CN2261449Y - Testing apparatus for static load of pile foundation - Google Patents

Testing apparatus for static load of pile foundation Download PDF

Info

Publication number
CN2261449Y
CN2261449Y CN 95208497 CN95208497U CN2261449Y CN 2261449 Y CN2261449 Y CN 2261449Y CN 95208497 CN95208497 CN 95208497 CN 95208497 U CN95208497 U CN 95208497U CN 2261449 Y CN2261449 Y CN 2261449Y
Authority
CN
China
Prior art keywords
pile foundation
pile
utility
model
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 95208497
Other languages
Chinese (zh)
Inventor
李家林
王准
陈玉琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LUTONG RAILWAY NEW TECHNOLOGY JOINT DEVEL Co HAIDIAN DISTRICT BEIJING
Original Assignee
LUTONG RAILWAY NEW TECHNOLOGY JOINT DEVEL Co HAIDIAN DISTRICT BEIJING
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LUTONG RAILWAY NEW TECHNOLOGY JOINT DEVEL Co HAIDIAN DISTRICT BEIJING filed Critical LUTONG RAILWAY NEW TECHNOLOGY JOINT DEVEL Co HAIDIAN DISTRICT BEIJING
Priority to CN 95208497 priority Critical patent/CN2261449Y/en
Application granted granted Critical
Publication of CN2261449Y publication Critical patent/CN2261449Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The utility model relates to a testing rack for the static load of the pile foundation, which is composed of the pile foundation, an anchor pile and transverse pressing rods. The utility model is characterized in that the testing rack for the static load adopts the symmetrical three connecting rod structure; a main upright post is taken as the centre; the main upright post and each draw rod and transverse pressing rod form a plurality of symmetrical triangular supporting brackets; each tension point of the testing rack is connected with the reinforcing bar of the anchor pile through a screw mechanism; the distance of the whole testing rack and the anchor pile can be adjusted; the connection of each tension point of the testing rack and the reinforcing bar of the anchor pile adopts the clamping form. The utility model can apply the load for 3300 tones to the pile foundation. The force of the testing frame is balanced and the operation of the testing rack is safe. The utility model is suitable for various site conditions and is convenient in assembly and disassembly.

Description

The dead load test on pile foundation frame
The utility model dead load test on pile foundation frame belongs to the test stand that the large-sized concrete pile foundation is applied static load, in order to the anti-pressure ability and the immerge amount of test pile foundation.
At present, do the test stand of this type of large-scale dead load test on pile foundation, adopt cross beam type to load, crossbeam two ends and the welding of anchoring pile reinforcing bar are placed jack between crossbeam middle part and pile foundation.The jack pressurization is to the pile foundation imposed load.Simultaneously, crossbeam is subjected to the jack reaction force, certainly leads to flexural deformation.This structure is subjected to the restriction of intensity, rigidity and the volume of crossbeam, often makes the static loading test below 1000 tons.And crossbeam two ends and anchoring pile reinforcing bar be connected to welding, can't adjust the crossbeam height, and stressed complexity, the dismounting difficulty.
The purpose of this utility model provides a kind of can executing pile foundation and is enlarged to 3300 tons load, and can adjust the crossbeam height, the dead load test on pile foundation frame of easy accessibility.
The purpose of this utility model is achieved in that the load test frame adopts symmetrical three bar linkage structures, also is umbrella-shaped structure.With the head tree is the center, and head tree is formed several symmetrical triangular shape bearing supports with each pull bar, horizontal depression bar, forms several stable triangular structures.
The utility model compared with prior art has following advantage:
1. can execute pile foundation and be enlarged to 3300 tons load, enlarge application, improve safety;
2. can regulate the distance of test stand and anchoring pile reinforcing bar, make the test stand stress balance, handling safety can adapt to various field conditions;
3. each pulling force point of test stand adopts clamping form, installation, convenient disassembly with being connected of each anchoring pile reinforcing bar.
Fig. 1: be the utility model dead load test on pile foundation frame schematic diagram;
Fig. 2: be the utility model triangular supporting frame distribution schematic diagram;
Fig. 3: be the utility model anchoring pile connection diagram;
Fig. 4: be B-B sectional drawing among Fig. 3.
Be described in further detail the utility model below in conjunction with accompanying drawing.
In Fig. 1, lay jack, oil cylinder footstock 2 and head tree 1 on the pile foundation 5 successively, each pull bar 3 is hinged by bearing pin 4 with head tree 1 and each horizontal depression bar 6, and horizontal depression bar roof pressure is on the end face of oil cylinder footstock.The angle of pull bar and head tree, horizontal depression bar is 45 °, and symmetry is formed several triangular supporting frames 8.
Be the vertical view of test stand shown in Fig. 2, illustrating six, four, three and two triangular supporting frames of symmetrical composition, according to the size selection group number that loads.The test stand of six groups of triangular supporting frames can load 3300 tons.
Shown in Fig. 3 anchoring pile reinforcing bar 10 and being connected of screw mechanism 7.End with anchoring pile reinforcing bar 10 clips with reinforcing bar anchor head 9 earlier, then reinforcing bar anchor head 9 is snapped in chuck 12 grooves, turns the adjusting nut 13 on the screw mechanism 7, and the distance of a tunable integer test stand and anchoring pile 11 is to guarantee each triangular supporting frame stress equalization.
When jack pressurizes between pile foundation and test stand head tree, the pile foundation pressurized, head tree is subjected to reaction pressure, and pull bar is subjected to pulling force, and horizontal depression bar is stressed, screw mechanism and anchoring pile reinforcing bar tension.In course of exerting pressure, whole test frame producing balanced forces, Stability Analysis of Structures, can be according to the size of pile foundation test pressure, increase and decrease triangular supporting frame symmetrically, as two, three, four, six, one group of triangular supporting frame of every increase, can improve 550 tons of load, the load maximum can reach 3300 tons, when dismantling after test is finished, as long as the bearing pin of each pin joint is unloaded, the anchor head of anchoring pile reinforcing bar is shifted out in chuck slot, just can all pull down each part of test stand.

Claims (5)

1, a kind of dead load test on pile foundation frame, form by pile foundation, anchoring pile and horizontal depression bar, it is characterized in that: the static loading test frame adopts symmetrical three bar linkage structures, is the center with head tree (1), and head tree (1) is formed several symmetrical triangular shape bearing supports (8) with each pull bar (3), horizontal depression bar (6).
2, dead load test on pile foundation frame according to claim 1 is characterized in that: the end points of each triangular supporting frame (8) is connected by screw mechanism (7) with anchoring pile reinforcing bar (10).
3, dead load test on pile foundation frame according to claim 2 is characterized in that: screw mechanism (7) is made up of screw rod, adjusting nut (13) and chuck (12).
4, dead load test on pile foundation frame according to claim 2 is characterized in that: the end points of the upper end of screw mechanism (7) and each triangular supporting frame (8) is hinged, and its lower end and anchoring pile reinforcing bar (10) block the jail in chuck (12).
5, dead load test on pile foundation frame according to claim 1 is characterized in that: test stand can be made up of a plurality of symmetric triangular bearing supports (8), as 2,3,4,6 etc.
CN 95208497 1995-04-28 1995-04-28 Testing apparatus for static load of pile foundation Expired - Fee Related CN2261449Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 95208497 CN2261449Y (en) 1995-04-28 1995-04-28 Testing apparatus for static load of pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 95208497 CN2261449Y (en) 1995-04-28 1995-04-28 Testing apparatus for static load of pile foundation

Publications (1)

Publication Number Publication Date
CN2261449Y true CN2261449Y (en) 1997-09-03

Family

ID=33859812

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 95208497 Expired - Fee Related CN2261449Y (en) 1995-04-28 1995-04-28 Testing apparatus for static load of pile foundation

Country Status (1)

Country Link
CN (1) CN2261449Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102409704A (en) * 2011-09-21 2012-04-11 云南锐索建设工程质量检测有限公司 Umbrella type platform static load test equipment
CN102720219A (en) * 2012-06-14 2012-10-10 清华大学 Model pile in shear structure for model testing
CN108331043A (en) * 2018-03-18 2018-07-27 中铁十九局集团第三工程有限公司 Large diameter and very long pile loading test device and detection method
CN108487341A (en) * 2018-06-21 2018-09-04 广州市汇富盈投资有限公司 A kind of large-tonnage static test counterforce structure and static-load testing device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102409704A (en) * 2011-09-21 2012-04-11 云南锐索建设工程质量检测有限公司 Umbrella type platform static load test equipment
CN102720219A (en) * 2012-06-14 2012-10-10 清华大学 Model pile in shear structure for model testing
CN102720219B (en) * 2012-06-14 2014-05-14 清华大学 Model pile in shear structure for model testing
CN108331043A (en) * 2018-03-18 2018-07-27 中铁十九局集团第三工程有限公司 Large diameter and very long pile loading test device and detection method
CN108331043B (en) * 2018-03-18 2023-09-19 中铁十九局集团第三工程有限公司 Large-diameter ultra-long pile bearing capacity detection device and detection method
CN108487341A (en) * 2018-06-21 2018-09-04 广州市汇富盈投资有限公司 A kind of large-tonnage static test counterforce structure and static-load testing device
CN108487341B (en) * 2018-06-21 2023-10-13 卓典高麦高科技(广东)有限公司 Large-tonnage static load test reaction structure and static load test device

Similar Documents

Publication Publication Date Title
CN111794127A (en) A reaction force preloading system and preloading method for 0# block bracket of ultra-high cantilevered beam
CN111794381A (en) Reverse cable-stayed device for installing cable-supported grid steel structure and implementation method thereof
CN2261449Y (en) Testing apparatus for static load of pile foundation
CN110018045A (en) A kind of counterforce device for pier stud pseudo-static experimental
CN214695184U (en) Pre-pressing system for double-thin-wall pier beam support bracket
CN201738246U (en) Ground prepressing device for continuous beam hanging basket
CN220915194U (en) One-column one-pull flexible photovoltaic bracket
CN111576501A (en) Bending resistance test system for vertically and upwardly loading tubular pile
CN2333108Y (en) Large span cable bridge rack
CN216893561U (en) Pipe truss high altitude makeup is gone up chord and is supported
CN113186840A (en) Combined bracket-based high pier zero-number block counter-force pre-pressing method
CN212358039U (en) A reaction force preloading system for 0# block brackets of ultra-high cantilevered beams
CN212404858U (en) Device for supporting rigid suspension cable by using existing suspension rod
CN210238297U (en) Detaching device for bent cap support
CN2775210Y (en) Adjustable control hydraulic support device for building structure construction
CN215104786U (en) Combined bracket suitable for high pier zero-number block
CN222008671U (en) Multi-hoop bracket for high pier capping beam construction of bridge
CN218521622U (en) Pre-buried rod iron method support system
CN220079752U (en) Double-support thin-wall pier 0# block suspension casting opposite-pulling bracket type triangular bracket structure
CN219793647U (en) Non-floor-standing support longitudinal beam for cast-in-situ bridge support
CN112302366A (en) Rapid and synchronous lifting device for building structure and construction method
CN212127029U (en) Pay-off rack for rod and wire packing machine
CN222044302U (en) Concrete pile foundation bearing capacity test structure
CN217631377U (en) Adjustable supporting platform device
CN215758544U (en) Bridge bent cap construction staple bolt bearing structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee