CN214832668U - Pile head integral breaking system for large-diameter bored pile - Google Patents
Pile head integral breaking system for large-diameter bored pile Download PDFInfo
- Publication number
- CN214832668U CN214832668U CN202120858726.4U CN202120858726U CN214832668U CN 214832668 U CN214832668 U CN 214832668U CN 202120858726 U CN202120858726 U CN 202120858726U CN 214832668 U CN214832668 U CN 214832668U
- Authority
- CN
- China
- Prior art keywords
- pile
- pile head
- cast
- counter
- fixing ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 238000006243 chemical reaction Methods 0.000 claims abstract description 65
- 238000000926 separation method Methods 0.000 claims abstract description 40
- 238000002955 isolation Methods 0.000 claims abstract description 28
- 238000005553 drilling Methods 0.000 claims abstract description 20
- 238000011065 in-situ storage Methods 0.000 claims description 20
- 238000007789 sealing Methods 0.000 claims description 16
- 230000002787 reinforcement Effects 0.000 claims description 15
- 230000000149 penetrating effect Effects 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 26
- 230000006378 damage Effects 0.000 abstract description 7
- 238000000034 method Methods 0.000 description 21
- 229910000831 Steel Inorganic materials 0.000 description 12
- 239000010959 steel Substances 0.000 description 12
- 230000015572 biosynthetic process Effects 0.000 description 8
- 239000007787 solid Substances 0.000 description 8
- 210000003205 muscle Anatomy 0.000 description 7
- 239000002689 soil Substances 0.000 description 7
- 238000006073 displacement reaction Methods 0.000 description 6
- 238000009412 basement excavation Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 230000002093 peripheral effect Effects 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000010720 hydraulic oil Substances 0.000 description 1
- 239000007943 implant Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model belongs to the technical field of the bored concrete pile construction. A pile head integral breaking system of a large-diameter bored pile comprises a pile head separation support, isolation sleeves, a first reaction frame, a second reaction frame and a driving part, wherein the first reaction frame and the second reaction frame are arranged in an up-down corresponding mode; a plurality of first counter-force holes are circumferentially distributed on the pile head of the cast-in-place pile, a plurality of second counter-force holes are circumferentially distributed on the cast-in-place pile at the lower part of the pile head separation support, and the first counter-force frame and the second counter-force frame are correspondingly arranged in the first counter-force holes and the second counter-force holes respectively. This application overall design is reasonable, can solve among the prior art to the difficult problem that exists of the abolishing of the pile head of major diameter drilling bored concrete pile, improves abolishing efficiency, reduces the structural damage to the pile body.
Description
Technical Field
The utility model belongs to the technical field of the bored concrete pile construction, concretely relates to major diameter drilling bored concrete pile head is whole breaks system.
Background
In the cast-in-situ bored pile construction process, in order to ensure the pouring quality of cast-in-situ bored pile body concrete, the pile body is usually subjected to over-pouring, and after the pile body concrete reaches the design strength, the over-poured pile head part is chiseled. The existing pile head breaking method mainly comprises the step of chiseling concrete of a pile head part by manually using small mechanical equipment such as an air pick and the like, the method has large field workload and low construction speed, and a longitudinal main rib of a cast-in-situ bored pile is extremely easy to damage in the pile head concrete breaking process to influence the stress of a structure.
In the prior related construction technology, before the concrete of the pile foundation is poured, materials such as PVC sleeves are used for wrapping the longitudinal main reinforcement at the top end of the reinforcement cage, so that the longitudinal main reinforcement at the pile head part is prevented from directly contacting the concrete; after the pouring of the pile foundation concrete is completed, the pile head and the pile body are separated by using an air pick, a steel wedge and the like between the pile head and the pile body, and then the pile head is integrally lifted away from the pile body.
SUMMERY OF THE UTILITY MODEL
The utility model discloses the purpose is to the problem that above-mentioned exists with not enough, provides a major diameter drilling bored concrete pile head is whole to break system, and its overall design is reasonable, can solve among the prior art to the difficult problem that the broken existence of the pile head of major diameter drilling bored concrete pile, improves and breaks efficiency, reduces the structural damage to the pile body.
In order to realize the purpose, the adopted technical scheme is as follows:
the utility model provides a whole system of demolising of major diameter drilling bored concrete pile head for the demolition of the pile head of bored concrete pile, includes:
a pile head separation support;
the pile head separation support is arranged on the pile head separation support, a plurality of longitudinal main reinforcements at the upper part of a reinforcement cage of the cast-in-place pile are arranged in the pile head separation support in a matching and penetrating mode, and the pile head separation support and the isolation sleeve are poured on the top of the cast-in-place pile;
the pile head of the cast-in-place pile is circumferentially provided with a plurality of first reaction holes, the cast-in-place pile at the lower part of the pile head separation support is circumferentially provided with a plurality of second reaction holes, and the first reaction frame and the second reaction frame are respectively and correspondingly arranged in the first reaction holes and the second reaction holes; and
and the driving part is arranged between the first reaction frame and the second reaction frame and is used for breaking and separating the pile head from the top of the cast-in-place pile.
According to the utility model discloses the whole system of abolishing of major diameter drilling bored concrete pile head, preferably, isolation sleeve's upper and lower both ends all are provided with the sealing plug, the sealing plug is laid between vertical main muscle and the isolation sleeve's inner wall.
According to the large-diameter bored pile head overall breaking system of the present invention, preferably, the pile head separating bracket includes an upper positioning fixing ring and a lower positioning fixing ring which are correspondingly disposed up and down, and a connecting rod is disposed between the upper positioning fixing ring and the lower positioning fixing ring; the isolation sleeve is fixedly arranged between the upper positioning fixing ring and the lower positioning fixing ring.
According to the utility model discloses the whole system of abolishing of major diameter drilling bored concrete pile head, preferably, go up fixed ring of location with fixed ring's circumference is provided with a plurality of constant head tanks down, the constant head tank is laid between two adjacent isolation sleeve, just go up fixed ring of location with the outer fringe of fixed ring of lower location and the outer wall parallel and level of bored concrete pile.
According to the utility model discloses the whole system of abolishing of major diameter drilling bored concrete pile head, preferably, first reaction frame with second reaction frame all includes:
the supporting rod is inserted into the first counter-force hole or the second counter-force hole in a matched manner;
a base disposed at an outer end of the support bar; and
and the limiting block is vertically arranged with the supporting rod, and the limiting block is attached to and supported by the side wall of the cast-in-place pile.
According to the utility model discloses the whole system of abolishing of major diameter drilling bored concrete pile head, preferably it reserves pipe and second counter-force hole reservation pipe to be the circumference laid on the pile head separation support, first counter-force hole is reserved pipe and second counter-force hole and is reserved the pipe and follow the pile head separation support is pour in the bored concrete pile, and form first counter-force hole and second counter-force hole.
According to the utility model discloses the whole system of abolishing of major diameter drilling bored concrete pile head, preferably, still include the guide unit, the guide unit includes:
the guide plates are matched, attached and distributed in the circumferential direction of the cast-in-place pile; and
the fixing ring is sleeved on the cast-in-place pile in a matching mode, locking bolts are arranged between the fixing ring and the cast-in-place pile, the guide plates are inserted between the fixing ring and the cast-in-place pile in a matching mode, and fastening bolts are arranged between the fixing ring and the guide plates.
According to the utility model discloses the whole system of abolishing of major diameter drilling bored concrete pile head, preferably, the drive division is hydraulic cylinder or jack, all is provided with the drive division between the first reaction frame and the second reaction frame that correspond.
By adopting the technical scheme, the beneficial effects are as follows:
this application overall design is reasonable, can solve among the prior art to the difficult problem that exists of the abolishing of the pile head of major diameter drilling bored concrete pile, improves abolishing efficiency, reduces the structural damage to the pile body. This application can ensure the pouring quality of bored concrete pile body through pile head separation support and isolation sleeve's setting, realizes the separation between the vertical main muscle of steel reinforcement cage and the concrete at corresponding position simultaneously, is more convenient for carry on the wholeness of upper portion and removes, avoids breaking the concrete placement quality of in-process pile body in the separation and receives the influence, and pile head separation support can also assist the installation location of vertical main muscle.
This application is through the setting of first reaction frame and second reaction frame, can realize the formation of prefracture face with the help of the structure of pile head separation support, reduces the destruction to concrete structure at prefracture face formation in-process for the effort of jacking is mostly concentrated on solid fixed ring of last location and the solid fixed ring of lower location, and the formation of prefracture face has predictability, can ensure that the prefracture face forms more and neatly, and the formation scope is more controllable, the integrality of guarantee pile body structure.
This application can set up multichannel deflector through setting up the direction unit on the pile body, retrains the displacement of pile head horizontal direction, upwards hangs the in-process that leaves at the pile head, only takes place vertical displacement to can avoid the pile head to lift by crane the in-process and lead to vertical main muscle to take place to buckle. And the safety in the operation process can be improved.
The construction of major diameter bored concrete pile is carried out in this application, can ensure construction quality and efficiency of construction, and each link through pouring stage, subsequent pile head breaking stage and whole construction process all with optimizing construction quality, reduces the pile head and breaks the degree of difficulty and design and structural arrangement as the basis for entire system's feasibility of implementation can improve greatly, and the practicality is stronger, and economic benefits and market value are comparatively showing.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings of the embodiments of the present invention will be briefly described below. The drawings are intended to depict only some embodiments of the invention, and not all embodiments of the invention are limited thereto.
Fig. 1 is a schematic three-dimensional structure diagram of a pile head breaking system according to an embodiment of the present invention;
fig. 2 is a schematic diagram of the construction of the excavation of the groove around the pile according to the embodiment of the present invention;
FIG. 3 is a schematic view of the A-A cross-sectional structure of FIG. 1 showing a pile head pre-fracturing construction;
FIG. 4 is a schematic structural view of section B-B of FIG. 1, illustrating a pile head pre-fracturing construction;
FIG. 5 is a schematic structural view of section C-C of FIG. 1 showing a first reaction force support and a second implant pile structure;
FIG. 6 is a schematic structural view of section D-D of FIG. 1, showing a guide plate mounting fixture;
fig. 7 is one of the schematic diagrams of the construction of the separated pile head hoisting according to the embodiment of the present invention;
fig. 8 is a second schematic view of the separated pile head hoisting construction according to the embodiment of the present invention;
fig. 9 is a schematic view of a positioning fixed ring structure according to an embodiment of the present invention;
fig. 10 is a schematic view of a pile head separation support according to an embodiment of the present invention;
FIG. 11 is a schematic three-dimensional view of a reaction bracket according to an embodiment of the present invention;
FIG. 12 is a second illustration of the three-dimensional structure of a reaction bracket according to an embodiment of the present invention;
fig. 13 is a schematic structural view of a guide plate and a fixing ring according to an embodiment of the present invention.
Number in the figure:
1-pile head separation support, 11-upper positioning fixing ring, 12-sleeve hole, 13-positioning groove, 14-connecting rod, 15-lower positioning fixing ring;
21-isolation sleeve, 22-sealing ring, 23-sealing plug;
31-cast-in-place pile, 32-longitudinal main reinforcement, 33-circumferential stirrup, 34-pile body concrete, 35-ground, 36-pile periphery soil body, 37-steel casing and 38-pile periphery groove;
41-first counter-force bracket, 411-base, 412-supporting rod, 413-stiffening rod, 414-limiting block, 42 is second counter-force bracket, 43-jack
51-a first counter-force hole, 52-a pile head, 53-a pre-split surface, 54-a hook, 55-a lifting rope and 56-a second counter-force hole;
61-fixed ring, 62-screw hole, 63-guide plate, 64-locking bolt, 65-fastening bolt.
Detailed Description
The embodiments of the present invention will be described more fully hereinafter with reference to the accompanying drawings, in which embodiments of the invention are shown. Unless defined otherwise, technical or scientific terms used herein shall have the ordinary meaning as understood by those of ordinary skill in the art.
In the description of the present invention, it is to be understood that the terms "first," "second," and the like are used for describing various elements of the present invention, and do not denote any order, quantity, or importance, but rather are used to distinguish one element from another.
It should be noted that when an element is referred to as being "connected," "coupled," or "connected" to another element, it can be directly connected, coupled, or connected, but it is understood that intervening elements may be present therebetween; i.e., positional relationships encompassing both direct and indirect connections.
It should be noted that the use of the terms "a" or "an" and the like do not necessarily denote a limitation of quantity. The word "comprising" or "comprises", and the like, means that the element or item listed before the word covers the element or item listed after the word and its equivalents, but does not exclude other elements or items.
It should be noted that terms indicating orientation or positional relationship such as "upper", "lower", "left", "right", and the like, are used only for indicating relative positional relationship, which is for convenience of describing the present invention, and not that the indicated device or element must have a specific orientation, be constructed and operated in a specific orientation; when the absolute position of the object to be described is changed, the relative positional relationship may also be changed accordingly.
Referring to fig. 1 to 13, the application discloses an overall pile head breaking system for a large-diameter bored pile, which is used for breaking a pile head of a bored pile, and includes a pile head separation support 1, isolation sleeves 21, a first reaction frame 41 and a second reaction frame 42 which are correspondingly arranged up and down, and a driving part, wherein a plurality of isolation sleeves 21 are arranged on the pile head separation support 1, a longitudinal main rib 32 on the upper part of a reinforcement cage of the bored pile 31 is arranged in the isolation sleeves 21 in a matching and penetrating manner, and the pile head separation support 1 and the isolation sleeves 21 are cast at the top of the bored pile 31; a plurality of first reaction holes 51 are circumferentially distributed on a pile head 52 of the cast-in-place pile 31, a plurality of second reaction holes 56 are circumferentially distributed on the cast-in-place pile 31 at the lower part of the pile head separation bracket 1, and the first reaction frame 41 and the second reaction frame 42 are respectively and correspondingly arranged in the first reaction holes 51 and the second reaction holes 56; a drive is provided between the first and second reaction frames 41, 42 for breaking the pile head 52 off the top of the cast-in-place pile 31.
Preferably, as shown in fig. 9 and 10, the pile head separating bracket 1 in this embodiment includes an upper positioning fixing ring 11 and a lower positioning fixing ring 15 which are correspondingly arranged up and down, and a connecting rod 14 is arranged between the upper positioning fixing ring 11 and the lower positioning fixing ring 15; isolation sleeve 21 is fixed to be set up go up between the solid fixed ring 11 of location and the solid fixed ring 15 of lower location, all be provided with sleeve hole 12 on the solid fixed ring of last location and the solid fixed ring of lower location, isolation sleeve matches and wears to establish in the sleeve hole 12 that corresponds.
In the embodiment, the upper end and the lower end of the isolation sleeve 21 are both provided with the sealing plugs 23, the sealing plugs 23 are arranged between the longitudinal main ribs 32 and the inner wall of the isolation sleeve 21, and the sealing plugs at the lower part of the isolation sleeve need to be penetrated by longitudinal steel bars, so that holes can be formed in the sealing plugs 23 at the lower part or the sealing rings 22 can be used for replacement. As shown in fig. 2, the isolation sleeve of the present application is a PVC sleeve, a sealing plug 23 is arranged at the top end of the PVC sleeve, a sealing ring 22 is arranged at the bottom end of the PVC sleeve 21, and the top end of a longitudinal main rib 32 of a filling pile 31 penetrates through the sealing ring 22 and extends into the PVC sleeve 21; the PVC sleeve 21, the sealing plug 23 and the sealing ring 22 wrap the top end of the longitudinal main rib 32, so that the top end of the longitudinal main rib 32 is prevented from being in direct contact with the pile body concrete 34. This application can ensure the pouring quality of bored concrete pile body through pile head separation support and isolation sleeve's setting, realizes the separation between the vertical main muscle of steel reinforcement cage and the concrete at corresponding position simultaneously, is more convenient for carry on the wholeness of upper portion and removes, avoids breaking the concrete placement quality of in-process pile body in the separation and receives the influence, and pile head separation support can also assist the installation location of vertical main muscle.
Further, the last fixed ring of location 11 of this application with the circumference of the fixed ring of location 15 is provided with a plurality of constant head tanks 13 down, constant head tank 13 is laid between two adjacent isolation sleeve 21, just go up fixed ring of location 11 with the outer fringe of the fixed ring of location 15 and bored concrete pile 31's outer wall parallel and level down, when the drilling in first counter-force hole and second counter-force hole carries out, can be based on this as the reference, creeps into. Specifically, as shown in fig. 9, the side wall of the upper positioning fixing ring 11 has a positioning groove 13, and the positioning groove 13 is disposed between two sleeve holes 12; a positioning groove 13 on the positioning fixing ring above the first counter-force hole is used as a mark, and the cast-in-situ pile 31 is horizontally drilled inwards from the outer side of the pile body; the positioning groove 13 can prevent the longitudinal main rib 32 from being damaged during the drilling process of the pile body radial drilling hole 51. And drilling the second reaction hole by taking the positioning groove on the lower positioning fixing ring below the lower part of the lower positioning fixing ring as a reference.
The first reaction frame 41 and the second reaction frame 42 of the present application each include a support bar 412, a base 411, and a limit block 414, and the support bar 412 is inserted into the first reaction hole 51 or the second reaction hole 56 in a matching manner; the base 411 is arranged at the outer end part of the supporting rod 412; the limiting block 414 is perpendicular to the supporting rod 412, and the limiting block 414 is attached to and supported by the side wall of the cast-in-place pile 31. As shown in fig. 11 and 12, the lower portion of the circular base in this embodiment is further provided with a stiffening rod 413, the supporting rod 412 and the stiffening rod 413 are fixed on the lower surface of the circular base 411, the inserted supporting rod 412 and the stiffening rod 413 are perpendicular to each other, and they may be an integral structure, that is, the end of the supporting rod forms a cross-shaped bracket, the base is fixed on the cross-shaped bracket to improve the stress performance, and the limiting block 414 is located below the circular base 411 and fixed on the inserted supporting rod 412; the inserted support rods 412 on the first reaction force bracket 41 and the second reaction force bracket 42 are inserted into the first reaction force hole 51 and the second reaction force hole 56 which are arranged in a radial shape, 4 reaction force brackets are respectively arranged on each plane, and 4 first reaction force brackets 41 on the upper plane are correspondingly aligned with 4 second reaction force brackets 42 on the lower plane one by one; the first reaction force support and the second reaction force support provide stable and reliable planes for the driving parts, the driving parts in the embodiment are hydraulic oil cylinders or jacks, the driving parts are arranged between the corresponding first reaction force support and the corresponding second reaction force support, the jacks are preferably adopted, and the pile head 52 where the pile head separation support 1 is located is separated from the cast-in-situ bored pile 31 through jacking of the jacks 43. This application is through the setting of first reaction frame and second reaction frame, can realize the formation of prefracture face with the help of the structure of pile head separation support, reduces the destruction to concrete structure at prefracture face formation in-process for the effort of jacking is mostly concentrated on solid fixed ring of last location and the solid fixed ring of lower location, and the formation of prefracture face has predictability, can ensure that the prefracture face forms more and neatly, and the formation scope is more controllable, the integrality of guarantee pile body structure.
In order to avoid subsequent drilling operation, this application can also be the circumference and has laid first counter-force hole reserved pipe and second counter-force hole reserved pipe on pile head separation support 1, first counter-force hole reserved pipe and second counter-force hole reserved pipe follow pile head separation support is pour in the bored concrete pile, and forms first counter-force hole and second counter-force hole. So as to facilitate subsequent construction and improve the operation efficiency.
Further, in order to avoid bending of the longitudinal main ribs and improve safety performance, the cast-in-place pile is further provided with a guide unit, the guide unit comprises guide plates 63 and fixing rings 61, and a plurality of guide plates 63 are matched, attached and distributed in the circumferential direction of the cast-in-place pile 31; fixed ring 61 matches the cover and establishes on bored concrete pile 31, just fixed ring 61 with be provided with locking bolt 64 between the bored concrete pile 31, the multi-disc deflector 63 matches and inserts and establish fixed ring 61 with between the bored concrete pile 31, fixed ring 61 with be provided with fastening bolt 65 between the deflector 63. Specifically, as shown in fig. 1 and fig. 4, a guide plate 63 is installed, and the guide plate 63 is tightly attached to the side wall of the shaft of the cast-in-situ bored pile 31 and fixed by using a fixing ring 61; as shown in fig. 13 and fig. 6, screw holes 62 are uniformly formed in the fixing ring 61, the fixing ring 61 is sleeved on the cast-in-place pile 31, and the locking bolt 64 passes through the screw hole 62 and abuts against the surface of the cast-in-place pile 31, so that the fixing ring 61 is fixed on the cast-in-place pile 31; the guide plate 63 is uniformly arranged between the fixing ring 61 and the cast-in-place bored pile 31 along the pile periphery, and the fastening bolt 65 penetrates through the screw hole 62 and abuts against the guide plate 63, so that the guide plate 63 is tightly attached to the surface of the cast-in-place bored pile 31; the locking bolts 64 and the fastening bolts 65 are uniformly staggered along the circumference; in the process of lifting and separating the pile head 52 upwards, the guide plate 63 can restrict the plane displacement of the pile head 52, so that the pile head 52 only generates vertical displacement, the longitudinal main reinforcement 32 can be prevented from being damaged in the lifting process of the pile head 52, and the construction safety is improved. This application can set up multichannel deflector through setting up the direction unit on the pile body, retrains the displacement of pile head horizontal direction, upwards hangs the in-process that leaves at the pile head, only takes place vertical displacement to can avoid the pile head to lift by crane the in-process and lead to vertical main muscle to take place to buckle. And the safety in the operation process can be improved.
The construction of the large-diameter cast-in-place bored pile is carried out by utilizing the whole pile head breaking system of the large-diameter cast-in-place bored pile, and the construction method specifically comprises the following steps:
a. installing an isolation sleeve on the pile head separation support, and correspondingly inserting a longitudinal main rib at the upper part of a reinforcement cage of the cast-in-situ bored pile into the isolation sleeve;
b. placing the reinforcement cage provided with the pile head separation support and the isolation sleeve into the pile hole, and pouring the pile body concrete;
c. after the cast-in-situ bored pile is poured and the pile body concrete is cured to the designed strength, cleaning the pile surrounding soil body around the pile body corresponding to the pile head, and reserving an operation space; in order to avoid mechanical damage to pile body concrete in the construction process, before cleaning the soil body around the pile, a steel pile casing is driven into the soil body around the pile, a groove around the pile is excavated from the ground along the periphery of the steel pile casing, after the groove around the pile is excavated, the steel pile casing is pulled out, and the soil body around the pile attached to the pile body of the bored pile is cleaned; specifically, as shown in fig. 2, after the cast-in-situ bored pile 31 is poured and the pile body concrete 34 is cured to the designed strength, a steel casing 37 is driven into the pile surrounding soil 36, a pile surrounding groove 38 is excavated from the ground along the periphery of the steel casing 37, and after the pile surrounding groove 38 is excavated, the steel casing 37 is pulled out to clean the pile surrounding soil 36 attached to the pile body of the cast-in-situ bored pile 31; the steel casing 37 can effectively ensure that the cast-in-situ bored pile 31 is not damaged by excavating machinery in the excavation process of the peripheral groove 38 of the pile, and the excavation efficiency of the peripheral groove 38 of the pile is improved; the peripheral groove 38 of the pile is excavated, so that a sufficient working space can be provided for the subsequent pile head separation operation;
d. drilling a first counter-force hole in the circumferential direction of the pile head, and drilling a second counter-force hole in the lower part of the pile head separation support;
e. a first counter-force support and a second counter-force support are respectively arranged in the first counter-force hole and the second counter-force hole, a driving part is arranged between the corresponding first counter-force support and the corresponding second counter-force support, the driving part is driven to extend and move, and the pile head is lifted upwards to enable the pile body concrete at the lower part of the support to be separated from the pile head to form a pre-crack surface; in order to avoid lateral bending of the longitudinal main rib and improve safety performance, a guide plate is installed before a jack of the driving part acts, and the guide plate is tightly attached to the side wall of the pile body of the cast-in-situ bored pile and fixed by a fixing ring. Specifically, after the first reaction force bracket 41, the second reaction force bracket 42 and the jack 43 are installed, the jack 43 is lifted upwards, and a pre-splitting surface 53 is formed on the plane of the pile body concrete 34 where the second reaction force holes 56 in the radial shape on the lower plane are located;
f. and dismantling the driving part, the first counter-force support and the second counter-force support, and lifting the pile head through lifting equipment until the pile head is completely separated from the pile body of the cast-in-situ bored pile, so as to complete the construction of the cast-in-situ bored pile with the large diameter. Specifically, as shown in fig. 7 and 8, the jack 43 and the second reaction support 42 on the lower plane are removed, the lifting rope 55 is hung on the first reaction support 41 on the upper plane of the pile head, the other end of the lifting rope 55 is hung on the hook 54, and the pile head 52 is lifted upwards until the pile head 52 is completely separated from the pile body of the cast-in-situ bored pile 31; finally, the guide plate needs to be removed, and the top end of the cast-in-situ bored pile needs to be roughened.
The construction of major diameter bored concrete pile is carried out in this application, can ensure construction quality and efficiency of construction, and each link through pouring stage, subsequent pile head breaking stage and whole construction process all with optimizing construction quality, reduces the pile head and breaks the degree of difficulty and design and structural arrangement as the basis for entire system's feasibility of implementation can improve greatly, and the practicality is stronger, and economic benefits and market value are comparatively showing.
While the above description has described in detail the preferred embodiments for carrying out the invention, it should be understood that these embodiments are presented by way of example only, and are not intended to limit the scope, applicability, or configuration of the invention in any way. The scope of the invention is defined by the appended claims and equivalents thereof. Many modifications may be made to the foregoing embodiments by those skilled in the art in light of the teachings of the present disclosure, and such modifications are intended to be within the scope of the present disclosure.
Claims (8)
1. The utility model provides a whole system of demolising of major diameter drilling bored concrete pile head for the demolition of the pile head of bored concrete pile, its characterized in that includes:
a pile head separation support;
the pile head separation support is arranged on the pile head separation support, a plurality of longitudinal main reinforcements at the upper part of a reinforcement cage of the cast-in-place pile are arranged in the pile head separation support in a matching and penetrating mode, and the pile head separation support and the isolation sleeve are poured on the top of the cast-in-place pile;
the pile head of the cast-in-place pile is circumferentially provided with a plurality of first reaction holes, the cast-in-place pile at the lower part of the pile head separation support is circumferentially provided with a plurality of second reaction holes, and the first reaction frame and the second reaction frame are respectively and correspondingly arranged in the first reaction holes and the second reaction holes; and
and the driving part is arranged between the first reaction frame and the second reaction frame and is used for breaking and separating the pile head from the top of the cast-in-place pile.
2. The pile head overall demolition system of a large-diameter cast-in-situ bored pile according to claim 1, wherein sealing plugs are disposed at both upper and lower ends of the isolation sleeve, and the sealing plugs are disposed between the longitudinal main reinforcement and the inner wall of the isolation sleeve.
3. The system for integrally breaking the pile head of the large-diameter cast-in-situ bored pile according to claim 1, wherein the pile head separation support includes an upper positioning fixing ring and a lower positioning fixing ring which are disposed in an up-down corresponding manner, and a connecting rod is disposed between the upper positioning fixing ring and the lower positioning fixing ring; the isolation sleeve is fixedly arranged between the upper positioning fixing ring and the lower positioning fixing ring.
4. The pile head overall demolition system according to claim 3, wherein the upper positioning fixing ring and the lower positioning fixing ring are circumferentially provided with a plurality of positioning grooves, the positioning grooves are arranged between two adjacent isolation sleeves, and the outer edges of the upper positioning fixing ring and the lower positioning fixing ring are flush with the outer wall of the cast-in-place pile.
5. The system of claim 1, wherein the first reaction frame and the second reaction frame each comprise:
the supporting rod is inserted into the first counter-force hole or the second counter-force hole in a matched manner;
a base disposed at an outer end of the support bar; and
and the limiting block is vertically arranged with the supporting rod, and the limiting block is attached to and supported by the side wall of the cast-in-place pile.
6. The pile head overall demolition system of a large-diameter bored pile according to claim 1, wherein a first counter-force hole reserved tube and a second counter-force hole reserved tube are circumferentially arranged on the pile head separating bracket, and the first counter-force hole reserved tube and the second counter-force hole reserved tube are cast in the bored pile along with the pile head separating bracket to form the first counter-force hole and the second counter-force hole.
7. The system for integrally breaking the pile head of the large-diameter cast-in-situ pile according to claim 1, further comprising a guiding unit, wherein the guiding unit comprises:
the guide plates are matched, attached and distributed in the circumferential direction of the cast-in-place pile; and
the fixing ring is sleeved on the cast-in-place pile in a matching mode, locking bolts are arranged between the fixing ring and the cast-in-place pile, the guide plates are inserted between the fixing ring and the cast-in-place pile in a matching mode, and fastening bolts are arranged between the fixing ring and the guide plates.
8. The system for integrally breaking the pile head of the large-diameter cast-in-situ pile according to claim 1, wherein the driving part is a hydraulic cylinder or a jack, and the driving part is arranged between the corresponding first reaction frame and the corresponding second reaction frame.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120858726.4U CN214832668U (en) | 2021-04-25 | 2021-04-25 | Pile head integral breaking system for large-diameter bored pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120858726.4U CN214832668U (en) | 2021-04-25 | 2021-04-25 | Pile head integral breaking system for large-diameter bored pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214832668U true CN214832668U (en) | 2021-11-23 |
Family
ID=78768672
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120858726.4U Withdrawn - After Issue CN214832668U (en) | 2021-04-25 | 2021-04-25 | Pile head integral breaking system for large-diameter bored pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214832668U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113089671A (en) * | 2021-04-25 | 2021-07-09 | 河南省公路工程局集团有限公司 | Pile head integral breaking system for large-diameter bored pile and construction method |
CN114086555A (en) * | 2021-11-25 | 2022-02-25 | 中铁三局集团有限公司 | Combined device for breaking pile head of bored pile foundation and pile head breaking construction method |
CN113089671B (en) * | 2021-04-25 | 2024-11-15 | 河南省公路工程局集团有限公司 | Integral breaking system for pile head of large-diameter bored pile and construction method |
-
2021
- 2021-04-25 CN CN202120858726.4U patent/CN214832668U/en not_active Withdrawn - After Issue
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113089671A (en) * | 2021-04-25 | 2021-07-09 | 河南省公路工程局集团有限公司 | Pile head integral breaking system for large-diameter bored pile and construction method |
CN113089671B (en) * | 2021-04-25 | 2024-11-15 | 河南省公路工程局集团有限公司 | Integral breaking system for pile head of large-diameter bored pile and construction method |
CN114086555A (en) * | 2021-11-25 | 2022-02-25 | 中铁三局集团有限公司 | Combined device for breaking pile head of bored pile foundation and pile head breaking construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109137915B (en) | Pile plate type roadbed pipe pile dry-digging implantation module structure and construction method thereof | |
CN109537579B (en) | Construction method of cast-in-situ bored pile | |
CN214832668U (en) | Pile head integral breaking system for large-diameter bored pile | |
CN113250186B (en) | Cast-in-place concrete pile head separation device and pile head breaking method | |
CN114086555B (en) | Construction method for breaking pile head of bored pile foundation | |
CN113309080B (en) | Construction method of double-casing cast-in-situ bored pile | |
KR100984762B1 (en) | Pressing apparatus of casing of retaining well construction and the constructing method thereof | |
CN212270916U (en) | Collimating pile structure | |
CN114278227A (en) | Construction method of lower pile casing of cast-in-place pile | |
CN113089671A (en) | Pile head integral breaking system for large-diameter bored pile and construction method | |
CN211037053U (en) | Suspension protection structure for pipe well | |
CN215105353U (en) | Can retrieve fender pile of steel pipe fast | |
CN113089671B (en) | Integral breaking system for pile head of large-diameter bored pile and construction method | |
CN108086309B (en) | Mini pile reinforcement cage installation method | |
CN113293792B (en) | Construction method of bored pile based on inclined pile in offshore wind power weathering soil layer | |
CN109680681A (en) | A kind of pile crown restructuring bankrupt of cast-in-situ bored pile | |
JP3427022B2 (en) | Construction method of shaft | |
CN218148364U (en) | Strong supporting construction of manual hole digging pile | |
CN114215051A (en) | A protect a device and dig rig soon for bored concrete pile construction | |
JP2003049424A (en) | Construction method of composite pile, diameter enlarging device and inter-pile cutting device | |
CN112962603A (en) | Dismantling construction process for reinforced concrete cast-in-place pile | |
CN112431611B (en) | Method for dismantling inner pipe sheet of steel ring of shield tunnel portal | |
CN217419585U (en) | Device for assisting in breaking pile head of concrete cast-in-place pile | |
CN217517549U (en) | Protection device for bored pile | |
CN219773006U (en) | Quick-dismantling type anti-slide pile wall protection structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20211123 Effective date of abandoning: 20241115 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20211123 Effective date of abandoning: 20241115 |