[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN218090337U - Composite cast-in-situ sand-based water permeable brick terrace - Google Patents

Composite cast-in-situ sand-based water permeable brick terrace Download PDF

Info

Publication number
CN218090337U
CN218090337U CN202221318782.XU CN202221318782U CN218090337U CN 218090337 U CN218090337 U CN 218090337U CN 202221318782 U CN202221318782 U CN 202221318782U CN 218090337 U CN218090337 U CN 218090337U
Authority
CN
China
Prior art keywords
sand
terrace
brick body
water permeable
permeable brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221318782.XU
Other languages
Chinese (zh)
Inventor
金昭
杨旭
金康
陈锦涛
陈绪勇
陈习松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Yuda Ecological Environment Co ltd
Original Assignee
Hubei Yuda Ecological Environment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Yuda Ecological Environment Co ltd filed Critical Hubei Yuda Ecological Environment Co ltd
Priority to CN202221318782.XU priority Critical patent/CN218090337U/en
Application granted granted Critical
Publication of CN218090337U publication Critical patent/CN218090337U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a compound cast-in-place sand base brick terrace that permeates water, including ground and terrace main part, the terrace main part is laid on the ground, and the terrace main part comprises the sand base brick body that permeates water and afforestation vegetation, and each sand base brick body that permeates water is rectangular array and distributes, and leaves the space between the adjacent sand base brick body that permeates water and form the escape canal. This compound cast-in-place sand base brick terrace that permeates water, lay a plurality of sand base brick bodies that permeate water on the ground according to rectangular array's distribution mode, make it form the terrace, and fill planting soil horizon in the planting regional hole of the sand base brick body that permeates water, cultivate afforestation vegetation in planting soil horizon, make the whole of terrace more pleasing to the eye, and afforestation vegetation highly is not higher than the sand base brick body that permeates water, then make the terrace can regard as the road of walking to use, the limitation is less, reserve the escape canal between each sand base brick body that permeates water, it is serious to avoid ponding, be equipped with anti-loss in the sand base brick body and keep off the net, in order to avoid planting regional downthehole ponding.

Description

Composite cast-in-situ sand-based water permeable brick terrace
Technical Field
The utility model relates to a terrace technical field specifically is a compound cast-in-place sand base brick terrace that permeates water.
Background
The ground material is usually a paving layer of the inner and surrounding ground surfaces of a building, and also a paving layer (floor) decoration material of the surface of a floor, and the following materials are commonly used: cement mortar flooring, marble flooring, terrazzo flooring, epoxy, tile, wood flooring, plastic flooring, carpet, and the like. At present, marble and wood floors are usually paved, but the materials and paving modes are different along with different scenes. At present, the existing ground laying and decorating mode is single, most of the existing ground laying and decorating mode is to lay floor tiles or pour concrete, and particularly, the greening effect of the existing ground laying and decorating mode is poor. Therefore, the terrace of the composite cast-in-situ sand-based water permeable brick needs to be designed so as to solve the problems provided in the above.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a compound cast-in-place sand base brick terrace that permeates water to solve the problem that above-mentioned background art provided.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a compound cast-in-place sand base brick terrace that permeates water, includes ground and terrace main part, the terrace main part is laid on the ground, and the terrace main part comprises the sand base brick body and the afforestation vegetation of permeating water, and each sand base brick body that permeates water is the rectangle array and distributes, and leaves the space between the adjacent sand base brick body that permeates water and form the escape canal, the sand base is permeated water and has seted up planting regional hole on the brick body, and the downthehole planting of planting regional has the afforestation vegetation, the top surface that highly is less than the sand base brick body that permeates water of afforestation vegetation.
Preferably, overflow grooves communicated with the planting area holes are formed in four side faces of the sand-based water permeable brick body, and anti-loss blocking nets are embedded in the overflow grooves.
Preferably, plant the regional downthehole agreeing with backing plate of installing, and agree with the backing plate and take on the ground, the soil horizon of planting has been laid to the top of agreeing with the backing plate, and plants the soil horizon and pack in planting regional downthehole, afforestation vegetation is cultivated in planting the soil horizon.
Preferably, the sand-based water permeable brick body consists of a concrete base layer, a water permeable brick layer and a quartz sand mixing layer, the concrete base layer is used as a base of the sand-based water permeable brick body, and the water permeable brick layer and the quartz sand mixing layer are sequentially connected to the concrete base layer from bottom to top.
Preferably, the thickness of the fitting pad is smaller than that of the concrete base layer.
Preferably, the sand-based water permeable brick body is a sand-based water permeable brick cast in situ by a matched mould.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) This compound cast-in-place sand base brick terrace that permeates water, lay a plurality of sand base brick bodies that permeate water on the ground according to rectangular array's distribution mode, make it form the terrace, and fill planting soil horizon in the planting regional hole of the sand base brick body that permeates water, cultivate afforestation vegetation in planting soil horizon, make the whole of terrace more pleasing to the eye, and afforestation vegetation highly is not higher than the sand base brick body that permeates water, then make the terrace can regard as the road of walking to use, the limitation is less, reserve the escape canal between each sand base brick body that permeates water, it is serious to avoid ponding, be equipped with anti-loss in the sand base brick body and keep off the net, in order to avoid planting regional downthehole ponding.
(2) This compound cast-in-place sand base brick terrace that permeates water, the sand base brick body that permeates water wholly comprises concrete-based layer, the brick layer that permeates water and quartz sand mix the layer to the sand base brick body that permeates water is the sand base brick that permeates water through supporting mould cast-in-place shaping, so that pours the sand base brick that permeates water as required, avoids pouring the waste of material.
Drawings
FIG. 1 is a perspective view of the whole structure of the present invention;
FIG. 2 is a perspective view of the sand-based water permeable brick of the present invention;
FIG. 3 is an exploded view of the sand-based water permeable brick of the present invention;
fig. 4 is the internal schematic view of the sand-based water permeable brick of the present invention.
In the figure: 1. a foundation; 2. sand-based water permeable brick bodies; 201. planting area holes; 3. greening vegetation; 4. a drainage canal; 5. an overflow tank; 6. a loss prevention blocking net; 7. planting a soil layer; 8. fitting a base plate; 9. a concrete base layer; 10. a permeable brick layer; 11. a quartz sand mixing layer.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides the following embodiments:
example one
The utility model provides a compound cast-in-place sand base brick terrace that permeates water, including ground 1 and terrace main part, the terrace main part is laid on ground 1, and the terrace main part is permeated water by the sand base brick body 2 and is constituteed with afforestation vegetation 3, each sand base is permeated water brick body 2 and is the rectangular array and distributes, and leaves the space between the adjacent sand base brick body 2 that permeates water and form escape canal 4, the sand base is permeated water and has seted up planting regional hole 201 on the brick body 2, and plant and have afforestation vegetation 3 in regional hole 201, afforestation vegetation 3 highly is less than the top surface of the sand base brick body 2 that permeates water.
Furthermore, overflow grooves 5 communicated with the planting region holes 201 are formed in four side faces of the sand-based water permeable brick body 2, and anti-loss blocking nets 6 are embedded in the overflow grooves 5.
Further, install in planting regional hole 201 and agree with backing plate 8, and agree with backing plate 8 and take on ground 1, laid planting soil layer 7 above agreeing with backing plate 8, and planted soil layer 7 and fill in planting regional hole 201, and afforestation vegetation 3 is planted in planting soil layer 7.
The specific implementation manner of this embodiment is: lay a plurality of sand base brick bodies 2 that permeate water on ground 1 according to rectangular array's distribution mode, make it form the terrace, and fill planting soil horizon 7 in the planting region hole 201 of the sand base brick body 2 that permeates water, cultivate 3 quilts of planting in planting soil horizon 7, make the whole of terrace more pleasing to the eye, and the height of afforestation vegetation 3 is not higher than the sand base brick body 2 that permeates water, then make the terrace can regard as the road of walking to use, the limitation is less, reserve escape canal 4 between each sand base brick body 2 that permeates water, it is serious to avoid ponding, be equipped with loss prevention in the sand base brick body 2 that permeates water and keep off net 6, take place ponding in order to avoid planting region hole 201.
Example two
The difference from the first embodiment is that the following contents are also included:
the sand-based water permeable brick body 2 is composed of a concrete base layer 9, a water permeable brick layer 10 and a quartz sand mixing layer 11, the concrete base layer 9 is used as a base of the sand-based water permeable brick body 2, and the water permeable brick layer 10 and the quartz sand mixing layer 11 are sequentially connected to the concrete base layer 9 from bottom to top.
Furthermore, the thickness of the matching backing plate 8 is smaller than that of the concrete base layer 9, so that the height of the permeable brick layer 10 is positioned at the position of the planting soil layer 7.
Furthermore, the sand-based water permeable brick body 2 is a sand-based water permeable brick cast in situ by a matched mould.
In this embodiment: the sand-based water permeable brick body 2 integrally comprises a concrete base layer 9, a water permeable brick layer 10 and a quartz sand mixing layer 11, and the sand-based water permeable brick body 2 is a sand-based water permeable brick cast in situ through a matched mould, so that the sand-based water permeable brick is poured according to requirements, and the waste of pouring materials is avoided.
Those not described in detail in this specification are within the skill of the art.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (6)

1. The utility model provides a compound cast-in-place sand base brick terrace that permeates water, includes ground (1) and terrace main part, its characterized in that: the terrace main part is laid on ground (1), and the terrace main part comprises sand base brick body (2) of permeating water and afforestation vegetation (3), and each sand base brick body (2) of permeating water is the rectangular array and distributes, and leaves space formation escape canal (4) between the adjacent sand base brick body (2) of permeating water, sand base brick body (2) of permeating water is last to have seted up and has planted regional hole (201), and plants in planting regional hole (201) and afforestation vegetation (3), the top surface that highly is less than the sand base brick body (2) of permeating water of afforestation vegetation (3).
2. The composite cast-in-place sand-based water permeable brick terrace according to claim 1, characterized in that: overflow grooves (5) communicated with the planting region holes (201) are formed in four side faces of the sand-based water permeable brick body (2), and anti-loss blocking nets (6) are embedded in the overflow grooves (5).
3. The composite cast-in-situ sand-based water permeable brick terrace according to claim 2, characterized in that: install in planting regional hole (201) and agree with backing plate (8), and agree with backing plate (8) and take on ground (1), plant soil layer (7) have been laid to the top of agreeing with backing plate (8), and plant soil layer (7) and fill in planting regional hole (201), afforestation vegetation (3) are cultivated in planting soil layer (7).
4. The composite cast-in-place sand-based water permeable brick terrace according to claim 3, characterized in that: the sand-based water permeable brick body (2) is composed of a concrete base layer (9), a water permeable brick layer (10) and a quartz sand mixing layer (11), the concrete base layer (9) serves as a base of the sand-based water permeable brick body (2), and the water permeable brick layer (10) and the quartz sand mixing layer (11) are sequentially connected to the concrete base layer (9) from bottom to top.
5. The composite cast-in-place sand-based water permeable brick terrace according to claim 4, characterized in that: the thickness of the fit backing plate (8) is smaller than that of the concrete base layer (9).
6. The composite cast-in-place sand-based water permeable brick terrace according to claim 1, characterized in that: the sand-based water permeable brick body (2) is formed by casting a matched mould in situ.
CN202221318782.XU 2022-05-30 2022-05-30 Composite cast-in-situ sand-based water permeable brick terrace Expired - Fee Related CN218090337U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221318782.XU CN218090337U (en) 2022-05-30 2022-05-30 Composite cast-in-situ sand-based water permeable brick terrace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221318782.XU CN218090337U (en) 2022-05-30 2022-05-30 Composite cast-in-situ sand-based water permeable brick terrace

Publications (1)

Publication Number Publication Date
CN218090337U true CN218090337U (en) 2022-12-20

Family

ID=84460678

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221318782.XU Expired - Fee Related CN218090337U (en) 2022-05-30 2022-05-30 Composite cast-in-situ sand-based water permeable brick terrace

Country Status (1)

Country Link
CN (1) CN218090337U (en)

Similar Documents

Publication Publication Date Title
CN207159737U (en) The prefabricated permeable parking bit architecture of outdoor grass planting
CN218090337U (en) Composite cast-in-situ sand-based water permeable brick terrace
KR20150145681A (en) Sidewalk block with multi-function
CN215210279U (en) Modular permeable pavement system
KR100708344B1 (en) The pavement spacer for using water permeability and water repair
TWM495384U (en) Support model base for opening type reinforced concrete
CN2299891Y (en) Combination brick having the function of decoration and afforestation
CN211621045U (en) Ecological road surface in gardens
CN101046080B (en) Paving process and pre-fabricated member for water permeable terrace
CN210086436U (en) Gardens greenery patches is got prefabricated muddy earth water intaking valve box that drainage combines
US20200123713A1 (en) Grass pavers for increasing visible green space
CN209941424U (en) Pavement is with ecological brick tile structure that permeates water
CN205676742U (en) A kind of can the concrete road surface structure of grass planting
CN210140808U (en) A ecological slope protection structure for hydraulic engineering bank protection
JP2005030028A (en) Pavement block
GB2390618A (en) Paving cast in situ in matrix
CN220724757U (en) Park ecological road structure
Avner et al. Jerusalem, Mar Elias–the Kathisma Church
CN213867299U (en) Stairway flower groove and bridge
JP2000136502A (en) Permeable block and manufacture thereof
CN215289938U (en) Structure of natural revetment grass slope into water
JPH0949202A (en) Decorative board
TW589430B (en) A factory cast brick and the construction method paving it
KR100970779B1 (en) Support for planting boundary stone
CN216156290U (en) Greening landscape retaining wall and landscape footpath combined structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221220