[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN218540682U - Constructional engineering pile device - Google Patents

Constructional engineering pile device Download PDF

Info

Publication number
CN218540682U
CN218540682U CN202222777874.0U CN202222777874U CN218540682U CN 218540682 U CN218540682 U CN 218540682U CN 202222777874 U CN202222777874 U CN 202222777874U CN 218540682 U CN218540682 U CN 218540682U
Authority
CN
China
Prior art keywords
motor
drilling
lifter plate
box
fixed mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222777874.0U
Other languages
Chinese (zh)
Inventor
肖兴鲁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Yanzhou Construction Corp
Original Assignee
Shandong Yanzhou Construction Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Yanzhou Construction Corp filed Critical Shandong Yanzhou Construction Corp
Priority to CN202222777874.0U priority Critical patent/CN218540682U/en
Application granted granted Critical
Publication of CN218540682U publication Critical patent/CN218540682U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a building engineering pile driver belongs to the building engineering field, including the box and articulate the chamber door in the box both sides, the both sides in the box are provided with drilling subassembly and pile pressing subassembly respectively, drilling subassembly includes first lifter plate, fixed mounting first motor and the drilling rod of fixed mounting at the first motor output on first lifter plate, pile pressing subassembly includes second lifter plate, fixed mounting second motor, the crank of fixed mounting at the second motor output, rotate the connecting rod of connecting in crank one end and articulate the briquetting at the connecting rod lower extreme at the second motor output on the second lifter plate bottom; through the setting of drilling subassembly and pile pressing subassembly, can make a device possess drilling and pile pressing function simultaneously, need not additionally to use pile pressing device again, through the setting of third motor, screw rod and guide arm, can carry out lift adjustment, convenient construction to drilling subassembly and pile pressing subassembly.

Description

Constructional engineering pile device
Technical Field
The utility model belongs to the technical field of building engineering, concretely relates to building engineering pile device.
Background
The building engineering refers to an engineering entity formed by the construction of various house buildings and their auxiliary facilities and the installation of lines, pipes and equipment matched with the buildings, and if the ground building is to be built on the ground, the ground is subject to a large pressure, so that the ground must have sufficient strength against the pressure, which is difficult to achieve, and the ground bearing the building must be reinforced or the ground bearing mode is improved, so that it is thought that piles are piled on the foundation, most of the weight of the building is transmitted to the ground through the piles, and the foundation of the building is firm.
The traditional Chinese patent with the publication number of CN214695614U discloses a construction engineering piling device, which comprises a supporting base, wherein a guide pipe is fixedly connected to the inner wall of the supporting base, a collecting box is movably connected to the outer wall of the guide pipe, a clamping block is fixedly connected to one side of the collecting box, a supporting block is fixedly connected to the top of the supporting base, a clamping block is fixedly connected to the top of the supporting block, a driving box is movably connected to the inner wall of the clamping block, a positioning block is fixedly connected to the inner wall of the driving box, and a driving motor is movably connected to the inner wall of the positioning block. The utility model discloses a drilling machine, including driving motor, coupling fixedly connected with drive shaft, the one end fixedly connected with connecting sleeve of drive shaft, the inner wall fixedly connected with threaded rod of connecting sleeve, the outer wall swing joint of threaded rod has the screwed pipe, the outer wall fixedly connected with backup pad of screwed pipe, the inner wall fixedly connected with of backup pad bores the motor, the output shaft that bores the motor passes through coupling fixedly connected with drilling shaft, the one end fixedly connected with drilling rod of drilling shaft.
In view of the above-mentioned related art, the inventors found that at least the following problems exist in the art: drilling and pile pressing are independent devices, and after drilling, a pile body needs to be driven into a pile hole by using a pile pressing device again, so that the function of the device is single.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building engineering pile device to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building engineering pile driving device, includes the box and articulates the chamber door in the box both sides, the inside both sides of box are provided with drilling subassembly and pressure stake subassembly respectively, drilling subassembly includes first lifter plate, fixed mounting first motor and the drilling rod of fixed mounting at first motor output on first lifter plate, it includes second lifter plate, fixed mounting second motor, the fixed mounting of fixed mounting in second lifter plate bottom at second motor output crank, rotates the connecting rod of connecting in crank one end and articulate the briquetting at the connecting rod lower extreme, the equal fixed mounting in both sides at box top has the third motor, the output fixedly connected with screw rod of third motor, the screw rod rotates to be installed in the box, first lifter plate and second lifter plate are the screw thread respectively cup joints on two screw rods.
As a preferred embodiment, a limiting rod is fixedly mounted at the bottom of the second lifting plate, and the pressing block is slidably sleeved on the limiting rod.
As a preferred embodiment, a guide rod is fixedly installed at one side of the screw rod inside the box body, and the first lifting plate and the second lifting plate are both slidably sleeved on the guide rod.
In a preferred embodiment, the bottom of the box body is provided with a first through hole below the drilling assembly.
In a preferred embodiment, the bottom of the box body is provided with a second through hole below the pile pressing assembly.
In a preferred embodiment, the four corners of the bottom of the box body are provided with walking wheels.
Compared with the prior art, the beneficial effects of the utility model are that:
according to the pile driving device for the building engineering, through the arrangement of the drilling component and the pile pressing component, one device has the functions of drilling and pile pressing at the same time, and the pile pressing device does not need to be additionally used, so that the construction is convenient;
this building engineering pile device through the setting of third motor, screw rod and guide arm, can start the third motor and drive the screw rod and rotate, makes the screw rod drive first lifter plate and second lifter plate along the vertical motion of guide arm to can carry out lift adjustment to drilling subassembly and pile pressing subassembly.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic structural view of the door of the present invention when opened;
fig. 3 is a schematic structural view of the pile pressing assembly of the present invention.
In the figure: 1. a box body; 2. a box door; 3. a first lifter plate; 4. a first motor; 5. drilling a rod; 6. a second lifter plate; 7. a second motor; 8. a crank; 9. a connecting rod; 10. briquetting; 11. a third motor; 12. a screw; 13. a limiting rod; 14. a guide bar; 15. a first through hole; 16. a second through hole; 17. and (5) traveling wheels.
Detailed Description
The present invention will be further described with reference to the following examples.
The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention. The condition in the embodiment can be further adjusted according to concrete condition the utility model discloses a it is right under the design prerequisite the utility model discloses a simple improvement of method all belongs to the utility model discloses the scope of claiming.
Referring to fig. 1-3, the utility model provides a building engineering pile driver, including box 1 and the chamber door 2 that articulates in box 1 both sides, walking wheel 17 is all installed to the four corners department of box 1 bottom, through the setting of walking wheel 17, conveniently removes the device. The drilling assembly and the pile pressing assembly are arranged on two sides of the interior of the box body 1 respectively, the first through hole 15 is formed in the position, below the drilling assembly, of the bottom of the box body 1, the second through hole 16 is formed in the position, below the pile pressing assembly, of the bottom of the box body 1, the device can have the drilling and pile pressing functions simultaneously through the drilling assembly and the pile pressing assembly, the pile pressing device does not need to be additionally used, and construction is facilitated.
The drilling assembly comprises a first lifting plate 3, a first motor 4 fixedly mounted on the first lifting plate 3 and a drill rod 5 fixedly mounted at the output end of the first motor 4, and the first motor 4 can be started to drive the drill rod 5 to rotate through the arrangement of the first lifting plate 3, the first motor 4 and the drill rod 5, so that the drill rod 5 drills in the ground.
The pile pressing assembly comprises a second lifting plate 6, a second motor 7 fixedly installed at the bottom of the second lifting plate 6, a crank 8 fixedly installed at the output end of the second motor 7, a connecting rod 9 rotatably connected to one end of the crank 8 and a pressing block 10 hinged to the lower end of the connecting rod 9 are connected, the second motor 7 is arranged through the second lifting plate 6, the crank 8, the connecting rod 9 and the pressing block 10 are arranged, the second motor 7 can be started to drive the crank 8 to rotate, the crank 8 drives the connecting rod 9 to perform circular motion at the upper end, the lower end of the connecting rod 9 drives the pressing block 10 to perform vertical reciprocating motion, and therefore the pile body is driven into a pile hole.
The bottom fixed mounting of second lifter plate 6 has gag lever post 13, and briquetting 10 slides and cup joints on gag lever post 13, through gag lever post 13's setting, can play limiting displacement to briquetting 10.
The equal fixed mounting in both sides at 1 top of box has third motor 11, and the output fixedly connected with screw rod 12 of third motor 11, screw rod 12 rotate and install in box 1, and first lifter plate 3 and second lifter plate 6 are the screw respectively and cup joint on two screw rods 12, and one side fixed mounting that 1 inside of box lies in screw rod 12 has guide arm 14, and first lifter plate 3 and second lifter plate 6 all slide to cup joint on guide arm 14. Through the setting of third motor 11, screw rod 12 and guide arm 14, can start third motor 11 and drive screw rod 12 and rotate, make screw rod 12 drive first lifter plate 3 and second lifter plate 6 along 14 vertical motions of guide arm to can carry out lift adjustment to drilling subassembly and pile pressing subassembly.
The utility model discloses a theory of operation and use flow: at first through the setting of drilling subassembly and pile pressing subassembly, can make a device possess drilling and pile pressing function simultaneously, through first lifter plate 3, the setting of first motor 4 and drilling rod 5, can start first motor 4 and drive drilling rod 5 and rotate, make drilling rod 5 drill in ground, through second lifter plate 6, second motor 7, crank 8, the setting of connecting rod 9 and briquetting 10, can start second motor 7 and drive crank 8 and rotate, make crank 8 drive the upper end circular motion of connecting rod 9, make the lower extreme of connecting rod 9 drive the vertical reciprocating motion of briquetting 10, thereby squeeze into the pile body downthehole, through third motor 11, the setting of screw rod 12 and guide arm 14, can start third motor 11 and drive screw rod 12 and rotate, make screw rod 12 drive first lifter plate 3 and second lifter plate 6 along the vertical motion of guide arm 14, thereby can carry out lift adjustment to drilling subassembly and pile pressing subassembly.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building engineering pile driver equipment, includes box (1) and articulates chamber door (2) in box (1) both sides, its characterized in that: the utility model discloses a drilling machine, including box (1), drilling subassembly and pile pressing subassembly, drilling subassembly includes first lifter plate (3), first motor (4) and drilling rod (5) of fixed mounting at first motor (4) output of fixed mounting on first lifter plate (3) of fixed mounting, the pile pressing subassembly includes second lifter plate (6), second motor (7) of fixed mounting in second lifter plate (6) bottom, crank (8), the rotation of fixed mounting in second motor (7) output are connected at connecting rod (9) of crank (8) one end and are articulated briquetting (10) at connecting rod (9) lower extreme, the equal fixed mounting in both sides at box (1) top has third motor (11), the output fixedly connected with screw rod (12) of third motor (11), screw rod (12) rotate and install in box (1), first lifter plate (3) and second lifter plate (6) are the screw thread respectively on two screw rods (12).
2. A construction piling device according to claim 1, wherein: the bottom of the second lifting plate (6) is fixedly provided with a limiting rod (13), and the pressing block (10) is sleeved on the limiting rod (13) in a sliding mode.
3. A construction piling device according to claim 1, wherein: a guide rod (14) is fixedly installed on one side, located on the screw rod (12), of the interior of the box body (1), and the first lifting plate (3) and the second lifting plate (6) are sleeved on the guide rod (14) in a sliding mode.
4. A construction piling device according to claim 1, wherein: a first through hole (15) is formed in the bottom of the box body (1) and located below the drilling assembly.
5. A construction piling device according to claim 1, wherein: and a second through hole (16) is formed in the bottom of the box body (1) below the pile pressing assembly.
6. A construction piling device according to claim 1, wherein: walking wheels (17) are installed at four corners of the bottom of the box body (1).
CN202222777874.0U 2022-10-20 2022-10-20 Constructional engineering pile device Active CN218540682U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222777874.0U CN218540682U (en) 2022-10-20 2022-10-20 Constructional engineering pile device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222777874.0U CN218540682U (en) 2022-10-20 2022-10-20 Constructional engineering pile device

Publications (1)

Publication Number Publication Date
CN218540682U true CN218540682U (en) 2023-02-28

Family

ID=85280174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222777874.0U Active CN218540682U (en) 2022-10-20 2022-10-20 Constructional engineering pile device

Country Status (1)

Country Link
CN (1) CN218540682U (en)

Similar Documents

Publication Publication Date Title
CN208026484U (en) Hydraulic engineering deep soil sampler
CN107654191B (en) Crawler-type double-arm multi-angle jumbolter
CN110748306B (en) Foldable pipe swinging robot for drilling platform surface
CN218540682U (en) Constructional engineering pile device
CN208545738U (en) A kind of rural highway engineering construction ditch tamping unit
CN115369847A (en) Hydraulic engineering foundation detection equipment
CN210269254U (en) Multifunctional engineering investigation construction equipment
CN208363095U (en) A kind of Static pressure pile driver
CN212359619U (en) Piling device for building construction
CN112921964B (en) Engineering building pile driving device and construction method
CN216247313U (en) Hydraulic and hydroelectric engineering construction ground sampling device
CN2296344Y (en) Iron outlet opening machine of blast furnace
CN214749036U (en) Quick drilling and coring device for pavement detection
CN210975785U (en) Construction support column tamping device capable of preventing skew
CN214460376U (en) Novel building engineering pile device
CN115679973A (en) Drilling and grouting equipment for slope support
CN208845095U (en) A kind of construction piling equipment
CN114813238A (en) Device for underground water environment monitoring and geological investigation
CN221838249U (en) Embedded automatic mast folding mechanism
CN217176498U (en) Mining rig convenient to adjust
CN219910634U (en) Piling device for construction
CN221271642U (en) Screw rod compressing device
CN221134122U (en) Steel construction drilling equipment
CN221779372U (en) Bridge guardrail construction water drilling machine mechanism with horizontal drilling structure
CN221779362U (en) Road drilling machine