CN220184441U - Prestressed anchorage device connecting device - Google Patents
Prestressed anchorage device connecting device Download PDFInfo
- Publication number
- CN220184441U CN220184441U CN202321737626.1U CN202321737626U CN220184441U CN 220184441 U CN220184441 U CN 220184441U CN 202321737626 U CN202321737626 U CN 202321737626U CN 220184441 U CN220184441 U CN 220184441U
- Authority
- CN
- China
- Prior art keywords
- bayonet
- plate
- movably connected
- fixed plate
- bolts
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 abstract description 6
- 239000011120 plywood Substances 0.000 description 9
- 230000000694 effects Effects 0.000 description 5
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000004873 anchoring Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000004567 concrete Substances 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 239000011513 prestressed concrete Substances 0.000 description 1
- 210000002435 tendon Anatomy 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
技术领域Technical field
本实用新型涉及锚具技术领域,尤其涉及一种预应力锚具连接装置。The utility model relates to the technical field of anchors, and in particular to a prestressed anchor connection device.
背景技术Background technique
锚具是指预应力混凝土中所用的永久性锚固装置,是在后张法结构或构件中,为保持预应力筋的拉力并将其传递到混凝土内部的锚固工具,也称之为预应力锚具。Anchors refer to the permanent anchoring devices used in prestressed concrete. They are anchoring tools used in post-tensioned structures or components to maintain the tension of prestressed tendons and transfer them to the interior of the concrete. They are also called prestressed anchors. Tool.
但是现有技术中,部分传统预应力锚具在安装过程中需要的工人较多,导致人力上的浪费,增加了工作人员的工作量,降低了工作效率;部分传统预应力锚具在安装夹板时由于没有集中安装的装置,需要工人对夹具进行依次安装,增加了工作人员的工作量降低了工作效率。However, in the existing technology, some traditional prestressed anchors require more workers during the installation process, resulting in a waste of manpower, increasing the workload of the staff, and reducing work efficiency; some traditional prestressed anchors require more workers when installing splints. Since there is no centralized installation device, workers need to install the fixtures in sequence, which increases the workload of the staff and reduces work efficiency.
实用新型内容Utility model content
本实用新型的目的是为了解决现有技术中存在的问题。The purpose of the utility model is to solve the problems existing in the prior art.
为了实现上述目的,本实用新型采用了如下技术方案:一种预应力锚具连接装置,包括:支撑板,所述支撑板的中心处活动连接有锚具,所述支撑板顶端设置有抬升装置,所述抬升装置的顶端活动连接有夹具。In order to achieve the above purpose, the present utility model adopts the following technical solution: a prestressed anchor connection device, including: a support plate, an anchor is movably connected to the center of the support plate, and a lifting device is provided at the top of the support plate , a clamp is movably connected to the top of the lifting device.
作为一种优选的实施方式,所述支撑板包括固定板一,所述固定板一表面的四端均固定安装有螺栓一,所述固定板一表面的一端固定安装有两个连接块一,所述固定板一的表面开设有卡口一,两个所述连接块一的顶端活动连接有螺栓二,两个所述螺栓二均活动连在两个螺孔的内腔。As a preferred embodiment, the support plate includes a fixed plate 1. Bolts 1 are fixedly installed at four ends of the fixed plate 1 surface. Two connecting blocks 1 are fixedly installed at one end of the fixed plate 1 surface. A bayonet is provided on the surface of the fixing plate one, and two bolts are movably connected to the tops of the two connecting blocks one. The two bolts two are movably connected to the inner cavities of the two screw holes.
采用上述进一步方案的技术效果是:起到了对锚具进行夹持固定的作用。The technical effect of adopting the above further solution is that it plays the role of clamping and fixing the anchor.
作为一种优选的实施方式,所述支撑板包括固定板二,所述固定板二表面的一端固定安装有两个连接块二,两个所述连接块二的顶端中心处均开设有螺孔,两个所述连接块二的底端均固定安装有固定板二,所述固定板二的表面开设有卡口二。As a preferred embodiment, the support plate includes a fixed plate 2, two connecting blocks 2 are fixedly mounted on one end of the surface of the fixed plate 2, and screw holes are provided at the top centers of the two connecting blocks 2 , The bottom ends of the two connecting blocks 2 are fixedly installed with a fixing plate 2, and a bayonet 2 is provided on the surface of the fixing plate 2.
采用上述进一步方案的技术效果是:起到了对锚具进行夹持固定的作用。The technical effect of adopting the above further solution is that it plays the role of clamping and fixing the anchor.
作为一种优选的实施方式,所述锚具表面一端的中心处开设有卡口三,所述卡口三的一端活动连接在卡口一的表面,所述卡口三的另一端活动连接在卡口二的表面。As a preferred embodiment, a bayonet three is provided at the center of one end of the surface of the anchor, one end of the bayonet three is movably connected to the surface of the bayonet one, and the other end of the bayonet three is movably connected to The surface of bayonet two.
采用上述进一步方案的技术效果是:起到了方便工作人员进行安装的作用,卡口二能够安装在卡口一和卡口二的表面。The technical effect of adopting the above further solution is that it facilitates installation by workers, and bayonet two can be installed on the surfaces of bayonet one and bayonet two.
作为一种优选的实施方式,所述抬升装置包括两个螺纹杆,两个所述螺纹杆的顶端均活动连接有螺栓三。As a preferred embodiment, the lifting device includes two threaded rods, and the top ends of the two threaded rods are movably connected with bolts 3.
采用上述进一步方案的技术效果是:起到了对夹具进行上下移动的作用。The technical effect of adopting the above further solution is that it plays the role of moving the clamp up and down.
作为一种优选的实施方式,所述夹具包括连接板一,所述连接板一表面的中心处固定安装有连接板二,所述连接板二的顶端开设有多个孔洞,多个所述孔洞的内腔均活动连接有夹板,所述连接板一底端的两侧均活动连接有螺栓四。As a preferred embodiment, the clamp includes a connecting plate 1, a connecting plate 2 is fixedly installed at the center of the surface of the connecting plate 1, a plurality of holes are provided at the top of the connecting plate 2, and a plurality of the holes are The inner cavity of the connecting plate is movably connected with a splint, and four bolts are movably connected to both sides of the bottom end of the connecting plate.
采用上述进一步方案的技术效果是:起到了对夹板进行固定的作用方便工作人员进行使用,开设在连接板二顶端的孔洞可以同时安装多个夹板,方便工作人员对夹板进行安装。The technical effect of adopting the above-mentioned further solution is: it plays a role in fixing the plywood and facilitates the staff to use it. The holes opened at the top of the second connecting plate can install multiple plywood at the same time, making it convenient for the staff to install the plywood.
与现有技术相比,本实用新型的优点和积极效果在于,Compared with the existing technology, the advantages and positive effects of this utility model are:
1、本实用新型,先将固定板一固定到指定位置后使用螺栓一可以使固定板以进一步固定,开设在固定板一表面的卡口一能够和开设在锚具上的卡口三进行连接对锚具进行固定,最后将固定板二进行固定可以方便工作人员进行安装,降低了工作人员的工作量,提高了工作效率。1. In this utility model, first fix the fixing plate 1 to a designated position and then use bolt 1 to further fix the fixing plate. The bayonet 1 opened on the surface of the fixing plate 1 can be connected with the bayonet 3 opened on the anchor. Fixing the anchor and finally fixing the fixing plate 2 can facilitate the installation by the staff, reduce the workload of the staff, and improve the work efficiency.
2、本实用新型,在设备固定完成后,安装在支撑板上的夹具通过螺纹杆上的螺栓三控制夹具进行上下移动,安装在夹具底端的螺栓四能够方便工作人员对夹具进行调整时对夹具进行固定的作用,连接板二上的孔洞对应夹板能够方便工作人员对夹板进行安装,降低了工作人员的工作量,提高了工作效率。2. In this utility model, after the equipment is fixed, the clamp installed on the support plate controls the clamp to move up and down through the three bolts on the threaded rod. The four bolts installed at the bottom of the clamp can facilitate the staff to adjust the clamp when adjusting the clamp. For the purpose of fixing, the holes on the second connecting plate correspond to the plywood, which can facilitate the staff to install the plywood, reducing the staff's workload and improving work efficiency.
附图说明Description of drawings
图1为本实用新型提供的一种预应力锚具连接装置的正面结构示意图;Figure 1 is a schematic front structural view of a prestressed anchor connection device provided by the utility model;
图2为本实用新型提供的一种预应力锚具连接装置的锚具结构示意图;Figure 2 is a schematic diagram of the anchor structure of a prestressed anchor connection device provided by the utility model;
图3为本实用新型提供的一种预应力锚具连接装置的侧面结构示意图;Figure 3 is a schematic side structural view of a prestressed anchor connection device provided by the utility model;
图4为本实用新型提供的一种预应力锚具连接装置的主体结构示意图。Figure 4 is a schematic diagram of the main structure of a prestressed anchor connection device provided by the utility model.
图例说明:illustration:
1、支撑板;101、固定板一;102、螺栓一;103、连接块一;104、螺栓二;105、连接块二;106、螺孔;107、卡口一;108、固定板二;109、卡口二;2、锚具;201、卡口三;3、抬升装置;301、螺纹杆;302、螺栓三;303、螺栓四;4、夹具;401、连接板一;402、连接板二;403、孔洞。1. Support plate; 101. Fixed plate one; 102. Bolt one; 103. Connecting block one; 104. Bolt two; 105. Connecting block two; 106. Screw hole; 107. Bayonet one; 108. Fixed plate two; 109. Bayonet two; 2. Anchor; 201. Bayonet three; 3. Lifting device; 301. Threaded rod; 302. Bolt three; 303. Bolt four; 4. Clamp; 401. Connecting plate one; 402. Connection Plate 2; 403, hole.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only part of the embodiments of the present utility model, not all implementations. example. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the scope of protection of the present utility model.
请参阅图1-4,本实用新型提供一种技术方案:一种预应力锚具连接装置,包括:支撑板1,支撑板1的中心处活动连接有锚具2,支撑板1顶端设置有抬升装置3,抬升装置3的顶端活动连接有夹具4。Please refer to Figures 1-4. The present utility model provides a technical solution: a prestressed anchor connection device, including: a support plate 1, an anchor 2 is movably connected to the center of the support plate 1, and a top end of the support plate 1 is provided with Lifting device 3, the top end of the lifting device 3 is movably connected with a clamp 4.
如图1-4所示,支撑板1包括固定板一101,固定板一101表面的四端均固定安装有螺栓一102,固定板一101表面的一端固定安装有两个连接块一103,固定板一101的表面开设有卡口一107,两个连接块一103的顶端活动连接有螺栓二104,两个螺栓二104均活动连在两个螺孔106的内腔,起到了对锚具2进行夹持固定的作用。As shown in Figure 1-4, the support plate 1 includes a fixed plate 101. Bolts 102 are fixedly installed on the four ends of the surface of the fixed plate 101. Two connecting blocks 103 are fixedly installed on one end of the surface of the fixed plate 101. The surface of the fixing plate 101 is provided with a bayonet 107, and the tops of the two connecting blocks 103 are movably connected with bolts 104. The two bolts 104 are movably connected to the inner cavities of the two screw holes 106, serving as anchors. Tool 2 plays the role of clamping and fixing.
如图1-4所示,支撑板1包括固定板二108,固定板二108表面的一端固定安装有两个连接块二105,两个连接块二105的顶端中心处均开设有螺孔106,两个连接块二105的底端均固定安装有固定板二108,固定板二108的表面开设有卡口二109,起到了对锚具2进行夹持固定的作用。As shown in Figure 1-4, the support plate 1 includes a fixed plate 108. Two connecting blocks 105 are fixedly installed on one end of the surface of the fixed plate 108. The two connecting blocks 105 have screw holes 106 at the top centers. , the bottom ends of the two connecting blocks 105 are fixedly installed with the second fixing plate 108, and the surface of the second fixing plate 108 is provided with a bayonet 2 109, which plays a role of clamping and fixing the anchor 2.
如图1-4所示,锚具2表面一端的中心处开设有卡口三201,卡口三201的一端活动连接在卡口一107的表面,卡口三201的另一端活动连接在卡口二109的表面,起到了方便工作人员进行安装的作用,卡口二109能够安装在卡口一107和卡口二109的表面。As shown in Figure 1-4, there is a bayonet three 201 at the center of one end of the surface of the anchor 2. One end of the bayonet three 201 is movably connected to the surface of the bayonet one 107, and the other end of the bayonet three 201 is movably connected to the card. The surface of the second port 109 serves to facilitate the installation by the staff. The second bayonet 109 can be installed on the surface of the bayonet one 107 and the second bayonet 109.
如图1-4所示,抬升装置3包括两个螺纹杆301,两个螺纹杆301的顶端均活动连接有螺栓三302,起到了对夹具4进行上下移动的作用。As shown in Figure 1-4, the lifting device 3 includes two threaded rods 301. The tops of the two threaded rods 301 are movably connected with three bolts 302, which serve to move the clamp 4 up and down.
如图1-4所示,夹具4包括连接板一401,连接板一401表面的中心处固定安装有连接板二402,连接板二402的顶端开设有多个孔洞403,多个孔洞403的内腔均活动连接有夹板,连接板一401底端的两侧均活动连接有螺栓四303,起到了对夹板进行固定的作用方便工作人员进行使用,开设在连接板二402顶端的孔洞403可以同时安装多个夹板,方便工作人员对夹板进行安装。As shown in Figure 1-4, the clamp 4 includes a connecting plate 401. A connecting plate 402 is fixedly installed at the center of the surface of the connecting plate 401. A plurality of holes 403 are provided at the top of the connecting plate 402. The plurality of holes 403 are The inner cavities are all movably connected with splints, and both sides of the bottom end of connecting plate one 401 are movably connected with bolts four 303, which play a role in fixing the splints for the convenience of workers. The holes 403 opened at the top of connecting plate two 402 can be used simultaneously Install multiple plywood to facilitate workers to install the plywood.
工作原理:先将固定板一101固定到指定位置后使用螺栓一102可以使固定板一101进一步固定,开设在固定板一101表面的卡口一107能够和开设在锚具2上的卡口三201进行连接对锚具2进行固定,最后将固定板二108进行固定可以方便工作人员进行安装,降低了工作人员的工作量,提高了工作效率;在设备固定完成后,安装在支撑板1上的夹具4通过螺纹杆301上的螺栓三302控制夹具4进行上下移动,安装在夹具4底端的螺栓四303能够方便工作人员对夹具4进行调整时对夹具4进行固定的作用,连接板二402上的孔洞403对应夹板能够方便工作人员对夹板进行安装,降低了工作人员的工作量,提高了工作效率。Working principle: First fix the fixing plate 101 to the designated position and then use the bolt 102 to further fix the fixing plate 101. The bayonet 107 opened on the surface of the fixing plate 101 can be connected with the bayonet 107 opened on the anchor 2 Three 201 are connected to fix the anchor 2, and finally the fixing plate 2 108 is fixed to facilitate the installation of the staff, reduce the workload of the staff, and improve the work efficiency; after the equipment is fixed, it is installed on the support plate 1 The clamp 4 on the upper part controls the clamp 4 to move up and down through the bolt 302 on the threaded rod 301. The bolt 4 303 installed at the bottom of the clamp 4 can facilitate the staff to fix the clamp 4 when adjusting the clamp 4. The connecting plate 2 The holes 403 on 402 correspond to the plywood, which can facilitate the staff to install the plywood, reduce the staff's workload and improve work efficiency.
以上所述,仅是本实用新型的较佳实施例而已,并非是对本实用新型作其它形式的限制,任何熟悉本专业的技术人员可能利用上述揭示的技术内容加以变更或改型为等同变化的等效实施例应用于其它领域,但是凡是未脱离本实用新型技术方案内容,依据本实用新型的技术实质对以上实施例所作的任何简单修改、等同变化与改型,仍属于本实用新型技术方案的保护范围。The above are only preferred embodiments of the present invention, and are not intended to limit the present invention in other forms. Any skilled person familiar with the art may make changes or modifications to equivalent changes using the technical contents disclosed above. Equivalent embodiments can be used in other fields, but any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present utility model without departing from the technical solutions of the present utility model still belong to the technical solutions of the present utility model. scope of protection.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321737626.1U CN220184441U (en) | 2023-07-04 | 2023-07-04 | Prestressed anchorage device connecting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321737626.1U CN220184441U (en) | 2023-07-04 | 2023-07-04 | Prestressed anchorage device connecting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220184441U true CN220184441U (en) | 2023-12-15 |
Family
ID=89114110
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321737626.1U Active CN220184441U (en) | 2023-07-04 | 2023-07-04 | Prestressed anchorage device connecting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220184441U (en) |
-
2023
- 2023-07-04 CN CN202321737626.1U patent/CN220184441U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN220184441U (en) | Prestressed anchorage device connecting device | |
CN214925589U (en) | Be used for prefabricated building PC wall conversion layer to reserve joint bar positioner | |
CN105696796A (en) | Cantilever scaffold steel girder anchoring method | |
CN113183310A (en) | Be used for prefabricated building PC wall conversion layer to reserve joint bar positioner | |
CN210263912U (en) | Floor support plate connecting piece | |
CN209356331U (en) | A test device capable of realizing pure shear loading of coupling beams with small span-to-height ratio | |
CN219387202U (en) | Progressive locking device for template sealing | |
CN215803206U (en) | Framework column formwork structure | |
CN112211098B (en) | Bolt connection device between prefabricated bridge floor boards of assembled bridge | |
CN214402735U (en) | Stable supporting device for shear wall | |
CN209686745U (en) | Prefabricated staircase adjustable and finalized support structure | |
CN115030500A (en) | A shear wall formwork installation and reinforcement device | |
CN210122816U (en) | Be used for assembled coincide floor bottom plate board seam template reinforcing apparatus | |
CN220226243U (en) | Building engineering template fixing device | |
CN221664266U (en) | Building templates fixing device | |
CN218860223U (en) | A new type of high-rise building assembly structure | |
CN204826693U (en) | Brick -laying machine | |
CN221799105U (en) | Assembled construction platform | |
CN211548667U (en) | Protection device for high-rise building construction | |
CN215048413U (en) | Horizontal anti-lateral-movement device matched with super high-rise hydraulic jacking platform | |
CN219587215U (en) | Structural beam template reinforcing apparatus | |
CN220927858U (en) | Auxiliary fixture for repairing side face of pouring body | |
CN217711762U (en) | Template anchor clamps for construction | |
CN205637340U (en) | Concrete beam prestressing force carbon fiber plate anchor | |
CN222922771U (en) | A detachable steel structure lifting fixture |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240912 Address after: 730311 Group 6, Shimengou Village, Qinchuan Town, Lanzhou New Area, Yongdeng County, Lanzhou City, Gansu Province Patentee after: Li Yuxue Country or region after: China Address before: No. 17, Floor 11, Building 2, Yantan New Area, High tech Zone, Chengguan District, Lanzhou City, Gansu Province 730030 Patentee before: Lanzhou Ruizhi Metal Materials Co.,Ltd. Country or region before: China |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20241125 Address after: 730050 room 306, building 1, zone a, No. 230 pengjiaping, Qilihe district, Lanzhou City, Gansu Province Patentee after: Lanzhou Hengchi Prestress Technology Co.,Ltd. Country or region after: China Address before: 730311 Group 6, Shimengou Village, Qinchuan Town, Lanzhou New Area, Yongdeng County, Lanzhou City, Gansu Province Patentee before: Li Yuxue Country or region before: China |
|
TR01 | Transfer of patent right |