CN217204017U - Pre-buried grout structure of underground continuous wall framing department - Google Patents

Pre-buried grout structure of underground continuous wall framing department Download PDF

Info

Publication number
CN217204017U
CN217204017U CN202122999463.1U CN202122999463U CN217204017U CN 217204017 U CN217204017 U CN 217204017U CN 202122999463 U CN202122999463 U CN 202122999463U CN 217204017 U CN217204017 U CN 217204017U
Authority
CN
China
Prior art keywords
underground continuous
grout
continuous wall
framing
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122999463.1U
Other languages
Chinese (zh)
Inventor
聂柏松
郭德昌
黄维
王鸿振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN202122999463.1U priority Critical patent/CN217204017U/en
Application granted granted Critical
Publication of CN217204017U publication Critical patent/CN217204017U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model relates to a pre-buried grout structure of underground continuous wall framing department. The waterproof structure is suitable for underground building engineering. The utility model adopts the technical proposal that: the utility model provides a pre-buried grout structure of underground continuous wall framing department, has underground continuous wall and arranges in the inside interior headwall of underground continuous wall, its characterized in that: a plurality of grouting pipes are embedded in the lining wall and close to the contact surface between the lining wall and the underground continuous wall, grout outlets are formed in the grouting pipes at intervals and arranged corresponding to the framing positions of the underground continuous wall, a plurality of grout inlets are formed in the grouting pipes, and grouting treatment is performed on the void and opening positions of the framing positions of the underground continuous wall through the grout inlets. The utility model discloses a following the pre-buried grout pipe of underground continuous wall framing department, realized opening, the evacuation position of framing department and carried out the grout of comprehensive system, the grout scope is comprehensive, and the effect has prevented the risk of framing department seepage.

Description

Pre-buried grout structure of underground continuous wall framing department
Technical Field
The utility model relates to a pre-buried grout structure of underground continuous wall framing department. The waterproof structure is suitable for underground building engineering.
Background
The underground construction engineering usually adopts a 'two-wall-in-one' structure, namely, the underground continuous wall is used as a foundation pit enclosure structure during the construction period, and is permanently combined with a lining wall on the inner side of the underground continuous wall to be used as an underground structure outer wall, so that the investment is saved.
The underground continuous wall is cast in a framing manner, the framing position is a concrete vertical construction joint, the joint surface is often not tightly attached and opened, the joint surface is a natural impermeable weak position, meanwhile, the framing position is often not compact in casting vibration, and the seepage risk at the framing position is further increased.
The current common method is grouting outside the framing part of the underground continuous wall or grouting in a lining wall hole. The grouting amount of the grouting outside the underground continuous wall is large, and the investment is high; the construction of the lining wall during drilling and grouting is complex, and the wall surface is more attractive due to more drilled holes.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is: aiming at the existing problems, the underground diaphragm wall framing pre-embedded grouting structure is simple and convenient to construct, does not affect the attractiveness of a wall body, aims at performing comprehensive system grouting on the opening and the void part of the framing part, and effectively prevents the risk of leakage of the framing part.
The utility model adopts the technical proposal that: the utility model provides an underground continuous wall framing department pre-buried grout structure, has underground continuous wall and arranges in the inside interior wall of underground continuous wall, its characterized in that: the underground diaphragm wall is characterized in that a plurality of grouting pipes are embedded in the lining wall and close to the contact surface between the lining wall and the underground diaphragm wall, grout outlets are formed in the grouting pipes at intervals and correspond to the framing positions of the underground diaphragm wall, a plurality of grout inlets are formed in the grouting pipes, and the grouting pipes are subjected to grouting treatment at the positions of separation positions of the underground diaphragm wall, such as a void and an opening position.
And the grout inlet of the grouting pipe is exposed out of the inner side of the inner lining wall.
And during grouting, pressurizing by grouting equipment, delivering grouting materials to the framing position of the underground continuous wall, and filling and compacting.
And after grouting is finished, plugging the grouting pipe.
The beneficial effects of the utility model are that: the utility model realizes the overall system grouting of the opening and the void part of the framing part through the grouting pipe pre-buried at the framing part along the underground continuous wall, the grouting range is overall, and the risk of leakage at the framing part is prevented; compared with the grouting scheme outside the underground diaphragm wall, the utility model has the advantages that the required grouting amount is small, and the investment is saved; compare with at inside lining wall drilling slip casting scheme, the utility model discloses a pre-buried grout pipe in inside lining wall advance the grout mouth direct grout, and seal the grout pipe after the grout is accomplished, construction convenience just does not influence the wall body pleasing to the eye.
Drawings
FIG. 1 is a longitudinal sectional view of the embodiment.
FIG. 2 is a cross-sectional view of an embodiment.
Fig. 3 is an elevation view of a grouting structure according to an embodiment.
In the figure: 1. an underground diaphragm wall; 2. lining the wall; 3. grouting pipes; 4. a pulp inlet; 5. a pulp outlet; 6. and (6) framing.
Detailed Description
As shown in fig. 1 to 3, the embodiment is an underground continuous wall framing pre-buried grouting structure, which includes an underground continuous wall 1 and a lining wall 2 poured inside the underground continuous wall 1, a grouting pipe 3 is pre-buried in the lining wall 2, the grouting pipe 3 is arranged along the framing position of the underground continuous wall 1 and is tightly attached to a contact surface between the lining wall 2 and the underground continuous wall 1, a grout inlet 4 of the grouting pipe 3 is exposed to the inside of the lining wall 2, grout outlets 5 are arranged at intervals of the grouting pipe 3 and are tightly attached to the framing position 6 of the underground continuous wall (actually, the surface of the underground continuous wall is uneven, and cannot be completely attached, and grouting grout particles are very small and can completely come out from a gap between the grout outlet and the underground continuous wall).
The construction steps of the embodiment are as follows: firstly, pouring an underground continuous wall 1, then pouring a lining wall 2, and embedding a grouting pipe 3 in the lining wall 2 when the lining wall 2 is poured; after the lining wall 2 is poured, grouting materials are pressurized and fed from a grout inlet 4 through grouting equipment, enter a void and open part at a framing part (parting part) of the underground continuous wall from a grout outlet 5 and are densely filled, so that the leakage risk of the part is reduced; and after grouting is finished, plugging the grouting pipe 3.
In the embodiment, in order to fill the gap and the opening of the framing part of the underground continuous wall, if the grouting pipe is far away from the underground continuous wall in the grouting process, the grouting pipe is surrounded by the concrete of the inner wall of the structure, so that the grouting grout cannot flow out and cannot reach the parting part of the underground continuous wall.
The present embodiment is mainly applicable to grouting in the following two cases: 1. quality problems such as under-vibration and the like occur during pouring, so that the hollow and open of the framing part of the underground continuous wall exist during pouring; 2 cracks may not occur until a period of time due to the concrete shrinkage cracking problem.

Claims (2)

1. The utility model provides a pre-buried grout structure of underground continuous wall framing department, has underground continuous wall (1) and arranges in interior headwall (2) of underground continuous wall (1) inboard which characterized in that: interior, hug closely this interior wall of interior wall (2) with the contact surface pre-buried a plurality of grout pipes (3) of underground continuous wall (1), grout pipe (3) are gone up the interval and are provided with grout outlet (5), and this grout outlet corresponds underground continuous wall's framing department (6) are arranged, be equipped with a plurality of grout inlet (4) on grout pipe (3), it is right to advance the grout inlet through this underground continuous wall framing department's (6) the evacuation, open the position and carry out the grout and handle.
2. The underground continuous wall framing position pre-buried grouting structure of claim 1, characterized in that: and a grout inlet (4) of the grouting pipe (3) is exposed out of the inner side of the inner lining wall (2).
CN202122999463.1U 2021-11-30 2021-11-30 Pre-buried grout structure of underground continuous wall framing department Active CN217204017U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122999463.1U CN217204017U (en) 2021-11-30 2021-11-30 Pre-buried grout structure of underground continuous wall framing department

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122999463.1U CN217204017U (en) 2021-11-30 2021-11-30 Pre-buried grout structure of underground continuous wall framing department

Publications (1)

Publication Number Publication Date
CN217204017U true CN217204017U (en) 2022-08-16

Family

ID=82782337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122999463.1U Active CN217204017U (en) 2021-11-30 2021-11-30 Pre-buried grout structure of underground continuous wall framing department

Country Status (1)

Country Link
CN (1) CN217204017U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117209235A (en) * 2023-11-09 2023-12-12 中铁四局集团第三建设有限公司 Slurry and construction joint grouting method suitable for reverse construction method structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117209235A (en) * 2023-11-09 2023-12-12 中铁四局集团第三建设有限公司 Slurry and construction joint grouting method suitable for reverse construction method structure
CN117209235B (en) * 2023-11-09 2024-02-13 中铁四局集团第三建设有限公司 Slurry and construction joint grouting method suitable for reverse construction method structure

Similar Documents

Publication Publication Date Title
CN201202890Y (en) Novel flexible water-proof sleeve pipe for pipeline mounting construction
CN206346209U (en) A kind of quick solution dewatering well piping plugging structure
CN103498486B (en) A kind of sleeve pipe that adopts implements the method for shutoff to ater-casting precipitation pipe well
CN102061710B (en) Underground continuous wall joint and manufacturing method thereof
CN217204017U (en) Pre-buried grout structure of underground continuous wall framing department
CN106894428A (en) Multi-channel waterproof plugging method for dewatering well of thick and large raft foundation
CN105587938A (en) Toilet pipe root blocking structure and construction process thereof
CN207714628U (en) A kind of branch sleeve, prefabricated components and its connection structure without independent grout outlet
CN110206071A (en) A kind of diaphram wall seam reinforcement means and device
CN108638317A (en) A kind of spheroidal graphite cast-iron push pipe is with pouring tooling and its working method
CN203514332U (en) Casing for blocking dewatering tube well of post-cast strip
CN104878741B (en) Post-grouting waterproof structure for wall joint of underground diaphragm wall and waterproof method thereof
CN107576574B (en) Testing method for equal-size limit water pressure resistance of deformation joint embedded water stop
CN209040133U (en) Well-covering device for dewatering well suitable for rich groundwater region
CN208039313U (en) A kind of immersed tube tunnel FS final spice
CN206988597U (en) Compound plastic film precast concrete pipeline and its special prepare mould
CN217353043U (en) Connecting structure of cast-in-place concrete wall and PC member wall
CN106013197A (en) Pre-grouting water stopping method for connecting part between diaphragm wall and bottom board
CN113373985B (en) Basement waterproof construction method
CN206829618U (en) A kind of quick service sleeve part
CN114197508B (en) Easy-to-seal water draining device, manufacturing method and using method thereof
CN214784092U (en) Foundation ditch relief well enclosed construction
CN105332383A (en) Device for rapidly blocking dewatering pipe well through drainage and decompression and method of device
CN107059944A (en) Basement seepage point gradually leak stopping structure and construction method
CN206902765U (en) A kind of antiseepage sand device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant