CN211172853U - Outer wall dry-hanging device for building - Google Patents
Outer wall dry-hanging device for building Download PDFInfo
- Publication number
- CN211172853U CN211172853U CN201921338942.5U CN201921338942U CN211172853U CN 211172853 U CN211172853 U CN 211172853U CN 201921338942 U CN201921338942 U CN 201921338942U CN 211172853 U CN211172853 U CN 211172853U
- Authority
- CN
- China
- Prior art keywords
- building
- groove
- fixed
- keel
- piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model provides an outer wall is hung device futilely for building, including the building outer wall, be fixed with vertical main joist on the building outer wall, vertical main joist is fixed with the level to the secondary joist, and the level is L shape stainless steel to the secondary joist, the level is connected with the regulating part to on the secondary joist, the bolt has the pendant on the regulating part, the fluting department of decorative board is inserted on pendant main part upper portion to it is fixed with the marble glue, the couple afterbody perk of pendant main part lower part, perk portion insert decorative board fluting department, and fix with the marble glue, the utility model discloses can effectively solve traditional dry hanging construction, decorative board must be installed according to the order limitation, can effectively shorten the time limit for a project, and later stage monolithic panel damage only need to demolish damage panel can, solve traditional maintenance and must demolish the limitation of whole row of decorative material, greatly reduce the maintenance cost.
Description
Technical Field
The utility model relates to a building element field especially relates to an outer wall ornamental material hangs structure futilely.
Background
A decorative material dry hanging method is a novel construction process in wall decoration. The method uses the metal hanging piece to directly hang the facing stone on the wall surface or hang the facing stone on the steel frame in the air, and grouting and pasting are not needed, so that the effect and the stability are superior to those of the traditional wet pasting method.
The construction method is limited by a dry hanging structure, the traditional dry hanging method construction needs to install the plates in sequence, the sectional construction cannot be carried out, and the damaged single plate can be replaced only by dismantling all plates in the same row, so that the construction period is greatly prolonged, and the later maintenance is greatly inconvenient.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel hang component futilely, constitute by a plurality of functional unit, solved current dry-hang technology and can not the segmentation construction, and the inconvenient problem of later maintenance.
In order to solve the existing problems, the utility model provides a device is hung futilely to outer wall for building, including the building outer wall, be fixed with vertical main joist on the building outer wall, vertical main joist is fixed with the level to the secondary joist, the level is L shape stainless steel to the secondary joist, be connected with the regulating part on the level to the secondary joist, the bolt has the pendant on the regulating part, pendant main part upper portion inserts the fluting department of decorative board and fixes with the marble glue, the couple afterbody perk of pendant main part lower part, perk portion inserts decorative board fluting department and fixes with the marble glue.
In the scheme, the adjusting piece can be adjusted in position forwards and backwards along the secondary keel through the second adjusting bolt hole and fixed through the second bolt; the hanger is connected to the adjusting piece, the hanger main body can be adjusted up and down along the first adjusting bolt hole, and finally the hanger is fixed through the first bolt.
In the scheme, the upper part of the hanging piece is provided with the inserting end, the inserting end is inserted into the pre-groove of the decorative plate, the groove hole is filled with marble glue and used for supporting the decorative plate on the upper part, the lower part of the hanging piece is provided with the limiting groove and tongue which are used for fixing the hook, and the groove and tongue are internally roughened.
In the scheme, the hook is provided with a rough surface for increasing the contact surface with the limiting rabbet, and the rough surface and the limiting rabbet are filled with marble glue; the tilting part of the tail end of the hook is inserted into the pre-groove of the decorative plate, and the marble glue is used for filling the groove hole.
In the scheme, the gap between the installed plates is subjected to gap filling treatment by adopting the structural adhesive.
In the scheme, the vertical main keel is a stainless steel square tube.
The utility model discloses an useful lies in: (1) the traditional dry-hanging structural member must be constructed in the sequence from bottom to top, and a single plate is damaged and all plates in the same row where the plate is located need to be removed, so that the construction period is greatly prolonged, and the later maintenance is inconvenient. The utility model can be installed at any position with the functional units arranged, and is not limited by any adjacent plates, so that the sectional construction can be realized, and the construction period can be shortened; only a single plate needs to be directly replaced when damaged in the later period, and other plates do not need to be repeatedly disassembled and assembled; (2) the utility model discloses functional unit form, processing technology are all simpler, and need not special material, very big reduction the cost that exterior wall ornamental material hung futilely.
Drawings
Fig. 1 is a left side view of the embodiment of the present invention.
Fig. 2 is the assembly and disassembly diagram of the present invention.
Fig. 3 is a detailed view of the adjustment member.
Fig. 4 is a detailed view of the pendant body.
Fig. 5 is a detail view of the hook.
Fig. 6 is an enlarged view of a portion H of fig. 1.
Detailed Description
The following is a further explanation of the method for implementing the present invention with reference to the drawings of the present invention, which aims to better understand the present invention, and the present invention is not limited to the present invention, any modification, equivalent replacement, improvement, etc. within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Referring to fig. 1, the dry hanging structure of the decorative plate of the outer wall comprises three functional units, a keel, an adjusting piece and a hanging piece, wherein a vertical main keel d is fixed on an outer wall e of a building, the vertical main keel d is a stainless steel square tube, a horizontal secondary keel 4 is fixed on the vertical main keel d, the horizontal secondary keel 4 is L-shaped stainless steel, the adjusting piece 3 is connected onto the horizontal secondary keel 4, the adjusting piece 3 can be adjusted forwards and backwards along the secondary keel 4 through a second adjusting bolt hole 3b and is fixed through a second bolt 5b, a hanging piece 2 is connected onto the adjusting piece 3, the main body of the hanging piece 2 can be adjusted upwards and downwards along a first adjusting bolt hole 3a and is finally fixed through a first bolt 5a, a plugging end 24 is arranged on the upper portion of the hanging piece 2, the plugging end 24 is inserted into a groove a position of a decorative plate f, a groove hole is filled with marble glue and is used for supporting the decorative plate on the upper portion, a limiting groove 21 is arranged on the lower portion of the hanging piece 2 and is used for fixing a hook and polishing treatment, a rough surface 11 is arranged on the hook 1 and a gap between the rough surface is filled with the limiting marble glue, and a gap between the limiting groove is smaller than a mounting groove, a gap filling glue filling groove 13, and a gap of the marble glue is used for completing a crack mounting process after the marble glue filling.
The installation sequence of each functional unit of the outer wall decorative plate dry-hanging structure of this embodiment is as follows: 1) and building a scaffold: and a scaffold is erected in the area for dry hanging, and a movable scaffold can be adopted if the area is small. 2) And cleaning: the outer wall of the building is cleaned, and particularly, the wall surface of the arrangement position of the main keel is noticed. 3) And measuring and paying off: and (3) placing a vertical line, positioning the installation position of the main keel, placing a horizontal line, positioning the installation position of the secondary keel, and determining the interval between the secondary keels according to the size of the plate. 4) And punching: according to dalle length size punch on the secondary joist for the installation regulating part, or punch the secondary joist in the mill according to predetermined interval. 5) And installing a keel: fixing a steel plate on a wall surface by using chemical bolts, welding the main keel on the steel plate, punching the main keel at a place where the main keel and the secondary keel are not in contact preferably, fixing the main keel on the wall surface by directly using the chemical bolts, and performing anti-corrosion treatment on the chemical bolts; and after the main keel is installed, the secondary keel is fixed on the main keel by adopting a welding method. Preferably, for the fabricated building outer wall, the secondary joist can be directly fixed on the outer wall by using bolts or other methods due to better flatness. 6) And installing an adjusting piece: the regulating part adopts the bolt to install in the trompil position department of secondary joist, and the regulating part has the degree of freedom of two directions, and secondary joist has confirmed a degree of freedom according to panel size promptly trompil interval in advance, and then realizes the regulation of each hanging point spatial position of panel, guarantees that the panel surface after accomplishing has higher roughness. 7) And mounting the plate: vertical grooves or chutes are formed in each lifting point of the plate according to the situation, the number of the lifting points is determined according to the weight and the area of the plate, the embodiment takes two lifting points as an example, the tail part of the hook is fixed in the two lifting points at the upper part of the plate by using marble glue, when the marble glue is coated, the tail part of the hook and the chutes are ensured to be free of other pollutants, and the glue is solidified; connecting the pendant main body to the adjusting piece by adopting a bolt; coating marble glue in a pre-groove at the lower part of the plate, inserting the lower part of the hanging piece, coating marble glue in the head part of the hook and the groove of the hanging piece, and rotating the plate along the connecting line of the groove at the lower part of the plate as a central line until the hook is clamped in the groove. 8) And a sealing interface: and pasting a wrinkle adhesive tape around each plate, adopting a structural adhesive to perform joint filling treatment on gaps between adjacent plates, tearing off the wrinkle adhesive tape after the structural adhesive is solidified, cleaning the surfaces of the plates, and dismantling the scaffold. 9) And at this point, the installation of a single plate is finished, and the other plates are similarly installed.
Preferably, in the concrete implementation engineering, the installation sequence of the plates can be carried out according to the actual situation on site, and the engineering with time tight and heavy tasks can be constructed in sections. And (3) directly cleaning the damaged plate and residual glue on the hanging piece by using an angle grinder under the condition that the damage of the single plate is found at the later stage, and installing again according to the implementation steps.
Claims (6)
1. A building outer wall dry hanging device comprises a building outer wall (e), and is characterized in that a vertical main keel (d) is fixed on the building outer wall (e), a horizontal secondary keel (4) is fixed on the vertical main keel (d), the horizontal secondary keel (4) is L-shaped stainless steel, an adjusting piece (3) is connected onto the horizontal secondary keel (4), a hanging piece (2) is connected onto the adjusting piece (3) in a bolted mode, the upper portion of the main body of the hanging piece (2) is inserted into a groove (a) of a decorative plate (f) and fixed through marble glue, the tail portion of a hook (1) at the lower portion of the main body of the hanging piece (2) tilts, and the tilting portion is inserted into the groove (a) of the decorative plate (f) and fixed through marble glue.
2. The exterior wall dry hanging device for the building as claimed in claim 1, wherein: the adjusting piece (3) can be adjusted in position back and forth along the secondary keel (4) through a second adjusting bolt hole (3b) and is fixed through a second bolt (5 b); the hanger (2) is connected to the adjusting piece (3), and the hanger (2) main body can be adjusted up and down along the first adjusting bolt hole (3a) and is finally fixed through the first bolt (5 a).
3. The exterior wall dry hanging device for the building as claimed in claim 1, wherein: the upper part of the hanging piece (2) is provided with an inserting end (24), the inserting end (24) is inserted into the pre-groove (b) of the decorative plate, the groove hole is filled with marble glue and used for supporting the decorative plate on the upper part, the lower part of the hanging piece (2) is provided with a limiting groove and tongue (21) which is used for fixing a hook, and the groove and tongue are internally roughened.
4. The exterior wall dry hanging device for the building as claimed in claim 1, wherein: the hook (1) is provided with a rough surface (11) for increasing the contact surface with the limiting rabbet (21), and the rough surface (11) and the limiting rabbet (21) are filled with marble glue; the tail end (13) of the hook is tilted at an angle of not less than 30 degrees, the tilted part is inserted into the pre-groove (b) of the decorative plate, and the groove hole is filled with marble glue.
5. The exterior wall dry hanging device for the building as claimed in claim 1, wherein: and (c) performing gap filling treatment on the mounted plate gaps by using structural adhesive.
6. The exterior wall dry hanging device for the building as claimed in claim 1, wherein: the vertical main keel (d) is a stainless steel square tube.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921338942.5U CN211172853U (en) | 2019-08-19 | 2019-08-19 | Outer wall dry-hanging device for building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921338942.5U CN211172853U (en) | 2019-08-19 | 2019-08-19 | Outer wall dry-hanging device for building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211172853U true CN211172853U (en) | 2020-08-04 |
Family
ID=71805321
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921338942.5U Expired - Fee Related CN211172853U (en) | 2019-08-19 | 2019-08-19 | Outer wall dry-hanging device for building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211172853U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110629957A (en) * | 2019-08-19 | 2019-12-31 | 江苏大学 | Outer wall dry-hanging device for building |
CN112282260B (en) * | 2020-09-28 | 2022-02-15 | 北京珠穆朗玛绿色建筑科技有限公司 | Dry hanging connection system for building decorative plate and construction method |
WO2024192514A1 (en) * | 2023-03-21 | 2024-09-26 | Pangaea Natural Stone Inc. | Anchorage system with locking mechanism for grooved cladding |
-
2019
- 2019-08-19 CN CN201921338942.5U patent/CN211172853U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110629957A (en) * | 2019-08-19 | 2019-12-31 | 江苏大学 | Outer wall dry-hanging device for building |
CN112282260B (en) * | 2020-09-28 | 2022-02-15 | 北京珠穆朗玛绿色建筑科技有限公司 | Dry hanging connection system for building decorative plate and construction method |
WO2024192514A1 (en) * | 2023-03-21 | 2024-09-26 | Pangaea Natural Stone Inc. | Anchorage system with locking mechanism for grooved cladding |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211172853U (en) | Outer wall dry-hanging device for building | |
CN101956438B (en) | Three-dimensionally adjustable disconnectable curtain wall connecting device and construction method thereof | |
CN110847350B (en) | Keel-free suspended ceiling structure and construction method thereof | |
CN111075091A (en) | Mounting structure of prefabricated grade furred ceiling light groove of falling of assembled | |
CN205444780U (en) | General system of hanging futilely of wall of interchangeable surface course material | |
CN111305448A (en) | Suspended ceiling for engineering construction | |
CN217580989U (en) | Assembled built-in integral bathroom structure | |
CN208039707U (en) | Building decoration Metal wall mounting device | |
CN110629957A (en) | Outer wall dry-hanging device for building | |
CN104649121B (en) | A kind of adjustable clamp of lifting in airduct | |
CN110056115B (en) | Using method of ceiling assembled metal keel structure | |
CN103967188A (en) | Special-shaped sculpture modeling ceiling assembled type installation structure | |
CN111851821B (en) | Installation method of dry hanging panel | |
CN113882565B (en) | Assembly type unit ceramic brick dry-hanging curtain wall system and construction method thereof | |
CN212427881U (en) | Wall surface hanging integral external corner system | |
CN210067191U (en) | Assembled aluminum plate wall | |
CN210239018U (en) | Wall brick mounting structure | |
CN205894577U (en) | Bulky heavy stone material flip -chip structure | |
CN112814323B (en) | Integrated combined hanging piece | |
CN203066416U (en) | Splayed stone/tile dry hanging piece | |
CN205776940U (en) | A kind of without Os Draconis light steel fastener direct hanging type Back-tied stone curtain wall | |
CN108360784B (en) | Assembled indoor dry-hanging wall brick and construction method thereof | |
CN207436443U (en) | A kind of edge closing bar and floor tile receive side structure | |
CN113585657B (en) | BIM-based dry-hanging clay brick external facing installation structure and installation method | |
CN221031085U (en) | Wall surface hanging piece for building material |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200804 Termination date: 20210819 |