CN212613634U - Capital construction engineering construction equipment - Google Patents
Capital construction engineering construction equipment Download PDFInfo
- Publication number
- CN212613634U CN212613634U CN202021192643.8U CN202021192643U CN212613634U CN 212613634 U CN212613634 U CN 212613634U CN 202021192643 U CN202021192643 U CN 202021192643U CN 212613634 U CN212613634 U CN 212613634U
- Authority
- CN
- China
- Prior art keywords
- base
- working platform
- fence
- ceiling
- horizontal support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Forklifts And Lifting Vehicles (AREA)
Abstract
The utility model discloses a capital construction engineering construction device, which comprises a base, wherein a telescopic lifting frame is arranged on the base, and a working platform is arranged on the lifting frame; a fence for protection is arranged on the working platform, a door capable of opening and closing is arranged on the fence, and a lifting mechanism for lifting tools is arranged on the fence; the working platform is also provided with a retractable ceiling, and the ceiling can be opened when the working platform works outdoors; the utility model discloses a solar energy water heater, including base, base bottom fixed mounting has the universal wheel, four adjustable support frames are installed to the side symmetry of base, the back is opened to the support frame, and the height-adjusting is fixed with ground, supports the base, through the ceiling that can open and shut of installation on the work platform of lift, can help the staff in time carry out the shading or take shelter from the rain according to the weather condition, avoids staff's long-time insolate or drench the rain, causes the harm to the health.
Description
Technical Field
The utility model relates to a construction technical field especially relates to a capital construction engineering construction equipment.
Background
In the engineering construction process, often need carry out to set up the construction or maintain at the eminence, so need the staff to carry out the eminence climbing with the help of the instrument, and carry out some maintenance or construction operation, but current capital construction installation device's flexibility is not high, it is inconvenient to use, in addition, the operation in many times all needs to be accomplished in outdoor long-time, make the long-time exposure of workman under the burning sun, cause the emergence of sunburn and heatstroke easily, salvage work that has to go on in rainy day also has to take a bad breath, cause the harm to staff's health, so there are some potential safety hazards, can't guarantee constructor's safety deposit.
SUMMERY OF THE UTILITY MODEL
To above-mentioned defect or not enough, the utility model aims to provide a capital construction engineering construction equipment.
In order to achieve the above purpose, the technical scheme of the utility model is that:
a capital construction project construction device comprises a base, wherein a telescopic lifting frame is arranged on the base, and a working platform is arranged on the lifting frame; a fence for protection is arranged on the working platform, a door capable of opening and closing is arranged on the fence, and a lifting mechanism for lifting tools is arranged on the fence; the working platform is also provided with a retractable ceiling, and the ceiling can be opened when the working platform works outdoors; the base bottom fixed mounting has the universal wheel, four adjustable support frames are installed to the side symmetry of base, the back is opened to the support frame, and the height-adjusting is fixed with ground, supports the base.
The crane comprises a plurality of hinged pieces which are hinged in a crossing mode, and a plurality of thrust devices are mounted on the hinged pieces.
The thrust device is an electric push rod, and a power supply is connected to the electric push rod; or the thrust device is a hydraulic cylinder.
The ceiling comprises a first horizontal support and a second horizontal support which are fixedly arranged on the working platform, and sunshade cloth capable of being horizontally pushed and pulled is arranged on the first horizontal support and the second horizontal support.
The two ends of the first horizontal support and the two ends of the second horizontal support are provided with limiting grooves, the first horizontal support and the second horizontal support are respectively provided with a sliding block, the sliding blocks are provided with connecting rods, one end of the sun-shading cloth is fixed with the first horizontal support and the second horizontal support, and the other end of the sun-shading cloth is connected with the connecting rods.
One side of the sun-shading cloth is coated with a dyeing coating.
The connecting rod is provided with a handle.
Including installing the jib on the rail, fixed pulley and movable pulley are installed to the distal end of jib, and the winding ware that the winding has the steel wire is installed to the near-end, and the steel wire passes behind fixed pulley and the movable pulley with jib fixed connection, movable pulley slidable mounting is on the steel wire, installs the couple on the movable pulley.
The wire winder is a manual rotating shaft type wire winder or an electric wire winder.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model provides a capital construction engineering construction equipment through the ceiling that can open and shut of installation on the work platform of lift, can help the staff in time to carry out the shading or take shelter from the rain according to the weather condition, avoids staff's long-time insolate or drench with the rain, causes the harm to the health, in addition, the utility model discloses still be provided with and lift by crane the mechanism, can make the staff on ground transport the staff's of above-mentioned work platform through the device with instrument or the material that needs in hand, avoid the staff to get off and take again specially, saved the time, avoided trouble about many times, improve work efficiency, guaranteed staff's safety.
Drawings
FIG. 1 is a schematic structural view of the construction device for capital construction;
FIG. 2 is a schematic view of the ceiling structure of the present invention;
FIG. 3 is a schematic view of the installation structure of the sunshade cloth of the present invention;
fig. 4 is a schematic structural view of the lifting mechanism of the present invention.
In the figure, 1 — base; 2, a lifting frame; 3, a working platform; 4, fencing; 5, a hoisting mechanism; 6, ceiling; 7-universal wheel; 8, a support frame; 9-a thrust device; 10-a handle; 31 — a first horizontal support; 32-a second horizontal support; 33-sun-shading cloth; 34-a limiting groove; 35-a slide block; 36-a connecting rod; 41-fixed pulley; 42-a wire winder; 43-steel wire; 44-a movable pulley; 45, hooking; 46-a door; 47-lifting rod.
Detailed Description
The present invention will be described in detail with reference to the drawings, and it should be understood that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1, the utility model provides a capital construction engineering construction device, which comprises a base 1, wherein a telescopic lifting frame 2 is arranged on the base 1, and a working platform 3 is arranged on the lifting frame 2; a protective fence 4 is arranged on the working platform 3, a door 46 which can be opened and closed is arranged on the fence 4, and a lifting mechanism 5 for lifting tools is arranged on the fence 4; the working platform 3 is also provided with a retractable ceiling 6, and when the working platform works outdoors, the ceiling 6 can be opened; the bottom of the base 1 is fixedly provided with universal wheels 7, four adjustable support frames 8 are symmetrically arranged on the side edges of the base 1, and after the support frames 8 are opened, the height is adjusted to be fixed with the ground so as to support the base 1.
Specifically, the crane 2 comprises a plurality of hinged hinges which are hinged in a crossing manner, and a plurality of thrust devices 9 are arranged on the hinges. The thrust device 9 is an electric push rod, and a power supply is connected to the electric push rod; or the thrust device 9 is a hydraulic cylinder.
As shown in fig. 2 and 3, the ceiling 6 preferably includes a first horizontal bracket 31 and a second horizontal bracket 32 fixedly mounted on the working platform 3, and a sunshade cloth 33 capable of being pushed and pulled horizontally is mounted on the first horizontal bracket 31 and the second horizontal bracket 32. Limiting grooves 34 are formed in two ends of the first horizontal support 31 and the second horizontal support 32, a sliding block 35 is mounted on each of the first horizontal support 31 and the second horizontal support 32, a connecting rod 36 is mounted on each sliding block 35, one end of the sun-shading cloth 33 is fixed to the first horizontal support 31 and the second horizontal support 32, and the other end of the sun-shading cloth is connected with the connecting rod 36. In order to achieve better sun-shading effect, one side of the sun-shading cloth 33 is coated with a dyeing coating. Further, in order to facilitate opening and closing the sunshade cloth 33, the handle 10 is disposed on the connecting rod 36.
As shown in fig. 4, the lifting mechanism 5 includes a lifting rod 47 mounted on the fence 4, a fixed pulley 41 and a movable pulley 44 are mounted at a distal end of the lifting rod 47, a wire winder 42 wound with a steel wire 43 is mounted at a proximal end of the lifting rod 47, the steel wire 43 passes through the fixed pulley 41 and the movable pulley 44 and then is fixedly connected with the lifting rod 47, the movable pulley 44 is slidably mounted on the steel wire 43, and a hook 45 is mounted on the movable pulley 44, wherein the wire winder 42 is a manual rotating shaft type wire winder or an electric wire winder.
The utility model discloses a working process does:
after the staff goes up work platform 3, close door 5 on rail 4, raise work platform 3 through telescopic crane 2, the staff carries out the operation to according to weather, open ceiling 6, in addition, when needing ground staff to deliver the thing, convey through lifting by crane mechanism 5, avoided the top-bottom operation, saved operating time.
It should be apparent to those skilled in the art that the above embodiments are only preferred embodiments of the present invention, and therefore, the modifications and changes that can be made by those skilled in the art to some parts of the present invention still embody the principles of the present invention, and the objects of the present invention are achieved, all falling within the scope of the present invention.
Claims (9)
1. A capital construction project construction device is characterized by comprising a base (1), wherein a telescopic lifting frame (2) is arranged on the base (1), and a working platform (3) is arranged on the lifting frame (2); a fence (4) for protection is arranged on the working platform (3), a door (46) which can be opened and closed is arranged on the fence (4), and a lifting mechanism (5) for lifting and taking tools is arranged on the fence (4); the working platform (3) is also provided with a retractable ceiling (6), and the ceiling (6) can be opened when the working platform works outdoors; base (1) bottom fixed mounting has universal wheel (7), four adjustable support frames (8) are installed to the side symmetry of base (1), after support frame (8) were opened, height-adjusting was fixed with ground, supported base (1).
2. The infrastructure construction equipment according to claim 1, wherein the crane (2) comprises a plurality of cross-hinged hinges on which a plurality of thrust devices (9) are mounted.
3. The capital construction project construction device according to claim 2, wherein the thrust device (9) is an electric push rod, and a power supply is connected to the electric push rod; or the thrust device (9) is a hydraulic cylinder.
4. The capital construction work construction device according to claim 1, characterized in that the ceiling (6) comprises a first horizontal bracket (31) and a second horizontal bracket (32) fixedly mounted on the working platform (3), and the first horizontal bracket (31) and the second horizontal bracket (32) are provided with a sunshade cloth (33) capable of horizontally pushing and pulling.
5. The capital construction project construction device according to claim 4, wherein both ends of the first horizontal support (31) and the second horizontal support (32) are provided with limiting grooves (34), each of the first horizontal support (31) and the second horizontal support (32) is provided with a sliding block (35), each of the sliding blocks (35) is provided with a connecting rod (36), one end of the sunshade cloth (33) is fixed with the first horizontal support (31) and the second horizontal support (32), and the other end of the sunshade cloth is connected with the connecting rod (36).
6. The infrastructure construction device according to claim 4 or 5, wherein the sunshade cloth (33) is coated on one side with a dyed coating.
7. Capital construction work installation according to claim 5, characterized in that a handle (10) is provided on the connecting rod (36).
8. The capital construction project construction device according to claim 1, wherein the hoisting mechanism (5) comprises a hoisting rod (47) arranged on the fence (4), a fixed pulley (41) and a movable pulley (44) are arranged at the far end of the hoisting rod (47), a wire winder (42) wound with a steel wire (43) is arranged at the near end of the hoisting rod, the steel wire (43) passes through the fixed pulley (41) and the movable pulley (44) and then is fixedly connected with the hoisting rod (47), the movable pulley (44) is slidably arranged on the steel wire (43), and a hook (45) is arranged on the movable pulley (44).
9. Infrastructure construction equipment according to claim 8, characterized in that the wire winder (42) is a manual spindle type or an electric type.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021192643.8U CN212613634U (en) | 2020-06-24 | 2020-06-24 | Capital construction engineering construction equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021192643.8U CN212613634U (en) | 2020-06-24 | 2020-06-24 | Capital construction engineering construction equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212613634U true CN212613634U (en) | 2021-02-26 |
Family
ID=74743529
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021192643.8U Active CN212613634U (en) | 2020-06-24 | 2020-06-24 | Capital construction engineering construction equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212613634U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115028119A (en) * | 2022-06-16 | 2022-09-09 | 中船澄西船舶修造有限公司 | Marine cage |
-
2020
- 2020-06-24 CN CN202021192643.8U patent/CN212613634U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115028119A (en) * | 2022-06-16 | 2022-09-09 | 中船澄西船舶修造有限公司 | Marine cage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212613634U (en) | Capital construction engineering construction equipment | |
CN212001956U (en) | Green building roof structure | |
CN209760893U (en) | movable construction engineering construction sunshade | |
CN218264819U (en) | Building engineering construction platform convenient to feed | |
CN211201101U (en) | Movable construction platform for bridge foundation construction | |
CN204802911U (en) | Worker china democratic national construction association is with three capstan winch high altitudes protection hanging flower basket | |
CN213145978U (en) | Total powerstation survey and drawing platform with sunshade structure | |
CN220117715U (en) | Lifting workbench | |
CN219174150U (en) | Power grid construction operation platform of ascending a height | |
CN214059801U (en) | High altitude electrician work platform | |
CN219343946U (en) | Safety construction hanging basket for building | |
CN212105041U (en) | Scaffold for architectural engineering decoration | |
CN216949417U (en) | Integral type construction hanging basket | |
CN212050240U (en) | Pipeline hoisting device | |
CN112456397A (en) | High altitude electrician work platform | |
CN112299317A (en) | Hydraulic elevator with protection mechanism and use method thereof | |
CN212743318U (en) | Hanging basket for high building outer wall | |
CN218991100U (en) | Top type awning | |
CN214740211U (en) | Gardens sunshade convenient to installation | |
CN220768804U (en) | Hanging basket for constructional engineering | |
CN220621697U (en) | Window convenient to adjust and having protection function | |
CN220666876U (en) | Hanging basket for building construction | |
CN211817825U (en) | High building lifting construction platform | |
CN212562401U (en) | Device for installing and overhauling air conditioner external unit of existing building | |
CN221201936U (en) | Distribution line operation and maintenance overhauling device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |