[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN214093317U - Gas pipeline laying structure combined with construction of comprehensive pipe gallery - Google Patents

Gas pipeline laying structure combined with construction of comprehensive pipe gallery Download PDF

Info

Publication number
CN214093317U
CN214093317U CN202022296157.7U CN202022296157U CN214093317U CN 214093317 U CN214093317 U CN 214093317U CN 202022296157 U CN202022296157 U CN 202022296157U CN 214093317 U CN214093317 U CN 214093317U
Authority
CN
China
Prior art keywords
hoop
fixing
fixed
base
gas pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022296157.7U
Other languages
Chinese (zh)
Inventor
王楠
张靖昊
袁畅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022296157.7U priority Critical patent/CN214093317U/en
Application granted granted Critical
Publication of CN214093317U publication Critical patent/CN214093317U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a gas pipeline that combines utility tunnel to build lays structure, the on-line screen storage device comprises a base, base one end bottom side is provided with the fixed plate, the upper end central line department swing joint of base has the fixing base, the fixing base middle part is run through and is provided with the bolt, fixed hoop under the fixing base upper end both sides fixedly connected with, fixed hoop upper end swing joint has last fixed hoop down, it runs through and is provided with clamping screw to go up fixed hoop front end, it is provided with the hinge to go up fixed hoop rear end, the inside upside of last fixed hoop has been seted up and has been accomodate the groove, it is provided with the connecting plate to accomodate inslot side upper end, connecting plate bottom center department fixedly connected with spring. A gas pipeline that combines utility tunnel construction lays structure, can prevent that the pipe joint is not hard up to lead to leaking gas, and avoid the gas pipeline expend with heat and contract with cold after the pine move lead to connecting the fracture, can increase the leakproofness that the gas pipeline connects, fixed more firm.

Description

Gas pipeline laying structure combined with construction of comprehensive pipe gallery
Technical Field
The utility model relates to a gas pipeline lays technical field, in particular to gas pipeline that combines utility tunnel to build lays structure.
Background
Pipe gallery, i.e. the corridor of the pipeline. Many pipelines in chemical industry and related factories are gathered together and arranged along the outside of a device or a factory building, generally in the air, supported by a support to form a similar appearance with a corridor, and a few pipe galleries are positioned underground. When the pressure of the gas in the pipeline is different, the requirements on the pipe, the installation quality, the inspection standard, the operation management and the like are different; present gas pipeline that combines utility tunnel construction lays structure has some problems when using, at first, when the gas pipeline is fixed, it is fixed with the pipeline support with the support usually, but the joint department of pipeline is fixed insecure, lead to easily connecting not hard up, and the gas pipeline can take place expend with heat and contract with cold the phenomenon, can lead to the pipeline not hard up in the fixed bolster to make the pipeline rock easily, lead to the pipeline to connect the department fracture, in order to solve above-mentioned problem, we have proposed a gas pipeline that combines utility tunnel construction lays structure.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a gas pipeline that combines utility tunnel to construct lays structure, can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a gas pipeline that combines utility tunnel construction lays structure, includes the base, base one end bottom side is provided with the fixed plate, the upper end central line department swing joint of base has the fixing base, the fixing base middle part runs through and is provided with the bolt, fixing base upper end both sides fixedly connected with down fixed hoop, fixed hoop upper end swing joint has last fixed hoop down, it runs through and is provided with clamping screw to go up fixed hoop front end, it is provided with the hinge to go up fixed hoop rear end, go up the inside upside of fixed hoop and seted up and accomodate the groove, accomodate inslot side upper end and be provided with the connecting plate, connecting plate bottom center department fixedly connected with spring, spring bottom fixedly connected with clamp plate.
Preferably, the top end of the connecting plate is welded with the upper side inside the containing groove, the spring is a high-strength hard spring, and the radian of the bottom surface of the pressing plate is the same as that of the inner surface of the upper fixing hoop.
Through adopting above-mentioned technical scheme, through the elastic force effect of spring, can make clamp plate lower extreme and gas pipeline upper end closely laminate.
Preferably, the fixing base is a concave structure with two convex ends, the lower fixing hoop and the upper fixing hoop are provided with two groups, and the lower fixing hoop and the upper fixing hoop are arranged at the convex parts on two sides of the upper end of the fixing base respectively.
Through adopting above-mentioned technical scheme, through setting up two sets of fixed hoops and last fixed hoops down in the protruding department in upper end both sides of fixing base, can fix the depressed part of fixing base between two sets of fixed hoops and last fixed hoops down with the joint department of gas pipeline.
Preferably, hinge upper end and last fixed hoop rear end fixed connection, hinge lower extreme and lower fixed hoop rear end fixed connection, fixed hoop passes through the hinge rotation with last fixed hoop rear end down and is connected, clamping screw runs through fixed hoop and fixed hoop front end down, and clamping screw bottom movable mounting has the nut, fixed hoop passes through clamping screw fixed mounting with last fixed hoop front end down.
Through adopting above-mentioned technical scheme, through the nut of pulling down the clamping screw bottom, can make down fixed hoop and last fixed hoop front end separation, can upwards open last fixed hoop front end through the hinge.
Preferably, the middle part of the bottom end of the base is provided with a through type pressure relief hole, the lower end of the bolt penetrates through the middle parts of the fixed seat and the bottom end of the base, a nut is movably mounted at the bottom end of the bolt, the nut at the bottom end of the bolt is arranged inside the pressure relief hole, and the fixed seat is movably mounted at the upper end of the base through the bolt.
Through adopting above-mentioned technical scheme, can eliminate partly with the buffering of quivering of pipeline through the through-going formula release hole, can be with fixing base movable mounting in base upper end through the bolt.
Preferably, the fixed plate is provided with two sets of, two sets of fixed plate fixed connection respectively in base both sides bottom, the fixed plate surface runs through and is provided with the lead screw.
Through adopting above-mentioned technical scheme, through the lead screw on fixed plate surface, can fix fixed plate and base in the piping lane.
Compared with the prior art, the utility model discloses following beneficial effect has: the gas pipeline laying structure constructed by combining the comprehensive pipe gallery can separate the front ends of the lower fixing hoop and the upper fixing hoop by detaching the nut at the bottom end of the fixing screw rod, under the action of the hinge, the front end of the upper fixing hoop can be opened upwards, the joints of the two groups of gas pipelines are placed in the concave parts of the fixed seats between the two groups of lower fixing hoops and the upper fixing hoop, can prevent air leakage caused by loosening of the pipeline joint, put down the upper fixing hoop, fix the lower fixing hoop and the front end of the upper fixing hoop through the fixing screw rod, further press the press plate on the upper end of the gas pipeline, make clamp plate lower extreme and gas pipeline upper end closely laminate under the elastic force effect of spring to make the pipeline firmly fix under between fixed hoop and the last fixed hoop, avoid gas pipeline expend with heat and contract with cold after the pine to lead to connecting the fracture, can increase the leakproofness that the gas pipeline connects, it is more firm to fix.
Drawings
Fig. 1 is a schematic view of the overall structure of a gas pipeline laying structure constructed in combination with a utility tunnel;
fig. 2 is an overall cutting schematic diagram of the gas pipeline laying structure constructed by combining the utility model with a comprehensive pipe rack;
fig. 3 is a schematic side sectional view of a lower fixing hoop and an upper fixing hoop of a gas pipeline laying structure constructed by combining a comprehensive pipe rack of the utility model;
fig. 4 is the utility model relates to a combine the gas pipeline of utility tunnel construction to lay a A of structure and enlarge the schematic diagram.
In the figure: 1. a base; 2. a fixing plate; 3. a fixed seat; 4. a bolt; 5. a lower fixing hoop; 6. an upper fixing hoop; 7. fixing the screw rod; 8. a hinge; 9. a connecting plate; 10. a spring; 11. pressing a plate; 12. a receiving groove.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-4, a gas pipeline laying structure that combines utility tunnel construction, including base 1, base 1 one end bottom side is provided with fixed plate 2, base 1's upper end central line department swing joint has fixing base 3, fixing base 3 middle part runs through and is provided with bolt 4, fixing base 3 upper end both sides fixedly connected with down fixing hoop 5, fixing hoop 5 upper end swing joint has last fixing hoop 6 down, it is provided with clamping screw 7 to run through to go up fixing hoop 6 front end, it is provided with hinge 8 to go up fixing hoop 6 rear end, the inside upside of going up fixing hoop has been seted up and has been accomodate groove 12, it is provided with connecting plate 9 to accomodate groove 12 inboard upper end, connecting plate 9 bottom center department fixedly connected with spring 10, spring 10 bottom fixedly connected with clamp plate 11.
The top end of the connecting plate 9 is welded with the upper side inside the accommodating groove 12, the spring 10 is a high-strength hard spring, and the radian of the bottom surface of the pressing plate 11 is the same as that of the inner surface of the upper fixing hoop 6.
Make 11 lower extremes of clamp plate and gas pipeline upper end closely laminate down through the spring action of spring 10 to make the pipeline firmly fixed, avoid gas pipeline expend with heat and contract with cold after the pine to lead to the joint fracture, can increase the leakproofness that gas pipeline connects, it is more firm to fix.
The fixing base 3 is a concave structure with two convex ends, the lower fixing hoop 5 and the upper fixing hoop 6 are provided with two groups, and the two groups of lower fixing hoops 5 and the upper fixing hoop 6 are respectively arranged at the convex parts on two sides of the upper end of the fixing base 3.
The sunken position of fixing base 3 between two sets of lower fixed hoops 5 and the last fixed hoop 6 is put into through the joint department with two sets of gas pipelines, can prevent that the pipe joint is not hard up to lead to gas leakage.
Hinge 8 upper end and last fixed hoop 6 rear end fixed connection, hinge 8 lower extreme and 5 rear end fixed connection of fixed hoop down, lower fixed hoop 5 passes through hinge 8 with last fixed hoop 6 rear end and rotates to be connected, and clamping screw 7 runs through fixed hoop 6 and 5 front ends of fixed hoop down, and 7 bottom movable mounting of clamping screw have a nut, and lower fixed hoop 5 passes through clamping screw 7 fixed mounting with last fixed hoop 6 front end.
The lower fixing hoop 5 can be separated from the front end of the upper fixing hoop 6 by detaching the nut at the bottom end of the fixing screw 7, and the front end of the upper fixing hoop 6 can be opened upwards under the action of the hinge 8.
The middle part of the bottom end of the base 1 is provided with a through type pressure relief hole, the lower end of the bolt 4 penetrates through the middle parts of the bottom ends of the fixing base 3 and the base 1, the nut is movably mounted at the bottom end of the bolt 4, the nut at the bottom end of the bolt 4 is arranged in the pressure relief hole, and the fixing base 3 is movably mounted at the upper end of the base 1 through the bolt 4.
The fixed seat 3 is arranged at the center of the upper end of the base 1 through a bolt 4, and the vibration of the pipeline can be partially buffered through the through pressure relief hole.
The fixed plate 2 is provided with two sets ofly, and two sets of fixed plates 2 are fixed connection in base 1 both sides bottom respectively, and the fixed plate 2 surface runs through and is provided with the lead screw.
Through the lead screw on 2 surfaces of fixed plate, can fix fixed plate 2 and base 1 in the piping lane.
It should be noted that, the utility model relates to a gas pipeline laying structure constructed by combining with a comprehensive pipe rack, a user fixes a fixed plate 2 and a base 1 in the pipe rack through a screw rod on the surface of the fixed plate 2, installs a fixed seat 3 at the center of the upper end of the base 1 through a bolt 4, separates a lower fixed hoop 5 from the front end of an upper fixed hoop 6 by dismounting a nut at the bottom end of a fixed screw 7, opens the front end of the upper fixed hoop 6 upwards under the action of a hinge 8, places the joint of two groups of gas pipelines into the dent of the fixed seat 3 between the two groups of lower fixed hoops 5 and the upper fixed hoop 6, places the upper fixed hoop 6 down, fixes the lower fixed hoop 5 and the front end of the upper fixed hoop 6 through the fixed screw 7, further presses a pressing plate 11 at the upper end of the gas pipeline, and tightly adheres the lower end of the pressing plate 11 to the upper end of the gas pipeline under the elastic action of a spring 10, so that the pipe is firmly fixed between the lower and upper fixing bands 5 and 6.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a combine gas pipeline of utility tunnel construction to lay structure, includes base (1), its characterized in that: the improved fixing device is characterized in that a fixing plate (2) is arranged on the bottom side of one end of the base (1), a fixing seat (3) is movably connected to the middle line of the upper end of the base (1), a bolt (4) penetrates through the middle of the fixing seat (3), a fixing hoop (5) is fixedly connected to the two sides of the upper end of the fixing seat (3), an upper fixing hoop (6) is movably connected to the upper end of the lower fixing hoop (5), a fixing screw rod (7) penetrates through the front end of the upper fixing hoop (6), a hinge (8) is arranged at the rear end of the upper fixing hoop (6), a containing groove (12) is formed in the upper side of the inner portion of the upper fixing hoop (6), a connecting plate (9) is arranged at the upper end of the inner side of the containing groove (12), a spring (10) is fixedly connected to the center of the bottom of the connecting plate (9), and a pressing plate (11) is fixedly connected to the bottom of the spring (10).
2. A gas pipelaying structure in combination with utility tunnel construction according to claim 1, characterized in that: the top end of the connecting plate (9) is welded with the upper side inside the containing groove (12), the spring (10) is a high-strength hard spring, and the radian of the bottom surface of the pressing plate (11) is identical to that of the inner surface of the upper fixing hoop (6).
3. A gas pipelaying structure in combination with utility tunnel construction according to claim 1, characterized in that: the fixing base (3) is of a concave structure with two convex ends, the lower fixing hoop (5) and the upper fixing hoop (6) are provided with two groups, and the lower fixing hoop (5) and the upper fixing hoop (6) are arranged at the convex positions on two sides of the upper end of the fixing base (3) respectively.
4. A gas pipelaying structure in combination with utility tunnel construction according to claim 1, characterized in that: hinge (8) upper end and last fixed hoop (6) rear end fixed connection, hinge (8) lower extreme and fixed hoop (5) rear end fixed connection down, fixed hoop (5) are connected through hinge (8) rotation with last fixed hoop (6) rear end down, fixed screw (7) run through fixed hoop (6) and fixed hoop (5) front end down, and fixed screw (7) bottom movable mounting has the nut, fixed hoop (5) and last fixed hoop (6) front end pass through fixed screw (7) fixed mounting down.
5. A gas pipelaying structure in combination with utility tunnel construction according to claim 1, characterized in that: base (1) bottom middle part is provided with through-type pressure relief hole, bolt (4) lower extreme runs through fixing base (3) and base (1) bottom middle part, and bolt (4) bottom movable mounting has the nut, the nut of bolt (4) bottom sets up inside the pressure relief hole, fixing base (3) are through bolt (4) movable mounting in base (1) upper end.
6. A gas pipelaying structure in combination with utility tunnel construction according to claim 1, characterized in that: the fixing plates (2) are arranged in two groups, the fixing plates (2) are fixedly connected to the bottoms of the two sides of the base (1) respectively, and a screw rod penetrates through the surface of each fixing plate (2).
CN202022296157.7U 2020-10-15 2020-10-15 Gas pipeline laying structure combined with construction of comprehensive pipe gallery Expired - Fee Related CN214093317U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022296157.7U CN214093317U (en) 2020-10-15 2020-10-15 Gas pipeline laying structure combined with construction of comprehensive pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022296157.7U CN214093317U (en) 2020-10-15 2020-10-15 Gas pipeline laying structure combined with construction of comprehensive pipe gallery

Publications (1)

Publication Number Publication Date
CN214093317U true CN214093317U (en) 2021-08-31

Family

ID=77443902

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022296157.7U Expired - Fee Related CN214093317U (en) 2020-10-15 2020-10-15 Gas pipeline laying structure combined with construction of comprehensive pipe gallery

Country Status (1)

Country Link
CN (1) CN214093317U (en)

Similar Documents

Publication Publication Date Title
CN208900840U (en) A kind of heat-insulated sliding supporter of buckle-type connection
CN103964076B (en) The adiabatic heat-insulation case of energy dismounting
CN108382747A (en) One kind connecing floating plate in liquid honeycomb fashion entirely
CN214093317U (en) Gas pipeline laying structure combined with construction of comprehensive pipe gallery
CN205329898U (en) But split wall body
CN201764119U (en) Lining plastic steel pipe fixing device
CN210830769U (en) Marine multi-core pipe steel pipe strutting arrangement
CN213954641U (en) Hinge type high-voltage quick connector
CN208804359U (en) A kind of flange connection
CN209986475U (en) Pipeline welding clamp
CN215633703U (en) Fracturing pump valve box convenient to oil pipe connects
CN208344973U (en) It is a kind of to connect floating plate in liquid honeycomb fashion entirely
CN209100773U (en) A kind of hydraulic hose fixing clamp
CN208900898U (en) A kind of universal flange of sweep-up pipe being completely embedded
CN209764452U (en) Sampling gun mounting base
CN210240842U (en) Steel pipe connecting piece
CN207007623U (en) A kind of bearing pipe bearing capacity detection means
CN207945382U (en) A kind of petroleum pipeline Quick Connect Kit
CN214500272U (en) Urban gas engineering pipeline supporting device
CN210623911U (en) Novel pipeline under-pressure plugging structure
CN204852678U (en) High sealing connection's nonrust steel pipe
CN217130607U (en) Clamp self-sealing high-pressure Y-shaped pipeline joint connecting mechanism
CN219834060U (en) Solar photovoltaic aluminum frame
CN217402029U (en) Mechanical cross joint suitable for pitched roof
CN206036392U (en) Adjustable support for underground pipe gallery

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210831