CN211548087U - Novel shear force wall building structure connects device - Google Patents
Novel shear force wall building structure connects device Download PDFInfo
- Publication number
- CN211548087U CN211548087U CN201922416062.1U CN201922416062U CN211548087U CN 211548087 U CN211548087 U CN 211548087U CN 201922416062 U CN201922416062 U CN 201922416062U CN 211548087 U CN211548087 U CN 211548087U
- Authority
- CN
- China
- Prior art keywords
- plate
- shear force
- force wall
- secondary beam
- shear wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 19
- 239000010959 steel Substances 0.000 claims abstract description 19
- 230000003014 reinforcing effect Effects 0.000 claims description 18
- 210000003205 muscle Anatomy 0.000 abstract description 4
- 230000008878 coupling Effects 0.000 abstract description 3
- 238000010168 coupling process Methods 0.000 abstract description 3
- 238000005859 coupling reaction Methods 0.000 abstract description 3
- 230000000694 effects Effects 0.000 description 6
- 238000010276 construction Methods 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
Novel shear force wall building structure connecting device, including shear force wall, floor, preset steel sheet, fixed plate, mounting plate, prefabricated secondary beam, indulge muscle, gusset plate, the floor is connected to shear force wall both sides, pre-buried prefabricated secondary beam in the floor, indulges the muscle both ends and connects prefabricated secondary beam, and the inside pre-buried preset steel sheet in shear force wall, preset steel sheet have the locating plate, and the locating plate has the locating hole, and the locating hole suits with prefabricated secondary beam, and prefabricated secondary beam passes the locating hole, it has the upper junction pole to predetermine steel sheet upper portion, and the upper junction pole passes shear force wall, fixed plate coupling nut in proper order, and the upper junction pole passes through threaded connection nut, and the shear force wall is connected to the fixed plate inboard, and the fixed plate has the picture peg, and the picture peg.
Description
Technical Field
The utility model relates to a building field especially relates to a novel shear force wall building structure connects device.
Background
The shear wall and the concrete floor slab are very widely applied to building structures, reliable connection is required to be arranged between the shear wall and the concrete floor slab, and the shear wall and the concrete floor slab can be coordinated and stable in the horizontal direction.
SUMMERY OF THE UTILITY MODEL
The utility model discloses it is not enough to the above-mentioned that prior art exists, provide a balanced novel shear force wall building structure connecting device of atress.
The utility model aims at realizing through the following technical scheme:
the utility model provides a novel shear force wall building structure connects device, includes shear force wall, floor, predetermines steel sheet, fixed plate, mounting plate, prefabricated secondary beam, indulges muscle, gusset plate, the floor is connected to shear force wall both sides, pre-buried prefabricated secondary beam in the floor, indulges the muscle both ends and connects prefabricated secondary beam, and the pre-buried steel sheet of predetermineeing in the shear force wall has the locating plate, and the locating plate has the locating hole, and the locating hole suits with prefabricated secondary beam, and prefabricated secondary beam passes the locating hole, predetermine steel sheet upper portion and have the upper junction pole, the upper junction pole passes shear force wall, fixed plate coupling nut in proper order, the upper junction pole passes through threaded connection nut, and the shear force wall is connected to the fixed plate inboard, and the fixed plate has the picture peg, and the shear force wall.
The lower portion of the preset steel plate is provided with a lower connecting rod, the lower connecting rod sequentially penetrates through the shear wall and the reinforcing plate connecting nut, the lower connecting rod passes through the threaded connecting nut, the inner side of the reinforcing plate is connected with the shear wall, the upper portion of the reinforcing plate is connected with the fastening plate, the inner side of the fastening plate is connected with the floor slab, the fastening plate is provided with a fastening rod, the fastening rod sequentially penetrates through the floor slab and the connecting plate connecting nut, the fastening rod passes through the threaded connecting nut, the shear wall and the outer side of the floor slab are both connected with.
Has the advantages that:
the prefabricated secondary beam is matched with the longitudinal ribs to strengthen the solid stability and stress balance of the floor slab, improve the self-bearing force, avoid the self-generation of cracks of concrete caused by uneven stress and influence the bearing effect, the positioning plate of the preset steel plate can reinforce the positioning property of the prefabricated secondary beam and the stress property of the shear wall to the shear wall, further improve the supporting and reinforcing stability of the floor slab and strengthen the bearing effect, the fixed plate and the reinforcing plate are respectively matched with the upper connecting rod and the lower connecting rod to increase the tight positioning property of the connection between the fixed plate and the shear wall, reinforce and improve the structural stability, avoid the displacement separation of the fixed plate, the connecting plate, the fastening plate and the reinforcing plate, have reasonable structure, are matched with each other to reinforce, position and support the stress at the connection part of the shear wall and the floor slab, ensure that the horizontal direction between the fixed plate, the connecting plate, the fastening plate and the reinforcing plate and the floor slab are, the reinforced structure stability improves the bearing effect, and fixed plate, gusset plate, connecting plate, mounting plate all belong to independent part, dismantle simple to operate, the reducible construction degree of difficulty.
Drawings
Fig. 1 is the structure schematic diagram of the novel shear wall building structure connecting device of the present invention.
Fig. 2 is a schematic structural view of the fixing plate and the connecting plate of the present invention.
Fig. 3 is the schematic structural view of the reinforcing plate and the fastening plate of the present invention.
Detailed Description
The invention is explained in more detail below with reference to the figures and examples:
a novel shear wall building structure connecting device comprises a shear wall 01, a floor slab 02, preset steel plates 05, a fixing plate 08, a fastening plate 10, prefabricated secondary beams 13, longitudinal ribs 14 and reinforcing plates 17, wherein the floor slab 02 is connected to two sides of the shear wall 01, the prefabricated secondary beams 13 are pre-buried in the floor slab 02, the prefabricated secondary beams 13 are connected to two ends of the longitudinal ribs 14, the prefabricated secondary beams 13 are matched with the longitudinal ribs 14, the solid stability and stress balance of the floor slab 02 are enhanced, the self bearing force of the floor slab is improved, cracks of concrete caused by uneven stress are avoided, the bearing effect is influenced, the preset steel plates 05 are pre-buried in the shear wall 01, the preset steel plates 05 are provided with positioning plates 11, the positioning plates 11 are provided with positioning holes 15, the positioning holes 15 are matched with the prefabricated secondary beams 13, the prefabricated secondary beams 13 penetrate through the positioning holes 15, the positioning plates 11 provided with the preset steel plates 05 can reinforce the positioning performance of the prefabricated secondary beams 13 and the stress of the shear wall, and then improve it and support reinforcing stability to floor 02, strengthen the bearing effect, predetermine steel sheet 05 upper portion and have upper connecting rod 06, upper connecting rod 06 passes shear force wall 01, fixed plate 08 coupling nut in proper order, and upper connecting rod 06 passes through the threaded connection nut, and fixed plate 08 inboard is connected shear force wall 01, and fixed plate 08 has picture peg 12, and picture peg 12 inserts shear force wall 01, and fixed plate 08 lower part connects connecting plate 16, and the inboard floor 02 of connecting plate 16 connection.
The lower portion of the preset steel plate 05 is provided with a lower connecting rod 07, the lower connecting rod 07 sequentially penetrates through a shear wall 01 and a reinforcing plate 17 to connect nuts, the lower connecting rod 07 is connected with the nuts through threads, a fixing plate 08 and the reinforcing plate 17 are respectively matched with the upper connecting rod 06 and the lower connecting rod 07 to increase the connection tightness and the positioning performance between the lower connecting rod and the shear wall 01, the structural stability can be reinforced and improved, the displacement and the separation can be avoided, the structure is reasonable, the inner side of the reinforcing plate 17 is connected with the shear wall 01, the upper portion of the reinforcing plate 17 is connected with a fastening plate 10, the inner side of the fastening plate 10 is connected with a floor slab 02, the fastening plate 10 is provided with a fastening rod 09, the fastening rod 09 sequentially penetrates through the floor slab 02 and a connecting plate 16 to connect the nuts, the fastening rod 09 is connected with the nuts through threads, the fixing plate 08, the connecting plate, make the horizontal direction coordination between the two firm, avoid its atress inequality, the fracture skew that leads to, reinforced structure stability improves bearing effect, and screed-coat 03 is all connected in shear force wall 01, the floor 02 outside, and screed-coat 03 connection dope layer 04, fixed plate 08, gusset plate 17, connecting plate 16, mounting plate 10 all belong to the individual part, dismantle simple to operate, reducible construction degree of difficulty.
Claims (2)
1. The novel shear wall building structure connecting device is characterized by comprising a shear wall, a floor slab, a preset steel plate, a fixing plate, a fastening plate, a prefabricated secondary beam, longitudinal ribs and a reinforcing plate, wherein the floor slab is connected to two sides of the shear wall, the prefabricated secondary beam is embedded in the floor slab, the two ends of each longitudinal rib are connected with the prefabricated secondary beam, the preset steel plate is embedded in the shear wall and provided with a positioning plate, the positioning plate is provided with a positioning hole, the positioning hole is matched with the prefabricated secondary beam, the prefabricated secondary beam penetrates through the positioning hole, the upper portion of the preset steel plate is provided with an upper connecting rod, the upper connecting rod sequentially penetrates through the shear wall and a fixing plate connecting nut, the upper connecting rod penetrates through a threaded connecting nut, the inner side of the fixing plate is connected with the shear wall, the fixing plate is.
2. The novel shear wall building structure connecting device is characterized in that the lower portion of the preset steel plate is provided with a lower connecting rod, the lower connecting rod sequentially penetrates through the shear wall and a reinforcing plate connecting nut, the lower connecting rod sequentially penetrates through a threaded connecting nut, the inner side of the reinforcing plate is connected with the shear wall, the upper portion of the reinforcing plate is connected with a fastening plate, the inner side of the fastening plate is connected with a floor slab, the fastening plate is provided with a fastening rod, the fastening rod sequentially penetrates through the floor slab and the connecting plate connecting nut, the fastening rod sequentially penetrates through the threaded connecting nut, the outer sides of the shear wall and the floor slab are both connected with a leveling.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922416062.1U CN211548087U (en) | 2019-12-29 | 2019-12-29 | Novel shear force wall building structure connects device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922416062.1U CN211548087U (en) | 2019-12-29 | 2019-12-29 | Novel shear force wall building structure connects device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211548087U true CN211548087U (en) | 2020-09-22 |
Family
ID=72510808
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922416062.1U Expired - Fee Related CN211548087U (en) | 2019-12-29 | 2019-12-29 | Novel shear force wall building structure connects device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211548087U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112459281A (en) * | 2020-11-11 | 2021-03-09 | 杨玮军 | Steel sheet shear force wall quick positioning connection structure among assembly type structure |
-
2019
- 2019-12-29 CN CN201922416062.1U patent/CN211548087U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112459281A (en) * | 2020-11-11 | 2021-03-09 | 杨玮军 | Steel sheet shear force wall quick positioning connection structure among assembly type structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204960038U (en) | Precast concrete shear wall structure | |
KR102079008B1 (en) | E-z connecting structure for beam and column wherein the end-moment and bending resistibility are reinforced | |
CN111395513A (en) | Assembled super high-rise core tube structure | |
CN107905385A (en) | The assembled arthitecutral structure and method of construction that steel construction is combined with concrete structure | |
CN113062476B (en) | Heavy-load large-span combined beam-column structure and construction method | |
KR20180058962A (en) | Seismic retrofit structure | |
CN110552494A (en) | Triangular overhanging scaffold base and two combined bases thereof | |
CN211548087U (en) | Novel shear force wall building structure connects device | |
CN209799437U (en) | Temporary oblique fixed support for prefabricated wall | |
JP3762689B2 (en) | Connection structure of wall frame panel and floor slab foundation | |
CN111794421B (en) | Prefabricated concrete floor assembling method | |
CN210658724U (en) | Rigid connection node of steel column and concrete column | |
CN203755451U (en) | Connecting device for dual-layer full-steel structure floor embedded with channel steel beam and column | |
KR102054990B1 (en) | Coupling Bar and End Reinforced Beam Using T-Shaped Member | |
CN216042833U (en) | Spliced supporting platform | |
CN211690765U (en) | Novel horizontal floor supporting structure | |
CN211572137U (en) | Steel pipe bundle wall and foundation connecting node | |
CN110939202A (en) | Novel floor horizontal supporting structure and construction method thereof | |
CN207646886U (en) | The assembled arthitecutral structure that steel construction is combined with concrete structure | |
CN207063232U (en) | A kind of precast concrete shear wall plate with perps | |
KR20190140141A (en) | Water tank and construction method thereof | |
CN111364680A (en) | Preformed column for reserved steel bars | |
CN221567492U (en) | Beam and column connecting node for assembled building | |
CN218346440U (en) | Connection structure of two steel sheet shear force walls in outside | |
CN217679833U (en) | Composite concrete construction type shear wall structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200922 |