CN214993829U - Ultra-large amplitude variable pile frame type pile driving ship - Google Patents

Ultra-large amplitude variable pile frame type pile driving ship Download PDF

Info

Publication number
CN214993829U
CN214993829U CN202120356855.3U CN202120356855U CN214993829U CN 214993829 U CN214993829 U CN 214993829U CN 202120356855 U CN202120356855 U CN 202120356855U CN 214993829 U CN214993829 U CN 214993829U
Authority
CN
China
Prior art keywords
pile
pair
main frame
platform
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120356855.3U
Other languages
Chinese (zh)
Inventor
沈火群
胡灵斌
卢益峰
胡春宝
孙钦扬
陈雪峰
陈建章
黄超
朱亚洲
胡敏
郭婷
顾俊
沈栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Third Harbor Engineering Co Ltd
Original Assignee
CCCC Third Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Third Harbor Engineering Co Ltd filed Critical CCCC Third Harbor Engineering Co Ltd
Priority to CN202120356855.3U priority Critical patent/CN214993829U/en
Application granted granted Critical
Publication of CN214993829U publication Critical patent/CN214993829U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses an ultra-large becomes width of cloth pile frame formula pile driving ship, including supporting device, pile gripper and the pile holder of hull, pile frame, longkou, the width of cloth hydro-cylinder, hydraulic hammer. The ship body is of a steel box type structure, an object nose bridge is arranged at the bow part of the ship body, and a variable amplitude oil cylinder support and a pair of hinge-changing support rod supports are arranged at the middle bow part of a main deck of the ship body; the middle stern part of the main deck of the ship body is provided with an superstructure and a bracket; ten ship moving winches, seven hoisting winches and two general cargo cranes are arranged on the main deck of the ship body; the pile frame comprises a main frame, a pile hanging platform, an auxiliary frame and a hanging hammer platform; the lower part of the main frame is also provided with a dragon mouth backrest mechanism; the auxiliary frame is of a four-side variable cross-section truss structure; the closure is welded on the middle parts of the front surfaces of the upper, middle and lower layer auxiliary frame platforms, the ninth layer main frame platform and the first layer main frame platform and the front surface of the closure lower backrest; the bottom of the amplitude variation oil cylinder is hinged on the lower hinged support of the amplitude variation oil cylinder. The utility model discloses a pile frame light in weight can be convenient for become width of cloth hydro-cylinder lectotype, reduces construction cost.

Description

Ultra-large amplitude variable pile frame type pile driving ship
Technical Field
The utility model relates to an ultra-large becomes width of cloth pile frame formula pile driving ship.
Background
Piling modes of the overwater pile foundation engineering are mainly three, namely variable amplitude pile frame type piling ship piling, platform or crane ship piling and vibrating hammer hanging piling. The second pile driving form is generally suitable for vertical pile foundation construction, is used for construction of large steel pipe piles of offshore wind power plants and offshore oil projects, and cannot be suitable for construction of wharf pile foundations and offshore wind power high-rise pile cap inclined piles; the third pile driving form construction generally uses small pile foundation construction such as steel sheet pile on water and offshore wind power platform fixing pile. The construction of the pile foundation of the projects such as the present harbor construction, ocean engineering, cross-sea bridge, offshore wind power high pile cap and the like basically adopts the first piling form.
The development of the variable-amplitude pile frame type pile driving ship is divided into four stages: the 40 m pile frame is in the middle of the 70 th generation, the 70 m pile frame is in the 90 th generation, and the 90 m pile frame is in the new century and the pile frame with the length of more than 100 m is in the present stage. However, in the last decade, new energy construction is vigorously advocated in China, offshore wind power is produced at the same time, the development speed is high, construction equipment cannot meet the market demand, the installed capacity is increased to 12MW from the initial 4MW, the water depth is increased gradually, the water depth of a wind field sea area of the offshore wind power reaches 40 meters, the longest length of a single inclined pile is 133 meters, the pile weight is over 340t, the wind field hydrological condition is severe, the wave length of surge is long, and the existing variable-amplitude pile frame type pile driving ship cannot complete the construction task. In addition, the engineering piles of the sea-crossing bridge are basically 80 meters long and more than 1.5 meters in pile diameter, and even larger piles are needed. Therefore, a novel ultra-large variable-amplitude pile frame type pile driving ship is urgently needed to be developed to meet the requirement of engineering construction.
The existing luffing pile frame type pile driving ship mainly has the following problems:
1) when the piling ship is used for piling, along with the increase of piling depth, the pile hammer moves closer to the lower end of the dragon mouth, the hammering force is larger and larger, and because the dead weight of the pile hammer is larger, the cantilever section at the lower part of the dragon mouth of the box-shaped structure can bear large radial load, the cantilever section at the lower part of the dragon mouth is supported by the backrest of the box-shaped structure at present, so that the weight of the whole pile frame can be increased, the section modulus of the pile frame is lower, the manufacturing cost is increased, the ship performance is influenced, and the type selection of the variable amplitude oil cylinder is restricted. At present, both a pile hanging platform and a hammer hanging platform are of box-shaped structures, forward cantilevers are long, and bending section modulus of box girders is large. Because the self weight of the pile frame and the gravity height greatly influence the stress of the variable-amplitude oil cylinder, the moment generated by the pile frame under the pile driving working condition accounts for about 35-40% of the total moment of the variable-amplitude oil cylinder, and the thrust of the variable-amplitude oil cylinder is determined by the weight of the pile frame and the gravity position under the inverted frame working condition. Therefore, on the premise of meeting the requirements of structural strength and rigidity, the pile frame structure is optimized, the weight of the pile frame is reduced as much as possible, the height of the center of gravity is reduced, and the method is one of the main means for reducing the cost and improving the use safety of the variable amplitude oil cylinder.
2) At present, when a pile frame of a pile driving barge is placed on a bracket, an upper fulcrum of a rear main pipe of a main pile frame is generally placed in a placing groove in which a hardwood is padded at the head of the bracket, and the bottom surface of the placing groove is an inclined surface matched with the inclination of the rear main pipe; the whole pile frame is supported by the support and the bracket on the bridge of the nose of a subject at three points. When the pile frame adopts the rear main pipe to support, the stability of the pile frame in a shelving state is poor, the swing of the pile frame in the towing process is more obvious, and in addition, because the inclination of the contact surface of the top surface of the bracket and the rear main pipe is consistent, the head of the bracket can bear horizontal force and generate great bending moment to the root of the bracket, so that the load of the bracket is increased.
3) The pile frame type pile driving ship generally adopts a diesel hammer hung on a dragon mouth to drive the pile. The striking energy of the diesel hammer is 200-300 kj, so that the energy efficiency is low, the pile sinking requirement of the offshore wind power large pile cannot be met, and particularly the pile foundation bearing platform foundation with the pile diameter of 1-3 m cannot be met. Because the energy efficiency of the hydraulic hammer acting on the pile top reaches 80 percent, the striking force and the energy efficiency are far greater than those of a diesel hammer, the multi-pile bearing platform of offshore wind power adopts the hydraulic hammer to sink the pile. At present, large-scale hydraulic hammers are used for hoisting and beating of crane ships. If the pile frame type pile driving ship is adopted to carry out pile sinking construction of offshore wind power, a large hydraulic hammer is required to replace a diesel hammer to be applied to the pile frame type pile driving ship. The hydraulic hammer is different and the diesel hammer, and the hammer block surface of hydraulic hammer does not have the longkou foot, can't directly carry out reasonable linking with the longkou of pile driving ship, and the hydraulic hammer is higher than the diesel hammer to the eccentricity requirement of stake.
4) The pile diameter range that very large pile driving ship can be executed is 1.6 meters-5 meters, the pile length is 80 meters-140 meters, therefore the sliding platform that can adjust the hammering center is equipped with on the drop hammer platform at the top of the pile frame. Under the circumstances at pile frame top adjustment hammering center, if adopt traditional pile gripper of fixed hammering center, then can't satisfy the construction requirement of stake position accurate positioning, and cause the damage of pile gripper, pile frame structure and accessory component easily.
5) The pile cap of the pile hammer is connected with a dragon mouth fixed in the middle of the front of the pile frame through a dragon mouth foot on the back of the pile hammer and can move up and down along the dragon mouth, the pile cap and the pile frame are relatively fixed and belong to static connection, and the steel pipe pile is tied and fixed with the main lifting hook through a pile hanging steel wire rope and is flexibly connected with the pile frame and belongs to dynamic connection. Along with the construction of the pile foundation, the sea area is more and more distant offshore, the water depth of the sea area is more and more deep, the natural conditions of the sea area are worse, the wind wave and the surge are larger, the pile frame height and other performances of the pile driving ship in site construction can be further improved, particularly, the pile length of the pile sinking is longer, the influence range of the wind wave of the sea area on the pile top is larger, after the pile erecting is completed in the construction process, the work that the pile cap of the pile driving hammer is required to be sleeved with the pile top at the top of the pile frame is more difficult, and the safety risk during construction is larger.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's defect and provide a super large-scale width of cloth stake posture pile driver, it can alleviate pile frame weight, is convenient for become the lectotype of width of cloth hydro-cylinder, reduces the construction cost of boats and ships, improves the ship performance.
The purpose of the utility model is realized like this: an ultra-large variable-amplitude pile frame type pile driving ship comprises a ship body, a pile frame, a keel, a variable-amplitude oil cylinder, a matching device of a hydraulic hammer, a pile gripper and a pile lifter;
the ship body is of a steel box type structure, an object nose bridge is arranged at the bow part of the ship body, and a variable amplitude oil cylinder support and a pair of hinge-changing support rod supports are arranged at the middle bow part of a main deck of the ship body; the middle stern part of the main deck of the ship body is provided with an upper building, and the middle part of the top surface of the upper building is provided with a bracket; ten ship moving winches, seven hoisting winches and two general cargo cranes are arranged on the main deck of the ship body;
the pile frame comprises a main frame, a pile hanging platform fixed on the top surface of the main frame, an auxiliary frame fixed on the top surface of the pile hanging platform and a hanging hammer platform fixed on the top surface of the auxiliary frame;
the main frame sequentially comprises a main frame lower part, a main frame main body and a main frame upper part from bottom to top; the main frame main body is of an isosceles inverted triangular variable cross-section truss structure and comprises a pair of front main pipes, a rear main pipe and third to eighth layers of main frame platforms which are all in an isosceles triangle shape; the pair of front main pipes extend upwards to the upper part of the main frame, and the pair of front main pipes extend downwards to the lower part of the main frame and are hinged with a pair of object nose bridges; the lower end of the rear main pipe is provided with a pile frame rear included angle structure, and the lower end of the pile frame rear included angle structure is hinged with a pair of exchange hinge support rods; a slide way is connected between the rear included angle structure of the pile frame and the middle part of a front transverse pipe of a fourth-layer main frame platform, the lower end of the slide way is a first upper hinge point of a variable amplitude oil cylinder, and the upper end of the slide way is a second upper hinge point of the variable amplitude oil cylinder; the lower part of the main frame comprises a negative second-layer main frame platform, a negative first-layer main frame platform, a No. 0 main frame platform, a first-layer main frame platform and a second-layer main frame platform which are arranged from bottom to top;
the auxiliary frame is of a four-side variable cross-section truss structure and comprises a pair of front supporting tubes, a pair of rear supporting tubes, an upper auxiliary frame platform, a middle auxiliary frame platform and a lower auxiliary frame platform; the upper, middle and lower layer subframe platforms correspondingly comprise an upper layer front beam, a middle layer front beam and a lower layer front beam one by one;
the bottom of the variable amplitude oil cylinder is hinged to the lower hinged support of the variable amplitude oil cylinder; when the pile is planted, the upper end of a piston rod of the amplitude-variable oil cylinder is hinged to a first upper hinge point of the amplitude-variable oil cylinder; when the pile frame is placed, the upper end of a piston rod of the amplitude-variable oil cylinder is hinged to a second upper hinge point of the amplitude-variable oil cylinder; wherein,
the bracket comprises four supporting tubes and is a space truss with tapered left and right side surfaces and isosceles trapezoid front and back side surfaces; the top surfaces of the two supporting tubes on the left side of the bracket and the top surfaces of the two supporting tubes on the right side of the bracket are respectively and symmetrically provided with a placing seat;
the upper part of the main frame comprises a pair of front main pipes, two rear inclined pipes which are connected with the tops of the rear main pipes in a V-shaped manner, two rear straight pipes which are connected with the upper ends of the two rear inclined pipes in a one-to-one correspondence manner, and a ninth layer of main frame platform which is connected between the lower ends of the two rear straight pipes and the pair of front main pipes and is in an isosceles trapezoid shape; the lower ends of the two rear straight pipes are fulcrums which are contacted with the two placing seats on the bracket when the pile frame is inclined backwards, a support is respectively arranged on the rear side surfaces of the two fulcrums, and the panels of the two supports are horizontal when the pile frame is inclined backwards to a placing angle and are placed on the two placing seats of the bracket in a one-to-one correspondence manner;
the No. 0 main frame platform, the first layer main frame platform and the second layer main frame platform are all isosceles trapezoids and respectively comprise a front cross bar, two side bars and a rear cross bar, and the lengths of the rear cross bar of the No. 0 main frame platform, the rear cross bar of the first layer main frame platform and the rear cross bar of the second layer main frame platform are equal; the negative one-layer main frame platform and the negative two-layer main frame platform are both in an isosceles triangle shape and respectively comprise two side rods and a rear cross rod;
the lower part of the main frame is also provided with a spout backrest mechanism, and the spout backrest mechanism comprises a spout lower backrest, a pair of lower rear main rods, a pair of upper rear support rods and a pair of lower rear support rods; the lower keel backrest is fixed in the middle of a front cross rod of the first layer main frame platform, the middle of a front cross rod of the No. 0 main frame platform, the front ends of two side rods of the negative one-layer main frame platform and the front ends of two side rods of the negative two-layer main frame platform; the pair of lower rear main rods are connected between the lower ends of the rear main pipes and the pair of front main pipes in an inverted V shape and are intersected with the two ends of the rear cross rod of the second-layer main frame platform; the pair of upper rear support rods are connected between the two ends of the rear cross rod of the second layer of main frame platform and the two ends of the rear cross rod of the No. 0 main frame platform in a parallel and forward inclining manner and are intersected with the two ends of the rear cross rod of the first layer of main frame platform; the pair of lower rear support rods are connected between the lower ends of the pair of upper rear support rods and the two side surfaces of the lower part of the lower backrest of the closure in a V shape and are respectively intersected with the two ends of the rear cross rod of the negative one-layer main frame platform and the two ends of the rear cross rod of the negative two-layer main frame platform;
the closure is welded on the middle parts of the front surfaces of the upper, middle and lower layer auxiliary frame platforms, the ninth layer main frame platform and the first layer main frame platform and the front surface of the closure lower backrest;
the matching device of the hydraulic hammer comprises a hydraulic hammer guide frame, a hydraulic hammer, a hanging beam, a transition pile cap and a pile sinking pile cap; the hydraulic hammer guide frame comprises a hydraulic hammer guide frame, a hydraulic hammer and a hydraulic hammer, wherein two pairs of dragon mouth feet are arranged on the back surface of the hydraulic hammer guide frame at intervals, so that the hydraulic hammer guide frame can be slidably arranged on a dragon mouth through the two pairs of dragon mouth feet, two anchor ears are arranged on the front surface of the hydraulic hammer guide frame corresponding to two ring grooves on the hydraulic hammer, and the hydraulic hammer is arranged on the hydraulic hammer guide frame through the two anchor ears; the middle part of the bottom surface of the hanging beam is provided with a pair of hanging beam lifting lugs for clamping the hydraulic hammer lifting lugs of the hydraulic hammer and is connected with the hydraulic hammer lifting lugs through a pin shaft; the top of the transition pile cap cylinder is provided with a flange and is connected with a flange at the bottom of the hydraulic hammer through a flange bolt; the pile sinking pile cap is slidably arranged on the closure through a pair of closure feet; when the hammer is lifted, the pile sinking cap and the transition cap are connected by two chains, and when the hammer is used for sinking the pile, the connection between the chains and the pile sinking cap is disconnected;
the pile gripper is arranged on a No. 0 main frame platform of the main frame;
and the pile holding device is arranged on a fourth layer of main frame platform of the main frame.
In the ultra-large variable-amplitude pile frame type pile driving vessel, wherein,
a lower-layer front cross beam cantilever extends to the right outer side of a lower-layer front cross beam in a lower-layer subframe platform of the subframe;
the pile hanging platform comprises a rear cross beam, a left longitudinal frame beam, a right outer longitudinal beam, a front cross beam, a left hanging beam with the rear end connected to the front end of the left longitudinal frame beam, a right hanging beam with the rear end connected to the front end of the right longitudinal frame beam, a right outer hanging beam with the rear end connected to the front end of the right outer longitudinal beam and a front outer cross beam connected to the front end of the right hanging beam and the front end of the right outer hanging beam;
a pull rod mechanism is also arranged between the pile hanging platform and the auxiliary frame, and comprises a straight pull rod and first to fifth diagonal pull rods; the straight pull rod is connected between the right end of the front cross beam and the outer end of a lower front cross beam cantilever of the subframe; the first diagonal draw bar is connected between the front end of the left hanging beam and the left end of the lower-layer front cross beam of the subframe; the second diagonal draw bar is connected between the front end of the right hanging beam and the right end of the lower-layer front cross beam of the subframe; the third diagonal draw bar is connected between the front end of the right outer hanging beam and the outer end of the lower front cross beam cantilever of the subframe; the fourth diagonal draw bar is connected between the rear end of the right outer hanging beam and the right end of the lower-layer front cross beam of the subframe; and the fifth diagonal draw bar is connected between the right part of the rear cross beam and the outer end of the lower front cross beam cantilever of the subframe.
In the ultra-large variable-amplitude pile frame type pile driving barge, the hammer platform comprises a top left longitudinal beam, a top right longitudinal beam, a top rear cross beam, a top middle cross beam and a top front cross beam; the left longitudinal beam is fixed on the top surface of the front supporting tube and the top surface of the rear supporting tube which are positioned on the left side of the subframe; the top right longitudinal beam is fixed on the top surface of the front supporting tube and the top surface of the rear supporting tube which are positioned on the right side; the top rear cross beam is fixed at the rear end of the top left longitudinal beam and the rear end of the top right longitudinal beam; the top middle cross beam is fixed between the top surfaces of a pair of front supporting tubes of the subframe; the top front cross beam is bridged between the front end of the top left longitudinal beam and the front end of the top right longitudinal beam;
and a support rod mechanism is further arranged between the drop hammer platform and the auxiliary frame and comprises two inclined support rods which are connected between the middle part of the bottom surface of the front section of the top left longitudinal beam and the left side of the top surface of the opening and between the middle part of the bottom surface of the front section of the top right longitudinal beam and the right side of the top surface of the opening in a one-to-one correspondence manner.
In the ultra-large variable-amplitude pile frame type pile driving barge, two horizontal inclined connecting rods are respectively connected between the two ends of the rear cross rod of the first layer main frame platform and the pair of upper rear support rods; an inclined connecting rod is respectively connected between the lower ends of the pair of upper rear supporting rods and the outer ends of the two horizontal inclined connecting rods.
In the ultra-large variable-amplitude pile frame type pile driving barge, the hydraulic hammer guide frame is of a quadrangular prism structure; two supporting feet are respectively arranged on two sides of a pair of lifting lugs of the lifting beam on the bottom surface of the lifting beam, and a lifting beam pulley for hanging a steel wire rope of the lifting hammer is arranged on the lifting beam; the transition pile cap comprises a transition pile cap cylinder and a transition anvil; a circle of lower limiting ring is arranged at the bottom of the inner wall of the transition pile cap cylinder, and a pair of upper hanging lugs is fixed on the outer surface of the transition pile cap cylinder in a centrosymmetric manner; the top of the transition pile cap cylinder is provided with a flange and is connected with the bottom flange of the hydraulic hammer through a flange bolt, so that the hammer core of the hydraulic hammer is positioned at the upper part of the inner cavity of the transition pile cap cylinder; the outer diameter of the transition anvil is larger than the outer diameter of the hammer core and is matched with the inner diameter of the lower limiting ring, the top of the outer surface of the transition anvil is provided with a circle of upper limiting ring with the outer diameter matched with the inner diameter of the transition pile cap cylinder, and the transition anvil is arranged in the inner cavity of the transition pile cap cylinder and the lower part of the transition anvil is exposed out of the bottom surface of the transition pile cap cylinder through the limiting of the upper limiting ring and the lower limiting ring; the pile sinking pile cap comprises a pile cap cylinder, an anvil and a pile cap cover plate, wherein a pair of tap feet are arranged on the back surface of the pile cap cylinder, so that the pile sinking pile cap can be slidably arranged on the tap through the pair of tap feet, and the middle part of the inner wall of the pile cap cylinder is divided into an upper pile cap cylinder and a lower pile cap cylinder through a circle of convex ring; the anvil is arranged in the upper pile cap cylinder; the pile cap cover plate is fixed at the top of the pile cap cylinder, a transition anvil through hole is formed in the center of the pile cap cover plate, and a pair of lower lugs is arranged on the pile cap cover plate in a central symmetry mode on the periphery of the transition anvil through hole; when the hammer is lifted, the two chains are correspondingly connected between the pair of lower lugs of the pile sinking cap and the pair of upper lugs of the transition pile cap one by one.
The ultra-large luffing pile-frame type pile driving barge is characterized in that the pile embracing device comprises a lower fixed seat, a lower longitudinal telescopic oil cylinder, a lower sliding seat, a pair of large rocker arms, a pair of small rocker arms, a pair of large rocker arm oil cylinders, a pair of small rocker arm oil cylinders, a pair of large embracing arms and a pair of small embracing arms; the lower fixing seat is arranged on the No. 0 main frame platform; the lower longitudinal telescopic oil cylinder is arranged on an oil cylinder seat in the middle of the rear end of the lower fixed seat; the lower sliding seat is slidably arranged at the middle front part of the lower fixed seat, the middle part of the rear end of the lower sliding seat is connected with the piston rod of the lower longitudinal telescopic oil cylinder, two front hinged supports are respectively and symmetrically arranged on two side surfaces of the front part of the lower sliding seat, and two rear hinged supports are respectively and symmetrically arranged on two side surfaces of the rear part of the lower sliding seat; the rear ends of the large rocker arms are hinged with the two front hinged supports of the lower sliding seat in a one-to-one correspondence manner; the inner side surfaces of the middle parts of the large rocker arms are respectively provided with a large armful arm seat along the radial direction; the middle parts of the inner sides of the pair of small rocker arms are hinged with the front ends of the pair of large rocker arms in a one-to-one correspondence manner; the inner side surfaces of the front parts of the small rocker arms are respectively provided with a small armful arm seat along the radial direction; the rear ends of the large rocker arm oil cylinders are hinged with the two rear hinged supports of the lower sliding seat in a one-to-one correspondence manner, and piston rods of the large rocker arm oil cylinders are hinged with the middle parts of the outer sides of the large rocker arms in a one-to-one correspondence manner; the rear ends of the pair of small rocker arm oil cylinders are hinged with the middle parts of the outer sides of the pair of large rocker arms in a one-to-one correspondence manner, and the piston rods of the pair of small rocker arm oil cylinders are hinged with the rear ends of the pair of small rocker arms in a one-to-one correspondence manner; the pair of large armful arms are correspondingly arranged on the pair of large armful arm seats one by one; the pair of small embracing arms are correspondingly arranged on the pair of small embracing arm seats one by one.
In the ultra-large variable-amplitude pile frame type pile driving vessel, the pile supporting device comprises an upper fixed support, an upper rear support seat, a pair of upper longitudinal telescopic oil cylinders, an upper sliding seat, a pair of extending arms, a pair of handrail oil cylinder seats and a pair of telescopic handrails; the upper fixing support is arranged on a sixth layer of main frame platform of the main frame main body; the upper back support seat is fixed at the rear end of the upper fixing bracket; a pair of upper longitudinal telescopic oil cylinders are arranged on the upper rear supporting seat from left to right; the upper sliding seat is slidably arranged on the upper fixed support, and the left rear end and the right rear end of the upper sliding seat are hinged with piston rods of the upper longitudinal telescopic oil cylinders in a one-to-one correspondence manner; the pair of the extending arms are fixedly connected to the left front end and the right front end of the upper sliding seat in a one-to-one correspondence mode, and openings of the extending arms face backwards; the surface of the handrail oil cylinder seat is provided with a plurality of pairs of connecting holes, and the rear end surfaces of the pair of handrail oil cylinder seats are welded on the front end surfaces of the pair of extending arms in a one-to-one correspondence manner; bolt holes are formed in the telescopic handrails corresponding to the bolt holes in the handrail oil cylinder bases, and the pair of telescopic handrails are installed on the pair of handrail oil cylinder bases in a one-to-one correspondence mode through the bolts.
The utility model discloses an ultra-large-scale width of cloth pile frame formula pile driving ship has following characteristics:
1. and optimizing the ship model based on the wave-resistance theoretical calculation to obtain the main scale of the ship with the best wave-resistance.
2. The pile frame is optimized as follows: the variable-amplitude oil cylinder can reduce the weight of the pile frame, is convenient for the selection of the variable-amplitude oil cylinder, can finish the variable-amplitude action of all the pile frames by only adopting one variable-amplitude oil cylinder, changes the condition that the prior similar ship needs three variable-amplitude oil cylinders, namely a main variable-amplitude oil cylinder and an auxiliary variable-amplitude oil cylinder, reduces the construction cost of the ship, and improves the performance of the ship.
3. The pile frame laying structure is optimized, so that the whole pile frame is supported by two hinged supports at the front lower part and two-point horizontal support at the rear part to form four-point support, when the rear part of the pile frame is laid on the bracket, the top of the bracket only bears vertical force, so that the phenomenon that the bracket root is subjected to large bending moment after the bracket top bears horizontal force can be effectively avoided, the load of the bracket is greatly reduced, and the structural optimization of the bracket is facilitated. Simultaneously, because whole pile frame is emptyd the back backward and is supported by four points, the pile frame is more stable at the towing in-process, simultaneously through the limiting displacement who shelves the vertical portion of seat, can effectively reduce the left and right rocking of towing in-process pile frame.
4. The utility model designs a supporting device of hydraulic hammer enables the hydraulic hammer that the model is S-800 and is applied to on the pile driver ship, satisfies the pile sinking needs of the large-scale stake of marine wind power:
5. the utility model discloses a centre-to-centre spacing of embracing the stake can be adjusted to the pile gripper, and embraces firmly, and the opening of opening can also enlarge the construction stake footpath scope of pile driving barge.
6. The utility model discloses a can conveniently accomplish the pile cap of pile hammer and the work of cup jointing on the pile bolck at the top of pile frame, set up pile holder on the sixth layer platform of pile frame, change and the change of stake footpath at the hammering center when this pile holder can not only adapt to the construction of pile driver to enable the pile cap to overlap on the pile bolck more easily.
Drawings
Fig. 1 is a side view of an ultra-large luffing pile-frame piling ship of the present invention;
fig. 2 is a top view of the main deck of the ultra-large luffing piler pile driving vessel of the present invention;
fig. 3 is a front view of the pile frame of the ultra-large variable-amplitude pile frame type pile driving barge according to the invention;
fig. 4 is a side view of the pile frame of the ultra-large variable amplitude pile frame type pile driving barge according to the invention;
figure 5 is a side view of the lower part of the main frame of the pile driving barge according to the invention;
FIG. 6 is a view taken in the direction A of FIG. 5;
FIG. 7 is a view from the direction B in FIG. 5;
fig. 8 is a front view of the upper part of the pile hanging platform of the pile frame of the pile driving barge according to the invention;
figure 9 is a side view of the upper part of the pile hanging platform of the pile frame of the pile driving barge according to the invention;
figure 10 is a top view of the pile hanging platform of the pile frame of the pile driving barge according to the invention;
FIG. 11 is a view from the C-C direction in FIG. 9;
figure 12 is a top view of the drop hammer platform of the pile frame of the pile driving barge according to the invention;
fig. 13 is a rear view of the upper part of the main frame of the pile frame of the present invention;
figure 14 is a front view of the carriage of the piling vessel of the present invention;
figure 15 is a side view of the piling vessel of the present invention with the pile frame in a resting position;
FIG. 16 is a left side view of FIG. 15;
figure 17 is an isometric view of the kit for the hydraulic hammer of the piling vessel of the present invention;
figure 18 is a front view of the kit of the hydraulic hammer of the piling vessel of the present invention;
FIG. 19 is a side view of FIG. 18;
FIG. 20 is a view from direction D-D of FIG. 19;
fig. 21 is a side view of a pile gripper of the present invention;
fig. 22 is a top view of the pile gripper of the present invention;
fig. 23a is a schematic structural view of a first-stage arm of the pile gripper of the present invention;
fig. 23b is a schematic structural view of a second-stage arm of the pile gripper of the present invention;
fig. 23c is a schematic structural view of a third-stage arm of the pile gripper of the present invention;
fig. 24a is a state diagram of the pile embracing device of the present invention in which the large and small swing arms are opened at the maximum hammering center;
fig. 24b is a state diagram of the pile gripper of the present invention with the large rocker arm clasped and the small rocker arm opened at the maximum hammering center;
fig. 24c is a state diagram of the large and small rocker arms clasping when the pile embracing device of the present invention is at the maximum hammering center;
fig. 25a is a state diagram of the pile embracing device of the present invention in which the large and small swing arms are opened at the maximum hammering center;
fig. 25b is a state diagram of the pile gripper of the present invention with the large rocker arm clasped and the small rocker arm opened at the maximum hammering center;
fig. 25c is a state diagram of the large and small rocker arms clasping when the pile gripper is at the maximum hammering center.
Fig. 26 is a side view of the pile guide of the present invention;
fig. 27 is a top view of the pile guide of the present invention;
fig. 28 is a side view of the upper fixing bracket and the upper back-support base of the pile guide of the utility model mounted on the sixth-layer main frame platform;
fig. 29a is a top view of the relative position of the pile lifter according to the present invention with respect to the sixth main frame platform when the pile lifter is used for holding a pile at the maximum hammering center;
fig. 29b is a top view of the relative position of the pile lifter of the present invention with respect to the sixth layer of main frame platform when the pile lifter is used for supporting the pile at the minimum hammering center;
fig. 29c is a top view of the relative position of the pile guide of the present invention and the sixth main frame platform in the non-operating state.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings.
Referring to fig. 1 to 29c, the ultra-large variable-amplitude pile frame type pile driving vessel of the present invention includes a hull 10, a pile frame 20, a keel 30, a variable-amplitude cylinder 50, a hydraulic hammer 60, a hydraulic hammer support device 60A, a pile gripper 70, and a pile holder 80.
An object bridge 10A is arranged at the bow of the hull 10, and a luffing cylinder support 501 and a pair of hinge-changing support 502 are arranged at the middle bow of a main deck of the hull; the left bow of the main deck of the ship body is provided with first to fifth ship-moving winches 101-105, and the right bow of the main deck of the ship body is provided with sixth to tenth ship-moving winches 106-110; an upper building 10B is arranged at the middle stern part of the main deck of the ship body, and a bracket 40 is arranged in the middle of the top surface of the upper building 10B; the middle part of the main deck of the ship body is provided with a left main hoisting pile winch 111, a right main hoisting pile winch 112, an auxiliary hoisting pile winch 113, a hoisting hammer winch 114, a hammer starting winch 115, a left miscellaneous goods winch 116 and a right miscellaneous goods winch 117, and the left middle part and the right middle part of the main deck of the ship body are respectively provided with a miscellaneous goods crane 118 (see figure 2). All be connected reduction gear between first to tenth ship moving winch 101 ~ 110's reel and the driving motor, all be equipped with the housing on the gear box, can the noise reduction, dustproof and corrosion-resistant.
The pile frame 20 includes a main frame 20A, a pile hanging platform 20B fixed to the top surface of the main frame 20A, a sub-frame 20C fixed to the top surface of the pile hanging platform 20B, and a hammer hanging platform 20D fixed to the top surface of the sub-frame 20C.
The main frame 20A sequentially comprises a main frame lower part 201, a main frame main body 200 and a main frame upper part 202 from bottom to top; the main frame main body 200 is of an isosceles inverted triangular variable cross-section truss structure and comprises a pair of front main pipes 211, a rear main pipe 212 and third to eighth layers of main frame platforms 133 to 138, wherein the third to eighth layers of main frame platforms 133 to 138 are all in the shape of an isosceles triangle and respectively comprise a front transverse pipe and a pair of side transverse pipes; a pair of lateral transverse pipes of the fourth layer main frame platform 134 is connected with a pair of lateral transverse pipes of the fifth layer main frame platform 135 through scissor tubes 213; the pair of side transverse pipes of the rest main frame platforms and the pair of side transverse pipes of the adjacent main frame platforms are respectively connected through one side inclined pipe 214 (see fig. 3 and 4), and the inclined pipes 214 are only used for connection, so that the weight can be greatly reduced compared with a cross bracing pipe.
The pair of front main pipes 211 extend upwards to the upper part 202 of the main frame, extend downwards to the lower part 201 of the main frame and are hinged with the pile frame support 10C on the bridge 10A of a pair of objects; the lower end of the rear main pipe 212 is provided with a pile frame rear included angle structure, the lower end of the pile frame rear included angle structure is hinged with two hinge-changing support rods 210, a slide way 220 is connected between the pile frame rear included angle structure and the middle part of a front transverse pipe of the fourth-layer main frame platform, the lower end of the slide way 220 is a first upper hinge point 511 of a variable-amplitude oil cylinder, and the upper end of the slide way 220 is a second upper hinge point 512 of the variable-amplitude oil cylinder (see fig. 1).
The main frame lower part 201 comprises a No. 0 main frame platform 130, a first layer main frame platform 131, a second layer main frame platform 132, a negative layer main frame platform 151 and a negative second layer main frame platform 152 which are all isosceles triangles; the No. 0 main frame platform 130, the first layer main frame platform 131 and the second layer main frame platform 132 respectively comprise a front cross rod, two side cross rods and a rear cross rod; the front cross bar 130a of the No. 0 main frame platform, the front cross bar 131a of the first layer main frame platform and the front cross bar 132a of the second layer main frame platform are connected between a pair of front main pipes 211; the lengths of the rear cross bar 130b of the No. 0 main frame platform, the rear cross bar 131b of the first layer main frame platform and the rear cross bar 132b of the second layer main frame platform are equal; the negative one-layer main frame platform 151 and the negative two-layer main frame platform 152 respectively comprise two side rods and a rear cross rod;
the main frame lower part 201 also comprises a lower back rest 301, a pair of lower rear main rods 121, a pair of upper rear support rods 122 and a pair of lower rear support rods 123; the lower keel backrest 301 is fixed in the middle of the front cross bar 131a of the first layer main frame platform 131, the middle of the front cross bar 130a of the No. 0 main frame platform 130, the front ends of two side bars of the negative one-layer main frame platform 151 and the front ends of two side bars of the negative two-layer main frame platform 152; the pair of lower rear main rods 121 are connected between the lower ends of the rear main pipes 212 and the pair of front main pipes 211 in an inverted V shape and intersect with the two ends of the rear cross rod 132b of the second main frame platform; a pair of upper rear stays 122 are connected in parallel and forward inclined between both ends of the rear cross bar 132b of the second deck main frame platform and both ends of the rear cross bar 130b of the No. 0 main frame platform and intersect both ends of the rear cross bar 131b of the first deck main frame platform; the pair of lower rear support rods 123 are connected between the lower ends of the pair of upper rear support rods 122 and the two lower side surfaces of the lower part of the lower backrest 301 in a V-shaped manner and are intersected with the two ends of the rear cross rod 151b of the negative one-layer main frame platform and the two ends of the rear cross rod 152b of the negative two-layer main frame platform; a horizontal inclined connecting rod 171 is respectively connected between the two ends of the rear cross rod 131b of the first layer main frame platform and the pair of upper rear supporting rods 122; a diagonal connecting rod 172 is respectively connected between the lower ends of the pair of upper rear stay bars 122 and the outer ends of the two horizontal diagonal connecting rods 171;
two first inclined connecting rods 161 in an inverted V shape are arranged between the two ends of the rear cross rod 151b of the negative layer main frame platform and the middle part of the rear cross rod 130b of the No. 0 main frame platform; two second inclined connecting rods 162 in an inverted V shape are arranged between the two ends of the rear cross rod 130b of the No. 0 main frame platform and the middle part of the rear cross rod 131b of the first layer main frame platform; two V-shaped third inclined connecting rods 163 are arranged between the middle part of the rear cross rod 131b of the first layer main frame platform and the two ends of the rear cross rod 132b of the second layer main frame platform;
the two side surfaces of the lower back rest 301 at the position of the main frame platform 151 at the lower layer are respectively connected with a transverse suspension rod 181; a straight suspender 182 is respectively connected between the outer ends of the two transverse suspenders 181 and the front cross bar 130a of the No. 0 main frame platform; a rear stay is connected between the outer ends of the two cross booms 181 and the pair of lower rear stays 123 (see fig. 5 to 7).
The subframe 20C is a four-sided variable cross-section truss structure and includes a pair of front support pipes 31, a pair of rear support pipes 32, a lower-layer subframe platform, a middle-layer subframe platform and an upper-layer subframe platform, wherein the lower-layer subframe platform, the middle-layer subframe platform and the upper-layer subframe platform respectively include a lower-layer front cross beam 33, a middle-layer front cross beam 34 and an upper-layer front cross beam 35 which are bridged between the pair of front support pipes 31; a lower front beam cantilever 330 extends to the right outer side of the lower front beam 33; the front end of the upper front beam 35 also extends with a faucet base 300 (see fig. 8-9).
The middle parts of the front surfaces of the upper, middle and lower auxiliary frame platforms and the middle parts of the front surfaces of the first to ninth main frame platforms are welded with the faucet 30, and the lower cantilever section of the faucet 30 is welded on the front surface of the lower backrest 301 of the faucet. The closure 30 is box-shaped and has waist-circular lightening holes on both sides of the upper part.
The utility model discloses adopt the truss-like structure with the dragon mouth back mechanism of body frame lower part 201 for support the cantilever section of dragon mouth 30 lower part, reduced the cantilever section length of dragon mouth lower part relatively, thereby improved the atress of dragon mouth 30, the truss-like structure can increase the cross-section modulus for the box structure can show moreover, and under equal load condition, the truss-like structure can effectively lighten weight.
The pile hanging platform 20B includes a rear cross member 21, a left longitudinal frame member 22, a right longitudinal frame member 23, a right outer longitudinal member 24, a front cross member 25, a left hanging beam 26B having a rear end connected to the front end of the left longitudinal frame member 22, a right hanging beam 27 having a rear end connected to the front end of the right longitudinal frame member 23, a right outer hanging beam 28 having a rear end connected to the front end of the right outer longitudinal member 24, and a front outer cross member 29 (see fig. 10) connected to the front end of the right hanging beam 27 and the front end of the right outer hanging beam 28.
A pull rod mechanism is further arranged between the pile hanging platform 20B and the auxiliary frame 20C, and comprises a straight pull rod and first to fifth diagonal pull rods; wherein, the drag link 310 is connected between the right end of the front beam 25 and the outer end of the lower front beam cantilever 330 of the sub-frame 20C; the first diagonal member 311 is connected between the front end of the left suspension beam 26 and the left end of the lower front cross member 33 of the sub-frame 20C; the second diagonal member 312 is connected between the front end of the right suspension beam 27b and the right end of the lower front cross member 33 of the sub-frame 20C; a third diagonal tie 313 is connected between the front end of the right outer suspension beam 28b and the outer end of the lower front beam cantilever 330 of the sub-frame 20C; the fourth diagonal member 314 is connected between the rear end of the right outer suspension beam 28 and the right end of the lower front cross member 33 of the sub-frame 20C; the fifth diagonal member 315 is connected between the right portion of the rear cross member 21 and the outer end of the lower front cross member cantilever 330 of the sub-frame 20C (see fig. 11).
The utility model discloses to hang pile platform 20B adopt the box girder structure and with the subframe 20C between set up the link mechanism, increase behind the link mechanism, the moment of flexure greatly reduced that heavy object load produced to hanging pile platform 20B's cantilever hanging beam root when hanging heavily can reduce the bending resistance cross section modulus of box girder, alleviate the weight of hanging pile platform 20B.
The drop hammer platform 20D comprises a top left longitudinal beam 41, a top right longitudinal beam 42, a top rear cross beam 43, a top middle cross beam 44 and a top front cross beam 45; wherein, the top left longitudinal beam 41 is fixed on the top surface of the front stay tube 31 and the top surface of the rear stay tube 32 on the left side of the subframe 20C; the top right side member 42 is fixed to the top surface of the front stay tube 31 and the top surface of the rear stay tube 32 located on the right; the top rear cross beam 43 is fixed at the rear end of the top left longitudinal beam 41 and the rear end of the top right longitudinal beam 42; the top center cross member 44 is fixed between the top surfaces of the pair of front stay tubes 31 of the sub-frame 20C; the top front cross member 45 spans between the front end of the top left side member 41 and the front end of the top right side member 42.
A brace mechanism is further provided between the drop hammer platform 20D and the subframe 20C, and the brace mechanism includes two diagonal braces 400 (see fig. 12) connected between the bottom surface middle part of the front section of the top left longitudinal beam 41 and the top surface left side of the faucet base 300 and between the bottom surface middle part of the front section of the top right longitudinal beam 42 and the top surface right side of the faucet base 300 in a one-to-one correspondence.
The utility model discloses adopt box girder structure and for open type structure with hammerhead platform 20D, and set up vaulting pole mechanism between hammerhead platform 20D and subframe 20C, increase the vaulting pole mechanism back, reduced hammerhead platform 20D's cantilever beam length in other words, make the bending moment greatly reduced that the hammerhead load produced the cantilever beam root to can reduce the bending resistance cross section modulus of box girder, alleviate hammerhead platform 20D's weight.
The main frame upper part 202 comprises a pair of front main pipes 211, two rear inclined pipes 221 connected to the tops of the rear main pipes 212 in a V-shaped manner, two rear straight pipes 222 connected to the upper ends of the two rear inclined pipes 222 in a one-to-one correspondence manner, and a ninth layer of main frame platform 139 connected between the lower ends of the two rear straight pipes 222 and the pair of front main pipes 211, wherein the ninth layer of main frame platform 139 is in an isosceles trapezoid shape; the lower ends of the two rear straight pipes 222 are fulcrums which are contacted with the two resting seats 410 on the bracket 40 when the pile frame 20 is inclined backwards, and a support 420 is respectively arranged on the rear side surfaces of the two fulcrums (see fig. 13); the support 420 comprises a middle longitudinal rib plate, two side plates, a plurality of transverse rib plates and a panel; the rear parts of the two side plates are bent inwards.
The bracket 40 comprises four supporting tubes and is a space truss with tapered left and right sides and isosceles trapezoid front and back sides; the top surfaces of the two support pipes on the left side of the bracket 40 and the top surfaces of the two support pipes on the right side of the bracket are respectively and symmetrically provided with a placing seat 410; the placing seat 410 comprises a lower bottom plate, an outer side plate fixed at the outer end of the lower bottom plate, an L-shaped upper bottom plate, a vertical rib plate fixed between the transverse parts of the lower bottom plate and the upper bottom plate at intervals, a transverse rib plate fixed between the vertical parts of the outer side plate and the upper bottom plate, an inner side plate fixed between the inner end of the lower bottom plate and the inner end of the upper bottom plate, and a top plate fixed between the top end of the outer side plate and the top end of the upper bottom plate, so that the placing seat 410 is of an L-shaped box-shaped structure, the transverse part of the upper bottom plate is a horizontal plane, and the vertical part of the upper bottom plate inclines outwards; the upper plate has a top surface of the lateral portion and an inner side surface of the vertical portion each having a wooden tie plate 418 mounted thereon by bolts (see fig. 14).
The inclination of the bent edges of the two supports 420 of the main frame upper part 202 is matched with the inclination of the vertical parts of the upper bottom plates of the two resting seats 410 on the bracket 40, and the panels of the two supports 420 are horizontal when the pile frame 20 is inclined backwards to the resting angle and rest on the two resting seats 410 of the bracket 40 in a one-to-one correspondence manner (see fig. 15 and 16).
The utility model discloses shelve seat 410 for the horizontal plane at two top surfaces of bracket 40's top installation, and turn into the quadrangular truss with body frame upper portion 202, and the lower extreme of straight tube 222 sets up a support 420 respectively after two of body frame upper portion 202, make pile frame 20 when towing on the air, when pile frame 20 emptys backward, the rear portion of pile frame 20 obtains two-point horizontal support, make whole pile frame 20 by two hinge seats of preceding lower part and two-point horizontal support four-point support at rear portion altogether support, when the rear portion of pile frame 20 is shelved on bracket 40, bracket 40's top only bears the vertical force, can avoid effectively that the bracket 40 top bears the horizontal force after producing very big moment to bracket 40 root, make bracket 40's load reduce by a wide margin, be convenient for bracket 40's structural optimization. Meanwhile, because the whole pile frame 20 is supported by four points after being toppled backwards, the pile frame 20 is more stable in the towing process, and the left-right swinging of the pile frame 20 in the towing process can be effectively reduced through the limiting effect of the vertical part of the placing seat 410.
The bottom of the amplitude variation oil cylinder 50 is hinged with an amplitude variation oil cylinder lower hinged support 501 on a main deck of the ship body; when the pile is planted, the upper end of the piston rod of the amplitude-variable oil cylinder 50 is hinged on a first upper hinge point 511 of the amplitude-variable oil cylinder of the pile frame 20; when the pile frame 20 is placed, the upper end of the piston rod of the luffing cylinder 50 is hinged on the second upper hinge point 512 of the luffing cylinder of the pile frame 20.
The hydraulic hammer 60 is a cylinder and the hammer core 600 protrudes from the bottom surface, the top surface center of the hydraulic hammer 60 is provided with a hydraulic hammer lug 601, and the outer surface of the hydraulic hammer 60 is provided with two annular grooves 602.
The hydraulic hammer kit 60A includes a hydraulic hammer guide 63, a suspension beam 64, a transition pile cap 65, and a pile driving cap 66 (see fig. 17 to 20); wherein;
the hydraulic hammer guide frame 63 is a quadrangular prism structure, two pairs of dragon mouth feet 630 are arranged on the back side of the hydraulic hammer guide frame at intervals, so that the hydraulic hammer guide frame 63 can be slidably arranged on the dragon mouth 30 through the two pairs of dragon mouth feet 630, two anchor ears 631 are arranged on the front side of the hydraulic hammer guide frame 63 corresponding to the two ring grooves 602 on the hydraulic hammer 60, and the hydraulic hammer 60 is arranged on the hydraulic hammer guide frame 63 through the two anchor ears 631; friction plates 632 are also disposed between the inner surfaces of the two anchor ears 631 and the outer surface of the hydraulic hammer 60.
The hanging beam 64 is a box structure beam, and the middle part of the bottom surface of the hanging beam 64 is provided with a pair of hanging beam lifting lugs 641, and the pair of hanging beam lifting lugs 641 are clamped at two sides of the hydraulic hammer lifting lug 601 and connected with the hydraulic hammer lifting lug 601 through a pin shaft; two braces 642 are respectively arranged on two sides of a pair of hanging beam lifting lugs 641 on the bottom surface of the hanging beam 64, and a hanging beam pulley 643 for hanging a steel wire rope of a hanging hammer is also arranged on the hanging beam 64.
The transition pile cap 65 comprises a transition pile cap cylinder 651 and a transition anvil 652; wherein, the bottom of the inner wall of the transition pile cap cylinder 651 is provided with a circle of lower limiting rings 6511, a pair of upper lugs 6512 is fixed on the outer surface of the transition pile cap cylinder 651 in a central symmetry manner, the top of the transition pile cap cylinder 651 is provided with a flange and is connected with the bottom flange of the hydraulic hammer 60 through a flange bolt, so that the hammer core 600 of the hydraulic hammer 60 is positioned at the upper part of the inner cavity of the transition pile cap cylinder 651; the outer diameter of the transition anvil 652 is larger than the outer diameter of the hammer core 600 and is matched with the inner diameter of the lower limiting ring 6511, the top of the outer surface of the transition anvil 652 is provided with a circle of upper limiting ring 6521 with the outer diameter matched with the inner diameter of the transition pile cap cylinder 651, the transition anvil 652 is installed in the inner cavity of the transition pile cap cylinder 651, and the lower part of the transition anvil 652 is exposed out of the bottom surface of the transition pile cap cylinder 651 through the limiting of the upper limiting ring 6521 and the lower limiting ring 6511.
The pile sinking pile cap 66 comprises a pile cap cylinder 661 and a pile cap cover plate 662 mounted on the top of the pile cap cylinder 661 through screws, wherein the back of the pile cap cylinder 661 is provided with a pair of dragon mouth legs 660, so that the pile sinking pile cap 6 can be slidably mounted on the dragon mouth 30 through the pair of dragon mouth legs 660, the middle part of the inner wall of the pile cap cylinder 661 is divided into an upper pile cap cylinder and a lower pile cap cylinder through a circle of convex ring 611, and an anvil 60 is mounted in the upper pile cap cylinder; a transition anvil through hole is formed in the center of the pile cap cover plate 662, and a pair of lower hanging lugs 612 are symmetrically arranged on the periphery of the transition anvil through hole on the pile cap cover plate 662; when the hammer is lifted, the two chains 650 are connected between the pair of lower lugs 612 of the pile sinking cap 66 and the pair of upper lugs 512 of the transition cap 65 in a one-to-one correspondence manner, so that the hydraulic hammer 60, the transition cap 65 and the pile sinking cap 66 are sleeved together for pile driving, and when the pile is driven to sink, the two chains 650 are disconnected from the pile sinking cap 66, so that the pile sinking cap 66 is independently sleeved on the top of a pile to be sunk.
In order to use the hydraulic hammer with the model of S-800 on a pile driver ship, the utility model discloses make following improvement:
1) a hanging beam 64 for lifting and lowering the hydraulic hammer 60 is provided on the top of the hydraulic hammer 60; the lifting and lowering of hydraulic hammer 60 on pile frame 20 is accomplished by a hammer hoist 114 on the pile driving vessel, a pulley mounted on the pile frame top hammer platform 20D, and a boom pulley 643 mounted on boom 64 to allow the lifting and lowering of hydraulic hammer 60 on pile frame 20. Because the hydraulic hammer 60 is hinged with the hanging beam 64, four supporting feet 642 are arranged on the bottom surface of the hanging beam 64, so that the hanging beam 64 can be prevented from toppling over and resting on the top surface of the hydraulic hammer 60 after the steel wire rope of the hanging hammer is loosened during pile sinking;
2) a hydraulic hammer guide frame 63 for ensuring that the hydraulic hammer 60 is parallel to the axis of the pile frame 20 and ensuring the perpendicularity or inclination of the pile sinking is arranged between the closure 39 and the hydraulic hammer 60; the back of the hydraulic hammer guide frame 63 is provided with two pairs of dragon mouth feet 630, the two hoops 631 are respectively arranged corresponding to the two circular grooves 602 on the hydraulic hammer 60, and the two hoops 631 are correspondingly arranged in the two circular grooves 602 of the hydraulic hammer 60 one by one, so that the hydraulic hammer 60 is connected with the dragon mouth 30 by means of the two pairs of dragon mouth feet 630 on the hydraulic hammer guide frame 63; during the piling operation, the hydraulic hammer 60 slides up and down along the keel 30 through the hydraulic hammer guide 63. Because the depth of the ring groove 602 on the hydraulic hammer 60 is only 20mm, in order to prevent the anchor ears 631 from loosening, a friction plate 632 is further arranged between the inner surfaces of the two anchor ears 631 and the outer surface of the hydraulic hammer 60, and a 6mm gap is left between the contact surfaces of the front half anchor ear and the rear half anchor ear of each anchor ear 631, so that pre-tightening is facilitated.
3) According to the delivery requirement of the hydraulic hammer, the hydraulic hammer 60 and the pile sinking cap 66 are connected together through flange bolts, and the hydraulic hammer 60 sleeves the pile along with the pile sinking cap 66 and carries out pile sinking. The pile slipping phenomenon usually occurs during offshore wind power pile sinking, the steel pipe pile suddenly sinks rapidly during pile slipping to cause the steel pipe pile to topple over, the steel pipe pile hanging hammer steel wire rope and the pile frame are damaged, the hydraulic hammer 60 and the pile sinking cap 66 are separated, the pile sinking cap 66 slips down along with the steel pipe pile when pile slipping occurs, the steel pipe pile can be prevented from toppling over by the faucet foot 660 on the back of the pile sinking cap 66, and the steel pipe pile hanging hammer steel wire rope is prevented from being damaged because the hydraulic hammer 60 does not slip down along with the steel pipe pile.
4) A transition pile cap 65 for preventing pile slipping and hammer core deflection is arranged at the bottom of the hydraulic hammer 60: after the hydraulic hammer 60 and the pile sinking cap 66 are separated, the hammer core 600 of the hydraulic hammer 60 can generate offset impact when hammering the anvil 660 in the pile sinking cap 66 (the specification of the hydraulic hammer requires that the angle between the hammer and the pile is not more than 1: 60), therefore, the transition cap 65 is additionally arranged at the bottom of the hydraulic hammer 60, the transition cap 65 is connected with the hydraulic hammer 60 through a flange bolt, and the diameter of the transition anvil 652 arranged in the transition cap 65 is not only larger than the outer diameter of the hammer core 600, but also larger than the diameter of the top end of the anvil 660 of the pile sinking cap 66, so that the hammer core 600 is ensured not to be offset impact. The transition pile cap 65 and the pile sinking pile cap 66 are connected through two chains 650, when the hammer is lifted, the hydraulic hammer 60, the transition pile cap 65 and the pile sinking pile cap 66 are lifted together to sleeve the pile, the chains 650 are untied after the pile is sleeved, and when the pile is sunk, the energy of the hydraulic hammer is transmitted through the hammer core 600 of the hydraulic hammer 60, the transition anvil 652 and the anvil 660 and then is applied to the top of the steel pipe pile to sink the pile.
The pile embracing device 70 is arranged on a No. 0 main frame platform 130 of the main frame 20; the pile embracing device 70 comprises a lower fixed seat 1, a lower longitudinal telescopic oil cylinder 2, a lower sliding seat 3, a pair of large rocker arms 4, a pair of small rocker arms 5, a pair of large rocker arm oil cylinders 6, a pair of small rocker arm oil cylinders 7, a pair of large embracing arms 8 and a pair of small embracing arms 9 (see fig. 21 and 22); wherein,
the lower fixing seat 71 is arranged on a No. 0 main frame platform 130 of a pile frame of the pile driving barge; the lower fixing seat 71 comprises a pair of upper-layer longitudinal rods, four upper-layer cross rods which are alternately crossed between the pair of upper-layer longitudinal rods, a pair of lower-layer longitudinal rods, four lower-layer cross rods which are alternately crossed between the pair of lower-layer longitudinal rods, a pair of front straight rods which are correspondingly connected between the front ends of the pair of upper-layer longitudinal rods and the front ends of the pair of lower-layer longitudinal rods one by one, and a rear supporting frame which is connected between the rear ends of the pair of upper-layer longitudinal rods and the rear ends of the pair of lower-layer longitudinal rods; the bottom surfaces of the pair of upper-layer longitudinal rods and the top surfaces of the pair of lower-layer longitudinal rods are respectively provided with a longitudinal rail; a lower oil cylinder seat is arranged at the rear end of the middle part of the rear support frame;
the lower longitudinal telescopic oil cylinder 72 is arranged on an oil cylinder seat in the middle of the rear end of the fixed seat 71;
the upper supporting roller 733 and the lower supporting roller 734 are respectively arranged on the front left side and the rear right side of the lower sliding seat 73 corresponding to the two longitudinal rails on the lower fixed seat 71, so that the lower sliding seat 73 can be slidably arranged on the middle front part of the lower fixed seat 71, the middle part of the rear end of the lower sliding seat is connected with the piston rod of the lower longitudinal telescopic cylinder 72, the front hinged supports 731 are respectively symmetrically arranged on the two side surfaces of the front part of the lower sliding seat 3, and the rear hinged supports 732 are respectively symmetrically arranged on the two side surfaces of the rear part of the lower sliding seat 73;
the rear ends of the pair of large swing arms 74 are hinged with the two front hinge supports 731 of the lower sliding seat 73 in a one-to-one correspondence manner; the inner side surfaces of the middle parts of the pair of large rocker arms 774 are respectively provided with a large armful arm seat along the radial direction, and the large armful arm seats are roller wheel supporting seats 780;
the middle parts of the inner sides of the pair of small rocker arms 75 are hinged with the front ends of the pair of large rocker arms 74 in a one-to-one correspondence manner, small arm-embracing seats are respectively arranged on the inner side surfaces of the front parts of the pair of small rocker arms 75 along the radial direction, and the small arm-embracing seats are also roller supporting seats 780;
the rear ends of the pair of large rocker arm oil cylinders 76 are hinged with the two rear hinged supports 32 of the lower sliding seat 3 in a one-to-one correspondence manner, and the piston rods of the pair of large rocker arm oil cylinders 76 are hinged with the middle parts of the outer sides of the pair of large rocker arms 74 in a one-to-one correspondence manner;
the rear ends of the pair of small rocker arm oil cylinders 77 are hinged with the middle parts of the outer sides of the pair of large rocker arms 74 in a one-to-one correspondence manner, and the piston rods of the pair of small rocker arm oil cylinders 77 are hinged with the rear ends of the pair of small rocker arms 75 in a one-to-one correspondence manner;
the pair of large embracing arms 78 are correspondingly arranged on the pair of large embracing arm seats (roller supporting seats 780) one by one;
the pair of small embracing arms 79 are correspondingly arranged on a pair of small embracing arm seats (roller wheel supporting seats 780).
The large embracing arm 78 and the small embracing arm 79 have the same structure and are connected with a first-stage embracing arm 78A or a first-stage embracing arm 78A and a second-stage embracing arm 78B or the first-stage embracing arm 78A and a second-stage embracing arm 78B and a third-stage embracing arm 78C in sequence according to the pile diameter; the first-stage embracing arm 78A comprises a first pipe section 781b with a first flange 781a at the front part and a first roller 781c connected to the front end of the first pipe section 781b, and the rear part of the first pipe section 781b is directly fixed on a roller supporting seat 780; the second-stage arm 78B comprises a first roller sleeve 781d with a second flange 782a at the rear end, a second pipe joint 782B connected to the front end of the first roller sleeve 781d and provided with a third flange 783a at the front part, and a second roller 782c connected to the front end of the second pipe joint 782B, wherein the first roller sleeve 781d is sleeved on the first roller sleeve 781c and then connected with the first flange 781a through the second flange 782 a; the third-stage arm 78C includes a second roller cover 782d having a fourth flange 784a at a rear end thereof, and a third roller 783C connected to a front end of the second roller cover 782d, and the second roller cover 782d is sleeved on the second roller 782C and then connected to the third flange 783a via the fourth flange 784a (see fig. 23a, 23b, and 23C).
The pile embracing device 70 of the utility model realizes pile embracing positioning and separation of the ship and the pile after piling by folding and opening the pair of large rocker arms 74 and the pair of small rocker arms 75; the actions of the pair of large rocker arms 74 and the pair of small rocker arms 75 can be operated independently, and can be switched flexibly according to the requirements of site construction, so that full-opening full-closing and half-opening half-closing of the pair of large rocker arms 74 and the pair of small rocker arms 75 can be realized, and not only left-opening right-closing but also front-opening rear-closing can be realized (see fig. 24a, 24b, 24c, 25a, 25b and 25 c). The pair of large rocker arms 74 and the pair of small rocker arms 75 are mounted on the lower sliding seat 73, the lower sliding seat 73 can move along the front-back direction of the ship through the driving of the lower longitudinal telescopic oil cylinder 72, the relative position of the lower sliding seat and the closure 30 is changed, the range of the hammering center distance can be adjusted to be 1.43-2.8 m, the requirement that the hammering center distance of a hanging hammer at the top of the pile frame 20 is changed is met, the lower longitudinal hydraulic oil cylinder 72 mounted at the rear end of the lower fixing seat 71 is used for realizing the longitudinal movement of the lower sliding seat 73 on the lower fixing seat 71, and the position of the lower sliding seat 73 is fixed by two positioning bolts between positioning holes formed in a pair of lower-layer longitudinal rods of the lower fixing seat 71 and positioning holes formed in two side faces of the lower sliding seat 73; a pair of large rocker arms 74 hinged on both sides of the lower slider 73 in a one-to-one correspondence manner are opened and closed under the hydraulic control of a large rocker arm cylinder 76; a pair of small rocker arms 75 hinged at the front ends of the pair of large rocker arms 74 in a one-to-one correspondence manner are opened and closed under the hydraulic control of a small rocker arm cylinder 77; the large embracing arm 78 mounted on the pair of large rocker arms 74 and the small embracing arm 79 mounted on the pair of small rocker arms 75 realize different pile diameters of the embracing pile by adopting different stages of embracing arms, and the diameter of the embracing pile is 1.5 m-5 m.
The pile righter 80 is arranged on the sixth layer of main frame platform 136 of the main frame main body 200; the pile lifter 80 includes an upper fixing bracket 81, an upper back support 82, a pair of upper longitudinal telescopic cylinders 83, an upper sliding seat 84, a pair of outwardly extending arms 85, a pair of armrest cylinder seats 86, and a pair of telescopic armrests 87 (see fig. 26 to 28); wherein,
the upper fixing bracket 81 comprises a pair of upper-layer longitudinal rods, three upper-layer cross rods which are alternately crossed between the pair of upper-layer longitudinal rods, a pair of lower-layer longitudinal rods, three lower-layer cross rods which are alternately crossed between the pair of lower-layer longitudinal rods, and a pair of straight rods which are correspondingly connected between the front ends of the pair of upper-layer longitudinal rods and the front ends of the pair of lower-layer longitudinal rods one by one; the fixed bracket 81 is arranged on the sixth layer main frame platform 136, and a pair of supporting wheels 810 is also arranged on the front beam 136a of the sixth layer main frame platform 136;
an upper rear stay 82 is fixed to the rear end of the upper fixing bracket 81;
a pair of upper longitudinal telescopic cylinders 83 are arranged on the upper rear supporting seat 82 from left to right;
the upper sliding seat 84 is slidably mounted on the upper fixing bracket 81, and the left rear end and the right rear end of the upper sliding seat 84 are hinged with the piston rods of the pair of upper longitudinal telescopic cylinders 83 in a one-to-one correspondence manner;
the pair of outwardly extending arms 85 are fixedly connected to the left front end and the right front end of the upper sliding seat 4 in a one-to-one correspondence manner with the outwardly extending arms 85 having the openings facing back;
a plurality of pairs of bolt holes are formed in the surface of the armrest oil cylinder seat 86 at intervals, and the rear end surfaces of the armrest seats 86 are welded to the front end surfaces of the pair of extending arms 85 in a one-to-one correspondence manner;
the telescopic handrail 87 comprises a handrail oil cylinder 871 arranged on the handrail oil cylinder seat 86 and a pile supporting roller connected to the piston rod of the handrail oil cylinder 871; bolt holes are also formed in the armrest oil cylinder 871 corresponding to the bolt holes in the armrest oil cylinder seat 86; a pair of telescopic handrails 87 are mounted on the pair of handrail cylinder blocks 86 through bolts in a one-to-one correspondence.
The pile supporting device 80 of the utility model can move back and forth in the upper fixing support 81 under the driving of the upper longitudinal telescopic oil cylinders 83 by the upper sliding seat 84, the maximum stroke of the upper longitudinal telescopic oil cylinder 83 is 600mm, the pile supporting device can adapt to the requirement of the change of the hammering center of the hanging hammer at the top of the pile frame, and the adjustable hammering center is 1.43 m-2.8 m; secondly, a plurality of pairs of bolt holes (the spacing distance is 250mm, the pile diameter is changed to 500mm) are respectively arranged on the handrail oil cylinder seat 86 and the telescopic handrail 87 at intervals, the telescopic handrail 87 is arranged on the handrail oil cylinder seat 86 by adopting bolts, the rough adjustment of the pile diameter change can be realized by adjusting the relative position of the telescopic handrail 87 and the handrail oil cylinder seat 86, the accurate adjustment of the pile diameter change is realized by the telescopic amount of the handrail oil cylinder 871, and the construction requirement that the maximum pile diameter is 5m under the condition that the maximum hammering center is 2.8m is met (see fig. 29 a); the construction requirement that the pile diameter is 2.5m under the minimum hammering center of 1.43m (see fig. 29b), and the pile can be completely contracted into the whole pile frame (see fig. 29c) after the pile supporting function is completed, so that the hydraulic hammer 60 can normally pass up and down, and the overall requirement of ship pile sinking construction is met; because the front cross beam 136a of the sixth-layer main frame platform 136 is also provided with the supporting roller 810, the supporting roller has sliding friction with the bottom of the upper sliding seat 84, so that the upper sliding seat 84 can move flexibly. The pile supporting operation control adopts a one-key operation mode. Except that the position adjustment between the armrest oil cylinder seat 86 and the armrest oil cylinder 871 is realized manually (once rough adjustment is in place after the pile diameter is determined), the accurate adjustment of the rest hammering centers and the pile diameter is realized by the hydraulic oil cylinder, the hydraulic control of the hydraulic oil cylinder is preset by a computer in a programming mode, and the hydraulic control is automatically realized by one-key operation in the actual use process.
The utility model discloses an ultra-large-scale change width of cloth pile frame formula pile driver ship to wave resistance theoretical calculation carries out the ship type optimization as the basis, obtains the best boats and ships major scale of wave resistance: the total length of the ship body is as follows: 118.5 m; captain of the ship: 108 m; the width of the ship: 38.0 m; the type depth of the ship is as follows: 7.2 m; designing draft: 4.5 m; structure draught: 5.2 m; height of the pile frame: 133.0 m; weight of pile frame: 874 t; pile frame laying height (navigation height): m, 55. m; pile diameter of a typical planted pile: phi 4000.0 mm; length of a typical pile: 105m + water depth; pile weight of a typical planted pile: 400 t; the working angle of the pile frame is as follows: piling: 18.5 °; the hoisting weight is 0-18.5 degrees; hinge changing: -27 °. Foretell boats and ships principal dimension makes the utility model discloses a piling ship has higher operating rate and construction precision under the sea condition abominable relatively.
The above embodiments are provided only for the purpose of illustration, not for the limitation of the present invention, and those skilled in the relevant art can make various changes or modifications without departing from the spirit and scope of the present invention, therefore, all equivalent technical solutions should also belong to the scope of the present invention, and should be defined by the claims.

Claims (7)

1. An ultra-large variable-amplitude pile frame type pile driving ship comprises a ship body, a pile frame, a keel, a variable-amplitude oil cylinder, a matching device of a hydraulic hammer, a pile gripper and a pile lifter;
the ship body is of a steel box type structure, an object nose bridge is arranged at the bow part of the ship body, and a variable amplitude oil cylinder support and a pair of hinge-changing support rod supports are arranged at the middle bow part of a main deck of the ship body; the middle stern part of the main deck of the ship body is provided with an upper building, and the middle part of the top surface of the upper building is provided with a bracket; ten ship moving winches, seven hoisting winches and two general cargo cranes are arranged on the main deck of the ship body;
the pile frame comprises a main frame, a pile hanging platform fixed on the top surface of the main frame, an auxiliary frame fixed on the top surface of the pile hanging platform and a hanging hammer platform fixed on the top surface of the auxiliary frame;
the main frame sequentially comprises a main frame lower part, a main frame main body and a main frame upper part from bottom to top; the main frame main body is of an isosceles inverted triangular variable cross-section truss structure and comprises a pair of front main pipes, a rear main pipe and third to eighth layers of main frame platforms which are all in an isosceles triangle shape; the pair of front main pipes extend upwards to the upper part of the main frame, and the pair of front main pipes extend downwards to the lower part of the main frame and are hinged with a pair of object nose bridges; the lower end of the rear main pipe is provided with a pile frame rear included angle structure, and the lower end of the pile frame rear included angle structure is hinged with a pair of exchange hinge support rods; a slide way is connected between the rear included angle structure of the pile frame and the middle part of a front transverse pipe of a fourth-layer main frame platform, the lower end of the slide way is a first upper hinge point of a variable amplitude oil cylinder, and the upper end of the slide way is a second upper hinge point of the variable amplitude oil cylinder; the lower part of the main frame comprises a negative second-layer main frame platform, a negative first-layer main frame platform, a No. 0 main frame platform, a first-layer main frame platform and a second-layer main frame platform which are arranged from bottom to top;
the auxiliary frame is of a four-side variable cross-section truss structure and comprises a pair of front supporting tubes, a pair of rear supporting tubes, an upper auxiliary frame platform, a middle auxiliary frame platform and a lower auxiliary frame platform; the upper, middle and lower layer subframe platforms correspondingly comprise an upper layer front beam, a middle layer front beam and a lower layer front beam one by one;
the bottom of the variable amplitude oil cylinder is hinged to the lower hinged support of the variable amplitude oil cylinder; when the pile is planted, the upper end of a piston rod of the amplitude-variable oil cylinder is hinged to a first upper hinge point of the amplitude-variable oil cylinder; when the pile frame is placed, the upper end of a piston rod of the amplitude-variable oil cylinder is hinged to a second upper hinge point of the amplitude-variable oil cylinder;
it is characterized in that the preparation method is characterized in that,
the bracket comprises four supporting tubes and is a space truss with tapered left and right side surfaces and isosceles trapezoid front and back side surfaces; the top surfaces of the two supporting tubes on the left side of the bracket and the top surfaces of the two supporting tubes on the right side of the bracket are respectively and symmetrically provided with a placing seat;
the upper part of the main frame comprises a pair of front main pipes, two rear inclined pipes which are connected with the tops of the rear main pipes in a V-shaped manner, two rear straight pipes which are connected with the upper ends of the two rear inclined pipes in a one-to-one correspondence manner, and a ninth layer of main frame platform which is connected between the lower ends of the two rear straight pipes and the pair of front main pipes and is in an isosceles trapezoid shape; the lower ends of the two rear straight pipes are fulcrums which are contacted with the two placing seats on the bracket when the pile frame is inclined backwards, a support is respectively arranged on the rear side surfaces of the two fulcrums, and the panels of the two supports are horizontal when the pile frame is inclined backwards to a placing angle and are placed on the two placing seats of the bracket in a one-to-one correspondence manner;
the No. 0 main frame platform, the first layer main frame platform and the second layer main frame platform are all isosceles trapezoids and respectively comprise a front cross bar, two side bars and a rear cross bar, and the lengths of the rear cross bar of the No. 0 main frame platform, the rear cross bar of the first layer main frame platform and the rear cross bar of the second layer main frame platform are equal; the negative one-layer main frame platform and the negative two-layer main frame platform are both in an isosceles triangle shape and respectively comprise two side rods and a rear cross rod;
the lower part of the main frame is also provided with a spout backrest mechanism, and the spout backrest mechanism comprises a spout lower backrest, a pair of lower rear main rods, a pair of upper rear support rods and a pair of lower rear support rods; the lower keel backrest is fixed in the middle of a front cross rod of the first layer main frame platform, the middle of a front cross rod of the No. 0 main frame platform, the front ends of two side rods of the negative one-layer main frame platform and the front ends of two side rods of the negative two-layer main frame platform; the pair of lower rear main rods are connected between the lower ends of the rear main pipes and the pair of front main pipes in an inverted V shape and are intersected with the two ends of the rear cross rod of the second-layer main frame platform; the pair of upper rear support rods are connected between the two ends of the rear cross rod of the second layer of main frame platform and the two ends of the rear cross rod of the No. 0 main frame platform in a parallel and forward inclining manner and are intersected with the two ends of the rear cross rod of the first layer of main frame platform; the pair of lower rear support rods are connected between the lower ends of the pair of upper rear support rods and the two side surfaces of the lower part of the lower backrest of the closure in a V shape and are respectively intersected with the two ends of the rear cross rod of the negative one-layer main frame platform and the two ends of the rear cross rod of the negative two-layer main frame platform;
the closure is welded on the middle parts of the front surfaces of the upper, middle and lower layer auxiliary frame platforms, the ninth layer main frame platform and the first layer main frame platform and the front surface of the closure lower backrest;
the matching device of the hydraulic hammer comprises a hydraulic hammer guide frame, a hydraulic hammer, a hanging beam, a transition pile cap and a pile sinking pile cap; the hydraulic hammer guide frame comprises a hydraulic hammer guide frame, a hydraulic hammer and a hydraulic hammer, wherein two pairs of dragon mouth feet are arranged on the back surface of the hydraulic hammer guide frame at intervals, so that the hydraulic hammer guide frame can be slidably arranged on a dragon mouth through the two pairs of dragon mouth feet, two anchor ears are arranged on the front surface of the hydraulic hammer guide frame corresponding to two ring grooves on the hydraulic hammer, and the hydraulic hammer is arranged on the hydraulic hammer guide frame through the two anchor ears; the middle part of the bottom surface of the hanging beam is provided with a pair of hanging beam lifting lugs for clamping the hydraulic hammer lifting lugs of the hydraulic hammer and is connected with the hydraulic hammer lifting lugs through a pin shaft; the top of the transition pile cap cylinder is provided with a flange and is connected with a flange at the bottom of the hydraulic hammer through a flange bolt; the pile sinking pile cap is slidably arranged on the closure through a pair of closure feet; when the hammer is lifted, the pile sinking cap and the transition cap are connected by two chains, and when the hammer is used for sinking the pile, the connection between the chains and the pile sinking cap is disconnected;
the pile gripper is arranged on a No. 0 main frame platform of the main frame;
and the pile holding device is arranged on a fourth layer of main frame platform of the main frame.
2. The ultra-large variable-amplitude pile-frame piling ship according to claim 1, wherein a lower front beam in a lower sub-frame platform of the sub-frame extends to the right outer side by a lower front beam cantilever;
the pile hanging platform comprises a rear cross beam, a left longitudinal frame beam, a right outer longitudinal beam, a front cross beam, a left hanging beam with the rear end connected to the front end of the left longitudinal frame beam, a right hanging beam with the rear end connected to the front end of the right longitudinal frame beam, a right outer hanging beam with the rear end connected to the front end of the right outer longitudinal beam and a front outer cross beam connected to the front end of the right hanging beam and the front end of the right outer hanging beam;
a pull rod mechanism is also arranged between the pile hanging platform and the auxiliary frame, and comprises a straight pull rod and first to fifth diagonal pull rods; the straight pull rod is connected between the right end of the front cross beam and the outer end of a lower front cross beam cantilever of the subframe; the first diagonal draw bar is connected between the front end of the left hanging beam and the left end of the lower-layer front cross beam of the subframe; the second diagonal draw bar is connected between the front end of the right hanging beam and the right end of the lower-layer front cross beam of the subframe; the third diagonal draw bar is connected between the front end of the right outer hanging beam and the outer end of the lower front cross beam cantilever of the subframe; the fourth diagonal draw bar is connected between the rear end of the right outer hanging beam and the right end of the lower-layer front cross beam of the subframe; and the fifth diagonal draw bar is connected between the right part of the rear cross beam and the outer end of the lower front cross beam cantilever of the subframe.
3. The ultra-large luffing pile driver vessel according to claim 1, wherein the hammer platform comprises a top left longitudinal beam, a top right longitudinal beam, a top rear cross beam, a top middle cross beam, and a top front cross beam; the left longitudinal beam is fixed on the top surface of the front supporting tube and the top surface of the rear supporting tube which are positioned on the left side of the subframe; the top right longitudinal beam is fixed on the top surface of the front supporting tube and the top surface of the rear supporting tube which are positioned on the right side; the top rear cross beam is fixed at the rear end of the top left longitudinal beam and the rear end of the top right longitudinal beam; the top middle cross beam is fixed between the top surfaces of a pair of front supporting tubes of the subframe; the top front cross beam is bridged between the front end of the top left longitudinal beam and the front end of the top right longitudinal beam;
and a support rod mechanism is further arranged between the drop hammer platform and the auxiliary frame and comprises two inclined support rods which are connected between the middle part of the bottom surface of the front section of the top left longitudinal beam and the left side of the top surface of the opening and between the middle part of the bottom surface of the front section of the top right longitudinal beam and the right side of the top surface of the opening in a one-to-one correspondence manner.
4. The ultra-large amplitude variable pile-frame piling ship according to claim 1, wherein a horizontal inclined connecting rod is respectively connected between both ends of the rear cross rod of the first-layer main frame platform and the pair of upper rear support rods; an inclined connecting rod is respectively connected between the lower ends of the pair of upper rear supporting rods and the outer ends of the two horizontal inclined connecting rods.
5. The ultra-large amplitude variable pile frame type pile driving vessel as recited in claim 1, wherein the hydraulic hammer guide frame is of a quadrangular prism structure; two supporting feet are respectively arranged on two sides of a pair of lifting lugs of the lifting beam on the bottom surface of the lifting beam, and a lifting beam pulley for hanging a steel wire rope of the lifting hammer is arranged on the lifting beam; the transition pile cap comprises a transition pile cap cylinder and a transition anvil; a circle of lower limiting ring is arranged at the bottom of the inner wall of the transition pile cap cylinder, and a pair of upper hanging lugs is fixed on the outer surface of the transition pile cap cylinder in a centrosymmetric manner; the top of the transition pile cap cylinder is provided with a flange and is connected with the bottom flange of the hydraulic hammer through a flange bolt, so that the hammer core of the hydraulic hammer is positioned at the upper part of the inner cavity of the transition pile cap cylinder; the outer diameter of the transition anvil is larger than the outer diameter of the hammer core and is matched with the inner diameter of the lower limiting ring, the top of the outer surface of the transition anvil is provided with a circle of upper limiting ring with the outer diameter matched with the inner diameter of the transition pile cap cylinder, and the transition anvil is arranged in the inner cavity of the transition pile cap cylinder and the lower part of the transition anvil is exposed out of the bottom surface of the transition pile cap cylinder through the limiting of the upper limiting ring and the lower limiting ring; the pile sinking pile cap comprises a pile cap cylinder, an anvil and a pile cap cover plate, wherein a pair of tap feet are arranged on the back surface of the pile cap cylinder, so that the pile sinking pile cap can be slidably arranged on the tap through the pair of tap feet, and the middle part of the inner wall of the pile cap cylinder is divided into an upper pile cap cylinder and a lower pile cap cylinder through a circle of convex ring; the anvil is arranged in the upper pile cap cylinder; the pile cap cover plate is fixed at the top of the pile cap cylinder, a transition anvil through hole is formed in the center of the pile cap cover plate, and a pair of lower lugs is arranged on the pile cap cover plate in a central symmetry mode on the periphery of the transition anvil through hole; when the hammer is lifted, the two chains are correspondingly connected between the pair of lower lugs of the pile sinking cap and the pair of upper lugs of the transition pile cap one by one.
6. The ultra-large luffing pile driver vessel according to claim 1, wherein the pile gripper comprises a lower fixed base, a lower longitudinal telescopic cylinder, a lower sliding base, a pair of large rocker arms, a pair of small rocker arms, a pair of large rocker arm cylinders, a pair of small rocker arm cylinders, a pair of large embracing arms and a pair of small embracing arms; the lower fixing seat is arranged on the No. 0 main frame platform; the lower longitudinal telescopic oil cylinder is arranged on an oil cylinder seat in the middle of the rear end of the lower fixed seat; the lower sliding seat is slidably arranged at the middle front part of the lower fixed seat, the middle part of the rear end of the lower sliding seat is connected with the piston rod of the lower longitudinal telescopic oil cylinder, two front hinged supports are respectively and symmetrically arranged on two side surfaces of the front part of the lower sliding seat, and two rear hinged supports are respectively and symmetrically arranged on two side surfaces of the rear part of the lower sliding seat; the rear ends of the large rocker arms are hinged with the two front hinged supports of the lower sliding seat in a one-to-one correspondence manner; the inner side surfaces of the middle parts of the large rocker arms are respectively provided with a large armful arm seat along the radial direction; the middle parts of the inner sides of the pair of small rocker arms are hinged with the front ends of the pair of large rocker arms in a one-to-one correspondence manner; the inner side surfaces of the front parts of the small rocker arms are respectively provided with a small armful arm seat along the radial direction; the rear ends of the large rocker arm oil cylinders are hinged with the two rear hinged supports of the lower sliding seat in a one-to-one correspondence manner, and piston rods of the large rocker arm oil cylinders are hinged with the middle parts of the outer sides of the large rocker arms in a one-to-one correspondence manner; the rear ends of the pair of small rocker arm oil cylinders are hinged with the middle parts of the outer sides of the pair of large rocker arms in a one-to-one correspondence manner, and the piston rods of the pair of small rocker arm oil cylinders are hinged with the rear ends of the pair of small rocker arms in a one-to-one correspondence manner; the pair of large armful arms are correspondingly arranged on the pair of large armful arm seats one by one; the pair of small embracing arms are correspondingly arranged on the pair of small embracing arm seats one by one.
7. The ultra-large luffing pile driver vessel according to claim 1, wherein the pile stabilizer comprises an upper fixed support, an upper rear support base, a pair of upper longitudinal telescopic cylinders, an upper sliding base, a pair of outriggers, a pair of armrest cylinder bases, and a pair of telescopic armrests; the upper fixing support is arranged on a sixth layer of main frame platform of the main frame main body; the upper back support seat is fixed at the rear end of the upper fixing bracket; a pair of upper longitudinal telescopic oil cylinders are arranged on the upper rear supporting seat from left to right; the upper sliding seat is slidably arranged on the upper fixed support, and the left rear end and the right rear end of the upper sliding seat are hinged with piston rods of the upper longitudinal telescopic oil cylinders in a one-to-one correspondence manner; the pair of the extending arms are fixedly connected to the left front end and the right front end of the upper sliding seat in a one-to-one correspondence mode, and openings of the extending arms face backwards; the surface of the handrail oil cylinder seat is provided with a plurality of pairs of connecting holes, and the rear end surfaces of the pair of handrail oil cylinder seats are welded on the front end surfaces of the pair of extending arms in a one-to-one correspondence manner; bolt holes are formed in the telescopic handrails corresponding to the bolt holes in the handrail oil cylinder bases, and the pair of telescopic handrails are installed on the pair of handrail oil cylinder bases in a one-to-one correspondence mode through the bolts.
CN202120356855.3U 2021-02-09 2021-02-09 Ultra-large amplitude variable pile frame type pile driving ship Active CN214993829U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120356855.3U CN214993829U (en) 2021-02-09 2021-02-09 Ultra-large amplitude variable pile frame type pile driving ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120356855.3U CN214993829U (en) 2021-02-09 2021-02-09 Ultra-large amplitude variable pile frame type pile driving ship

Publications (1)

Publication Number Publication Date
CN214993829U true CN214993829U (en) 2021-12-03

Family

ID=79147545

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120356855.3U Active CN214993829U (en) 2021-02-09 2021-02-09 Ultra-large amplitude variable pile frame type pile driving ship

Country Status (1)

Country Link
CN (1) CN214993829U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112796319A (en) * 2021-02-09 2021-05-14 中交第三航务工程局有限公司 Ultra-large amplitude variable pile frame type pile driving ship
CN115949804A (en) * 2022-12-30 2023-04-11 武汉长江航运规划设计院有限公司 Suspension pipe laying system and method
CN116104083A (en) * 2022-12-29 2023-05-12 中国电建集团西北勘测设计研究院有限公司 Piling ship with broadside positioning tool and use method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112796319A (en) * 2021-02-09 2021-05-14 中交第三航务工程局有限公司 Ultra-large amplitude variable pile frame type pile driving ship
CN112796319B (en) * 2021-02-09 2024-09-06 中交第三航务工程局有限公司 Ultra-large variable-amplitude pile frame type piling ship
CN116104083A (en) * 2022-12-29 2023-05-12 中国电建集团西北勘测设计研究院有限公司 Piling ship with broadside positioning tool and use method thereof
CN115949804A (en) * 2022-12-30 2023-04-11 武汉长江航运规划设计院有限公司 Suspension pipe laying system and method

Similar Documents

Publication Publication Date Title
CN214993829U (en) Ultra-large amplitude variable pile frame type pile driving ship
WO2016173238A1 (en) Floating crane and multifunctional suspension hook and multifunctional suspension hook group thereof
CN102328732A (en) Offshore pile driving, pile pressing and installing united engineering ship
KR100932971B1 (en) Work brage having a worktable of jack-up type
CN110258293A (en) Cable-stayed bridge steel truss girder main pylon pier top erection construction method
CN112796319A (en) Ultra-large amplitude variable pile frame type pile driving ship
CN2615042Y (en) Special crane ship for transporting & erecting bridges on sea
CN211113627U (en) Unsettled self-supporting formula pile driver
CN207904921U (en) A kind of simple floating driving plant
WO2020090611A1 (en) Work ship having tower crane and crane operating method therefor
CN214363462U (en) Combined type unit steel structure crane piling platform capable of being rapidly disassembled and assembled
CN214940112U (en) Pile frame of ultra-large pile driving ship
CN214940120U (en) Pile supporting device of ultra-large pile driving ship
CN221608862U (en) Detachable pile frame of pile driving ship suitable for multiple working conditions
CN202492846U (en) Drop hammer pile-sinking device
CN216339535U (en) Pile gripper of ultra-large pile driving ship
CN201095571Y (en) Door type floating crane
CN221760676U (en) Pile pulling device used under limited beam bottom space condition
CN218933058U (en) Semi-submersible positioning guide frame for port ocean engineering
CN111962543A (en) Rapid connection and separation process of pile stabilizing platform and mother ship
CN209854802U (en) Dredging boat
CN216640577U (en) Pile frame placing structure of ultra-large pile driving ship
CN216863468U (en) Boom device and crane
CN221760468U (en) Steel jacket case lowering device
CN214940114U (en) Piling and hole guiding device for bridge erecting pile driver

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Shen Huoqun

Inventor after: Hu Min

Inventor after: Guo Ting

Inventor after: Gu Jun

Inventor after: Shen Dong

Inventor after: Hu Lingbin

Inventor after: Lu Yifeng

Inventor after: Hu Chunbao

Inventor after: Sun Qinyang

Inventor after: Chen Xuefeng

Inventor after: Chen Jianzhang

Inventor after: Huang Chao

Inventor after: Zhu Yazhou

Inventor before: Shen Huoqun

Inventor before: Hu Min

Inventor before: Guo Ting

Inventor before: Gu Jun

Inventor before: Shen Dong

Inventor before: Hu Lingbin

Inventor before: Lu Yifeng

Inventor before: Hu Chunbao

Inventor before: Sun Qinyang

Inventor before: Chen Xuefeng

Inventor before: Chen Jianzhang

Inventor before: Huang Chao

Inventor before: Zhu Yazhou