrom- und/oder Wechselstromverbrauchern (V1 bis V4) angeordneten Schalter (S7 bis S15) schließbar sind, wenn die Drehstrom- und/oder Wechselstromverbraucher (V1 bis V4) Strom verbrauchen und die mindestens eine Drehstrom- und/oder Wechselstromquelle (G1 bis Gn) Strom liefert.Circuit arrangement according to claim 4, characterized in that with the control device ( 12 ) some or all of the at least one three-phase and / or AC power source (G1 to Gn) and the three-phase and / or AC consumers (V1 to V4) arranged switches (S7 to S15) are closable when the three-phase and / or AC consumers (V1 to V4) consume power and the at least one three-phase and / or AC power source (G1 to Gn) provides power. Schaltungsanordnung nach Anspruch 4 oder 5, dadurch gekennzeichnet, dass mit der Steuereinrichtung (12) die zwischen der mindestens einen Drehstrom- und/oder Wechselstromquelle (G1 bis Gn) und dem Versorgungsnetz (11) angeordneten Schalter (S1, S2, S3) für eine oder mehrere Phasen (L1, L2, L3) schließbar sind, wenn die mindestens eine Drehstrom- und/oder Wechselstromquelle (G1 bis Gn) mehr Strom liefert, als die Drehstrom- und/oder Wechselstromverbraucher (V1 bis V4) benötigen.Circuit arrangement according to Claim 4 or 5, characterized in that with the control device ( 12 ) between the at least one three-phase and / or alternating current source (G1 to Gn) and the supply network ( 11 ) arranged switches (S1, S2, S3) for one or more phases (L1, L2, L3) are closable when the at least one three-phase and / or alternating current source (G1 to Gn) provides more power than the three-phase and / or or AC consumers (V1 to V4) need. Schaltungsanordnung nach einem der Ansprüche 4 bis 6, dadurch gekennzeichnet, dass mit der Steuereinrichtung (12) die zwischen dem Versorgungsnetz (11) und den Drehstrom- und/oder Wechselstromverbrauchern (V1 bis V4) angeordneten Schalter (S4, S5, S6) für eine oder mehrere Phasen (L1, L2, L3) schließbar sind, wenn die Drehstrom- und/oder Wechselstromverbraucher (V1 bis V4) mehr Strom benötigen, als die mindestens eine Drehstrom- und/oder Wechselstromquelle (G1 bis Gn) liefert.Circuit arrangement according to one of claims 4 to 6, characterized in that with the control device ( 12 ) between the supply network ( 11 ) and the three-phase and / or Wech Selstromverbrauchern (V1 to V4) arranged switches (S4, S5, S6) for one or more phases (L1, L2, L3) are closable when the three-phase and / or AC consumers (V1 to V4) require more power than the at least a three-phase and / or alternating current source (G1 to Gn) supplies. Schaltungsanordnung nach einem der Ansprüche 3 bis 7, dadurch gekennzeichnet, dass die zwischen der mindestens einen Drehstrom- und/oder Wechselstromquelle (G1 bis Gn) und den Drehstrom- und/oder Wechselstromverbrauchern (V1 bis V4) angeordneten Schalter (S7 bis S15) manuell betätigbar sind.Circuit arrangement according to one of claims 3 to 7, characterized in that between the at least one Three-phase and / or AC power source (G1 to Gn) and the three-phase and / or AC consumers (V1 to V4) arranged switch (S7 to S15) are manually operable.
DE102009035399A 2009-07-30 2009-07-30 Circuit arrangement for current steering Withdrawn DE102009035399A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE102009035399A DE102009035399A1 (en) 2009-07-30 2009-07-30 Circuit arrangement for current steering
PCT/EP2010/004526 WO2011012272A2 (en) 2009-07-30 2010-07-23 Circuit assembly for current steering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102009035399A DE102009035399A1 (en) 2009-07-30 2009-07-30 Circuit arrangement for current steering

Publications (1)

Publication Number Publication Date
DE102009035399A1 true DE102009035399A1 (en) 2011-02-03

Family

ID=43402582

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102009035399A Withdrawn DE102009035399A1 (en) 2009-07-30 2009-07-30 Circuit arrangement for current steering

Country Status (2)

Country Link
DE (1) DE102009035399A1 (en)
WO (1) WO2011012272A2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014076446A1 (en) * 2012-11-16 2014-05-22 Torch Solar Technologies Limited A power management system
US9760956B2 (en) 2011-04-08 2017-09-12 Sma Solar Technology Ag Optimized load management

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1965483A1 (en) * 2007-02-27 2008-09-03 SMA Solar Technology AG Circuit for connecting an energy generation unit to the power grid

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002204531A (en) * 2000-10-31 2002-07-19 Canon Inc Ac-interconnecting device and control method thereof
ITMI20022414A1 (en) * 2002-11-14 2004-05-15 Walter Cassani PLANT FOR THE EXPLOITATION OF ENERGY SOURCES
AU2007229854B2 (en) * 2006-03-23 2011-02-03 Enphase Energy, Inc. Method and apparatus for converting direct current to alternating current
DE102007054647A1 (en) * 2007-11-15 2009-06-18 Siemens Ag Solar inverter with several parallel single inverters and with a higher-level electronic control unit

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1965483A1 (en) * 2007-02-27 2008-09-03 SMA Solar Technology AG Circuit for connecting an energy generation unit to the power grid

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
Informationsblatt für EEG- und KWK-Anlagenbetreiber über die gesetzlichen Auswirkungen der Änderung des EEG und des KWKG 2009. Stadtwerke Schwäbisch Gmünd GmbH, Stand Mai 2009. Im Internet: http://www.stwgd.de/img_down/Strom%20_EEG_%20KWK_I fo.pdf [abgerufen 05.05.2010] *
Informationsblatt für EEG- und KWK-Anlagenbetreiber über die gesetzlichen Auswirkungen der Änderung des EEG und des KWKG 2009. Stadtwerke Schwäbisch Gmünd GmbH, Stand Mai 2009. Im Internet: http://www.stwgd.de/img_down/Strom%20_EEG_%20KWK_Info.pdf [abgerufen 05.05.2010]

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9760956B2 (en) 2011-04-08 2017-09-12 Sma Solar Technology Ag Optimized load management
DE102012103081B4 (en) 2011-04-08 2021-12-30 Sma Solar Technology Ag Optimized load management
WO2014076446A1 (en) * 2012-11-16 2014-05-22 Torch Solar Technologies Limited A power management system

Also Published As

Publication number Publication date
WO2011012272A3 (en) 2011-06-30
WO2011012272A2 (en) 2011-02-03

Similar Documents

Publication Publication Date Title
DE102014104216B3 (en) Single-phase emergency operation of a three-phase inverter and corresponding inverter
EP2009763B1 (en) Electricity supply device
EP2348597A1 (en) Equalisation of the partial outputs flowing over the individual phases of a multi-phase alternating current
DE10162955A1 (en) Arrangement for the energy management of an uninterruptible power supply
DE202009019050U1 (en) Device for transmission line control
EP2919352B1 (en) Method for operating an electric subscriber, an electrical measuring point in a subscriber network and an electrical subscriber and electric measuring point
DE102011084216A1 (en) Device for controlling electrical charging of electric car in e.g. multi-storey car park, has measuring instrument determining electric power, and control unit controlling certain portion of power such that maximum value is not exceeded
WO2013064377A2 (en) Supply unit and a power generation-and-consumption arrangement
WO2013045072A2 (en) Pv system having a safeguard against feeding into a public power distribution network
DE102013106216B4 (en) Measuring device for current measurement
DE102012210613A1 (en) Wind farm with several grid entry points
DE102013217743A1 (en) Method and control device for limiting an electrical load in a network branch of an electrical network
DE20218473U1 (en) Device for connecting a building or the like. to an electrical low-voltage network
EP2697889A2 (en) Power distribution system and method for operation thereof
DE102009041632A1 (en) Circuit arrangement with an inverter part comprising a central control unit
DE102009035399A1 (en) Circuit arrangement for current steering
DE102009031550A1 (en) Device for energy distribution and method
DE2316341A1 (en) PROCESS FOR CONTINUOUSLY DISTRIBUTING ELECTRIC ENERGY
DE2657784A1 (en) DEVICE FOR SWITCHING OFF ONE PHASE OF A MULTI-PHASE SUPPLY
DE102010043001A1 (en) Charging system and method for charging vehicle batteries
EP2355295A2 (en) Charge regulator
EP3596792B1 (en) Electrical energy supplying network and method for operating thereof
WO2015104177A2 (en) Method and inverter for feeding electrical energy to an ac network
WO2019030048A1 (en) Electrical energy storage assembly
EP3422522A1 (en) Provision of electrical power to an energy supply network by means of a provisioning device with extended range

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
R016 Response to examination communication
R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee