CN220226425U - Steel pipe tower equipment connection structure - Google Patents

Steel pipe tower equipment connection structure Download PDF

Info

Publication number
CN220226425U
CN220226425U CN202321528234.4U CN202321528234U CN220226425U CN 220226425 U CN220226425 U CN 220226425U CN 202321528234 U CN202321528234 U CN 202321528234U CN 220226425 U CN220226425 U CN 220226425U
Authority
CN
China
Prior art keywords
steel pipe
fixedly connected
shell
connection structure
limiting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321528234.4U
Other languages
Chinese (zh)
Inventor
孙洪涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Mastercard Power Ltd By Share Ltd
Original Assignee
Liaoning Mastercard Power Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Mastercard Power Ltd By Share Ltd filed Critical Liaoning Mastercard Power Ltd By Share Ltd
Priority to CN202321528234.4U priority Critical patent/CN220226425U/en
Application granted granted Critical
Publication of CN220226425U publication Critical patent/CN220226425U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to the technical field of steel tube towers, in particular to a steel tube tower assembling and connecting structure, which comprises a tube sleeve, wherein the top of the tube sleeve is fixedly connected with a top plate, the outer side of the lower part of the top plate is fixedly connected with a uniformly distributed reinforcing plate, uniformly distributed through holes are formed in the top plate, fixing bolts are arranged in the through holes formed in the top plate, fixing nuts are spirally connected to the outer sides of the fixing bolts, a limiting shell is arranged on the outer sides of the fixing nuts, the top of the limiting shell is fixedly connected with a fixing ring, the outer sides of the fixing rings are fixedly connected with a steel tube, and uniformly distributed first limiting holes are formed in the fixing ring.

Description

Steel pipe tower equipment connection structure
Technical Field
The utility model relates to the technical field of steel pipe towers, in particular to an assembly and connection structure of a steel pipe tower.
Background
The steel pipe tower is a lattice tower which is mainly composed of steel pipes and other components such as steel pipes or section steel, the steel pipe tower is usually used for erecting a power transmission line, when the steel pipe tower is erected, the steel pipe is usually assembled and erected directly through a flange and a fixed plate welded on a steel pipe frame, and then the power transmission line is erected on the steel pipe tower.
The traditional steel pipe tower is assembled by the flange generally, then fixed angle bar consolidates on the fixed plate, when the steel pipe tower used, the pressure of top steel pipe was born for a long time to flange and mount, simultaneously in strong wind season, strong wind blows on the steel pipe tower, can lead to the slight rocking of steel pipe tower self this moment, the long-time rocking of steel pipe tower leads to flange board and fixed plate to keep the atress, thereby lead to flange board and fixed plate to become even damage, need change whole steel pipe because of the welded reason when changing, cause the wasting of resources, consequently, propose a steel pipe tower equipment connection structure to above-mentioned problem.
Disclosure of Invention
The utility model aims to provide a steel pipe tower assembling and connecting structure so as to solve the problem of high replacement cost of a flange plate and a mounting plate.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
the utility model provides a steel pipe tower equipment connection structure, includes the pipe box, pipe box top fixedly connected with roof, roof below outside fixedly connected with is evenly distributed's gusset plate, offer in the roof and be evenly distributed's through-hole, be equipped with fixing bolt in the through-hole that the roof was offered, fixing bolt outside screwed connection has fixation nut, the fixation nut outside is equipped with spacing shell, spacing shell top fixedly connected with solid fixed ring, gu fixed ring outside and steel pipe fixed connection, gu first spacing hole that is evenly distributed has been offered in the fixed ring, second spacing hole has been offered in the spacing shell, pipe box outside fixedly connected with is the mounting panel that the symmetry set up.
Preferably, a limit groove is formed in the limit shell, the limit shell is slidably connected with a push plate through the limit groove, and the push plate penetrates through the limit shell.
Preferably, the number of the limiting shells is four, and the inner sides of the limiting shells are mutually attached to the fixing nuts.
Preferably, the reinforcing plate is fixedly connected with the pipe sleeve, and the reinforcing plate is uniformly distributed on the outer side of the pipe sleeve.
Preferably, the number of the fixing bolts is four, and the fixing bolts are uniformly distributed in the flange ring.
Compared with the prior art, the utility model has the beneficial effects that:
according to the utility model, the flange ring and the mounting plate can be conveniently mounted through the arranged pipe sleeve, the top plate, the fixing ring, the limiting shell, the fixing bolt and the fixing nut, when the flange ring and the mounting plate are deformed or damaged, the flange ring, the mounting plate and the pipe sleeve are directly taken down and replaced, the steel pipe main body is kept unchanged, the replacement cost is reduced, the pipe and the top plate can be conveniently reinforced through the arranged reinforcing plate, the steel pipe connection is more stable, the fixing nut can be conveniently taken out through the arranged push plate, and the replacement of the pipe sleeve is convenient.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic view of the mounting structure of the top plate of the present utility model;
FIG. 3 is a schematic view of the mounting bottom cross-sectional structure of the push plate of the present utility model;
fig. 4 is a schematic diagram of the structure of fig. 1 at a.
In the figure: 1-pipe sleeve, 2-steel pipe, 3-roof, 4-gusset plate, 5-flange ring, 6-fixed ring, 7-spacing shell, 8-fixing bolt, 9-fixation nut, 10-through hole, 11-first spacing hole, 12-second spacing hole, 13-spacing groove, 14-push pedal, 15-mounting panel.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, the present utility model provides a technical solution:
the utility model provides a steel pipe tower equipment connection structure, including pipe box 1, pipe box 1 top fixedly connected with roof 3, roof 3 below outside fixedly connected with is evenly distributed's gusset plate 4, set up in the roof 3 and be evenly distributed's through-hole 10, be equipped with fixing bolt 8 in the through-hole 10 seted up to roof 3, fixing bolt 8 outside screwed connection has fixation nut 9, the fixation nut 9 outside is equipped with spacing shell 7, spacing shell 7 top fixedly connected with solid fixed ring 6, gu fixed ring 6 outside and steel pipe 2 fixed connection, gu set up in the fixed ring 6 and be evenly distributed's first spacing hole 11, set up second spacing hole 12 in the spacing shell 7, pipe box 1 outside fixedly connected with is the mounting panel 15 that the symmetry set up, install flange ring 5 and mounting panel 15 through this setting can be convenient, be convenient for change flange ring 5 and mounting panel 15.
The limiting groove 13 has been seted up in the limiting shell 7, limiting shell 7 has push pedal 14 through limiting groove 13 sliding connection, push pedal 14 runs through limiting shell 7, push out fixation nut 9 through this setting can be convenient, the convenience is changed fixation nut 9, the total number of limiting shell 7 is four, and the limiting shell 7 inboard is laminated with fixation nut 9 each other, fix roof 3 through this setting can be convenient, gusset plate 4 and pipe box 1 fixed connection, and gusset plate 4 is evenly distributed in the pipe box 1 outside, support pipe box 1 and roof 5 that can be convenient through this setting, make steel pipe 2 install more stably, the total four of the number of fixation bolt 8, and fixation bolt 8 is evenly distributed in flange ring 5, install flange ring 5 and mounting panel 15 that can be convenient through this setting.
The working flow is as follows: when the steel pipe tower assembling and connecting structure is used, firstly, the fixing nut 9 is placed into the limit shell 7 through the fixing ring 6, at the moment, two sides of the fixing nut 9 are attached to the limit shell 7, then the pipe sleeve 1 is sleeved on the outer side of the steel pipe 2, at the moment, the top plate 3 is rotated to align the through hole 10 formed in the top plate 3 with the first limit hole 11 formed in the fixing ring 6 and the second limit hole 12 formed in the limit groove 13, then a bolt penetrates through the through hole 10 formed in the top plate 3 and the first limit hole 11 formed in the fixing ring 6, at the moment, the bottom of the bolt enters the fixing nut 9, then the fixing bolt 8 is rotated to enable the fixing bolt 8 to be in spiral connection with the fixing nut 9, at the moment, the pipe sleeve 1 and the top plate 3 can be fixed on the outer side of the steel pipe 2, then through roof 3, flange ring 5 and mounting panel 15, assemble the erection to the steel pipe tower, when using for a long time to lead to flange ring 5 or mounting panel 15 wearing and tearing, directly take off the steel pipe 2 at flange ring 5 and mounting panel 15 place, take off fixed runner brush this moment, then take off the sleeve pipe from steel pipe 2 outside, afterwards pass the fixed ring 6 deep into pipe box 1 with the hand, then promote push pedal 14, push pedal 14 promotes fixation nut 9 removal this moment, release fixation nut 9 one side spacing shell 7, can take out fixation nut 9 this moment, then put into spacing shell 7 with new fixation nut 9, afterwards can install new pipe box 1, flange ring 5 and mounting panel 15.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a steel pipe tower equipment connection structure, includes pipe box (1), its characterized in that: the pipe box (1) top fixedly connected with roof (3), roof (3) below outside fixedly connected with is evenly distributed's gusset plate (4), set up in roof (3) and be evenly distributed's through-hole (10), be equipped with fixing bolt (8) in through-hole (10) are seted up to roof (3), fixing bolt (8) outside screwed connection has fixation nut (9), fixation nut (9) outside is equipped with spacing shell (7), spacing shell (7) top fixedly connected with solid fixed ring (6), gu fixed ring (6) outside and steel pipe (2) fixed connection, gu set up in fixed ring (6) and be evenly distributed's first spacing hole (11), set up second spacing hole (12) in spacing shell (7), mounting panel (15) that are the symmetry setting are connected with in pipe box (1) outside.
2. The steel pipe tower assembly connection structure according to claim 1, wherein: the limiting shell (7) is internally provided with a limiting groove (13), the limiting shell (7) is slidably connected with a push plate (14) through the limiting groove (13), and the push plate (14) penetrates through the limiting shell (7).
3. The steel pipe tower assembly connection structure according to claim 1, wherein: the number of the limiting shells (7) is four, and the inner sides of the limiting shells (7) are mutually attached to the fixing nuts (9).
4. The steel pipe tower assembly connection structure according to claim 1, wherein: the reinforcing plate (4) is fixedly connected with the pipe sleeve (1), and the reinforcing plates (4) are uniformly distributed on the outer side of the pipe sleeve (1).
5. The steel pipe tower assembly connection structure according to claim 1, wherein: the number of the fixing bolts (8) is four, and the fixing bolts (8) are uniformly distributed in the flange ring (5).
CN202321528234.4U 2023-06-15 2023-06-15 Steel pipe tower equipment connection structure Active CN220226425U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321528234.4U CN220226425U (en) 2023-06-15 2023-06-15 Steel pipe tower equipment connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321528234.4U CN220226425U (en) 2023-06-15 2023-06-15 Steel pipe tower equipment connection structure

Publications (1)

Publication Number Publication Date
CN220226425U true CN220226425U (en) 2023-12-22

Family

ID=89171701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321528234.4U Active CN220226425U (en) 2023-06-15 2023-06-15 Steel pipe tower equipment connection structure

Country Status (1)

Country Link
CN (1) CN220226425U (en)

Similar Documents

Publication Publication Date Title
EP3667079B1 (en) Hybrid wind power tower based on edge-stiffened combined shells
CN220226425U (en) Steel pipe tower equipment connection structure
CN214998049U (en) Truss supporting structure in wind power tower cylinder
CN201276864Y (en) Wind power generation tower barrel with prefabricated steel reinforced concrete pillar
CN212296703U (en) Speed-increasing type fan pipe barrel supporting structure
CN212802053U (en) Damping device, tower and wind generating set
CN220687492U (en) Reinforced wind power tower
CN219840750U (en) Stably supported tower for onshore wind power generation
CN219080398U (en) Wind generating set basis crab-bolt cage optimization structure
CN221220687U (en) Multifunctional built-in stiffening plate for tower barrel of offshore wind turbine generator
CN112253395A (en) Split type connecting flange and using method thereof
CN217232976U (en) Steel pipe tower base reinforced structure
CN218116947U (en) Assembled general assembled steel structure connection gusset plate
CN220352863U (en) Reinforced structure for water conservancy construction cofferdam
CN221646047U (en) Assembled building corner permeation prevention structure
CN212389472U (en) Wind turbine tower cylinder reinforcing assembly
CN221547189U (en) Modularized foundation system of wind turbine generator
CN220792360U (en) Can assemble superimposed PCCP pipe
CN219774038U (en) Can put outside cat ladder of wind tower of installation
CN214532228U (en) Plug-in type connecting device for annular concrete pole
CN220986268U (en) Detachable five-way mounting bracket
CN213039386U (en) Wind driven generator blade lengthening assembly
CN218235346U (en) Composite structure wind power tower cylinder with inner lining truss
CN212506746U (en) Utilize V shaped steel board to connect reinforced (rfd) steel construction beam column
CN221879600U (en) Wind power sleeve with wind resistance function