[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN214658089U - Isolation curtain wall for building intelligent installation engineering - Google Patents

Isolation curtain wall for building intelligent installation engineering Download PDF

Info

Publication number
CN214658089U
CN214658089U CN202120665876.3U CN202120665876U CN214658089U CN 214658089 U CN214658089 U CN 214658089U CN 202120665876 U CN202120665876 U CN 202120665876U CN 214658089 U CN214658089 U CN 214658089U
Authority
CN
China
Prior art keywords
fixed
wall
curtain
plate
curtain wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120665876.3U
Other languages
Chinese (zh)
Inventor
余靖
黄建琴
黄子明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Tansheng Construction Engineering Co ltd
Original Assignee
Fujian Tansheng Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Tansheng Construction Engineering Co ltd filed Critical Fujian Tansheng Construction Engineering Co ltd
Priority to CN202120665876.3U priority Critical patent/CN214658089U/en
Application granted granted Critical
Publication of CN214658089U publication Critical patent/CN214658089U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Curtains And Furnishings For Windows Or Doors (AREA)

Abstract

The utility model belongs to the technical field of building engineering, especially, an isolation curtain wall for building intelligent installation engineering, the problem of inconvenient installation and operation of the isolation curtain wall for the building is solved, the scheme is provided, which comprises a slide rail, wherein a first curtain wall is fixed on the inner side wall of the slide rail, a second curtain wall is connected on one side of the inner wall of the slide rail, a fixed plate is fixed on one side of the inner wall of the first curtain wall, a rotating shaft is fixed on one side of the inner wall of the first curtain wall, a gear is fixed on the outer surface of the rotating shaft, and a sliding rod penetrates through the inner part of the fixed plate in a sliding manner; the utility model discloses in through mutually supporting of extrusion piece and first dentate plate, make first dentate plate under the extrusion of extrusion piece, thereby remove through the slide bar and drive the gear and rotate, make first dentate plate card go into the inside of draw-in groove, the second dentate plate can carry on spacingly to the gear, realizes the concatenation between the curtain, and the staff of being convenient for installs it, improves staff's work efficiency.

Description

Isolation curtain wall for building intelligent installation engineering
Technical Field
The utility model relates to a building engineering technical field especially relates to an intelligent installation engineering of building is with keeping apart curtain.
Background
The curtain wall is an outer wall enclosure of a building and is hung like a curtain, so the curtain wall is also called a hanging wall and is a light wall with decoration effect commonly used by modern large and high-rise buildings. Building a curtain wall: the double-layer curtain wall is composed of an inner layer and an outer layer, and is composed of an inner vertical surface structure and an outer vertical surface structure.
Among the prior art, when keeping apart the installation of curtain usually, install fixedly through welding and bolt fastening's mode, when installing through these two kinds of modes, can consume too much time and fix it, because keep apart the curtain and expose in the air usually, the bolt can produce the rust under long-time effect, and the influence is comparatively inconvenient to the operation of keeping apart the curtain when installing.
Therefore, an isolation curtain wall for building intelligent installation engineering is needed to solve the problem that the installation and operation of the isolation curtain wall are inconvenient.
SUMMERY OF THE UTILITY MODEL
The utility model provides a pair of intelligent installation engineering of building is with keeping apart curtain has solved the inconvenient problem of curtain installation operation to building isolation.
In order to achieve the above purpose, the utility model adopts the following technical scheme: an isolation curtain wall for building intelligent installation engineering comprises a slide rail, wherein a first curtain wall is fixed on the inner side wall of the slide rail, a second curtain wall is connected on one side of the first curtain wall, a fixing plate is fixed on the side wall of one side of the first curtain wall, a rotating shaft is fixed on the inner wall of one side of the first curtain wall, a gear is fixed on the outer surface of the rotating shaft, a sliding rod penetrates through the fixing plate in a sliding manner, a first toothed plate fixed to the bottom end of the sliding rod is installed on one side of the gear, a telescopic spring fixed to the side wall of the top end of the fixing plate is sleeved on the outer surface of the sliding rod in a sliding manner, a sliding block fixed to the side wall of the top end of the sliding rod is installed above the fixing plate, the side wall of the top end of the telescopic spring is fixed to the top end of the telescopic spring, a clamping groove matched with the first toothed plate is formed in one side of the slide rail, and a clamping assembly is arranged between the first curtain wall and the second curtain wall.
Preferably, the clamping assembly comprises a moving block fixed to one side wall of the second curtain wall, an extrusion rod is fixed to one side wall of the moving block, an extrusion block matched with the first toothed plate is fixed to one side wall, away from the second curtain wall, of the extrusion rod, a fixing rod is fixed to the position, below the extrusion rod, of one side wall of the second curtain wall, an arc-shaped clamp is fixed to one end, close to the first curtain wall, of the fixing rod, a second toothed plate matched with the gear is installed below the fixing rod, and an arc-shaped block matched with the arc-shaped clamp is fixed to one side wall of the fixing plate.
Preferably, the top cross-section of sliding block is the inclined plane, the sliding block with extrusion piece contact surface is the inclined plane of looks adaptation, the extrusion pole with the fixed plate is parallel arrangement.
Preferably, the below of gear install with the fixed cover of one side inner wall of slide rail, the inside of fixed cover slides and runs through there is the gag lever post, the one end of gag lever post is fixed with the stopper, one side lateral wall of stopper with be fixed with limiting spring between the lateral wall of one side of fixed cover, the below of second toothed plate is fixed with the limiting plate, the gag lever post extends to one side inner wall of limiting plate.
Preferably, one side wall of the moving block is slidably connected with one side wall of the first curtain wall, and the extrusion rod is parallel to the fixed rod.
Preferably, one end of the arc-shaped clamp is arc-shaped in cross section, and one side wall of the arc-shaped clamp is in sliding connection with one side wall of the fixed plate.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses in through mutually supporting of extrusion piece and first dentate plate, make first dentate plate under the extrusion of extrusion piece, thereby remove through the slide bar and drive the gear and rotate, make first dentate plate card go into the inside of draw-in groove, the second dentate plate can carry on spacingly to the gear, makes it be in relatively stable state, realizes the concatenation between first curtain wall and the second curtain, and the staff of being convenient for installs it, improves staff's work efficiency.
2. The utility model discloses in through the setting of second dentate plate and arc clamp, the arc clamp is mutually supported with the fixed plate, makes it have spacing effect when installing, prevents to produce the skew of position when installing the butt joint, leads to the isolation curtain after the installation to produce not hard up, influences the qualification efficiency of curtain.
Drawings
Fig. 1 is a schematic view of the internal structure of an isolation curtain wall for building intelligent installation engineering provided by the utility model;
fig. 2 is a schematic structural view of an internal part of an isolation curtain wall for building intelligent installation engineering provided by the utility model;
fig. 3 is a schematic view of an internal part of a first curtain wall of an isolation curtain wall for building intelligent installation engineering, which is provided by the utility model;
fig. 4 is the utility model provides a building intelligent installation engineering is with main structure schematic diagram of looking at of isolation curtain.
In the figure: 1. a slide rail; 2. a first curtain wall; 3. a second curtain wall; 4. a fixing plate; 5. a rotating shaft; 6. a gear; 7. a slide bar; 8. a first castellated plate; 9. a tension spring; 10. a slider; 11. a card slot; 12. a clamping assembly; 120. a moving block; 121. an extrusion stem; 122. extruding the block; 123. fixing the rod; 124. an arc-shaped clamp; 125. a second toothed plate; 126. an arc-shaped block; 13. fixing a sleeve; 14. a limiting rod; 15. a limiting block; 16. a limiting spring; 17. and a limiting plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, an isolating curtain wall for building intelligent installation engineering comprises a slide rail 1, a first curtain wall 2 is slidably fixed on the inner side wall of the slide rail 1, a second curtain wall 3 is slidably connected to one side of the first curtain wall 2 on the inner wall of one side of the slide rail 1, specifically, the first curtain wall 2 and the second curtain wall 3 are double-layer hollow curtain walls, a fixing plate 4 is fixed on the side wall of one side of the first curtain wall 2, a rotating shaft 5 is fixed on the side wall of one side of the first curtain wall 2, a gear 6 is fixed on the outer surface of the rotating shaft 5, a sliding rod 7 is slidably penetrated in the fixing plate 4, a first toothed plate 8 fixed with the bottom end of the sliding rod 7 is installed on one side of the gear 6, a telescopic spring 9 fixed with the side wall of the top end of the fixing plate 4 is slidably sleeved on the outer surface of the sliding rod 7, a sliding block 10 fixed with the side wall of the top end of the sliding rod 7 is installed above the fixing plate 4, the top lateral wall of sliding block 10 is fixed with 9 tops of expanding spring, and one side of slide rail 1 is inside to be seted up with first flute profile plate 8 matched with draw-in groove 11, is provided with joint subassembly 12 between first curtain 2 and the second curtain 3, realizes the concatenation between first curtain 2 and the second curtain 3, and the staff of being convenient for installs it, improves staff's work efficiency.
The clamping assembly 12 comprises a moving block 120 fixed on one side wall of the second curtain wall 3, a squeezing rod 121 is fixed on one side wall of the moving block 120, a squeezing block 122 matched with the first toothed plate 8 is fixed on one side wall of the squeezing rod 121 far away from the second curtain wall 3, a fixing rod 123 is fixed below the squeezing rod 121 on one side wall of the second curtain wall 3, an arc-shaped clamp 124 is fixed at one end of the fixing rod 123 close to the first curtain wall 2, a second toothed plate 125 matched with the gear 6 is installed below the fixing rod 123, an arc-shaped block 126 matched with the arc-shaped clamp 124 is fixed on one side wall of the fixing plate 4, and through the mutual matching of the squeezing block 122 and the first toothed plate 8, the first toothed plate 8 is squeezed by the squeezing block 122 to move so as to drive the gear 6 to rotate, and the first toothed plate 8 is clamped into the clamping groove 11.
The top cross section of the sliding block 10 is an inclined plane, the contact surface of the sliding block 10 and the extrusion block 122 is an inclined plane matched with each other, the extrusion rod 121 and the fixed plate 4 are arranged in parallel, a fixed sleeve 13 fixed with one side inner wall of the sliding rail 1 is installed below the gear 6, a limiting rod 14 penetrates through the inside of the fixed sleeve 13 in a sliding manner, one end of the limiting rod 14 is fixed with a limiting block 15, a limiting spring 16 is fixed between one side wall of the limiting block 15 and one side wall of the fixed sleeve 13, a limiting plate 17 is fixed below the second toothed plate 125, the limiting rod 14 extends to one side inner wall of the limiting plate 17, one side wall of the moving block 120 is connected with one side wall of the first curtain wall 2 in a sliding manner, the extrusion rod 121 and the fixed rod 123 are arranged in parallel, the cross section of one end of the arc-shaped clamp 124 is arc-shaped, one side wall of the arc-shaped clamp 124 is connected with one side wall of the fixed plate 4 in a sliding manner, and is matched with the fixed plate 4 through the arc-shaped clamp 124, so that the installation of the bracket has a limiting effect.
The working principle is as follows: when the isolating curtain wall is required to be installed in the building engineering, the first curtain wall 2 is firstly placed in the sliding rail 1 for fixing, the second curtain wall 3 is then placed in the sliding rail 1 for fixing, the second curtain wall 3 moves towards the direction of the first curtain wall 2 to form butt joint, the second curtain wall 3 can drive the moving block 120 to move when moving, the moving block 120 can drive the extrusion rod 121 to move when moving, the extrusion rod 121 can drive the extrusion block 122 to move when moving, the extrusion block 122 can contact with the sliding block 10 when moving, the sliding rod 7 can move towards the direction of the sliding rail 1 with the first toothed plate 8 under the extrusion of the extrusion rod 121, the expansion spring 9 can contract under the extrusion of the extrusion block 122, the first toothed plate 8 can drive the gear 6 to rotate when moving, the gear 6 can drive the rotating shaft 5 to rotate when rotating, the first toothed plate 8 moves in the direction of the sliding rail 1 under the extrusion of the extrusion block 122, the first toothed plate 8 is clamped into the clamping groove 11 under the extrusion of the extrusion block 122, the limiting block 15 supports the first toothed plate 8 to realize the fixation between two building curtain walls, meanwhile, the fixing rod 123 and the arc clamp 124 move along with the movement of the second curtain wall 3, the fixing plate 4 is clamped into the arc clamp 124, the arc clamp 124 and the fixing plate 4 are matched with each other to have the limiting function when being installed, the position deviation generated when the installation and the butt joint are prevented, the second toothed plate 125 moves along with the movement of the fixing rod 123 in the direction of the first curtain wall 2, the second toothed plate 125 is meshed with the gear 6, the limiting rod 14 moves along with the movement of the second toothed plate 125, the limiting rod 14 is clamped into the limiting plate 17 to push the limiting rod 14, the increase is to the driving force of first dentate plate 8, makes it be in more stable state after the installation, and gear 6 can be in the state of blocking this moment, has accomplished the concatenation between the curtain, has realized the installation to the building isolation curtain.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a building intelligent installation engineering is with keeping apart curtain, includes slide rail (1), the inside wall of slide rail (1) is fixed with first curtain (2), one side inner wall of slide rail (1) is located one side sliding connection of first curtain (2) has second curtain (3), its characterized in that, one side lateral wall of first curtain (2) is fixed with fixed plate (4), one side inner wall of first curtain (2) is fixed with axis of rotation (5), the surface mounting of axis of rotation (5) has gear (6), the inside slip of fixed plate (4) has run through slide bar (7), one side of gear (6) install with the first dentate plate (8) of the bottom mounting of slide bar (7), the surface slip of slide bar (7) cup joint with the top lateral wall mounting's of fixed plate (4) expanding spring (9), the top of fixed plate (4) install with sliding block (10) that the top lateral wall of slide bar (7) is fixed, the top lateral wall of sliding block (10) with expanding spring (9) top is fixed, the inside seted up of one side of slide rail (1) with first dentate plate (8) matched with draw-in groove (11), first curtain (2) with be provided with joint subassembly (12) between second curtain (3).
2. The isolating curtain wall for the intelligent building installation project of claim 1, the clamping assembly (12) comprises a moving block (120) fixed on the side wall of one side of the second curtain wall (3), a squeezing rod (121) is fixed on the side wall of one side of the moving block (120), a squeezing block (122) matched with the first toothed plate (8) is fixed on the side wall of one side of the squeezing rod (121) far away from the second curtain wall (3), a fixing rod (123) is fixed on the side wall of one side of the second curtain wall (3) below the extrusion rod (121), an arc-shaped clamp (124) is fixed at one end of the fixed rod (123) close to the first curtain wall (2), a second toothed plate (125) matched with the gear (6) is arranged below the fixed rod (123), an arc-shaped block (126) matched with the arc-shaped clamp (124) is fixed on the side wall of one side of the fixed plate (4).
3. The isolating curtain wall for the intelligent building installation engineering according to claim 2, wherein the top cross section of the sliding block (10) is an inclined surface, the contact surface of the sliding block (10) and the extrusion block (122) is an adaptive inclined surface, and the extrusion rod (121) and the fixing plate (4) are arranged in parallel.
4. The isolating curtain wall for the intelligent building installation project according to claim 2, wherein a fixed sleeve (13) fixed to one side inner wall of the sliding rail (1) is installed below the gear (6), a limiting rod (14) penetrates through the inside of the fixed sleeve (13) in a sliding manner, a limiting block (15) is fixed to one end of the limiting rod (14), a limiting spring (16) is fixed between one side wall of the limiting block (15) and one side wall of the fixed sleeve (13), a limiting plate (17) is fixed below the second toothed plate (125), and the limiting rod (14) extends to one side inner wall of the limiting plate (17).
5. The isolating curtain wall for the intelligent building installation project as claimed in claim 2, wherein a side wall of the moving block (120) is slidably connected with a side wall of the first curtain wall (2), and the extrusion rod (121) and the fixing rod (123) are arranged in parallel.
6. The isolating curtain wall for the building intelligent installation project of claim 2, wherein the section of one end of the arc-shaped clamp (124) is arc-shaped, and one side wall of the arc-shaped clamp (124) is in sliding connection with one side wall of the fixing plate (4).
CN202120665876.3U 2021-04-01 2021-04-01 Isolation curtain wall for building intelligent installation engineering Active CN214658089U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120665876.3U CN214658089U (en) 2021-04-01 2021-04-01 Isolation curtain wall for building intelligent installation engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120665876.3U CN214658089U (en) 2021-04-01 2021-04-01 Isolation curtain wall for building intelligent installation engineering

Publications (1)

Publication Number Publication Date
CN214658089U true CN214658089U (en) 2021-11-09

Family

ID=78458142

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120665876.3U Active CN214658089U (en) 2021-04-01 2021-04-01 Isolation curtain wall for building intelligent installation engineering

Country Status (1)

Country Link
CN (1) CN214658089U (en)

Similar Documents

Publication Publication Date Title
CN214658089U (en) Isolation curtain wall for building intelligent installation engineering
CN214272397U (en) Beam column connected node structure that steel construction room was built
CN204826342U (en) Erection joint spare for construction
CN107740520B (en) High strength curtain bearing structure for building
CN208586788U (en) A kind of Fast Installation anti-corrosion building curtain wall
CN216340301U (en) Curtain wall steel structure with telescopic function
CN210140909U (en) Sunshine room with extend platform
CN220267097U (en) Wallboard mounting rack
CN214994938U (en) Novel light-weight buckling type concrete inner partition wall
CN216819262U (en) Cable testing bridge convenient to installation
CN212836143U (en) Curtain wall glass frame structure
CN217353110U (en) Curtain wall upright post fixing assembly
CN215254769U (en) Assembled external wall panel for plate type building
CN220247313U (en) Novel toughened glass building curtain wall
CN219992822U (en) Assembly type energy-saving curtain wall mounting assembly
CN221590087U (en) Keel structure of assembled building
CN218719543U (en) Engineering pipe with good sealing performance
CN117868367B (en) Be used for building curtain installation mosaic structure
CN221989663U (en) Prefabricated modularized curtain wall capable of realizing rapid construction
CN219365808U (en) Combined auxiliary frame of bridge-cut-off casement window
CN212755225U (en) Curtain hook mounting device
CN220434003U (en) Building curtain wall mounting and fixing support
CN214461560U (en) Novel back bolt type connecting piece for curtain wall
CN220666773U (en) Assembled building wallboard mounting structure
CN211473003U (en) Building curtain wall mounting and fixing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant