CN210888040U - Concrete building template for building - Google Patents
Concrete building template for building Download PDFInfo
- Publication number
- CN210888040U CN210888040U CN201921768064.0U CN201921768064U CN210888040U CN 210888040 U CN210888040 U CN 210888040U CN 201921768064 U CN201921768064 U CN 201921768064U CN 210888040 U CN210888040 U CN 210888040U
- Authority
- CN
- China
- Prior art keywords
- template
- floor
- building
- climbing frame
- wall body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a concrete building templates for building, including the building, the building includes wall body, floor and support column, and floor and support column all set up the one side at the wall body, the support column sets up the one side at the floor, the upper end of floor is provided with the building templates, the building templates includes floor template, supporting template, interior climbing frame and outer climbing frame, and floor template and supporting template all set up the upper end at the floor, the supporting template sets up the lower extreme at floor template. The utility model has the advantages that: the building templates that set up climbs the frame by floor template, supporting template, interior and climbs the frame outward and constitute and component as an organic whole to staff need not set up outer scaffold frame in addition in the use, and set up the third and promoted chain block and can be convenient for the staff and promote whole template outside climbing on the frame, do not need tower crane handling to promote, make this concrete building templates's use experience better.
Description
Technical Field
The utility model relates to a concrete building template specifically is a concrete building template for building, belongs to concrete building template application technical field.
Background
The concrete building template is a temporary supporting structure, the concrete building template is manufactured according to design requirements, the concrete structure is made, components are formed according to specified positions and geometric dimensions to keep correct positions of the components and bear dead weights of the building template and external loads acting on the building template, building templates built by different buildings are different, the template built by workers at present and a scaffold are separated, the template and the scaffold are required to be separately built, meanwhile, when the template is lifted, the scaffold is required to be built again to improve the height of the scaffold, inconvenience is brought to the workers, and hoisting and lifting are required to be carried out by means of a tower crane in the process of lifting the template and the scaffold, and the concrete building template is troublesome.
SUMMERY OF THE UTILITY MODEL
The purpose of the utility model can be realized by the following technical scheme: the utility model provides a concrete building templates for building, includes the building, the building includes wall body, floor and support column, and floor and support column all set up the one side at the wall body, the support column sets up the one side at the floor, the upper end of floor is provided with building templates, building templates includes floor template, supporting template, interior climbing frame and outer climbing frame, and floor template and supporting template all set up the upper end at the floor, supporting template sets up the lower extreme at floor template, and the interior climbing sets up the one side of setting at floor template.
Preferably, the inner climbing frame is arranged on the inner side of the wall body, and the outer climbing frame is arranged on the outer side of the wall body.
Preferably, one side of the inner climbing frame close to the wall body is provided with an inner climbing template, and a first lifting chain block is arranged between the inner climbing template and the inner climbing frame.
Preferably, one side of the outer climbing frame close to the wall body is provided with an outer climbing template, and a second lifting chain block is arranged between the outer climbing template and the outer climbing frame.
Preferably, the outer surface of the outer climbing frame is provided with a third lifting chain block.
Preferably, the bolt hole has been seted up to the position that one side surface of climbing the frame outward is close to the below, the preformed hole has been seted up to the position that the inside of wall body is close to the below, and bolt hole and preformed hole communicate each other, the bolt hole runs through with the inside in preformed hole and is provided with the bolt.
Preferably, the number of preformed holes is a plurality of groups, and the preformed holes all are the equidistance and set up in the inside of wall body.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the building template is used for the building of a high-rise house, the template consists of a floor template, a supporting template, an inner climbing frame and an outer climbing frame, and the inner climbing frame, the outer climbing frame and the floor template and the supporting template are integrated members, so that a worker does not need to additionally set up an outer scaffold in the use process, simultaneously the inner climbing frame and the outer climbing frame can be simultaneously lifted when the floor template and the supporting template are lifted along with the building height of a floor, the convenience is better, a third lifting chain block is arranged on the outer climbing frame, the worker can conveniently lift the whole template, the outer climbing frame is connected with a lifting hook of the third lifting chain block, then the third lifting chain block is arranged on a built wall surface, and then the outer climbing frame can be lifted by pulling a pull ring of the third lifting chain block, because the inner climbing frame, the outer climbing frame, the floor template and the supporting template are integrated members, therefore, the whole building template can be lifted upwards, and a tower crane is not needed to hoist the lifting template, so that the building template is more convenient to use.
Drawings
In order to facilitate understanding for those skilled in the art, the present invention will be further described with reference to the accompanying drawings.
Fig. 1 is a schematic view of the overall structure of the present invention.
In the figure: 1. building a template; 101. a floor template; 102. supporting the template; 103. an inner climbing frame; 1031. a first hoisting chain block; 104. internally climbing a template; 105. an outer climbing frame; 1051. a second lifting chain block; 1052. thirdly, lifting the chain block; 1053. bolt holes; 106. climbing out a template; 2. building a building; 201. a wall body; 202. a floor slab; 203. a support pillar; 204. reserving a hole; 3. and (4) bolts.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the following embodiments, and it should be understood that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1, a concrete building formwork for building includes a building 2, the building 2 includes a wall 201, a floor 202 and a support column 203, the floor 202 and the support column 203 are both disposed on one side of the wall 201, the support column 203 is disposed on one side of the floor 202, a building formwork 1 is disposed on an upper end of the floor 202, the building formwork 1 includes a floor formwork 101, a support formwork 102, an inner climbing frame 103 and an outer climbing frame 105, the floor formwork 101 and the support formwork 102 are both disposed on an upper end of the floor 202, the support formwork 102 is disposed on a lower end of the floor formwork 101, the inner climbing frame 103 is disposed on one side of the floor formwork 101, the outer climbing frame 105 is disposed on one side of the inner climbing frame 103, and the wall 201 is disposed between the outer climbing frame 105 and the inner climbing frame 103.
As the utility model discloses a technical optimization scheme, the frame 103 setting is climbed in the inboard of wall body 201 in, and climbs the outside of frame 105 setting at wall body 201 outward, and the constructor can stand and be under construction to the inboard of wall body 201 on climbing frame 103 including, stands and is under construction to the outside of wall body 201 on climbing frame 105 outward.
As a technical optimization scheme, one side that interior climbing frame 103 is close to wall body 201 is provided with interior climbing formwork 104, constructor piles up wall body 201 with the help of interior climbing formwork 104, guarantee the perpendicular effect that wall body 201 piles up, the condition of avoiding wall body 201 slope takes place, and be provided with first promotion chain block 1031 between the upper and lower of interior climbing formwork 104 and interior climbing frame 103, the lifting hook on first promotion chain block 1031 is connected with interior climbing formwork 104, the pull ring that constructor pulling on the first promotion chain block 1031 can follow wall body 201 highly promotes interior climbing formwork 104.
As a technical optimization scheme, one side that outer climbing frame 105 is close to wall body 201 is provided with outer climbing formwork 106, constructor piles up wall body 201 with the help of outer climbing formwork 106, guarantee the perpendicular effect that wall body 201 piles up, and outer climbing formwork 106 and outer climbing frame 105 be provided with the second between from top to bottom and promote chain block 1051, the second promotes the lifting hook on chain block 1051 and is connected with interior climbing formwork 104, constructor stimulates the pull ring that second promoted on the chain block 1051 and can follow wall body 201 highly promotes outer climbing formwork 106.
As a technical optimization scheme of the utility model, the surface of climbing frame 105 is provided with third promotion chain block 1052 outward.
As the utility model discloses a technical optimization scheme, the bolt hole 1053 has been seted up to the position that one side surface of outer climbing frame 105 is close to the below, and the inside of wall body 201 is close to the position of below and has been seted up preformed hole 204, and bolt hole 1053 and preformed hole 204 communicate each other, and bolt hole 1053 runs through with the inside of preformed hole 204 and is provided with bolt 3, screws into bolt hole 1053 and preformed hole 204 clockwise with bolt 3 and can fix outer climbing frame 105 and wall body 201.
As a technical optimization scheme of the utility model, the quantity of preformed hole 204 is a plurality of groups, and preformed hole 204 all is the equidistance and sets up in the inside of wall body 201, has all set up preformed hole 204 on the wall of each floor, will climb outside and can fix climbing frame 105 outside in can screwing into the preformed hole 204 of this floor with bolt 3 after frame 105 promotes a floor.
When the utility model is used, firstly, a constructor supports the building template 1 at the upper end of the built low floor, when the building template 1 is supported at the upper end of the built low floor, the floor template 101 and the supporting template 102 of the building template 1 are supported at the upper end of the floor 202, meanwhile, the inner climbing frame 103 is supported at the inner side of the wall 201, the outer climbing frame 105 is supported at the outer side of the wall 201, secondly, the constructor constructs a new floor 202 and a supporting column 203 through the floor template 101 and the supporting template 102, then the constructor stands on the inner climbing frame 103 to construct the inner side of the wall 201, stands on the outer climbing frame 105 to construct the outer side of the wall 201 to pile up the wall 201, in the process of piling up the wall 201, the constructor piles up the wall 201 by means of the inner climbing template 104 and the outer climbing template 106, ensures the vertical effect of piling up the wall 201, and piles up the wall 201 to a certain height at the same position, when a constructor pulls the pull ring on the first lifting chain block 1031 to lift the inner climbing formwork 104 along with the height of the wall body 201, pulls the pull ring on the second lifting chain block 1051 to lift the outer climbing formwork 106 along with the height of the wall body 201, and when the constructor finishes the construction of a floor and needs to lift the building formwork 1, firstly, the bolt 3 is unscrewed from the preformed hole 204 and the bolt hole 1053 of the floor counterclockwise, the outer climbing frame 105 is connected with the lifting hook of the third lifting chain block 1052, then the third lifting chain block 1052 is installed on the constructed wall surface, and then the outer climbing frame 105 can be lifted by pulling the pull ring of the third lifting chain block 1052, since the inner climbing frame 103 and the outer climbing frame 105 and the floor formwork 101 and the supporting formwork 102 are an integral member, therefore, the whole building template 1 can be lifted upwards, and after the building template 1 is lifted by one floor, the bolt 3 is screwed into the preformed hole 204 of the floor to fix the outer climbing frame 105.
The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments are not exhaustive and do not limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, to thereby enable others skilled in the art to best understand the invention for and utilize the invention. The present invention is limited only by the claims and their full scope and equivalents.
Claims (7)
1. A concrete building template for building comprises a building (2) and is characterized in that the building (2) comprises a wall body (201), a floor slab (202) and supporting columns (203), the floor slab (202) and the supporting columns (203) are arranged on one side of the wall body (201), the supporting columns (203) are arranged on one side of the floor slab (202), and a building template (1) is arranged at the upper ends of the floor slab (202);
building templates (1) include floor template (101), supporting template (102), interior climbing frame (103) and outer climbing frame (105), and floor template (101) and supporting template (102) all set up the upper end at floor (202), supporting template (102) set up the lower extreme at floor template (101), and interior climbing frame (103) set up the one side at floor template (101).
2. A concrete building formwork for construction according to claim 1, wherein the inner climbing frame (103) is provided on the inner side of the wall body (201), and the outer climbing frame (105) is provided on the outer side of the wall body (201).
3. The concrete building template for the building according to claim 1, wherein an inner climbing template (104) is arranged on one side of the inner climbing frame (103) close to the wall body (201), and a first lifting chain block (1031) is arranged between the inner climbing template (104) and the inner climbing frame (103) from top to bottom.
4. The concrete building template for building according to claim 1, wherein an outer climbing template (106) is arranged on one side of the outer climbing frame (105) close to the wall body (201), and a second lifting chain block (1051) is arranged between the outer climbing template (106) and the upper part and the lower part of the outer climbing frame (105).
5. A concrete building formwork for construction according to claim 1, wherein the outer surface of the outer climbing frame (105) is provided with a third lifting chain block (1052).
6. The concrete building template for buildings according to claim 1, wherein a bolt hole (1053) is formed in a position close to the lower part of the outer surface of one side of the outer climbing frame (105), a reserved hole (204) is formed in a position close to the lower part of the inside of the wall body (201), the bolt hole (1053) is communicated with the reserved hole (204), and a bolt (3) penetrates through the bolt hole (1053) and the reserved hole (204).
7. The concrete building template for building as claimed in claim 6, wherein the number of the prepared holes (204) is several groups, and the prepared holes (204) are all equidistantly arranged inside the wall body (201).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921768064.0U CN210888040U (en) | 2019-10-21 | 2019-10-21 | Concrete building template for building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921768064.0U CN210888040U (en) | 2019-10-21 | 2019-10-21 | Concrete building template for building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210888040U true CN210888040U (en) | 2020-06-30 |
Family
ID=71312708
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921768064.0U Expired - Fee Related CN210888040U (en) | 2019-10-21 | 2019-10-21 | Concrete building template for building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210888040U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114439223A (en) * | 2022-02-17 | 2022-05-06 | 中铁一局集团建筑安装工程有限公司 | Foldable formwork for high-rise eaves and high-rise eaves construction method |
-
2019
- 2019-10-21 CN CN201921768064.0U patent/CN210888040U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114439223A (en) * | 2022-02-17 | 2022-05-06 | 中铁一局集团建筑安装工程有限公司 | Foldable formwork for high-rise eaves and high-rise eaves construction method |
CN114439223B (en) * | 2022-02-17 | 2023-09-08 | 中铁一局集团建筑安装工程有限公司 | Foldable template for high-rise eave and high-rise eave construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106437130A (en) | Inner roof external climbing type formwork construction platform for super high-rise building construction | |
CN105201195A (en) | Liftable supporting leg type elevator shaft construction platform and method | |
CN202850498U (en) | Hydraulic support system used for elevator shaft mold | |
CN206233541U (en) | A kind of interior top external climbing mould bases operation platform for construction of super highrise building | |
CN205296803U (en) | Elevator automatic lifting operation panel | |
CN210888040U (en) | Concrete building template for building | |
CN205955160U (en) | Antiskid lattice formula elevartor shaft removes operation platform | |
CN209467471U (en) | A kind of superimposed sheet pile pallet of sectional | |
CN202577925U (en) | Lifting type platform in elevator shaft | |
CN202441045U (en) | Rail-type electric attached lifting scaffold | |
CN203547125U (en) | Column type overall steel platform hydraulic creeping formwork | |
CN206769351U (en) | A kind of regularization hoistway operation platform hoisting frame | |
CN202380721U (en) | Hydraulic self-elevating climbing system | |
CN205955171U (en) | Fall to ground scaffold collet device | |
CN204456816U (en) | One can promote supporting leg type elevator hoistway construction platform | |
CN216810895U (en) | Elevator shaft operation platform | |
CN213979843U (en) | Prefabricated staircase safety operation platform of assembled structure | |
CN215291319U (en) | Multi-point elevator shaft construction lifting platform | |
CN206397107U (en) | Armored concrete construction of lift well operating platform bracket | |
CN107642241A (en) | The stress supporting construction and construction method of a kind of prefabricated balcony | |
CN208684250U (en) | One kind being based on the quick detachable boom hoisting of major structure of construction | |
CN204754150U (en) | Dish -type node formula scaffold | |
CN215717318U (en) | Climbing formula cloth machine protection platform | |
CN209760761U (en) | Construction platform and elevator core section of thick bamboo construction structures in a core section of thick bamboo | |
CN218623600U (en) | 5G roof television microwave signal tower lifting installation structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200630 Termination date: 20211021 |