CN215367385U - Cantilever type retaining wall of non-excavation construction - Google Patents

Cantilever type retaining wall of non-excavation construction Download PDF

Info

Publication number
CN215367385U
CN215367385U CN202120559024.6U CN202120559024U CN215367385U CN 215367385 U CN215367385 U CN 215367385U CN 202120559024 U CN202120559024 U CN 202120559024U CN 215367385 U CN215367385 U CN 215367385U
Authority
CN
China
Prior art keywords
wall
retaining wall
square pile
wall body
pile foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120559024.6U
Other languages
Chinese (zh)
Inventor
娄中波
徐文斌
李传宪
刘钦振
张四国
闫颂
朱春雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Municipal Engineering Design and Research Institute
Original Assignee
Tianjin Municipal Engineering Design and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Municipal Engineering Design and Research Institute filed Critical Tianjin Municipal Engineering Design and Research Institute
Priority to CN202120559024.6U priority Critical patent/CN215367385U/en
Application granted granted Critical
Publication of CN215367385U publication Critical patent/CN215367385U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model provides a cantilever type retaining wall for trenchless construction, which comprises railings, a wall body and a square pile foundation which are sequentially arranged from top to bottom, wherein the wall body is rigidly connected with the square pile foundation, a reversed filtering layer is arranged on the wall body, water drainage holes are arranged in the wall body, settlement seams are longitudinally arranged in the wall body at equal intervals and penetrate through the railings, asphalt-impregnated wood boards are filled in the settlement seams, and the square pile foundation is of a rectangular section. The utility model reduces the conflict between the retaining wall and the buried municipal pipeline.

Description

Cantilever type retaining wall of non-excavation construction
Technical Field
The utility model relates to the field of reinforced concrete cantilever type retaining walls, in particular to a cantilever type retaining wall for trenchless construction.
Background
In the process of constructing the urban road overpass, the cantilever retaining wall is applied to filling roadbeds with height difference between main roads and auxiliary roads due to smaller size and lighter self weight. Cantilevered retaining walls are typically constructed of a wall body, toe plates, heel plates, and the like. Generally, the larger the toe and heel plates, the higher the stability, resistance to overturning and resistance to sliding of the cantilevered retaining wall, but the toe plates consequently come into the range of the side road, affecting the arrangement of the buried municipal pipeline in the cross section of the side road.
At present, the cantilever type retaining wall is built on a soft soil foundation, and the retaining wall foundation needs to be treated firstly. After the foundation is qualified, the retaining wall foundation is excavated, the reinforced concrete retaining wall is constructed, and foundation treatment and retaining wall construction are two sets of processes. Traditional cantilever type retaining wall construction process is many, and construction cycle is long, need carry out basic excavation and backfill in the work progress, is unfavorable for the raise dust management and control.
In addition, each other does not link to each other between the foundation treatment structure under the retaining wall and the retaining wall structure, only as the load-bearing platform of retaining wall after the foundation treatment, and the retaining wall satisfies the stability and the atress needs of retaining wall self through setting up wall toe and wall heel, and the performance such as anti slippage, antidumping of foundation treatment structure can not effectively be brought into play.
Therefore, there is a need in the art for a solution that reduces the conflict with the buried municipal pipeline and improves the bearing capacity of the retaining wall
SUMMERY OF THE UTILITY MODEL
In order to solve the problems, the utility model provides a cantilever type retaining wall for trenchless construction.
The utility model provides a cantilever type retaining wall of non-excavation construction, includes railing, wall and the square pile basis that top-down set gradually, the wall with square pile basis rigid connection, be provided with the reversed filter bed on the wall, the inside outlet that is provided with of wall, be provided with the subsiding crack along vertical equidistant in the wall, the subsiding crack runs through the railing, the subsiding crack is filled with the asphalt-impregnated plank, the square pile basis adopts rectangular cross section.
The square pile foundation penetrates through a soft soil layer, the horizontal height of the bottom end of the wall body is lower than that of an auxiliary road surface, and the horizontal height of the top end of the wall body is lower than that of a main road surface.
The distance between two adjacent settlement joints is 10-15 m.
Compared with the prior art, the utility model has the following beneficial effects:
1. toe boards and heel boards are not needed, the cross section space of the road is saved, and the conflict between the retaining wall and the buried municipal pipeline is reduced.
2. Need not to carry out foundation treatment alone, need not to excavate the barricade basis, the construction process is few, and construction cycle is short, has reduced the raise dust.
3. The method can be used for dealing with various soft soil foundations by adjusting the length or the distance of the square piles, has low requirement on the bearing capacity of the foundations and has wide application range.
4. The square pile foundation can be prefabricated in factories, and is formed into a pile by static pressing or piling on site, so that the pile forming speed is high, and the construction quality is high.
5. The square pile foundation and the retaining wall body are rigidly connected to form a whole, the square pile foundation and the retaining wall body are stressed integrally, the anti-sliding and anti-overturning capabilities of the square pile foundation are fully exerted, and the stress performance is superior to that of a traditional cantilever type retaining wall.
Drawings
Fig. 1 is a cross-sectional view of a cantilevered retaining wall for trenchless construction.
Fig. 2 is a longitudinal sectional view of the cantilever type retaining wall for trenchless construction.
Detailed Description
The cantilever type retaining wall for trenchless construction shown in fig. 1-2 comprises a railing 1, a wall body 2 and a square pile foundation 3 which are sequentially arranged from top to bottom, wherein the wall body 2 is rigidly connected with the square pile foundation 3, and the wall body 2 and the square pile foundation 3 form a whole to be combined with stress. Be provided with reversed filter layer 4 on the wall 2, wall 2 is inside to be provided with outlet 5, and wall 2 is the same with driven cantilever type retaining wall, but does not have toe and wall heel, and the cross-section width is little, has saved road cross section resource, has reduced and has buried municipal pipeline's conflict with ground. Settlement joints 6 are arranged in the wall body 2 at equal intervals along the longitudinal direction, the railings 1 penetrated by the settlement joints 6 are filled with asphalt-impregnated wood boards in the settlement joints 6, and the interval between every two adjacent settlement joints 6 is 10-15 m. In this embodiment, the settlement joints 6 are arranged at equal intervals of 12m each. The square pile foundation 3 has a rectangular cross section and has higher bending resistance under the same cross section size. The square pile foundations 3 penetrate through the soft soil layer, and the number and the lengths of the square pile foundations 3 are designed and calculated according to the actual foundation bearing capacity and soil mechanical parameters of the soft soil layer. The horizontal height of the bottom end of the wall body 2 is lower than the road surface of the auxiliary road, and the horizontal height of the top end of the wall body 2 is lower than the road surface of the main road.
Non-excavation construction's cantilever type retaining wall implementation case in soft soil foundation place:
the method comprises the following steps: the square pile foundation 3 of the retaining wall is prefabricated in a factory, and the length of the square pile foundation 3 is 0.5 m greater than the designed length.
Step two: after the field is leveled, the concrete position of the square pile foundation 3 is positioned, and the prefabricated square pile foundation 3 can be constructed by adopting a static pressure method or a hammering method.
Step three: and after the prefabricated square pile foundation 3 is qualified by inspection, 0.5 m of pile head concrete is chiseled out to expose the reinforcing steel bars in the square pile foundation 3.
Step four: and (3) carrying out construction of a wall body template of the retaining wall, binding the steel bars of the wall body 2, and welding the steel bars in the square pile foundation 3 and the main steel bars of the wall body 2.
Step five: and (5) pouring concrete of the wall body 2.
Step six: and maintaining the wall body 2 of the retaining wall, and removing the template after the design strength is reached.
Step seven: and constructing a reverse filtering layer on the rear wall of the wall body 2 of the retaining wall, backfilling after the platform, and compacting by layers.
The above description is only for the preferred embodiment of the present invention, but the present invention is not limited to the above specific embodiments, and those skilled in the art can make various changes and modifications without departing from the inventive concept of the present invention, which falls into the protection scope of the present invention.

Claims (3)

1. The utility model provides a cantilever type retaining wall of non-excavation construction, characterized by, railing (1), wall (2) and square pile basis (3) that set gradually including top-down, wall (2) with square pile basis (3) rigid connection, be provided with reversed filter (4) on wall (2), wall (2) inside is provided with outlet (5), be provided with settlement joint (6) along vertical equidistant in wall (2), settlement joint (6) run through railing (1), fill in settlement joint (6) and have the pitch-impregnated plank, square pile basis (3) adopt the rectangular cross section.
2. A cantilevered retaining wall for trenchless construction as claimed in claim 1, wherein the square pile foundation (3) penetrates soft soil, the bottom end of the wall body (2) has a lower level than a sub road surface, and the top end of the wall body (2) has a lower level than a main road surface.
3. The trenchless construction cantilevered retaining wall of claim 1, wherein a distance between adjacent two settlement joints (6) is 10-15 m.
CN202120559024.6U 2021-03-18 2021-03-18 Cantilever type retaining wall of non-excavation construction Active CN215367385U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120559024.6U CN215367385U (en) 2021-03-18 2021-03-18 Cantilever type retaining wall of non-excavation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120559024.6U CN215367385U (en) 2021-03-18 2021-03-18 Cantilever type retaining wall of non-excavation construction

Publications (1)

Publication Number Publication Date
CN215367385U true CN215367385U (en) 2021-12-31

Family

ID=79624727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120559024.6U Active CN215367385U (en) 2021-03-18 2021-03-18 Cantilever type retaining wall of non-excavation construction

Country Status (1)

Country Link
CN (1) CN215367385U (en)

Similar Documents

Publication Publication Date Title
CN104018518A (en) Prefabricated underground diaphragm wall and method for constructing outer basement wall and floor slabs
CN105756091B (en) A kind of Metro station excavation construction method of control adjacent building composition deformation
CN112554198B (en) Construction method of deep foundation pit protection structure adjacent to high-rise building
CN110777806B (en) Multi-connecting-rod plane frame permanent supporting structure and construction process thereof
CN108385693B (en) Equal-generation anchor bolt supporting method and system for staged basement supporting
CN204000925U (en) Prefabricated diaphragm wall
CN110593080B (en) Inter-support trestle system combined with inner support system and construction method
CN211200426U (en) Anti-sliding supporting and retaining structure for miniature steel pipe pile retaining wall
CN101892670B (en) Multifunctional cofferdam of steel sheet piles and concrete arch rings construction method thereof
CN111622234B (en) Unloading type thin-wall box-type retaining wall supported by obliquely and vertically combined steel pipe pile and construction process
CN114086590A (en) Pre-reinforcing device for repairing pile foundation of transmission terminal tower and construction method thereof
CN104712341A (en) Shallow burial soil area shield driving stratum strengthening system and construction method thereof
CN215367385U (en) Cantilever type retaining wall of non-excavation construction
CN217078834U (en) Cement tank foundation suitable for silt geology
CN210887256U (en) Straight combined sheet pile-ground wall-connecting type frame of water retaining cofferdam
CN211421179U (en) Existing pipe gallery underground space and supporting construction thereof
CN211228521U (en) Frame bridge supporting construction
CN212375698U (en) Ultrahigh composite reinforced earth abutment combined with prestressed anchor cable
CN201756700U (en) Multifunctional steel sheet pile concrete arch ring cofferdam
CN114855819B (en) Municipal road deep foundation pit supporting structure and construction process
CN219195966U (en) Composite filling side slope supporting and retaining structure
CN115198787B (en) Steel tube column type tower crane foundation and construction method thereof, and cover-excavation reverse construction method
CN115030200B (en) Integrated cofferdam structure for construction of offshore side underwater bridge foundation and construction method
CN219568637U (en) Buried drainage box culvert
CN204000837U (en) A kind of prefabricated diaphragm wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 300051 No. 239, Yingkou Road, Heping District, Tianjin

Patentee after: Tianjin municipal engineering design and Research Institute Co.,Ltd.

Address before: 300051 No. 239, Yingkou Road, Heping District, Tianjin

Patentee before: TIANJIN MUNICIPAL ENGINEERING DESIGN & Research Institute