CN220283237U - Building construction elevator - Google Patents
Building construction elevator Download PDFInfo
- Publication number
- CN220283237U CN220283237U CN202321912883.4U CN202321912883U CN220283237U CN 220283237 U CN220283237 U CN 220283237U CN 202321912883 U CN202321912883 U CN 202321912883U CN 220283237 U CN220283237 U CN 220283237U
- Authority
- CN
- China
- Prior art keywords
- frame
- base
- connection
- building construction
- construction elevator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009435 building construction Methods 0.000 title claims abstract description 18
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 17
- 230000005540 biological transmission Effects 0.000 claims description 25
- 238000009434 installation Methods 0.000 claims description 21
- 229910000831 Steel Inorganic materials 0.000 claims description 7
- 239000010959 steel Substances 0.000 claims description 7
- 230000003028 elevating effect Effects 0.000 claims description 6
- 230000006978 adaptation Effects 0.000 claims description 5
- 238000000034 method Methods 0.000 description 21
- 238000010276 construction Methods 0.000 description 15
- 238000004804 winding Methods 0.000 description 5
- 239000004566 building material Substances 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 238000012938 design process Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- -1 prefabricated parts Substances 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 210000003781 tooth socket Anatomy 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a building construction lifter, which comprises a mounting base, wherein the top end of the mounting base is provided with a moving mechanism, the moving mechanism comprises a connecting base, a driving motor and a screw rod, the connecting base is connected with the top end of the mounting base in a sliding manner, the driving motor is fixedly arranged on the side surface of the mounting base, the screw rod is fixedly sleeved at the output end of the driving motor, the screw rod is in threaded connection with the connecting base, the connecting base is provided with a lifting mechanism, the lifting mechanism comprises a lifting frame, a winch and a mounting frame, the lifting frame is arranged at the top end of the connecting base, the middle part of the lifting frame is provided with the winch, the winch is in driving connection with the mounting frame, and the lower end of the mounting frame is provided with an adjusting mechanism which comprises an adjusting table, a folding plate and a reinforcing frame.
Description
Technical Field
The utility model relates to the technical field of elevators, in particular to a building construction elevator.
Background
A common building construction hoist is a tower crane, which is also called a tower crane, which is a high-efficiency and safe building construction equipment, and is generally used for lifting and transporting heavy building materials and equipment on a building site, the tower crane can reach a very high height to adapt to the construction requirements of high-rise buildings, can be directly installed on a foundation or a special crane bracket on the building site, has a large load carrying capacity, can bear heavy building materials and equipment, such as steel, prefabricated parts, concrete, building machinery and the like, has different load carrying capacities, can be selected according to specific requirements, can adapt to different building site requirements by adjusting arm lengths and lifting hook positions, can rotate 360 degrees in the horizontal direction, covers a large construction range, and is generally provided with various safety devices such as overload protection, wind speed monitoring, height limitation and the like in the design and manufacturing process, so as to ensure the safety in the construction process, can improve the construction efficiency, reduce the labor intensity of workers, reduce the labor intensity of manual lifting, can quickly reach the specified construction efficiency, and can meet the requirements of the specific requirements, and can meet the requirements of the construction requirements in the specific operation, and the safety requirements of workers in the construction process.
The existing building construction lifter cannot move in the front-back direction according to the condition of a construction site in the use process, inconvenience is caused to the construction process, so that the construction efficiency is affected.
Disclosure of Invention
The utility model aims to provide a building construction elevator, which solves the problems that the front and back positions of the elevator in the prior art are not adjustable, the structure of the existing elevator is unstable and constructors are inconvenient to operate.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
the utility model provides a building construction lift, includes the installation base, installation base top is provided with moving mechanism, moving mechanism is including connecting base, driving motor and lead screw, connect base sliding connection on the top of installation base, the side fixed mounting of installation base has driving motor, driving motor's output has fixedly cup jointed the lead screw, lead screw and connection base threaded connection, install elevating system on the connection base, elevating system includes lifting frame, hoist engine and installing frame, lifting frame installs on the top of connection base, lifting frame's middle part is provided with the hoist engine, hoist engine and installing frame drive connection, the installing frame lower extreme is provided with adjustment mechanism, adjustment mechanism includes adjustment table, folding plate and reinforcing frame, the adjustment table sets up the lower extreme at the installing frame, the adjustment table both sides all are provided with the folding plate through pivot rotation connection, the adjustment table bottom is provided with the reinforcing frame.
As a further scheme of the utility model: the top of installation base has seted up the slide rail, the top of connection base is equipped with the slider, and slider and slide rail looks adaptation make connection base can carry out the slip process on the installation base through using slide rail and slider.
As still further aspects of the utility model: the outer end of hoist engine is equipped with the hoist frame, be equipped with wire rope on the hoist engine, be equipped with on the installing frame and hang and detain, wire rope is connected with hanging knot, uses through the cooperation of individual part and makes the hoist engine utilize couple and wire rope to promote the installing frame, accomplishes high regulation process.
As still further aspects of the utility model: the mounting frame lower extreme is connected and is equipped with the guardrail, the guardrail bottom is connected and is equipped with the base, the guardrail outside is equipped with the bin gate, has protected for constructor's safety in the construction through using the guardrail to constructor utilizes the bin gate to go on the base from top to bottom, accomplishes the work progress.
As still further aspects of the utility model: the support rod is rotatably connected to two sides of the reinforcing frame, the annular grooves are formed in two sides of the reinforcing frame, the support rod is matched with the annular grooves, the adjusting table and the folding plate are respectively provided with an adjusting slide rail, the bottom end of the base is provided with a connecting slide block, the support rod can be unfolded when the base needs to be moved through cooperation of the components, and the support rod can be received in the annular grooves when the support rod is not used, so that the use area is reduced.
As still further aspects of the utility model: the motor is arranged on the adjusting table, the output end of the motor is connected with a belt, one end of the belt is connected with a transmission shaft, two transmission shafts are arranged, the transmission shafts are all arranged in the adjusting table, and the power is provided for the movement of the base through the cooperation of all the components.
As still further aspects of the utility model: be equipped with the drive belt between the transmission shaft, the transmission shaft both ends all are equipped with the gear, the connection slider bottom is equipped with the tooth's socket, tooth's socket meshes with the gear mutually, uses through the cooperation of each part and makes the gear can utilize the tooth's socket to promote the connection slider and remove, and then promotes the removal process of base.
Compared with the prior art, the utility model has the advantages that:
1. the utility model comprises a connecting base, a driving motor and a screw rod, and the moving process of the front and back positions of the lifter is completed through the matched use of the components, so that the moving process is more convenient and quicker, the working speed is improved, the practicability of the lifter is increased, and the lifter can be widely applied to the building construction process.
2. The utility model comprises the lifting frame, the winch and the mounting frame, and the lifting frame is more stable in the height adjusting process by the cooperation of the components, so that the use process of the lifting machine is safer, the practicability of the lifting machine is improved, the lifting machine can be more convenient and quicker in the use process, and the lifting machine can be widely applied.
3. In addition, the lifting platform comprises the adjusting platform, the folding plate and the reinforcing frame, the lifting platform can be adjusted through the cooperation of the components, the usable area can be enlarged even in the position with narrow usable space, the potential safety hazard of constructors is reduced, the stability of the equipment is improved, and the lifting platform is more convenient in the use process.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is an enlarged schematic view of the structure A in the present utility model;
FIG. 3 is an enlarged schematic view of B in the present utility model;
FIG. 4 is an enlarged schematic view of structure C in the present utility model;
fig. 5 is a schematic view of a part of the structure in the present utility model.
In the figure: 1. a mounting base; 2. the base is connected; 3. a driving motor; 4. a screw rod; 5. a lifting frame; 6. a hoist; 7. a mounting frame; 8. an adjustment table; 9. a folding plate; 10. a reinforcing frame; 11. a slide rail; 12. a slide block; 13. a hoist frame; 14. a wire rope; 15. hanging buckle; 16. guard bars; 17. a base; 18. a bin gate; 19. a support rod; 20. an annular groove; 21. adjusting the sliding rail; 22. the connecting slide block; 23. a motor; 24. a belt; 25. a transmission shaft; 26. a transmission belt; 27. a gear; 28. tooth slots.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Example 1:
referring to fig. 1 to 5, in an embodiment of the present utility model:
the utility model provides a building construction lift, including installation base 1, installation base 1 top is provided with moving mechanism, moving mechanism is including connecting base 2, driving motor 3 and lead screw 4, connect the top of base 2 sliding connection at installation base 1, the side fixed mounting of installation base 1 has driving motor 3, driving motor 3's output fixed sleeve has lead screw 4, lead screw 4 and connection base 2 threaded connection, install elevating system on the connection base 2, elevating system includes lift frame 5, hoist engine 6 and installing frame 7, lift frame 5 installs the top at connection base 2, the middle part of lift frame 5 is provided with hoist engine 6, hoist engine 6 and installing frame 7 drive connection, the installing frame 7 lower extreme is provided with adjustment mechanism, adjustment mechanism includes adjustment table 8, folding plate 9 and reinforcing frame 10, adjustment table 8 sets up the lower extreme at installing frame 7, the adjustment table 8 both sides all are provided with folding plate 9 through the pivot swivelling joint, adjustment table 8 bottom is provided with reinforcing frame 10.
In the embodiment of the utility model, the following steps are included: the slide rail 11 has been seted up at the top of installation base 1, and the top of connection base 2 is equipped with slider 12, and slider 12 and slide rail 11 looks adaptation, starts driving motor 3, makes the lead screw 4 of its output rotate to make the slider 12 of connection base 2 bottom remove along the slide rail 11 on the installation base 1, and then accomplish the removal process to connection base 2.
In the embodiment of the utility model, the following steps are included: the outer end of the winch 6 is provided with a winch frame 13, the winch 6 is provided with a steel wire rope 14, the mounting frame 7 is provided with a hanging buckle 15, the steel wire rope 14 is connected with the hanging buckle 15, the winch 6 on the winch frame 13 is started to drive the winding and unwinding processes of the steel wire rope 14, and then the hanging buckle 15 is driven to move, so that the mounting frame 7 on the hanging buckle 15 completes the upward moving process.
In the embodiment of the utility model, the following steps are included: the lower extreme connection of installing frame 7 is equipped with guardrail 16, and the connection of guardrail 16 bottom is equipped with base 17, and the guardrail 16 outside is equipped with door 18, when constructor carries out the lift and builds, can carry out the lift along door 18 to in the work progress, guardrail 16 has played the guard action to constructor's safety.
In the embodiment of the utility model, the following steps are included: the reinforcing frame 10 both sides rotate the connection and are equipped with bracing piece 19, and annular groove 20 has been seted up to reinforcing frame 10 both sides, and bracing piece 19 and annular groove looks adaptation all are equipped with on adjusting table 8 and the folding board 9 and adjust slide rail 21, and the base 17 bottom is equipped with connecting slider 22, when needs are under construction in narrow position upper end side, can open folding board 9 to support bracing piece 19, can put down folding board 9 when not using, and put into annular groove 20 with bracing piece 19, make it can not occupy the construction place yet.
In the embodiment of the utility model, the following steps are included: the motor 23 is arranged on the adjusting table 8, the output end of the motor 23 is connected with a belt 24, one end of the belt 24 is connected with two transmission shafts 25, the transmission shafts 25 are arranged in the adjusting table 8, and the motor 23 is started to drive one transmission shaft 25 to rotate through the belt 24 at the output end.
In the embodiment of the utility model, the following steps are included: be equipped with drive belt 26 between the transmission shaft 25, the transmission shaft 25 both ends all are equipped with gear 27, connect slider 22 bottom and be equipped with tooth's socket 28, tooth's socket 28 and gear 27 mesh, and a transmission shaft 25 rotates, makes another transmission shaft 25 also can be corresponding through drive belt 26 rotate, and then makes the gear 27 on two transmission shafts 25 all take place to rotate, drives connect slider 22 through gear 27 and removes.
Example 2:
referring to fig. 1 to 5, when in use, when the position of the connection base 2 needs to be moved, the driving motor 3 can be manually started to enable the lead screw 4 at the output end of the connection base 2 to rotate, and the slide block 12 at the bottom of the connection base 2 moves along the slide rail 11 on the installation base 1, so that the moving process of the connection base 2 is completed, when the height of the installation frame 7 needs to be adjusted, the winding machine 6 on the winding machine frame 13 can be started, the winding and unwinding process of the steel wire rope 14 is driven, and then the hanging buckle 15 is driven to move, the upward moving process of the installation frame 7 on the hanging buckle 15 is completed, when the constructor performs construction by the up-down lifter, the up-down lifter can be performed along the bin gate 18, and in the construction process, the guardrail 16 plays a protective role for the safety of the constructor, when the side face at the upper end of the narrow position is required to be constructed, the folding plate 9 can be opened, and the support 19 can be put down when the support rod 19 is not used, and the support rod 19 is put into the 20, and the supporting rod is also taken into 20, the driving motor is enabled, the two sides of the support rod need not to occupy the winding and unwinding shaft 25 can be driven by the support rod, and the two sides of the support rod 25 can rotate along the two sides 25, and the transmission shafts can rotate along the transmission shaft 25, and the transmission shafts 25 can rotate through the rotation 25, and the transmission shafts 25 can rotate through the rotation 25.
In all the above mentioned embodiments, the welding, the matching connection of the bolt and the nut, the bolt or the screw connection or other known connection modes can be selected according to the actual situation, and are not described in detail herein, the above description refers to the write-in fixed connection, and the welding is preferentially considered, but the protection scope of the present utility model is not limited thereto, and any person skilled in the art should be covered by the protection scope of the present utility model if the technical scheme and the inventive concept thereof are equivalent or changed within the scope of the present utility model.
Claims (7)
1. Building construction elevator, including installation base (1), its characterized in that: the utility model provides a mobile device, including installation base (1) top is provided with moving mechanism, moving mechanism is including connecting base (2), driving motor (3) and lead screw (4), the top at installation base (1) is connected to connection base (2) sliding connection, the side fixed mounting of installation base (1) has driving motor (3), lead screw (4) have been fixedly cup jointed to the output of driving motor (3), lead screw (4) and connection base (2) threaded connection, install elevating system on connection base (2), elevating system includes lifting frame (5), hoist engine (6) and installing frame (7), the top at connection base (2) is installed to lifting frame (5), the middle part of lifting frame (5) is provided with hoist engine (6), hoist engine (6) and installing frame (7) drive connection, installing frame (7) lower extreme is provided with adjustment mechanism, adjustment mechanism includes adjustment platform (8), folding board (9) and reinforcing frame (10), adjustment platform (8) set up in the lower extreme of installation frame (7), adjustment platform (8) are provided with reinforcing plate (10) through adjustment platform (8), both sides are connected with reinforcing frame (8).
2. A building construction elevator according to claim 1, wherein: the top of installation base (1) has seted up slide rail (11), the top of connection base (2) is equipped with slider (12), and slider (12) and slide rail (11) looks adaptation.
3. A building construction elevator according to claim 2, wherein: the outer end of the winch (6) is provided with a winch frame (13), the winch (6) is provided with a steel wire rope (14), the mounting frame (7) is provided with a hanging buckle (15), and the steel wire rope (14) is connected with the hanging buckle (15).
4. A building construction elevator according to claim 1, wherein: the mounting frame (7) lower extreme connection is equipped with guardrail (16), guardrail (16) bottom connection is equipped with base (17), guardrail (16) outside is equipped with bin gate (18).
5. A building construction elevator according to claim 4, wherein: the utility model discloses a folding device, including reinforcing frame (10), bracing piece (19) are equipped with in reinforcing frame (10) both sides rotation connection, ring channel (20) have been seted up to reinforcing frame (10) both sides, bracing piece (19) and ring channel looks adaptation, all be equipped with on adjusting bench (8) and folding board (9) and adjust slide rail (21), base (17) bottom is equipped with connecting slider (22).
6. A building construction elevator according to claim 5, wherein: the motor (23) is arranged on the adjusting table (8), a belt (24) is connected and arranged at the output end of the motor (23), a transmission shaft (25) is connected and arranged at one end of the belt (24), two transmission shafts (25) are arranged, and the transmission shafts (25) are all arranged in the adjusting table (8).
7. A building construction elevator according to claim 6, wherein: a transmission belt (26) is arranged between the transmission shafts (25), gears (27) are arranged at two ends of the transmission shafts (25), tooth grooves (28) are formed in the bottom ends of the connecting sliding blocks (22), and the tooth grooves (28) are meshed with the gears (27).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321912883.4U CN220283237U (en) | 2023-07-20 | 2023-07-20 | Building construction elevator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321912883.4U CN220283237U (en) | 2023-07-20 | 2023-07-20 | Building construction elevator |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220283237U true CN220283237U (en) | 2024-01-02 |
Family
ID=89331842
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321912883.4U Active CN220283237U (en) | 2023-07-20 | 2023-07-20 | Building construction elevator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220283237U (en) |
-
2023
- 2023-07-20 CN CN202321912883.4U patent/CN220283237U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218620225U (en) | Electric rotary lifting insulating platform for operation on auxiliary rod | |
CN211419395U (en) | Telescopic jib loading boom for hoist device | |
CN110512869A (en) | It is novel and multifunctional to cut wall drill hole fluting and material lift all-in-one machine | |
CN112623976A (en) | Heavy tower crane with transverse supporting and stabilizing equipment | |
CN220283237U (en) | Building construction elevator | |
CN113955636A (en) | Hoisting equipment for assembly type building construction | |
CN214527774U (en) | A masonry hoisting accessory for high-rise building construction | |
CN109052186A (en) | A kind of novel slewing crane and its application method with spiral arm slewing equipment | |
CN208429786U (en) | A kind of cold-strip steel lifting machine | |
CN116425096A (en) | Overhead working suspension platform for architectural decoration engineering | |
CN216613816U (en) | Universal curtain wall and quick hoisting device for components thereof | |
CN213738292U (en) | Steel construction section bar lifting device | |
CN214243550U (en) | Assembled hoisting accessory for building | |
CN214653150U (en) | Equipment for hoisting prefabricated arched tunnel roof structure | |
CN114635552A (en) | Elevator shaft lifting construction protection operation platform | |
CN209799334U (en) | lifting device for lifting scaffold | |
CN2835192Y (en) | Crane | |
CN111706053A (en) | Be used for construction machinery and construction synchronous elevation structure | |
CN218465333U (en) | ALC partition plate installation hoisting device | |
CN219885608U (en) | Hoisting platform in elevator well | |
CN216105816U (en) | Mining lifting machine overhauls device | |
CN221587916U (en) | Overhead hoist convenient to protection network construction | |
CN220432142U (en) | Building construction tower crane | |
CN219603204U (en) | Safety lifting device | |
CN220317182U (en) | Building structure suspender device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||