CN210198672U - An artificial watershed suitable for studying the relationship between rainfall and stratified runoff - Google Patents

An artificial watershed suitable for studying the relationship between rainfall and stratified runoff Download PDF

Info

Publication number
CN210198672U
CN210198672U CN201920730713.1U CN201920730713U CN210198672U CN 210198672 U CN210198672 U CN 210198672U CN 201920730713 U CN201920730713 U CN 201920730713U CN 210198672 U CN210198672 U CN 210198672U
Authority
CN
China
Prior art keywords
rainfall
watershed
artificial
runoff
collecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920730713.1U
Other languages
Chinese (zh)
Inventor
Weizu Gu
顾慰祖
jiufu Liu
刘九夫
Aimin Liao
廖爱民
Jianyun Zhang
张建云
Niu Wang
王妞
Jiaju Lu
陆家驹
Tao Ma
马涛
Hongwei Liu
刘宏伟
Hao Zheng
郑皓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Original Assignee
Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources filed Critical Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Priority to CN201920730713.1U priority Critical patent/CN210198672U/en
Application granted granted Critical
Publication of CN210198672U publication Critical patent/CN210198672U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model relates to an artificial drainage basin, especially the artificial drainage basin who is fit for studying rainfall-layering runoff relation, including the triplex: the artificial watershed comprises a main body part, an input part and an output part. The main body part comprises a watershed boundary (1), an experimental soil body (2), a longitudinal collecting ditch (3) and a transverse collecting ditch (4); the input part comprises an artificial rainfall system and a measuring station network. The output part refers to an observation chamber (7) of the artificial watershed, and layered flow measurement weirs (9) are arranged according to the number of the flow collection grooves and are provided with water sample collection points of the system. For the research of utilizing natural experiment basin rainfall-layering runoff relation in the traditional meaning, the utility model discloses can be at tripartite precision measurement hydrology key element such as input, output and internal variable to analyze the isotopic composition and the water chemistry index of water sample, utilize the tracer effect of these indexes to study basin hydrology mechanism.

Description

Artificial drainage basin suitable for researching rainfall-stratified runoff relation
Technical Field
The utility model relates to an artificial drainage basin, especially the artificial drainage basin who is fit for studying rainfall-layering runoff relation belongs to hydrology experiment technical field.
Background
The rainfall-runoff relation is a basic problem in hydrology and hydrology experiments and is also the main content of hydrology simulation. At present, the rainfall-runoff relation of a drainage basin is researched, basically, rainfall is measured to serve as an input variable of the drainage basin, total runoff is measured to serve as an output variable of the drainage basin at an outlet section of the drainage basin, the rainfall-runoff relation of the drainage basin is researched in a black box type mode, the water motion rule inside the drainage basin cannot be deeply disclosed, and new theoretical support cannot be provided for development of hydrological models and hydrology. Therefore, a brand-new hydrological experimental facility is necessary to be designed and constructed to study the rainfall-runoff relation of the drainage basin, a new method, new data and a new theory are provided for the development of hydrological models and hydrology, and the method has important scientific significance and application value.
SUMMERY OF THE UTILITY MODEL
The utility model provides a technical problem be: an artificial drainage basin is constructed, the input quantity, the output quantity and the internal variable of the drainage basin are comprehensively obtained, and the artificial drainage basin is used for researching the rainfall-layered runoff relation of the drainage basin.
In order to solve the technical problem, the utility model provides a technical scheme is: an artificial drainage basin suitable for researching rainfall-stratified runoff relation is designed and constructed, and comprises three parts: the artificial watershed comprises a main body part, an input part and an output part.
The main body part comprises a basin boundary (1), an experimental soil body (2), a longitudinal collecting ditch (3) and a transverse collecting ditch (4). The basin boundary (1) is formed by constructing a water-resisting boundary by using concrete from an upstream boundary, two side boundaries and a bottom boundary, the shape of the peripheral boundary is a natural basin boundary such as a leaf shape, a fan shape and the like, regular boundaries such as a rectangle and the like are not adopted, and the basin area is 100-10000 m-2Within the range; the bottom boundary is divided into two pieces by a middle line, and the two pieces are collected at the middle line by an inclination angle of 5-20 degrees; the lower boundary has a longitudinal inclination of 5-20 degrees from upstream to downstream of the basin. The area above the longitudinal collecting ditch is not ditched and is used as an independent flow generating area, namely a ditch-free area. And in the boundary (1) of the flow field, filling soil with the thickness of 1-5 m as an experimental soil body (2) in a layered manner. Excavating a longitudinal flow collecting ditch (3) with the width of 30-100cm in the center of an experimental soil body, arranging transverse flow collecting ditches (4) at the outlet boundary of a flow field, and erecting a plurality of layers of flow collecting ditches in the ditches at intervals of 30-60cm, wherein each layer of flow collecting ditches comprises a layer of flow collecting ditch (25) for directly collecting rainfall, a layer of flow collecting ditch (26) for collecting surface runoff and a plurality of layers of flow collecting ditches (27) for collecting subsurface runoff. Layered panels (21) with the length of 10-20cm on two sides of the collecting groove are directly cut into the experimental soil body (2) and are used for separating runoff generated by different layers of soil.
The water-proof bottom plate of the watershed boundary (1) is built on a hard foundation rock surface, and soil and a weathered layer above the foundation rock surface are removed before construction.
The material of the flow collecting groove (25) for directly collecting rainfall, the material of the flow collecting groove (26) for collecting surface runoff, the material of the flow collecting grooves (27) for collecting subsurface runoff and the material of the flat plates (21) on the two sides of the flow collecting groove (27) for collecting subsurface runoff are 304 stainless steel plates, and the thickness of the stainless steel plates is 2-5 mm.
A reverse filtering quartz sand layer (24) is arranged among the longitudinal collecting ditch (3), the transverse collecting ditch (4) and the experimental soil body (2), so that the produced flow in the soil body can smoothly enter the collecting ditch, and soil loss is prevented. The interface between the reverse-filtering quartz sand layer (24) and the experimental soil body (2) is separated by a nylon net (23), and the reverse-filtering quartz sand layer is separated from the longitudinal collecting ditch (3) and the transverse collecting ditch (4) by a stainless steel net (22). The width of the reverse filtering quartz sand layer is 10-20cm, the half part close to the nylon net (23) is fine sand (the diameter is 0.5-1mm), and the half part close to the stainless steel net (22) is coarse sand (the diameter is 1-2 mm).
The experimental soil body (2) is provided with a soil moisture profile tachymeter (16) to monitor the change of the soil moisture content; an underground water well (15) is arranged, a pressure type water level meter is arranged in the underground water well to monitor the underground water level, and meanwhile, a water suction pipe is preset to be used for extracting an underground water sample; a transmitter (19) and a receiver (20) of a large-aperture or small-aperture scintillator are respectively arranged at two points outside the drainage basin to monitor the evapotranspiration amount of the drainage basin; argil heads (17) are embedded at different depths of an experimental soil body in the flow field and are used for extracting a soil water sample.
The input part comprises an artificial rainfall system and a measuring station network. The artificial rainfall system comprises a plurality of movable travelling crane nozzle groups (5), the arrangement quantity is determined according to the condition that the whole artificial drainage basin can be covered, and the controllable rainfall intensity of the artificial rainfall system is within the range of 6-240 mm/h. When an artificial rainfall experiment needs to be performed, the artificial rainfall system is moved to the artificial drainage basin through the travelling track (6); when the artificial rainfall experiment is not performed, the artificial rainfall system is moved out of the artificial flow area so as to avoid influencing the measurement of the natural rainfall. The rain gauge station network is provided with enough rain gauges (18) according to the area and the shape of the drainage basin, and the artificial rainfall and the natural rainfall are monitored in real time.
The rain gauge (12) can adopt a tipping bucket rain gauge or a weighing rain gauge to measure the rainfall process, and can also adopt a standard rain gauge to measure the total amount of rainfall in a field.
The output part refers to an observation chamber (7) of the artificial watershed, layered flow measurement weirs (9) are arranged in the observation chamber according to the number of the flow collection grooves, and the longitudinal flow collection grooves (3), the transverse flow collection grooves (4) and the flow measurement weirs (9) are connected through bent flow guide grooves (8). After passing through the layered runoff weir, each layered runoff is collected into a buffer pool (10), and a total runoff weir (11) is arranged at the outlet of the buffer pool.
The layered flow measuring weir (9) and the total runoff flow measuring weir (11) can adopt a triangular weir, a rectangular weir or a logarithmic weir and a combination thereof according to the flow.
And layered runoff sampling points (28) are distributed between the diversion trench (8) and the flow measurement weir (9) and are used for collecting layered runoff water samples.
The observation room (7) is provided with a rainfall sampler, which comprises a rain bearing device (12), a water storage bottle (13) and a connecting pipe (14) arranged between the rain bearing device and the water storage bottle.
Has the advantages that:
for the research of the rainfall-runoff relation of utilizing the natural experiment basin in the traditional meaning, the utility model discloses can be at tripartite accurate measurement hydrology key element such as input, output and internal variable: in the aspect of input variables, the total amount, process and distribution of natural rainfall or artificial rainfall input into the drainage basin can be accurately measured; in the aspect of output variables, surface runoff at an outlet of a drainage basin and subsurface runoff generated by soil at different depths can be monitored, wherein the layered runoff cannot be obtained by adopting a traditional total runoff measuring mode and structure), and the evapotranspiration of the surface; in the aspect of internal variables, the soil moisture content and the underground water level can be synchronously monitored.
The utility model discloses except the accurate measurement that can realize the water yield, still be equipped with the sampling equipment of rainfall, layering runoff, soil water and groundwater, can gather high time resolution's water sample at rainfall-runoff in-process, carry out the isotopic composition and the water chemistry index of analysis water sample, utilize the tracer effect of these indexes to study basin hydrology mechanism.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a cross-sectional view of the collecting channel of the present invention.
Fig. 3 is a schematic view of the design in the observation room of the present invention.
Fig. 4 is a diagram showing an example of rainfall process measured in a hydrographic mountain.
Fig. 5 is an example graph of a layered runoff process measured in a hydrographic mountain.
FIG. 6 is an example graph of the water chemistry ion process in stratified runoff measured in hydrographic mountains.
In the figure: 1-artificial watershed boundaries; 2-experimental soil body; 3-longitudinal collecting channels; 4-transverse collecting channels; 5-artificial rainfall traveling crane spray head group; 6-orbit; 7-observation room; 8-a diversion trench; 9-layered flow measurement weir; 10-a buffer pool; 11-total runoff measuring weir; 12-a rain bearing device; 13-a water collecting bottle; 14-a connecting tube; 15-underground water well; 16-soil moisture content profile tachymeter; 17-embedding clay heads; 18-a rain gauge; 19-a transmitter of a small aperture scintillator; 20-receiver of small aperture scintillation detector; 21-a layered panel of a launder; 22-stainless steel mesh; 23-nylon mesh; 24-reverse filtering the quartz sand; 25-a collecting groove for collecting rainfall, 26-a collecting groove for collecting surface runoff and 27-a collecting groove for collecting subsurface runoff; 28-stratified runoff sampling point
Detailed Description
The technical solution of the present invention will be further described in detail with reference to the accompanying drawings.
Example (b):
by adopting the technical scheme of the utility model, an artificial watershed-hydrology mountain experimental watershed (hereinafter referred to as 'hydrology mountain') suitable for researching rainfall-layered runoff relation is constructed in Chuzhou experimental base of Nanjing Water conservancy science research institute. The hydrology mountain is built near the exit of the flower mountain watershed in the west of Chuzhou city on a hill slope with an inclination angle of about 14 degrees (118 degrees 12 '34.68' E, 32 degrees 17 '25.75' N). Before the water wenshan is built, soil and weathered layers on the surface layer of a hillside are removed to expose a fresh rocky basement rock surface, then a bottom plate of the water wenshan is poured on the basement rock surface by using concrete and serves as an underwater isolation boundary, the longitudinal inclination angle of the bottom plate is 14 degrees, and two sides of the center line of the bottom plate are converged on the center line in an opposite mode by two slopes with the inclination angles of 10 degrees. Concrete is poured into the periphery of the water-proof side wall with the height of 130cm (except for the drainage basin outlet) of the water-proof mountain. Taking soil from nearby farmland, backfilling the soil layer by layer into the hydrological mountain, wherein the average thickness of the soil is about 100 cm. The slope surface area of the whole drainage basin is 512m2The projected area on the horizontal plane is 490m2
And excavating a collecting ditch with the width of about 40cm to the bottom plate at the center and the outlet of the drainage basin. Five layers of stainless steel collecting grooves with the width of 40cm are erected in the collecting grooves, and the uppermost layer is 5cm higher than the ground and is used for collecting rainfall; the second layer is flush with the ground, surface runoff is collected and recorded as RC; the stainless steel panels of the lower three layers of the collecting grooves are respectively cut into soil with the depth of 30cm, 60cm and 100cm, and the subsurface runoff generated by the soil layers with the depth of 0cm to 30cm, 30cm to 60cm and 60cm to 100cm is respectively collected and is respectively marked as R30, R60 and R100.
A mobile artificial rainfall system is erected above a drainage basin and comprises five groups of artificial rainfall traveling cranes, wherein each group of the traveling cranes is provided with 26 large, medium and small sprayers, and the total number of the sprayers is 390. The rainfall area formed by spraying is 656m2The whole water wenshan can be effectively covered. By controlling the opening and the pressure of the large, medium and small spray heads, the artificial rainfall with the rain intensity of 10-200mm/h can be manufactured.
And carrying out hydrological full factor (water quantity plus water quality) observation on the hydrological mountain. In the aspect of rainfall observation, 5 rain gauges and 12 rain gauges are installed, and the model of the rain gauge is JQH-2; the rain gauge adopts two 1mm tipping bucket rain gauges (JDZ10-1, Nanjing institute of Water conservancy Automation) and 3 0.1mm tipping bucket rain gauges (SL3-1, Shanghai weather instrumentation and plant), and the measurement time resolution is 1 minute. In the aspect of runoff observation, each layer of runoff is guided to the observation chamber through a connecting groove with the length of 6 meters between the artificial watershed and the observation chamber, and then the flow is measured by utilizing a triangular-logarithmic weir. The trough surface, the 30cm, the 60cm and the 100cm runoff were distributed from left to right in the observation room. In terms of soil moisture content observation, 31-section soil moisture content tacheometers (PR2, Delta, uk) were installed to measure soil moisture content at depths of 10, 20, 30, 40, 60 and 100 cm. In the aspect of underground water level observation, 22 steel pipes penetrating through a soil layer to a concrete bottom plate are arranged in a hydrological mountain area to serve as underground water wells, openings are formed in the bottoms of the steel pipes by 20cm, pressure type water level gauges (LEV01, ADCON, Austria) are installed in the underground water wells to monitor the underground water level, and data are sent to a base server through a remote measuring terminal. In the aspect of evapotranspiration observation, two sets of systems are adopted to measure the evapotranspiration and adopt a small-aperture scintillation spectrometer. In the aspect of water sample collection, the hydrographic mountain rainfall sampling can be through two kinds of modes water sample collection: firstly, the 'groove surface' of the uppermost layer of the layered radial-flow groove is used as a large-scale rain gauge to guide rainfall into an observation room for collection; and secondly, a rainfall sampler with the diameter of 40cm is installed on the top of the observation room, and rainfall is guided into the observation room through a pipeline to be collected. The hydrology mountain runoff sampling adopts the layering runoff sampling system, and the system can rapidly and synchronously collect runoff water samples of all layers. The water sample collection point is arranged in front of the flow measurement weir water tank, so that the influence of the old water in the water tank is avoided. 9, 12 and 10 argil heads are respectively buried in 15 cm, 45 cm and 85cm deep soil of the hydrographic mountains as soil water collecting points, after the hydrographic mountains are installed at an early stage, the water pumping effect is good, and in a later stage, because the argil heads are blocked, the water pumping effect is poor, the argil heads need to be distributed in an important mode. A hard air pipe with the inner diameter of 3mm and the outer diameter of 4mm is bundled on a pressure type water level gauge in 22 underground water wells to be used as an underground water sampling point. And arranging a negative pressure system on the side walls of two sides of the drainage basin to pump soil water and underground water into the sampling bottle.
From experimental data measured by hydrographic mountain devices, the following conclusions have been reached:
(1) rainfall was generally uniform in the hydrological mountain runoff area, which can be reflected by the distribution of rainfall of different magnitudes measured by 11 rain gauges, with a mean square error within 0.6mm (table 1), which had little effect on analyzing the rainfall-runoff relationship for rainfall above 20 mm. Therefore, the measurement requirement can be met by using 2 rain gauges (with the resolution of 0.1mm and 1mm) to measure the heavy rainfall process and then using 2 rain gauges to measure the rainfall from 8 points to 8 points. The reason for setting 2 rain gauges is to prevent the appearance of artificial gross errors.
TABLE 1 RECORDING TABLE FOR MEASURING FIELD AND SUSPENSION LEVEL OF RAIN MEASURER
Figure DEST_PATH_GDA0002325869070000051
Figure DEST_PATH_GDA0002325869070000061
(2) The triangular-logarithmic weir provided in the observation chamber can accurately measure the rainfall and stratified runoff processes (see fig. 4 and 5), and the change process of water chemical ions in runoff (see fig. 6). Under the condition that the rainfall is more than 25mm, the runoff proportions of the four layered runoff surface runoff of the hydrographic mountain, 0-30cm, 30-60cm and 60-100cm are respectively 35.3%, 17.7%, 13.6% and 33.4%. The ground runoff is the sum of the latter, and accounts for about 65%, which indicates that the ground runoff of the hydrological basin is dominant during heavy rain. The layered runoff results cannot be obtained by adopting the traditional total runoff measurement mode, and the hydrological process can be deeply known.

Claims (9)

1.一种适合研究降雨-分层径流关系的人工流域,其特征在于:全面获取流域的输入量、输出量和内部变量,用于研究流域的降雨-分层径流关系,包括三部分:人工流域的主体部分、输入部分和输出部分,所述的输入部分包括人工降雨系统和测量站网,所述的输出部分指人工流域的观测室(7),所述主体部分包括流域边界(1)、实验土体(2)、纵向集流沟(3)和横向集流沟(4);所述流域边界(1)由四周边界和底部边界构成,所述四周边界和底部边界都使用混凝土构建隔水边界,四周边界的形状为叶状或扇状自然流域边界,不采用矩形规则的边界,流域面积100-10000m2;底部边界以中线分两片,两片以5-20度的倾角汇集于中线;底部边界从流域上游向下游的纵向倾角在5-20度;在流域边界(1)内,分层回填1-5米厚的土壤作为实验土体(2);在实验土体(2)的中央开挖宽度为30-100cm的纵向集流沟(3),在纵向集流沟(3)以上区域未开沟,作为一个独立的产流区,即无沟区;在流域出口边界布设横向集流沟(4),在横向集流沟(4)中每隔30-60cm架设多层集流槽,包括一层直接收集降雨的集流槽(25)、一层收集地表径流的集流槽(26)和若干层收集地面下径流的集流槽(27);集流槽两侧为10-20cm的分层嵌板(21)直接切入实验土体(2)中,用于分隔不同层土壤产生的径流,在人工流域的观测室(7)内,根据集流槽的数目设置分层测流堰(9),纵向集流沟(3)、横向集流沟(4)和分层测流堰(9)之间由弯折的导流槽(8)连接;各分层径流经过分层测流堰(9)后,汇集到缓冲池(10),在缓冲池(10)的出口处设置总径流测流堰(11)。1. An artificial watershed suitable for studying the relationship between rainfall and stratified runoff is characterized in that: the input, output and internal variables of the watershed are comprehensively obtained, and the rainfall-stratified runoff relationship of the watershed is used to study, including three parts: artificial The main part, the input part and the output part of the watershed, the input part includes the artificial rainfall system and the network of measuring stations, the output part refers to the observation room (7) of the artificial watershed, and the main part includes the watershed boundary (1) , the experimental soil (2), the longitudinal collecting ditch (3) and the lateral collecting ditch (4); the watershed boundary (1) is composed of a surrounding boundary and a bottom boundary, and the surrounding boundary and the bottom boundary are both constructed with concrete Waterproof boundary, the shape of the surrounding boundary is leaf-like or fan-shaped natural watershed boundary, not using rectangular regular boundary, the watershed area is 100-10000m 2 ; Center line; the longitudinal inclination angle of the bottom boundary from upstream to downstream of the watershed is 5-20 degrees; within the watershed boundary (1), 1-5 m thick soil is backfilled in layers as the experimental soil body (2); in the experimental soil body (2) ) with a longitudinal collecting ditch (3) with a width of 30-100 cm in the center of the excavation, and no ditch is opened in the area above the longitudinal collecting ditch (3), as an independent flow-producing area, that is, a ditch-free area; at the outlet boundary of the watershed Lay horizontal collecting ditch (4), in the lateral collecting ditch (4), erect multi-layer collecting troughs every 30-60cm, including a layer of collecting troughs (25) for directly collecting rainfall, and a layer for collecting surface runoff. A collecting trough (26) and several layers of collecting troughs (27) for collecting subsurface runoff; the layered panels (21) with 10-20 cm on both sides of the collecting trough are directly cut into the experimental soil (2) for To separate the runoff generated by different layers of soil, in the observation room (7) of the artificial watershed, according to the number of collecting grooves, set up layered flow measuring weirs (9), vertical collecting ditch (3), and horizontal collecting ditch (4) It is connected with the stratified weir (9) by a bent diversion groove (8); after each stratified runoff passes through the stratified weir (9), it is collected into the buffer pool (10), and the runoff in the buffer pool ( A total runoff flow measuring weir (11) is arranged at the outlet of 10). 2.根据权利要求1所述的适合研究降雨-分层径流关系的人工流域,其特征在于:所述的实验土体(2)布设土壤水分剖面速测仪(16)来监测土壤含水率的变化;布设地下水井(15),在井内安装压力式水位计来监测地下水位,同时预设吸水管用于抽取地下水样;在流域外两点分别布设大孔径或小孔径闪烁仪的发射器(19)和接收器(20)来监测流域的蒸散发量;在流域内实验土体的不同深度预埋陶土头(17)用于抽取土壤水样。2. The artificial watershed suitable for studying rainfall-stratified runoff relationship according to claim 1, is characterized in that: described experimental soil body (2) is arranged with soil moisture profile speed measuring instrument (16) to monitor soil moisture content. change; laying groundwater wells (15), installing pressure-type water level meters in the wells to monitor groundwater levels, and preset suction pipes for taking groundwater samples; arranging large- or small-aperture scintillator transmitters at two points outside the watershed (19 ) and a receiver (20) to monitor the evapotranspiration in the watershed; clay heads (17) are pre-buried at different depths of the experimental soil body in the watershed for taking soil water samples. 3.根据权利要求1所述的适合研究降雨-分层径流关系的人工流域,其特征在于:所述流域边界(1)的隔水底板建设在坚硬的基岩面之上,建设之前应将基岩面之上的土壤和风化层去除。3. The artificial watershed suitable for studying the relationship between rainfall and stratified runoff according to claim 1 is characterized in that: the water-proof floor of the watershed boundary (1) is constructed on the hard bedrock surface, and the Soil and regolith removal above the bedrock face. 4.根据权利要求1所述的适合研究降雨-分层径流关系的人工流域,其特征在于:所述的直接收集降雨的集流槽(25)、收集地表径流的集流槽(26)、收集地面下径流的集流槽(27)及其两侧的分层嵌板(21)材质选用304不锈钢板,厚度为2-5mm。4. The artificial watershed suitable for studying the relationship between rainfall and stratified runoff according to claim 1, is characterized in that: the collecting trough (25) for directly collecting rainfall, the collecting trough (26) for collecting surface runoff, The collecting tank (27) for collecting the runoff under the ground and the layered panels (21) on both sides are made of 304 stainless steel plate with a thickness of 2-5mm. 5.根据权利要求1所述的适合研究降雨-分层径流关系的人工流域,其特征在于:纵向集流沟(3)和横向集流沟(4)与实验土体(2)之间设置反滤石英砂层(24),可以使土体内产流顺畅地进入到集流沟中,同时防止泥土流失;反滤石英砂层(24)与实验土体(2)之间的界面使用尼龙网(23)隔开,反滤石英砂层(24)与纵向集流沟(3)和横向集流沟(4)之间使用不锈钢网(22)分开;反滤石英砂层(24)宽度为10-20cm,在靠近尼龙网(23)一半为细砂,直径为0.5-1mm,靠近不锈钢网(22)的一半为粗砂,直径为1-2mm。5. The artificial watershed suitable for studying the relationship between rainfall and stratified runoff according to claim 1 is characterized in that: the vertical collecting ditch (3) and the lateral collecting ditch (4) and the experimental soil body (2) are arranged between The reverse filter quartz sand layer (24) can make the flow in the soil smoothly enter the collecting ditch and prevent soil loss at the same time; the interface between the reverse filter quartz sand layer (24) and the experimental soil (2) is made of nylon The mesh (23) is separated, and the quartz sand layer (24) for reverse filtering is separated from the vertical collecting ditch (3) and the horizontal collecting ditch (4) by a stainless steel mesh (22); the width of the reverse filtering quartz sand layer (24) The diameter is 10-20 cm, and the half near the nylon mesh (23) is fine sand with a diameter of 0.5-1 mm, and the half near the stainless steel mesh (22) is coarse sand with a diameter of 1-2 mm. 6.根据权利要求1所述的适合研究降雨-分层径流关系的人工流域,其特征在于:布设人工降雨系统和测量站网,人工降雨系统包括若干个可移动式的行车喷头组(5),布设的数量根据能保证能够覆盖整个人工流域来决定,人工降雨系统可控制的雨强在6-240mm/h范围内,在需要做人工降雨实验时,将人工降雨系统通过行车轨道(6)移动到人工流域上面;在不在人工降雨实验时,将人工降雨系统移动到人工流域外,以免影响天然降雨的测量,雨量计测量站网根据流域的面积和形状布设足够的雨量器(18),实时监测人工降雨和天然降雨。6. the artificial watershed suitable for researching rainfall-stratified runoff relationship according to claim 1, is characterized in that: laying artificial rainfall system and measuring station network, artificial rainfall system comprises several movable driving sprinkler groups (5) , the number of layouts is determined according to the ability to ensure that the entire artificial watershed can be covered. The rain intensity that can be controlled by the artificial rainfall system is within the range of 6-240mm/h. Move to the artificial watershed; when not in the artificial rainfall experiment, move the artificial rainfall system outside the artificial watershed to avoid affecting the measurement of natural rainfall. Real-time monitoring of artificial and natural rainfall. 7.根据权利要求1所述的适合研究降雨-分层径流关系的人工流域,其特征在于:分层测流堰(9)和总径流测流堰(11)可根据流量的大小采用三角堰、矩形堰或对数堰及它们的组合。7. The artificial watershed suitable for studying the relationship between rainfall and stratified runoff according to claim 1, is characterized in that: stratified weir (9) and total runoff measuring weir (11) can adopt triangular weir according to the size of flow , rectangular weirs or logarithmic weirs and their combinations. 8.根据权利要求1所述的适合研究降雨-分层径流关系的人工流域,其特征在于:不仅可利用直接收集降雨的集流槽(25)最上面一层可直接收集降雨,还可利用在观测室(7)上由承雨器(12)、储水瓶(13)以及二者间的连接管(14)构成的降雨采样器进行采集降雨。8. The artificial watershed suitable for studying the relationship between rainfall and stratified runoff according to claim 1 is characterized in that: not only can the uppermost layer of the collecting trough (25) for directly collecting rainfall be used to directly collect rainfall, but also On the observation room (7), a rainfall sampler composed of a rain catcher (12), a water storage bottle (13) and a connecting pipe (14) between them is used to collect rainfall. 9.根据权利要求1所述的适合研究降雨-分层径流关系的人工流域,其特征在于:所述的导流槽(8)和测流堰(9)之间布设分层径流采样点(28),用于收集分层径流水样。9. The artificial watershed suitable for studying the relationship between rainfall and stratified runoff according to claim 1, characterized in that: a stratified runoff sampling point ( 28), used to collect stratified runoff water samples.
CN201920730713.1U 2019-05-21 2019-05-21 An artificial watershed suitable for studying the relationship between rainfall and stratified runoff Active CN210198672U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920730713.1U CN210198672U (en) 2019-05-21 2019-05-21 An artificial watershed suitable for studying the relationship between rainfall and stratified runoff

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920730713.1U CN210198672U (en) 2019-05-21 2019-05-21 An artificial watershed suitable for studying the relationship between rainfall and stratified runoff

Publications (1)

Publication Number Publication Date
CN210198672U true CN210198672U (en) 2020-03-27

Family

ID=69875665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920730713.1U Active CN210198672U (en) 2019-05-21 2019-05-21 An artificial watershed suitable for studying the relationship between rainfall and stratified runoff

Country Status (1)

Country Link
CN (1) CN210198672U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110031183A (en) * 2019-05-21 2019-07-19 水利部交通运输部国家能源局南京水利科学研究院 A kind of suitable research artificial basin of rainfall-layering runoff relationship

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110031183A (en) * 2019-05-21 2019-07-19 水利部交通运输部国家能源局南京水利科学研究院 A kind of suitable research artificial basin of rainfall-layering runoff relationship
CN110031183B (en) * 2019-05-21 2024-02-13 水利部交通运输部国家能源局南京水利科学研究院 Artificial river basin suitable for researching rainfall-layered runoff relationship

Similar Documents

Publication Publication Date Title
CN102539642B (en) Simulation testing system of water circulation process under human activity disturbance conditions
CN110793964B (en) A field simulation test system for rainfall-induced soil landslides
CN107796926B (en) Device and method for failure simulation test of large-scale buried gas pipeline under landslide action
CN110047368B (en) Filling karst cave deposition and tunnel intermittent water and mud outburst integrated test device and method
CN113252876B (en) Rock-soil mass slope surface water movement simulation device with root stone structure and experiment method
CN109975518B (en) Physical test device and test method for simulating sandy soil debris flow
CN105786032B (en) A kind of trial zone level of ground water accuracy-control system and method
CN103063819A (en) Application method of indoor simulation device for migration and conversion of pollutant in artificial shore zone
CN103389260B (en) Pile foundation hinders the simulation laboratory test method of seepage action of ground water
CN114486683B (en) A test device for simulating pumping in foundation pits and recharging groundwater outside foundation pits
CN101713771A (en) Construction method of sloping surface runoff field
CN112302059B (en) Device for simulating foundation pit precipitation plane seepage and retaining wall deformation and use method
CN210198672U (en) An artificial watershed suitable for studying the relationship between rainfall and stratified runoff
CN110031183B (en) Artificial river basin suitable for researching rainfall-layered runoff relationship
CN101231185A (en) Construction method and structure of observation plots for soil and water loss on thin slopes
CN212083426U (en) Adjustable karst underground water and soil leakage simulator
CN204694307U (en) A kind of for orchard rainwash in site measurement minimum facility
CN205015318U (en) Domatic hydraulic budget field observation device
CN205581667U (en) Accurate controlling means of trial zone ground water level
CN211926964U (en) Automatic dynamic monitoring system for surface runoff and interflow of field natural slope
CN215641239U (en) An experimental device for water and soil surface and underground loss and leakage process in karst areas
CN113588913B (en) A physical test system and method for simulating disasters caused by underground space development
CN212133744U (en) Open-air nature sloping field surface runoff and interflow monitoring devices
CN204679292U (en) Construction and operation phase seepage field of tunnel model assay systems
CN207007837U (en) A kind of soil runoff observation subdistrict construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant