CN211923517U - A auxiliary stay frame for installing platform in hydraulic pressure creeping formwork - Google Patents
A auxiliary stay frame for installing platform in hydraulic pressure creeping formwork Download PDFInfo
- Publication number
- CN211923517U CN211923517U CN202020028676.2U CN202020028676U CN211923517U CN 211923517 U CN211923517 U CN 211923517U CN 202020028676 U CN202020028676 U CN 202020028676U CN 211923517 U CN211923517 U CN 211923517U
- Authority
- CN
- China
- Prior art keywords
- frame
- triangular support
- support frame
- creeping formwork
- hydraulic pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses an auxiliary stay frame for installing platform in hydraulic pressure creeping formwork relates to construction technical field. Hang equipment rack under to utilizing current scaffold frame to hydraulic pressure creeping formwork and support temporarily, have the problem of potential safety hazard. Hang equipment rack support in auxiliary stay frame under hydraulic pressure creeping formwork, auxiliary stay frame includes: the device comprises a plurality of triangular support frames, a plurality of supporting frames and a plurality of supporting frames, wherein the triangular support frames are arranged at the bottom of the hydraulic climbing formwork lower hanging device frame in parallel at intervals, each triangular support frame consists of a transverse rod and a vertical rod which are vertically arranged and an inclined strut connected between the transverse rod and the vertical rod, the vertical rods of the triangular support frames are tightly attached to the outer side of the core tube shear wall and movably connected with the core tube shear wall, and the width of each triangular support frame is more than or equal to that of the hydraulic climbing formwork; the connecting beams are horizontally connected to the tops of the triangular support frames; and the platform plate is laid on the tops of the connecting beams.
Description
Technical Field
The utility model relates to a construction technical field, in particular to an auxiliary stay frame for installing platform in hydraulic pressure creeping formwork.
Background
The hydraulic climbing formwork is common equipment applied to construction of high-rise buildings (structures), an inner platform equipment frame of the hydraulic climbing formwork is located in a core cylinder of the high-rise buildings (structures), when the inner platform equipment frame is installed, the lower hanging equipment frame of the hydraulic climbing formwork needs to be temporarily supported, after the inner platform equipment frame is hoisted and installed, the inner platform equipment frame can be fixed, and therefore stress conversion can be completed.
At present, the scaffold is mostly erected below the lower hanging equipment rack of the hydraulic climbing formwork to temporarily support the lower hanging equipment rack, the width of the scaffold erected on site cannot meet the requirement of the lower hanging equipment rack of the hydraulic climbing formwork, the scaffold needs to be widened, or the bearing capacity of the scaffold cannot meet the requirement, so that potential safety hazards exist when the scaffold is used as the temporary support of the lower hanging equipment rack of the hydraulic climbing formwork.
Disclosure of Invention
Hang equipment rack under to utilizing current scaffold frame to hydraulic pressure creeping formwork and support temporarily, have the problem of potential safety hazard. The utility model aims at providing an auxiliary stay frame for installing platform in hydraulic pressure creeping formwork, its installation accuracy is high, stable in structure, and the security is better, and the dismouting is nimble convenient moreover, is favorable to used repeatedly.
The utility model provides a technical scheme that its technical problem adopted is: the utility model provides an auxiliary stay frame for installing platform in hydraulic pressure creeping formwork, hang equipment rack support in auxiliary stay frame under the hydraulic pressure creeping formwork, auxiliary stay frame includes:
the triangular support frames are arranged at the bottom of the hydraulic creeping formwork lower hanging equipment rack in parallel at intervals and consist of transverse rods and vertical rods which are vertically arranged and inclined struts which are connected between the transverse rods and the vertical rods, the vertical rods of the triangular support frames are tightly attached to the outer side of the core barrel shear wall and movably connected with the core barrel shear wall, and the width of each triangular support frame is more than or equal to that of the hydraulic creeping formwork lower hanging equipment rack;
the connecting beams are horizontally connected to the tops of the triangular support frames;
and the platform plates are laid on the tops of the connecting beams.
The utility model discloses an auxiliary support frame for installing platform in hydraulic climbing mould, including a plurality of triangular supports frame that swing joint outside core section of thick bamboo shear force wall, many tie beams that the level connects in a plurality of triangular supports frame tops, and lay the platform board at many tie beam tops; under the premise that the installation height of a platform equipment frame in a hydraulic creeping formwork can be met, an auxiliary support frame is installed at a preset position of a core tube shear wall to provide temporary support for a hydraulic creeping formwork lower hanging equipment frame, and after the hydraulic creeping formwork is installed, the auxiliary support frame is dismantled and recovered; because this auxiliary stay's triangular supports frame can prefabricate in advance and according to preset position swing joint in core section of thick bamboo shear force wall, consequently, its installation accuracy is high, stable in structure, and the security is better, and the dismouting is nimble convenient moreover, is favorable to used repeatedly.
Preferably, a pre-buried screw is arranged in the core tube shear wall, one end of the pre-buried screw is anchored in the core tube shear wall, and the other end of the pre-buried screw penetrates through the top of the vertical rod of the triangular support frame and is locked and fixed by a nut.
Preferably, the connecting beam is perpendicular to the cross bar of the triangular support frame.
Preferably, the connecting beam is made of channel steel, a wing plate on one side of the channel steel is fixedly connected to the cross rod of the triangular support frame, and a wing plate on the other side of the channel steel is fixedly connected to the platform plate.
Preferably, the connecting beam is connected with a cross rod bolt of the triangular support frame, and the platform plate is connected with the connecting beam bolt.
Drawings
Fig. 1 is a schematic structural view of an embodiment of an auxiliary support frame for mounting a platform in a hydraulic climbing formwork according to the present invention;
fig. 2 is a schematic diagram of a position relationship between the auxiliary supporting frame and the lower hanging device rack of the hydraulic climbing formwork according to an embodiment of the present invention.
The numbers in the figures are as follows:
a core barrel shear wall 1; the hydraulic climbing formwork lower hanging equipment rack 2;
a triangular support frame 10; a cross bar 11; a vertical rod 12; a diagonal brace 14; pre-burying a screw 15; a tie beam 20; a platform board 30.
Detailed Description
The present invention will be described in further detail with reference to the following drawings and specific embodiments. It should be noted that the drawings are in simplified form and are not to precise scale, and are provided for convenience and clarity in order to facilitate the description of the embodiments of the present invention. For convenience of description, the directions of "up" and "down" in the following description are the same as the directions of "up" and "down" in the drawings, but this should not be construed as limiting the technical solution of the present invention.
Describe with fig. 1 and fig. 2 the utility model discloses an auxiliary stay frame for installing platform in hydraulic pressure creeping formwork, hang equipment rack 2 and support in auxiliary stay frame under the hydraulic pressure creeping formwork, this auxiliary stay frame includes:
the triangular support frames 10 are arranged at the bottom of the hydraulic creeping formwork lower hanging equipment rack 2 in parallel at intervals, each triangular support frame 10 consists of a transverse rod 11 and a vertical rod 12 which are vertically arranged and an inclined strut 14 connected between the transverse rod 11 and the vertical rod 12, the vertical rods 12 of the triangular support frames 10 are tightly attached to the outer side of the core barrel shear wall 1 and movably connected with the core barrel shear wall, and the width of each triangular support frame 10 is more than or equal to that of the hydraulic creeping formwork lower hanging equipment rack 2;
a plurality of connecting beams 20 horizontally connected to the tops of the plurality of triangular support frames 10;
and the platform plate 30 is laid on the tops of the connecting beams 20.
The utility model discloses an auxiliary support frame for installing platform in hydraulic climbing mould, including a plurality of triangular supports frame 10 of swing joint in the core section of thick bamboo shear force wall 1 outside, many tie beams 20 of horizontal connection in a plurality of triangular supports frame 10 tops, and lay in the platform board 30 at many tie beams 20 tops; on the premise of meeting the installation height of a platform equipment frame in a hydraulic climbing formwork, an auxiliary support frame is installed at a preset position of a core tube shear wall 1 to provide temporary support for a hydraulic climbing formwork lower hanging equipment frame 2, and after the hydraulic climbing formwork is installed, the auxiliary support frame is removed and recovered; because the triangular support frame 10 of the auxiliary support frame can be prefabricated in advance and movably connected to the core tube shear wall 1 according to a preset position, the auxiliary support frame is high in installation precision, stable in structure, better in safety, flexible and convenient to assemble and disassemble and favorable for repeated use.
As shown in fig. 1 and 2, an embedded screw 15 is disposed in the core tube shear wall 1, one end of the embedded screw 15 is anchored in the core tube shear wall 1, the other end of the embedded screw 15 penetrates through the top of a vertical rod 12 of the triangular support frame 10 and is locked and fixed by a nut (not shown in the figure), the top end of the triangular support frame 10 is connected with the embedded screw 15 in the core tube shear wall 1 to bear vertical force and horizontal pulling force, the bottom end of the triangular support frame 10 is supported on the core tube shear wall 1 to form support counterforce, and thus a stable triangular support structure is formed.
As shown in fig. 1, the connecting beam 20 is perpendicular to the cross bar 11 of the triangular support frame 10, and can transversely connect a plurality of triangular support frames 10 arranged in parallel into a whole, thereby enhancing the overall structural strength of the auxiliary support frame. Preferably, the connecting beam 20 is made of channel steel, a wing plate at one side of the channel steel is fixedly connected to the cross bar 11 of the triangular support frame 10, and a wing plate at the other side of the channel steel is fixedly connected to the platform plate 30.
For the convenience of disassembly and assembly, the connecting beam 20 is connected with the cross bar 11 of the triangular support frame 10 through bolts, and the platform plate 30 is connected with the connecting beam 20 through bolts.
The following description is provided with reference to fig. 1 and 2 to describe the use process of the auxiliary support frame for installing a platform in a hydraulic climbing formwork of the present invention:
before the concrete placement of core section of thick bamboo shear force wall 1, bury buried screw 15 underground at predetermined elevation position, after this layer concrete placement is accomplished and reaches the intensity of designing requirement, install a plurality of triangular supports 10 and make it and buried screw 15 swing joint in advance, then, lay tie beam 20 and landing slab 30 in proper order at triangular supports 10 top for hang equipment frame 2 under the hydraulic pressure creeping formwork and support in auxiliary stay, treat that hydraulic pressure creeping formwork installs the completion after, demolish recovery auxiliary stay in proper order.
The above description is only for the purpose of describing the preferred embodiments of the present invention, and is not intended to limit the scope of the present invention, so that any changes and modifications made by those skilled in the art according to the above disclosure are all within the scope of the appended claims.
Claims (5)
1. The utility model provides an auxiliary stay frame for installing platform in hydraulic pressure creeping formwork, hang equipment rack support in auxiliary stay frame under the hydraulic pressure creeping formwork, its characterized in that, auxiliary stay frame includes:
the triangular support frames are arranged at the bottom of the hydraulic creeping formwork lower hanging equipment rack in parallel at intervals and consist of transverse rods and vertical rods which are vertically arranged and inclined struts which are connected between the transverse rods and the vertical rods, the vertical rods of the triangular support frames are tightly attached to the outer side of the core barrel shear wall and movably connected with the core barrel shear wall, and the width of each triangular support frame is more than or equal to that of the hydraulic creeping formwork lower hanging equipment rack;
the connecting beams are horizontally connected to the tops of the triangular support frames;
and the platform plates are laid on the tops of the connecting beams.
2. The auxiliary support frame of claim 1, wherein: be equipped with pre-buried screw rod in the core section of thick bamboo shear wall, the one end anchor of pre-buried screw rod in the core section of thick bamboo shear wall, the other end of pre-buried screw rod runs through the montant top of triangular supports frame and is fixed by nut locking.
3. The auxiliary support frame of claim 1, wherein: the connecting beam is perpendicular to the cross bar of the triangular support frame.
4. The auxiliary support frame of claim 1, wherein: the connecting beam is made of channel steel, a wing plate at one side of the channel steel is fixedly connected with the cross rod of the triangular support frame, and a wing plate at the other side of the channel steel is fixedly connected with the platform plate.
5. The auxiliary support frame of claim 1, wherein: the connecting beam is connected with the cross rod bolt of the triangular support frame, and the platform plate is connected with the connecting beam bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020028676.2U CN211923517U (en) | 2020-01-07 | 2020-01-07 | A auxiliary stay frame for installing platform in hydraulic pressure creeping formwork |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020028676.2U CN211923517U (en) | 2020-01-07 | 2020-01-07 | A auxiliary stay frame for installing platform in hydraulic pressure creeping formwork |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211923517U true CN211923517U (en) | 2020-11-13 |
Family
ID=73330446
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020028676.2U Active CN211923517U (en) | 2020-01-07 | 2020-01-07 | A auxiliary stay frame for installing platform in hydraulic pressure creeping formwork |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211923517U (en) |
-
2020
- 2020-01-07 CN CN202020028676.2U patent/CN211923517U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106437130A (en) | Inner roof external climbing type formwork construction platform for super high-rise building construction | |
CN104389419A (en) | Cantilevered formwork platform installation structure and construction method | |
CN111779248A (en) | High formwork system and construction method thereof | |
CN110725597A (en) | Construction platform erection structure and method for ring beam at top of concrete silo | |
CN220036109U (en) | Large-span cantilever structure plate formwork supporting structure | |
CN109138431B (en) | Super high-rise pump pipe bridge crossing device and construction method thereof | |
CN109162437B (en) | Integral steel platform for multi-cylinder steel plate shear wall and construction method thereof | |
CN212507296U (en) | High formwork system | |
CN206319610U (en) | Roof system steel truss slipping and assembling construction platform structure | |
CN202125061U (en) | Scaffold of large-space concrete structure | |
CN108729640B (en) | Mounting method of cantilever plate of assembled building | |
CN114134820A (en) | Formwork support and construction method for I-shaped composite beam cast-in-place bridge deck | |
CN203452375U (en) | Hydraulic self-jacking oblique creeping formwork | |
CN109025259A (en) | One kind can turnover type hydraulic climbing formwork wall-attaching equipment | |
CN102312563A (en) | Method for connecting external scaffold with wall for large-span and ultra-story-height structures | |
CN211923517U (en) | A auxiliary stay frame for installing platform in hydraulic pressure creeping formwork | |
CN209924434U (en) | High-altitude overhanging formwork support frame body | |
CN104831928B (en) | High-altitude long-span concrete conjoined structure shuttering supporting steel platform construction method | |
CN216947881U (en) | Formwork support of I-shaped composite beam cast-in-situ bridge deck | |
CN110886225A (en) | Construction method of cable tower stay cable installation system | |
CN111042508A (en) | High-altitude overlong cantilever support member and construction method thereof | |
CN213038845U (en) | Support system | |
CN210798994U (en) | Concrete structure wall body unilateral template structure | |
CN211815605U (en) | Construction device for pile column type pier tie beam and capping beam | |
CN216921347U (en) | Primary and secondary formula supports tripod |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |