Elevator shaft with bottom plate prefabricated reinforcement cage Download PDF

Info

Publication number
CN211447882U
CN211447882U CN201922266046.9U CN201922266046U CN211447882U CN 211447882 U CN211447882 U CN 211447882U CN 201922266046 U CN201922266046 U CN 201922266046U CN 211447882 U CN211447882 U CN 211447882U
Authority
CN
China
Prior art keywords
steel
bottom plate
prefabricated
pit
reinforcement cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922266046.9U
Other languages
Chinese (zh)
Inventor
聂永明
聂境朗
杨世荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou Mingheng Ladder Well Co ltd
Original Assignee
Huizhou Mingheng Ladder Well Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huizhou Mingheng Ladder Well Co ltd filed Critical Huizhou Mingheng Ladder Well Co ltd
Priority to CN201922266046.9U priority Critical patent/CN211447882U/en
Application granted granted Critical
Publication of CN211447882U publication Critical patent/CN211447882U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model belongs to the technical field of building engineering of old buildings to build steel structure elevator shafts, in particular to an elevator shaft with a bottom plate prefabricated reinforcement cage, which comprises a steel structure elevator shaft pit steel frame, a prefabricated bottom plate reinforcement cage, a concrete wall plate and a static pressure anchor rod pile; the utility model discloses, steel construction elevator well pit festival steelframe at the mill, the steel reinforcement cylinder mould, static pressure stock stake mouth and pile pressing pulling force screw rod are prefabricated, the job site only need dig the elevartor shaft foundation ditch, steel construction elevator well pit festival steelframe with prefabricating is drawn to the scene, put in the elevartor shaft of digging with hoist handle steel construction elevator well pit festival steelframe, pass pit festival steelframe crossbeam with two girder steels, support and adjust then divide twice concreting after good, accomplish the preparation of steel construction elevator well pit, make the construction process flow simplify, and do not receive the influence of weather in the mill's manufacture process, the site operation time is short, ensure the safety of whole well pit construction, it is high-efficient convenient.

Description

Elevator shaft with bottom plate prefabricated reinforcement cage
Technical Field
The utility model belongs to the technical field of the building engineering of steel construction elevator well is built additional to old building, concretely relates to elevator well of taking bottom plate prefabricated steel reinforcement cage.
Background
Traditional old building adds builds steel construction elevator well, needs following steps to accomplish: 1. excavating on site, 2, making slope protection, 3, beating cushion concrete, 4, supporting a bottom plate template, 5, binding bottom plate reinforcing steel bars, 6, pouring bottom plate concrete, 7, supporting a pit concrete wall external template, 8, dredging mud, 9, binding concrete wall reinforcing steel bars again, 10 and supporting a concrete wall internal template; 11. then pouring the concrete wall; 12. the concrete wall form needs to be disassembled, 13, the pit wall body is made to be waterproof, 14, soil is backfilled, 15 and then ground concrete is poured, so that collapse easily occurs, danger is caused to construction, safety is not controlled, quality is not controlled strictly, water leakage easily occurs, and installation time is long.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a take elevator well of prefabricated steel reinforcement cage of bottom plate has safety, saves installation time's characteristics.
In order to achieve the above object, the utility model provides a following technical scheme: an elevator well with a bottom plate prefabricated reinforcement cage comprises a steel structure elevator well bottom pit section steel frame, a prefabricated bottom plate reinforcement cage, a concrete wall plate and a static pressure anchor rod pile, wherein the static pressure anchor rod pile is buried in soil underground, a bearing platform is arranged above the static pressure anchor rod pile, the concrete wall plate is arranged on the bearing platform, the steel structure elevator well bottom pit section steel frame comprises four stand columns, four cross beams, a reinforcement mesh and a steel plate inner mold, the number of the stand columns and the number of the cross beams are four, the stand columns and the cross beams are welded to form a three-dimensional frame, the reinforcement meshes are arranged in the middle of every two of the four stand columns, the number of the reinforcement meshes is four, the steel plate inner mold is arranged on the inner wall of the reinforcement mesh, two connecting rods are arranged between the four stand columns in a crossed manner, the prefabricated bottom plate reinforcement cage comprises a reinforcement mesh, the bottom of the steel bar net cage is provided with a static pressure anchor rod pile opening, and the bottom of the steel bar net cage is fixedly connected with a pile pressing tension screw rod.
Preferably, the concrete wallboard is a concrete body formed by pouring concrete after the steel structure elevator shaft pit section steel frame is installed.
Preferably, the reinforcing mesh comprises vertical reinforcing steel bars, horizontal reinforcing steel bars and connecting plates, the connecting plates are welded between the two upright posts, and the vertical reinforcing steel bars and the horizontal reinforcing steel bars are arranged in a cross manner to form a grid.
Preferably, the transverse reinforcing steel bars penetrate through round holes formed in the upright posts and are located on the outer sides of the upright posts, and the length of the transverse reinforcing steel bars located on the outer sides of the upright posts is 500 mm.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses, through the accurate well pit festival steelframe of taking steel reinforcement cage of prefabricating of mill, only need the excavation foundation ditch at the scene, the hoist and mount adjustment, fall the concrete and tear the centre form steel sheet open, when steel construction elevator well needs to be built additional at the old building, make the great simplification of construction process flow of well pit and do not receive the influence of weather in the mill's manufacture process, it is very short at the site work time, ensure that the safety of whole well pit construction is high-quality, it is high-efficient convenient, and simultaneously, the material and the specification of steel construction elevator well pit can be checked controllably, the steel bar interval of steel construction elevator well and the size of pit are accurate, static pressure stock stake mouth and setting of pile pressing pulling force screw rod are firm reliable in addition, pile sealing structural strength satisfies the designing requirement.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural view of a steel structure elevator shaft pit steel frame of the present invention;
fig. 2 is a schematic structural view of a reinforcing mesh in the present invention;
fig. 3 is a schematic structural view of a concrete wall panel according to the present invention;
FIG. 4 is a schematic structural view of a middle prefabricated bottom plate reinforcement cage of the present invention;
fig. 5 is a schematic structural view of the tension screw for a medium pressure pile of the present invention;
in the figure: 1. a concrete wall panel; 2. a bearing platform; 3. static pressure anchor pile; 4. a steel structure elevator shaft pit steel frame; 41. a cross beam; 42. a connecting rod; 43. a reinforcing mesh; 431. a connecting plate; 432. transverse reinforcing steel bars; 433. erecting steel bars; 44. a column; 45. a steel plate inner die; 5. prefabricating a bottom plate reinforcement cage; 51. a steel bar net cage; 52. a static pressure anchor rod pile mouth; 53. and (5) pressing a pile tension screw rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-5, the present invention provides the following technical solutions: an elevator well with a bottom plate prefabricated reinforcement cage comprises a steel structure elevator well bottom pit section steel frame 4, a prefabricated bottom plate reinforcement cage 5, a concrete wall plate 1 and a static pressure anchor rod pile 3, wherein the static pressure anchor rod pile 3 is buried in soil in an underground mode, a bearing platform 2 is arranged above the static pressure anchor rod pile 3, the concrete wall plate 1 is arranged on the bearing platform 2, the steel structure elevator well bottom pit section steel frame 4 comprises stand columns 44, cross beams 41, reinforcement meshes 43 and steel plate internal molds 45, the stand columns 44 and the cross beams 41 are four in number, the stand columns 44 and the cross beams 41 are welded to form a three-dimensional frame, the reinforcement meshes 43 are arranged in the middle of every two of the four stand columns 44, the reinforcement meshes 43 are double-layered, the reinforcement meshes 43 are four in number, the steel plate internal molds 45 are arranged on the inner walls of the reinforcement meshes 43, and two connecting rods 42 are arranged between the four stand, prefabricated bottom plate steel reinforcement cage 5 includes steel reinforcement cylinder mould 51, static pressure stock stake mouth 52 and pile pressing pulling force screw rod 53, static pressure stock stake mouth 52 has been seted up to steel reinforcement cylinder mould 51's bottom, steel reinforcement cylinder mould 51's bottom fixedly connected with pile pressing pulling force screw rod 53, when steel construction elevator well need be built additional to the old building, only need excavation foundation ditch, hoist and mount adjustment, fall the concrete and tear down the centre form steel sheet at the scene, make the great simplification of construction process flow of well pit and do not receive the influence of weather in the mill's manufacture process, at the scene engineering time very short, ensure that the safety of whole well pit construction is high-quality, high-efficient convenient.
Specifically, the concrete wallboard 1 is a concrete body formed by pouring concrete after the steel structure elevator shaft pit section steel frame 4 is installed.
Specifically, the reinforcing mesh 43 includes vertical reinforcing bars 433, horizontal reinforcing bars 432 and connecting plates 431, the connecting plates 431 are welded between the two columns 44, and the vertical reinforcing bars 433 and the horizontal reinforcing bars 432 are arranged in a grid shape in a criss-cross manner.
Specifically, the transverse reinforcing steel bars 432 pass through the circular holes formed in the upright posts 44 and are located on the outer sides of the upright posts 44, and the length of the transverse reinforcing steel bars 432 located on the outer sides of the upright posts 44 is 500 mm.
The utility model discloses a theory of operation and use flow: the utility model discloses, during the use, steel construction elevator well pit festival steelframe 4 is in the mill, reinforcing bar cylinder mould 51, static pressure stock stake mouth 52 and pile pressing tension screw 53 are prefabricated, the job site only need dig the elevartor shaft foundation ditch, steel construction elevator well pit festival steelframe 4 that will prefabricate is pulled to the scene, put in the elevartor shaft that digs with hoist handle steel construction elevator well pit festival steelframe 4, pass pit festival steelframe crossbeam 41 with two girder steels, support and adjust then divide twice concreting after good, accomplish the preparation of steel construction elevator well pit.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (4)

1. The utility model provides a take elevator well of prefabricated steel reinforcement cage of bottom plate, includes steel construction elevator well pit festival steelframe (4), prefabricated bottom plate steel reinforcement cage (5), concrete wall board (1) and static pressure stock stake (3), its characterized in that: the static pressure anchor rod pile (3) is buried underground in soil, a bearing platform (2) is arranged above the static pressure anchor rod pile (3), a concrete wall plate (1) is arranged on the bearing platform (2), a steel structure elevator well pit section steel frame (4) comprises upright columns (44), cross beams (41), reinforcing mesh (43) and steel plate internal molds (45), the number of the upright columns (44) and the number of the cross beams (41) are four, the upright columns (44) and the cross beams (41) are welded to form a three-dimensional frame, the four steel mesh (43) are arranged in the middle of every two upright columns (44), the number of the reinforcing mesh (43) is four, the steel plate internal molds (45) are arranged on the inner wall of the reinforcing mesh (43), the four steel plate internal molds (44) are arranged between the upright columns (44) in a crossed mode, two connecting rods (42) are arranged between the upright columns (44), and the prefabricated bottom plate reinforcing, The static pressure anchor rod pile mouth (52) and pile pressing tension screw (53), the static pressure anchor rod pile mouth (52) has been seted up to the bottom of steel reinforcement cylinder mould (51), the bottom fixedly connected with pile pressing tension screw (53) of steel reinforcement cylinder mould (51).
2. The elevator shaft with the bottom plate prefabricated reinforcement cage according to claim 1, characterized in that: the concrete wallboard (1) is a concrete body formed by pouring concrete after the steel structure elevator shaft pit steel frame (4) is installed.
3. The elevator shaft with the bottom plate prefabricated reinforcement cage according to claim 1, characterized in that: the reinforcing mesh (43) comprises vertical reinforcing bars (433), horizontal reinforcing bars (432) and connecting plates (431), the connecting plates (431) are welded between the two upright posts (44), and the vertical reinforcing bars (433) and the horizontal reinforcing bars (432) are arranged in a grid shape in a crossed mode.
4. The elevator shaft with the bottom plate prefabricated reinforcement cage according to claim 3, characterized in that: the transverse reinforcing steel bars (432) penetrate through round holes formed in the upright columns (44) and are located on the outer sides of the upright columns (44), and the length of the transverse reinforcing steel bars (432) located on the outer sides of the upright columns (44) is 500 mm.
CN201922266046.9U 2019-12-17 2019-12-17 Elevator shaft with bottom plate prefabricated reinforcement cage Active CN211447882U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922266046.9U CN211447882U (en) 2019-12-17 2019-12-17 Elevator shaft with bottom plate prefabricated reinforcement cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922266046.9U CN211447882U (en) 2019-12-17 2019-12-17 Elevator shaft with bottom plate prefabricated reinforcement cage

Publications (1)

Publication Number Publication Date
CN211447882U true CN211447882U (en) 2020-09-08

Family

ID=72302776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922266046.9U Active CN211447882U (en) 2019-12-17 2019-12-17 Elevator shaft with bottom plate prefabricated reinforcement cage

Country Status (1)

Country Link
CN (1) CN211447882U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112411943A (en) * 2021-01-04 2021-02-26 江苏万融工程科技有限公司 Prefabricated elevator shaft

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112411943A (en) * 2021-01-04 2021-02-26 江苏万融工程科技有限公司 Prefabricated elevator shaft

Similar Documents

Publication Publication Date Title
CN111441343A (en) Mountain photovoltaic support micropore cast-in-place pile foundation system, construction method and application
CN211447882U (en) Elevator shaft with bottom plate prefabricated reinforcement cage
CN111236259A (en) Combined lattice-shaped prefabricated pile wall supporting structure and construction method thereof
CN108755663B (en) Construction method of large-diameter overlong variable-cross-section cast-in-situ bored pile
CN212801564U (en) Foundation ditch steel sheet pile supporting construction
CN212506301U (en) Support system in combination assembled forever
CN212249179U (en) Basement outer wall single face formwork support system
CN210507502U (en) Prefabricated assembled concrete slab bed structure
CN111472363A (en) Construction method of foundation pit enclosure structure located in underground space of existing building
CN110685287A (en) Double-row pile foundation pit supporting system with drainage ditch and retaining wall and construction method
CN116464060A (en) Construction method for accelerating high-span region structure at high-low span position of basement bottom plate
CN108951643A (en) The big region support replacement construction method of Super High deep basal pit basement Core Walls Structure large span
CN113700004B (en) Deep foundation pit combined support construction device and method thereof
CN206956738U (en) A kind of super-sized foundation pit subregion adds inner supporting structure after excavating
CN219364635U (en) Combined supporting structure for replacing support by utilizing basement structure and steel diagonal support
CN111962522A (en) Combined supporting structure of inclined wedge-shaped pile and vertical pipe pile and construction method thereof
CN218990240U (en) Side mold system at deep pit of foundation slab
CN217174899U (en) Major diameter underground concrete barrel construction structures
CN108442406B (en) Semi-reverse construction method foundation pit inner supporting structure and construction method thereof
CN216810448U (en) Assembled formwork support integrated shear wall device
CN114232676B (en) Method for synchronously and quickly constructing balance weight type retaining wall structure and grouted stone slab
CN215948247U (en) Pile foundation structure
CN212896374U (en) Foundation pit support structure located in underground space of existing building
CN218933149U (en) SMW construction method pile structure
CN115822252B (en) Construction method and supporting structure for ultra-high inclined column in limited space

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant