[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN217537080U - Karst refuse dump foundation treatment structure - Google Patents

Karst refuse dump foundation treatment structure Download PDF

Info

Publication number
CN217537080U
CN217537080U CN202221541047.5U CN202221541047U CN217537080U CN 217537080 U CN217537080 U CN 217537080U CN 202221541047 U CN202221541047 U CN 202221541047U CN 217537080 U CN217537080 U CN 217537080U
Authority
CN
China
Prior art keywords
karst
dump
barricade
treatment structure
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221541047.5U
Other languages
Chinese (zh)
Inventor
马艳
马鑫泽
陈芳平
周科
张虎
唐为民
王四戌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Transportation Planning Survey and Design Academe Co Ltd
Original Assignee
Guizhou Transportation Planning Survey and Design Academe Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Transportation Planning Survey and Design Academe Co Ltd filed Critical Guizhou Transportation Planning Survey and Design Academe Co Ltd
Priority to CN202221541047.5U priority Critical patent/CN217537080U/en
Application granted granted Critical
Publication of CN217537080U publication Critical patent/CN217537080U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a karst refuse dump foundation treatment structure, including annular barricade one, annular barricade one encircles the hole of falling into water or disappears the hole and sets up, barricade one is encircleed outward and is provided with annular barricade two, barricade one forms the sump pit with barricade two, the well head interval on barricade two is equipped with a plurality of inclined inlet openings, the inlet opening is the low side towards the sump pit end, the lower part on barricade two is equipped with the apopore of slope, the apopore is high-end towards the sump pit end, the apopore low side is connected with the drainage french drain of slope, the low side of drainage french drain links to each other with the sewage collecting pit outside the refuse dump; the structure can avoid the pollution to the karst underground water and can not cause the karst to sink.

Description

Karst refuse dump foundation treatment structure
Technical Field
The utility model relates to a karst refuse dump, in particular to karst refuse dump ground handles structure.
Background
Karst (also called karst) is a general name of a soluble rock distribution area mainly containing carbonates, and water (particularly underground water) has a comprehensive geological effect mainly containing erosion on rocks and generates various phenomena. Carbonate rocks in China are widely distributed, particularly in southwest regions, surface karst depressions and troughs develop, when a dumping site is arranged in the karst depressions and the troughs, the karst depressions and the troughs often meet water falling holes or pits, and the karst collapse can be caused by failure of proper treatment measures, so that reasonable treatment measures must be taken to ensure the stability of karst foundations.
The field of the refuse dump in engineering construction can meet different shapes of water falling holes or pit elimination, the most common treatment measure at present is landfill and grouting reinforcement, but the treatment method is not suitable for the water falling holes or pit elimination communicated with underground rivers.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model aims at providing a karst refuse dump ground treatment structure can avoid the pollution to karst groundwater, can not cause the karst to sink again.
The utility model aims at realizing through the following technical scheme:
the utility model provides a karst refuse dump ground processing structure, includes annular barricade one, and annular barricade one encircles the hole of falling into water or the pit setting disappears, barricade one is encircleed outward and is provided with annular barricade two, barricade one forms the sump pit with two rooms of barricade, the well head interval on the barricade two is equipped with the inlet opening of a plurality of slopes, the inlet opening is the low side towards the sump pit end, the lower part on the barricade two is equipped with the apopore of slope, the apopore is high-end towards the sump pit end, the apopore low side meets with the drainage blind ditch of slope, the low side of drainage blind ditch links to each other with the sewage collecting pit in the refuse dump outside.
Furthermore, an impermeable material layer is arranged on one outer side of the retaining wall.
Further, the drainage french drain includes the ditch body, the ditch body forms on the waste of refuse dump, the bottom of ditch body is equipped with the prevention of seepage basis, and the middle part is filled with coarse grain material, coarse grain material top covers has the roof, there is the infiltration layer of outside-in one-way infiltration on ditch body both sides.
Further, the top plate is a grouted stone sheet top plate.
Further, the anti-seepage foundation is a reinforced concrete foundation.
Furthermore, the height of the top surface of the second retaining wall is higher than that of the waste dump and lower than that of the first retaining wall.
Furthermore, the high-end parcel of inlet opening has the geotechnological cloth that permeates water, the geotechnological cloth that permeates water peripheral hardware gravel reversed filter, and the discarded object upper berth in the refuse dump of gravel reversed filter bottom surface has the mortar layer.
Furthermore, the two ends of the drainage blind ditch are wrapped with permeable geotextiles.
And furthermore, the first retaining wall, the second retaining wall and the bottom of the water collecting well are all of reinforced concrete structures.
The utility model has the advantages that:
the utility model discloses a karst refuse dump ground treatment structure, barricade one intercepts refuse dump district water, keeps apart and protects the hole that falls into water or disappears the hole, and the sump pit is collected refuse dump district water and is arranged to the sewage collecting pit outside the refuse dump through the drainage french drain, has avoided refuse dump groundwater to get into the hole that falls into water or disappear the hole and pollute karst groundwater, has also avoided the refuse dump to seal simultaneously and has caused the karst subsidence that the interior karst space induces under positive, negative pressure; the structure is convenient for later observation and maintenance, and has simple structure and low cost.
Additional advantages, objects, and features of the invention will be set forth in part in the description which follows and in part will become apparent to those having ordinary skill in the art upon examination of the following or may be learned from practice of the invention. The objectives and other advantages of the present invention will be realized and attained by the structure particularly pointed out in the written description and claims hereof.
Drawings
In order to make the objects, technical solutions and advantages of the present invention clearer, the present invention will be further described in detail with reference to the accompanying drawings, in which:
fig. 1 is a plan view of the utility model in use.
Fig. 2 is a schematic view of the arrangement of the first retaining wall and the second retaining wall in fig. 1.
Fig. 3 is a perspective view of the retaining wall in fig. 1.
Fig. 4 is a cross-sectional view of the retaining wall of fig. 1.
Fig. 5 is a perspective view of the retaining wall shown in fig. 1.
Fig. 6 is a cross-sectional view of the retaining wall of fig. 1.
FIG. 7 is a schematic view of the connection between the blind drain and the retaining wall in FIG. 1.
FIG. 8 is a sectional view of the drain blind ditch.
Detailed Description
Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. It should be understood that the preferred embodiments are presented for purposes of illustration only and are not intended to limit the scope of the present disclosure.
As shown in fig. 1-8, a karst soil-discharging field foundation treatment structure, which solves the karst problems of water falling hole or pit elimination and the like when a soil-discharging field is arranged in a karst depression or valley, comprises an annular reinforced concrete retaining wall I1, the annular retaining wall I1 is arranged around a water falling hole 5 or a pit elimination, the annular reinforced concrete retaining wall II 3 is arranged around the retaining wall I1, a water collecting well 2 is formed between the retaining wall I1 and the retaining wall II 3, the bottom of the water collecting well 2 is also of a reinforced concrete structure, a plurality of inclined water inlet holes 301 are arranged at intervals on the middle upper part of the retaining wall II 3, the water inlet holes 301 are arranged at the lower end towards the water collecting well 2, so that groundwater in the soil-discharging field can enter the water collecting well 2 from the water inlet holes 301, an inclined water outlet hole 302 is arranged at the lower end towards the water collecting well 2, the water outlet hole 302 is arranged at the upper end towards the water collecting well 2, so that water in the water collecting well 2 can be discharged from the water outlet hole 301, the lower end of the drainage blind ditch 4 is connected with a sewage collecting pool 9, the sewage collecting pool is arranged at the lower end of the drainage ditch 9, the sewage collecting pool is arranged at the lower end of the sewage collecting basin, and the sewage collecting pool side of the retaining wall is arranged at the sewage collecting pool side, and the sewage collecting pool side of the sewage collecting pool 9, the sewage collecting pool side, and the sewage collecting pool side of the sewage collecting pool.
The outer side of the first retaining wall 1 is provided with an impermeable material layer 101, so that the first retaining wall can be prevented from being permeated by sewage.
The drainage blind ditch 4 comprises a ditch body, the ditch body is formed on the waste of a refuse dump, the bottom of the ditch body is provided with an anti-seepage foundation 404, the middle part of the ditch body is filled with a coarse-grained material 403, a top plate 401 covers the coarse-grained material 403, two sides of the ditch body are provided with water seepage layers 10 for one-way water seepage from outside to inside, the water seepage layers 10 are one-way water-permeable geotextiles, namely, the underground water of the refuse dump on two sides of a side ditch can enter the drainage blind ditch 4 from the water seepage layers 10, and the purpose of arranging the top plate 401 is to prevent the waste from entering the coarse-grained material 403 to block the drainage blind ditch 4.
The roof 401 is a grouted stone slab.
The impermeable foundation 404 is a reinforced concrete foundation.
The top surface of the second retaining wall 3 is higher than the height of the waste of the refuse dump and lower than the height of the first retaining wall 1, and the top surface of the second retaining wall 3 is lower than the height of the first retaining wall 1 so as to avoid the problem that leachate of the refuse dump crosses the first retaining wall 1 to enter the water falling hole 5 or the pit elimination under extreme conditions and pollute karst groundwater.
The high-end parcel of inlet opening 301 has the geotechnological cloth 6 that permeates water, and the geotechnological cloth 6 that permeates water peripheral hardware gravel reversed filter 7, has laid the clay layer 8 on the discarded object of 7 bottom surfaces refuse dumps of gravel reversed filter, can avoid the discarded object to get into sump pit 2.
The two ends of the drainage blind ditch 4 are wrapped with the permeable geotextile 6, so that the waste can be prevented from entering the sewage collecting tank 9.
The underground water of the refuse dump enters the water collecting well 2 through the water inlet hole 301, is intercepted by the retaining wall 1 at the position of the water collecting well 2, and then is discharged to the sewage collecting tank 9 through the water outlet hole 302 and the drainage blind ditch 4.
The structure can isolate and protect the water falling hole or the pit, is convenient for discharging karst depression or trough dump slope water, avoids the pollution to karst underground water, and simultaneously avoids the phenomenon that the dump is sealed to cause the collapse of karst caused by positive pressure and negative pressure in the interior karst space.
A method for realizing a karst dump foundation treatment structure comprises the following steps:
a. and calculating a flood level elevation according to the catchment area of the waste dump field area, and determining the height of the retaining wall I1, the height of the water collecting well 2 and the size of the drainage blind ditch 4 according to the flood level elevation.
b. Cleaning a field, excavating a foundation pit, placing a retaining wall I1 on a watertight layer, and performing waterproof treatment on the foundation, wherein the foundation is a permeable layer.
c. Binding a reinforcing steel bar of the first retaining wall 1, installing a template of the first retaining wall 1, pouring concrete, and coating an impermeable material 101 on the peripheral surface of the first retaining wall 1.
d. And (5) binding the reinforcing steel bars of the water collecting well 2, installing a template of the water collecting well 2, and pouring concrete.
e. Reserve PVC pipe inlet opening 301 passageway on d step sump pit 2, the high-end parcel of inlet opening 301 has the geotechnological cloth 6 that permeates water, the geotechnological cloth 6 that permeates water peripheral hardware gravel reversed filter 7, has laid the clay layer 8 on the 7 bottom surfaces discarded articles of gravel reversed filter.
f. Reserving a water outlet hole 302 channel on the d-step water collecting well 2, adjusting the height of the water outlet hole 302 according to the actual terrain condition, and wrapping the lower end of the water outlet hole 302 with the permeable geotextile 6.
g. And paving a drainage blind ditch 4 at the base of the waste dump field, wherein the bottom of the drainage blind ditch 4 is an impermeable foundation 404, the top of the drainage blind ditch is a grouted stone sheet top plate, the middle of the drainage blind ditch is filled with permeable block stones, and two side surfaces of the drainage blind ditch 4 are provided with one-way permeable geotextiles.
h. And a sewage collecting tank 9 is built at the lower end of the drainage blind ditch 4, leachate in the water collecting well 2 is discharged into the sewage collecting tank 9 through the drainage blind ditch 4, and the leachate is treated by a sewage treatment system and discharged after reaching the standard when the leachate does not meet the discharge requirement.
Finally, the above embodiments are only used for illustrating the technical solutions of the present invention and not for limiting, and although the present invention has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that modifications or equivalent substitutions may be made to the technical solutions of the present invention without departing from the spirit and scope of the technical solutions, and all of them should be covered by the scope of the claims of the present invention.

Claims (9)

1. The utility model provides a karst refuse dump foundation treatment structure which characterized in that: including annular barricade (1), annular barricade (1) encircles the hole of falling into water (5) or the pit setting disappears, barricade (1) outer loop is around being provided with annular barricade two (3), form sump pit (2) between barricade (1) and barricade two (3), well upper portion interval on the barricade two (3) is equipped with inlet opening (301) of a plurality of slopes, inlet opening (301) are held for the low side towards sump pit (2), the lower part on the barricade two (3) is equipped with apopore (302) of slope, apopore (302) are held for high-end towards sump pit (2), apopore (302) low side meets with the drainage blind pit (4) of slope, the low side of drainage blind pit (4) links to each other with sewage collecting pit (9) outside the refuse dump.
2. The karst dump foundation treatment structure according to claim 1, characterized in that: and an impermeable material layer (101) is arranged on the outer side of the first retaining wall (1).
3. The karst dump foundation treatment structure according to claim 1, characterized in that: the drainage blind ditch (4) comprises a ditch body, the ditch body is formed on the waste of a waste dump, the bottom of the ditch body is provided with an anti-seepage foundation (404), the middle part of the ditch body is filled with coarse grain materials (403), a top plate (401) covers the coarse grain materials (403), and water seepage layers (10) capable of realizing one-way water seepage from outside to inside are arranged on two sides of the ditch body.
4. The karst dump foundation treatment structure according to claim 3, characterized in that: the top plate (401) is a grouted stone sheet top plate.
5. The karst dump foundation treatment structure according to claim 3, wherein: the impermeable foundation (404) is a reinforced concrete foundation.
6. The karst dump foundation treatment structure according to claim 1, characterized in that: the top surface of the second retaining wall (3) is higher than the height of the waste in the waste dump and lower than the height of the first retaining wall (1).
7. The karst dump foundation treatment structure according to claim 1, characterized in that: the high-end parcel of inlet opening (301) has geotechnological cloth (6) that permeates water, geotechnological cloth (6) that permeates water peripheral hardware gravel reversed filter (7), and the thing of abandonment of gravel reversed filter (7) bottom surface refuse dump is spread and is had clay layer (8).
8. The karst dump foundation treatment structure according to claim 1, characterized in that: and both ends of the drainage blind ditch (4) are wrapped with permeable geotextiles (6).
9. The karst dump foundation treatment structure according to any one of claims 1 to 8, wherein: the bottoms of the first retaining wall (1), the second retaining wall (3) and the water collecting well (2) are all of reinforced concrete structures.
CN202221541047.5U 2022-06-20 2022-06-20 Karst refuse dump foundation treatment structure Active CN217537080U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221541047.5U CN217537080U (en) 2022-06-20 2022-06-20 Karst refuse dump foundation treatment structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221541047.5U CN217537080U (en) 2022-06-20 2022-06-20 Karst refuse dump foundation treatment structure

Publications (1)

Publication Number Publication Date
CN217537080U true CN217537080U (en) 2022-10-04

Family

ID=83420784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221541047.5U Active CN217537080U (en) 2022-06-20 2022-06-20 Karst refuse dump foundation treatment structure

Country Status (1)

Country Link
CN (1) CN217537080U (en)

Similar Documents

Publication Publication Date Title
CN208309312U (en) Reinforced earth retaining wall embankment drainage system
CN111236284A (en) Basement bottom and periphery underground water drainage method and structure
CN107816050B (en) Concrete cofferdam and earth-rock cofferdam combined cofferdam and construction method thereof
CN111648383A (en) Internal drainage method for loess high-fill side slope
CN217537080U (en) Karst refuse dump foundation treatment structure
CN110158541B (en) Double-layer geomembrane seepage-proofing drainage structure, construction method and basin seepage-proofing drainage structure
CN114457855B (en) Sinking type horizontal seepage-proofing and vertical seepage-proofing combined structure
CN217760383U (en) Enclosure structure arranged on slope support
CN114837234A (en) Karst refuse dump foundation treatment structure
CN214783977U (en) Compound foundation pit supporting structure of full miscellaneous filled earth stratum
CN211472400U (en) Dam slag blocking structure
CN114703805A (en) Combined seepage-proofing and sewage-intercepting system and method for adjusting plain reservoir
CN210482215U (en) Anti-seepage drainage and exhaust structure suitable for flat reservoir basin
CN113106940A (en) Flood drainage method for reservoir area type waste slag yard
CN210561998U (en) Double-layer geomembrane seepage-proofing drainage structure and reservoir basin seepage-proofing drainage structure
CN210288489U (en) Refuse landfill based on coal gangue
CN112176945A (en) Construction method for moving back dike to sea
CN215105840U (en) Road rain and sewage separation continuous drainage system
CN114439049B (en) Combined seepage-proofing body for preventing and controlling solid waste pile pollution and restoring ecology
CN215105484U (en) Hydraulic engineering retaining wall drainage structures
CN114525817B (en) Construction method of horizontal seepage-proofing and vertical seepage-proofing combined structure
CN221167881U (en) Foundation pit hydrophobic structure suitable for under rich water stratum condition
CN215977615U (en) Semi-closed rain sewage lift pump well facility
CN114031256B (en) Mud-water separation system for sludge landfill and construction method thereof
CN219342721U (en) Roadbed filled by construction waste

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant