CN213233728U - Municipal works drainage open channel construction fixing device - Google Patents
Municipal works drainage open channel construction fixing device Download PDFInfo
- Publication number
- CN213233728U CN213233728U CN202020734887.8U CN202020734887U CN213233728U CN 213233728 U CN213233728 U CN 213233728U CN 202020734887 U CN202020734887 U CN 202020734887U CN 213233728 U CN213233728 U CN 213233728U
- Authority
- CN
- China
- Prior art keywords
- fixed
- fixing device
- open channel
- supporting
- channel construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses a municipal works drainage open channel construction fixing device, which belongs to the field of municipal works reinforcing equipment, and comprises two fixed support columns, wherein the left and right inner walls of the two fixed support columns are both provided with fixed stone slabs, a baffle is fixedly connected between the front two fixed stone slabs and the back two fixed stone slabs from top to bottom, mounting grooves are respectively arranged at the left and right ends of the two fixed support columns, slots are respectively arranged at the upper and lower parts of the left ends of the four fixed stone slabs, spacing pipes are respectively movably inserted into the inner walls of the front two groups of slots and the back two groups of slots from top to bottom, lead screws are respectively movably inserted into the inner walls of the four spacing pipes, fixing screws are respectively and threadedly connected at the left and right parts of the circumferential surfaces of the four lead screws, springs are respectively sleeved on the circumferential surfaces of the four spacing pipes, supporting mechanisms are respectively arranged at the left and right sides of the two fixed, the phenomenon that the fixing device is broken down due to the fact that the flow speed is too fast is prevented.
Description
Technical Field
The utility model relates to a municipal works reinforced apparatus field, more specifically say, relate to a municipal works drainage open channel construction fixing device.
Background
The open channel is a channel with free surface (each point on the surface is acted by atmospheric pressure) water flow, and can be divided into a natural open channel and an artificial open channel according to the formation of the channel, wherein the natural open channel is a natural river channel, and the artificial open channel is a water delivery channel, a canal and a pipeline which is not filled with water flow, the flowing water needs to be blocked when the drainage open channel is constructed manually, the construction quality is influenced if the blocking is not carried out, the construction difficulty is increased, the common measures for blocking water generally adopt manual excavation and mechanical plugging, the manual plugging efficiency is low, the quality of the plugging is poor, potential danger exists, economic loss and casualties are caused after soil heap leakage, and the cost is increased due to mechanical plugging.
When the existing open channel fixing device meets a rapid stream, the fixing device is broken down, and an open channel fixing device with a buffering effect is urgently needed.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
To the problem that exists among the prior art, the utility model aims to provide a municipal works drainage open channel construction fixing device, it can realize when rivers torrent is urgent, can effectually play the buffering effect, prevents that the velocity of flow from leading to the phenomenon that fixing device washed down too fast.
2. Technical scheme
In order to solve the above problem, the utility model adopts the following technical scheme:
the utility model provides a municipal works drainage open channel construction fixing device, includes two fixed stay, two the inner wall all is provided with fixed slabstone about fixed stay, two before the top-down equal fixedly connected with baffle between fixed slabstone and two back fixed slabstones, two both ends are all dug to fixed stay have a mounting groove, four the left end upper and lower two parts of fixed slabstone are all dug there is the slot, two sets of preceding two sets of top-down slots that open channel of top-down
(1) This scheme is when the velocity of flow of water is too fast, water contacts the baffle, the surface of baffle is a plurality of curved surfaces, can effectually disperse the speed of rivers, realize the first buffering effect of this device, after baffle and water contact, the first baffle of from left to right begins to be pushed away by water and moves right, four springs begin to compress, four spacing posts slide to the right side in four jacks, when the one end that two baffles are close to reachs the nearest distance, the baffle stops to move, under the elasticity of four springs resets, two baffles reset to the initial position, realize the second time strand buffering effect of this device, finally realize the buffering effect of this device to the torrent, effectually prevent that this device from being washed down under the torrent.
(2) The equal fixedly connected with base in rear end of two fixed posts of this scheme, base and ground area of contact are greater than the front end area of fixed post, and the setting of base has improved the supporting effect of this device, and this device is provided with four supporting mechanism, and every supporting mechanism all forms triangle-shaped's two limits with fixed post, and triangle-shaped has stability, and consequently, the setting of supporting mechanism has improved the steadiness of this device, further prevents this device from being washed out.
Drawings
Fig. 1 is a plan view of a municipal drainage open channel construction fixing device of the utility model;
fig. 2 is a top view of the municipal drainage open channel construction fixing device of the present invention;
fig. 3 is the utility model discloses a municipal works drainage open channel construction fixing device's local cross-sectional view.
The reference numbers in the figures illustrate:
the support comprises a fixed support 1, a jack 2, a fixed stone plate 3, a limit column 4, a spring 5, a limit pipe 6, a baffle 7, a support rod 8, a support foot 81, a fixed plate 82, a first hinge shaft 83, a second hinge shaft 84, a base 9, a fixing screw 10, a lead screw 11, a mounting groove 12 and a slot 13.
Detailed Description
The technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiment of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by those skilled in the art without any inventive work are within the scope of the present invention based on the embodiments of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top/bottom", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "sleeved/connected", "connected", and the like are to be understood in a broad sense, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Example (b):
please refer to fig. 1-3, a municipal works open drain construction fixing device, including two fixed pillars 1, the inner wall all is provided with fixed slabstone 3 about two fixed pillars 1, equal fixedly connected with baffle 7 between two fixed slabstones 3 before top-down and two fixed slabstones 3 after, both ends are all cut open and are equipped with mounting groove 12 about two fixed pillars 1, slot 13 is all cut open and are equipped with about two left ends of four fixed slabstones 3, spacing pipe 6 is all pegged graft in the activity of the inner wall of two sets of slot 13 before top-down and two sets of slot 13 after, lead screw 11 is all pegged graft in the activity of the inner wall of four spacing pipe 6, both ends are all threaded connection has set screw 10 about the circumference surface of four lead screw 11, the circumference surface of four spacing pipe 6 all overlaps and is equipped with spring 5, the left and right sides of two fixed pillars 1 all.
In this embodiment, fixed pillar 1 is the position of supporting baffle 7, fixed slabstone 3 is connection baffle 7, spacing post 4 is fixed slabstone 3 position of being convenient for, spring 5 is fixed slabstone 3 elasticity of being convenient for resets, spacing pipe 6 is that the removal that goes on fixed slabstone 3 carries on spacingly, baffle 7 is that block water, set screw 10 and lead screw 11 are fixed slabstone 3 position of being convenient for, mounting groove 12 is the installation set screw 10 of being convenient for, slot 13 is the removal of spacing pipe 6 of being convenient for.
Specifically, referring to fig. 1-2, the supporting mechanism includes a supporting rod 8, a supporting leg 81, a fixing plate 82, a first hinge shaft 83 and a second hinge shaft 84, the supporting rod 8 is disposed at the left end of the fixed support 1, the supporting leg 81 is disposed at the left portion of the fixed support 1, the rear end of the supporting leg 81 is fixed on the ground, the rear end of the supporting rod 8 is movably hinged to the supporting leg 81 through the second hinge shaft 84, the fixing plate 82 is fixedly connected to the left end of the fixed support 1, and the fixing plate 82 is movably hinged to the supporting rod 8 through the first hinge shaft 83.
In this embodiment, the supporting rod 8 supports the position of the fixing post 1, the supporting foot 81 is fixed on the ground, the fixing plate 82 is fixed on the fixing post 1, and the first hinge 83 and the second hinge 84 are convenient for adjusting the angle of the supporting rod 8, which is beneficial to improving the fixing effect of the device and preventing the device from being broken by water.
Specifically, referring to fig. 1-3, the ends of the four groups of fixed stone slabs 3 away from each other are fixedly connected with limiting posts 4, the front and rear parts of the left and right ends of the two fixed support posts 1 are respectively provided with insertion holes 2, and the eight limiting posts 4 are inserted into the eight insertion holes 2.
In this embodiment, the equal fixedly connected with of one end of keeping away from mutually of four fixed slabstone 3 of group is spacing post 4, and the position of the fixed slabstone 3 of restriction of being convenient for prevents that fixed slabstone 3 from misplacing from top to bottom and removing, and both ends are all dug about two fixed stay 1 have jack 2, and eight spacing posts 4 are all pegged graft in eight jacks 2, are of value to the fixed effect that improves this device, have improved the security of this device.
Specifically, referring to fig. 1-3, the ends of the two baffles 7 away from each other are both set to be wavy curved surfaces, the ends of the two baffles 7 away from each other are coated with waterproof glue, and the rear ends of the two fixing pillars 1 are both fixedly connected with the base 9.
In this embodiment, the one end that two baffles 7 kept away from mutually all sets up to the wave curved surface, is of value to improving and the buffering effect of this device, and the one end that two baffles 7 kept away from mutually has all been smeared waterproof glue, prevents that baffle 7 from leading to baffle 7 to damage with the water contact for a long time, and the equal fixedly connected with base 9 in rear end of two fixed stay 1 is of value to increasing the fixed effect of this device.
Specifically, referring to fig. 1-2, two mounting holes are drilled in the upper ends of the four supporting legs 81, and mounting screws are screwed into the eight mounting holes.
In this embodiment, two mounting holes are drilled in the upper ends of the four supporting legs 81, so that the mounting screws can be mounted conveniently, the mounting screws are screwed into the eight mounting holes, and the second hinge shaft 84 is fixed to the ground conveniently.
Specifically, referring to fig. 1-2, the four supporting legs 81, the four supporting rods 8, the four second hinge shafts 84, the four first hinge shafts 83, and the four fixing plates 82 are all made of stainless steel, and the surfaces of the four supporting legs 81, the four supporting rods 8, the four second hinge shafts 84, the four first hinge shafts 83, and the four fixing plates 82 are all galvanized.
In this embodiment, the four support legs 81, the four support bars 8, the four second hinge shafts 84, the four first hinge shafts 83 and the four fixing plates 82 are made of stainless steel, which is beneficial to preventing the four support legs 81, the four support bars 8, the four second hinge shafts 84, the four first hinge shafts 83 and the four fixing plates 82 from being corroded due to the contact between the four support legs 81, the four support bars 8, the four second hinge shafts 84, the four first hinge shafts 83 and the four fixing plates 82, and thus the service life of the device is prolonged, and the surfaces of the four support legs 81, the four support bars 8, the four second hinge shafts 84, the four first hinge shafts 83 and the four fixing plates 82 are galvanized, so that the device is more attractive.
The working principle is as follows: when the flow velocity of water is too fast, the water contacts the baffle 7, the surface of the baffle 7 is provided with a plurality of curved surfaces, the speed of the water flow can be effectively dispersed, the first buffer effect of the device is realized, after the baffle 7 is contacted with the water, the first baffle 7 from left to right is pushed by the water to move rightwards, the four springs 5 are compressed, the four limit posts 4 slide rightwards in the four jacks 2, when one end of the two baffle 7 close to each other reaches the nearest distance, the baffle 7 stops moving, under the elastic reset of the four springs 5, the two baffle 7 are reset to the initial position, the second buffer effect of the device is realized, the buffer effect of the device on the torrent is finally realized, the device is effectively prevented from being washed down under the torrent, the rear ends of the two fixed pillars 1 are fixedly connected with the base 9, the contact area of the base 9 and the ground is larger than the front end area of the fixed pillars 1, the setting of base 9 has improved the support effect of this device, and this device is provided with four supporting mechanism, and every supporting mechanism all forms two limits of triangle-shaped with fixed pillar 1, and triangle-shaped has stability, and consequently, the setting of supporting mechanism has improved the steadiness of this device, further prevents that this device from being washed out.
The above description is only the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art can substitute or change the technical solution and the improvement concept of the present invention within the technical scope disclosed in the present invention.
Claims (6)
1. The utility model provides a municipal works drainage open channel construction fixing device, includes two fixed stay (1), its characterized in that: two inner wall all is provided with fixed slabstone (3) about fixed pillar (1), two before the top-down equal fixedly connected with baffle (7) between fixed slabstone (3) and two back fixed slabstone (3), two mounting groove (12), four are all dug at both ends about fixed pillar (1) the upper and lower two parts of the left end of fixed slabstone (3) are all dug slot (13), two sets of before the top-down slot (13) and back are two sets of the equal activity of inner wall of slot (13) is pegged graft and is had spacing pipe (6), four the equal activity of inner wall of spacing pipe (6) is pegged graft and is had lead screw (11), four equal threaded connection has set screw (10) in two parts about the circumference surface of lead screw (11), four the circumference surface of spacing pipe (6) all overlaps and is equipped with spring (5), two the left and right sides of fixed pillar (1) all is provided with supporting mechanism.
2. The municipal drainage open channel construction fixing device of claim 1, wherein: the supporting mechanism comprises a supporting rod (8), supporting legs (81), a fixing plate (82), a first hinge shaft (83) and a second hinge shaft (84), the supporting rod (8) is arranged at the left end of the fixed support column (1), the supporting legs (81) are arranged at the left part of the fixed support column (1), the rear end of each supporting leg (81) is fixed to the ground, the rear end of the supporting rod (8) is movably hinged to the supporting legs (81) through the second hinge shaft (84), the fixing plate (82) is fixedly connected to the left end of the fixed support column (1), and the fixing plate (82) is movably hinged to the supporting rod (8) through the first hinge shaft (83).
3. The municipal drainage open channel construction fixing device of claim 2, wherein: four groups the equal fixedly connected with spacing post (4) of one end that fixed slabstone (3) kept away from mutually, two jack (2) have all been dug in both ends front and back about fixed pillar (1), eight spacing post (4) all peg graft in eight in jack (2).
4. The municipal drainage open channel construction fixing device of claim 3, wherein: two the one end that baffle (7) kept away from mutually all sets up to the wave curved surface, and the one end that two baffles (7) kept away from mutually has all been smeared waterproof glue, two the equal fixedly connected with base (9) in rear end of fixed stay (1).
5. The municipal drainage open channel construction fixing device of claim 4, wherein: four two mounting holes are drilled in the upper ends of the supporting legs (81), and eight mounting holes are internally and uniformly in threaded connection with mounting screws.
6. The municipal drainage open channel construction fixing device of claim 5, wherein: the four supporting legs (81), the four supporting rods (8), the four second hinge shafts (84), the four first hinge shafts (83) and the four fixing plates (82) are made of stainless steel, and the surfaces of the four supporting legs (81), the four supporting rods (8), the four second hinge shafts (84), the four first hinge shafts (83) and the four fixing plates (82) are all subjected to galvanizing treatment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020734887.8U CN213233728U (en) | 2020-05-07 | 2020-05-07 | Municipal works drainage open channel construction fixing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020734887.8U CN213233728U (en) | 2020-05-07 | 2020-05-07 | Municipal works drainage open channel construction fixing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213233728U true CN213233728U (en) | 2021-05-18 |
Family
ID=75868166
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020734887.8U Active CN213233728U (en) | 2020-05-07 | 2020-05-07 | Municipal works drainage open channel construction fixing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213233728U (en) |
-
2020
- 2020-05-07 CN CN202020734887.8U patent/CN213233728U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111425669A (en) | A water conservancy pipeline supports connection structure for hydraulic engineering | |
CN213233728U (en) | Municipal works drainage open channel construction fixing device | |
CN212477633U (en) | Self-adaptive hinge movable dam | |
CN210975429U (en) | Highway construction drainage device | |
CN220746747U (en) | Retaining wall that water conservancy stability is good | |
CN214738190U (en) | Foundation pit drainage structure | |
CN211948543U (en) | Assembled retaining wall | |
CN214832361U (en) | Hydraulic engineering slope net | |
CN213013977U (en) | Reinforced concrete box culvert | |
CN113338220A (en) | Combined movable hydraulic retaining dam | |
CN220725139U (en) | Ecological restoration device for mountain slope greening | |
CN216130078U (en) | Irrigation ditch for forestry engineering | |
CN222349567U (en) | A new type of water retaining dam | |
CN218880721U (en) | Dyke structure suitable for harbour channel engineering silt ground | |
CN107893403B (en) | A two segmentation river course interception equipment for river course retaining flood discharge | |
CN218291805U (en) | River course dyke reinforcing apparatus | |
CN220565154U (en) | Ecological facing structure of seawall | |
CN115094843B (en) | Labyrinth weir with drainage flow control function | |
CN213836539U (en) | Hydraulic engineering slope net | |
CN221501887U (en) | Slope protection plate with buffer mechanism | |
CN219930897U (en) | Dredge flood discharge canal | |
CN214884258U (en) | Chute for highway engineering | |
CN220813909U (en) | Arch slope protection device for preventing water and soil loss | |
CN220847666U (en) | Cofferdam structure for hydraulic construction of hydraulic engineering | |
CN220704577U (en) | Waterproof foundation pit fender post |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |