- CN203499277U CN203499277U CN201320596529.5U CN201320596529U CN203499277U CN 203499277 U CN203499277 U CN 203499277U CN 201320596529 U CN201320596529 U CN 201320596529U CN 203499277 U CN203499277 U CN 203499277U
- Authority
- CN
- China
- Prior art keywords
- canopy
- floor
- frame
- building
- section steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model discloses a tool type section steel hard isolation protective shed, which comprises a group of unit sheds which are fixed on a building floor (1), wherein adjacent unit sheds are connected through turning plates (2). Operating personnel complete operation in a floor during the lifting process, the tool type section steel hard isolation protective shed is safe in operation, does not have risk of aloft work, and reduces pressure of site safety management construction. Plates of the unit sheds are adjusted to be on the same plane through steel wire ropes after being lifted, and are excellently in appearance effect. The turning plates are arranged between the plates of the unit sheds, effectively seal gaps between the plates, guarantee safe protection integrality. The tool type section steel hard isolation protective shed can be turned over and used for many times after being processed and formed at one time, is simple to turnover and maintain, can be used for new sites after being painted with antirust paint again, and has excellent social and economic benefits. The tool type section steel hard isolation protective shed meets high efficiency construction requirement, also supplies safe guarantee for the operating personal, and has wide practicability and popularization.
Description
Technical field
the utility model relates to the hard isolating and protecting canopy of a kind of tools type section steel, belongs to construction safety guard technology field.
Background technology
development along with Building Trade in China, all kinds of types of construction continue to bring out, and super highrise building constantly increases, in building engineering construction, for preventing falling object from high altitude injury, the protection canopy that adopts steel pipe to set up is set outward at proposed building, and this protection canopy is set up and demolishing process needs workman's work high above the ground, and danger is larger, be unfavorable for site safety management, and it is slower to set up progress, can not reuse, there is wasting of resources phenomenon.
Summary of the invention
the purpose of this utility model is, provides a kind of tools type section steel hard isolating and protecting canopy.Adopt quick-assembling mode, can reuse, pacify the tool-type protection canopy of tearing convenience, job safety open, to meet site operation security needs.
the technical solution of the utility model:
the hard isolating and protecting canopy of tools type section steel, this protection canopy consists of the one group of unit canopy being fixed on building floor; Between adjacent cells canopy, through turnover panel, connect.
in aforementioned protection canopy, described turnover panel is connected with the one side upset of unit canopy through hinge.
in aforementioned protection canopy, described unit canopy comprises frame, and frame is the rectangular frame that i iron and steel bar welding are connected into; On frame, be equipped with protected apron, frame is provided with Cantilever Beams by building one side, and Cantilever Beams is fixedly connected with the floor of building through one group of fixation kit, and frame outside is provided with protective guard, and the pre-buried anchor ring of frame outside on wire rope and upper strata floor sockets.
in aforementioned protection canopy, described fixation kit comprises the U-shaped built-in fitting in the floor that is embedded in building, between two screw rods of the Cantilever Beams on frame on U-shaped built-in fitting, through pressing plate and nut, is fixed on the floor of building.
in aforementioned protection canopy, two screw rods of described U-shaped built-in fitting are provided with sleeve pipe.
in aforementioned protection canopy, described protective guard is steel pipe welding fitting, and protective guard is provided with protective screening; Frame outside is provided with one group of column, and protective guard and column are pegged graft.
in aforementioned protection canopy, on two angles in described frame outside, be welded with drawknot ring, wire rope one end from drawknot ring through doubling through wire clips and wire rope crimping; The pre-buried anchor ring of the wire rope other end from the floor of upper strata passes rear doubling through wire clips and wire rope crimping.
compared with prior art, the utility model adopts shaped steel, reinforcing bar, checkered steel plate to make, and protection rigidity is good, can protect the falling object from high altitude of greater impact power, better than steel pipe protection canopy protection effect.The utility model is simple in structure and practical, and all nodes connect all employing welding, and construction quality is secure; Each unit canopy is made approximately 4~6 meters wide, and 3 meters of long unit plates lift convenient and swiftly, and speed of application is quick.Whole protection canopy is installed and demolishing process, and operating personnel all completes in floor, and job safety is dangerous without work high above the ground, reduces site safety management operation pressure.After unit canopy burst lifts, by wire rope, all plates are adjusted to same plane, appearance effect is good.Between unit canopy, turnover panel is set, effectively the gap between closed cell canopy, guarantees security protection globality; After the moulding of the utility model time processing, can repeatedly have enough to meet the need use, and turnover maintenance is simple, only needs again can drop into the use of new building site after brushing rustproof paint, there is good Social benefit and economic benefit.Both meet high efficiency construction requirement, again for operating personnel provide safety guarantee, there is practicality and generalization widely.
Accompanying drawing explanation
fig. 1 is structural representation of the present utility model;
fig. 2 is the structural representation of fixation kit.
being labeled as in accompanying drawing: 1-building floor, 2-turnover panel, 3-hinge, 4-i iron, 5-reinforcing bar, 6-protected apron, 7-Cantilever Beams, 8-fixation kit, 9-protective guard, 10-wire rope, the pre-buried anchor ring of 11-, 12-U shape built-in fitting, 13-screw rod, 14-pressing plate, 15-nut, 16-sleeve pipe, 17-protective screening, 18-column, 19-drawknot ring, 20-wire clips.
The specific embodiment
below in conjunction with accompanying drawing, the utility model is described in further detail, but not as to any restriction of the present utility model.
the hard isolating and protecting canopy of tools type section steel, as shown in Figure 1.In order to see complete structure clearly, in Fig. 1, at a protection canopy, do not draw protected apron 6 and protective guard 9.This protection canopy consists of the one group of unit canopy being fixed on building floor 1; Between adjacent cells canopy, through turnover panel 2, connect.Turnover panel 2 is connected with the one side upset of unit canopy through hinge 3.Described unit canopy comprises frame, and frame is the rectangular frame that i iron 4 and reinforcing bar 5 are welded into; On frame, be equipped with protected apron 6, frame is provided with Cantilever Beams 7 by building one side, Cantilever Beams 7 is fixedly connected with the floor 1 of building through one group of fixation kit 8, and frame outside is provided with protective guard 9, and frame outside sockets through wire rope 10 and the pre-buried anchor ring 11 on the floor of upper strata.Described fixation kit 8 as shown in Figure 2, comprises the U-shaped built-in fitting 12 in the floor 1 that is embedded in building, between two screw rods 13 of the Cantilever Beams 7 on frame on U-shaped built-in fitting 12, through pressing plate 14 and nut 15, is fixed on the floor 1 of building.Two screw rods 13 of described U-shaped built-in fitting 12 are provided with sleeve pipe 16.Described protective guard 9 is steel pipe welding fittings, and protective guard 9 is provided with protective screening 17; Frame outside is provided with one group of column 18, and protective guard 9 is pegged graft with column 18.On two angles in described frame outside, be welded with drawknot ring 19, wire rope 10 one end from drawknot ring 19 through doubling through wire clips 20 and wire rope 10 crimping; The pre-buried anchor ring 11 of wire rope 10 other ends from the floor of upper strata passes rear doubling through wire clips 20 and wire rope 10 crimping.
Embodiment
during concrete enforcement,
1, first production unit canopy.It is long that unit canopy adopts 14# i iron 4 and φ 20 reinforcing bars 5 to be welded into 4~6m, and then the framework that 3m is wide lays checkered steel plate that one deck 3mm is thick as protected apron 6 on framework.In lengths of frame direction one side, weld two 14# i iron as the Cantilever Beams 7 being connected with construction panel, then weld along its length row's column 18 for connecting protective guard 9 at lengths of frame direction opposite side.On the framework at protective guard 9 two ends, weld respectively a drawknot ring 19 for metal binding wire rope 10.At frame width direction welding one row's hinge 3, by hinge 3 and turnover panel 2 welding, turnover panel 2 is connected for the unit canopy with adjacent, by the space between turnover panel 3 sealing two unit canopies.In case falling stop thing falls and hurts sb.'s feelings from the space between two unit canopies.
2, when carrying out building floor 1 casting, set up the pre-buried fixation kit 8 of floor in advance, setting up the pre-buried anchor ring 11 of floor last layer.Pre-buried fixation kit 8 as shown in Figure 2, consists of U-shaped built-in fitting 12, pressing plate 14 and nut 15.On U-shaped built-in fitting 12, have 13, two screw rod 13 one end of two screw rods to be welded on base plate, when pre-buried, at two screw rods, 13 cover the preceding paragraph sleeve pipes 16, sleeve pipe 16 can adopt φ 22PVC plastic pipe, so that can remove smoothly U-shaped built-in fitting 12 in the future, reuses.
3, carry out unit canopy lifting, during lifting as shown in Figure 1, by tower crane, unit canopy is winched to and sets up floor, two Cantilever Beams 7 on unit canopy are winched on U-shaped built-in fitting 12 and had between two screw rods 13, on two screw rods 13, overlap top board 14, then with nut 15 by Cantilever Beams 7 being pressed in floor plates tightly.After two Cantilever Beams 7 all fix, then tie up on the drawknot ring 19 of unit canopy and be connected with the pre-buried anchor ring 11 on the floor of upper strata with wire rope 10.On building, lift as stated above a row unit canopy.Then the turnover panel on unit canopy 2 is turned over to turnback, the another side of turnover panel 2 is ridden on adjacent unit canopy, in case falling stop thing is hurted sb.'s feelings from falling between two module unit canopies.
4,, after unit canopy has lifted, with wire rope 10, two drawknot rings 19 in unit canopy outside and the pre-buried anchor ring 11 on the floor of upper strata are strained.The colligation of wire rope 10 can adopt wire clips 20 to carry out colligation.
5, finally again protective guard 9 is inserted on row's column 18 of unit canopy outer ledge, in order to prevent that protective guard 9 from coming off, can on the steel pipe of column 18 and protective guard 9, pin-and-hole be set, after being plugged, with pin, fix.Protective guard 9 is provided with protective screening 17.So far the hard isolating and protecting canopy of tool-type of the present utility model has been set up.
the utility model operating personnel in hoisting process all complete in floor, and job safety is dangerous without work high above the ground, reduces site safety management operation pressure.After protection canopy unit plate burst lifts, by wire rope, all plates are adjusted to same plane, appearance effect is good.Turnover panel is set between unit plate, effectively seals gap between plate, guarantee security protection globality; After the moulding of the hard isolating and protecting canopy of tools type section steel time processing, can repeatedly have enough to meet the need use, and turnover maintenance is simple, only needs again can drop into the use of new building site after brushing rustproof paint, there is good Social benefit and economic benefit.The utility model had both met high efficiency construction requirement, again for operating personnel provide safety guarantee, had practicality and generalization widely.
the specification of main material used in the utility model.I iron 4 adopts No. 14 i iron, and reinforcing bar adopts the screw-thread steel of φ 20, and wire rope adopts the wire rope of φ 16mm, and protected apron 6 and turnover panel 2 adopt the thick checkered steel plate of 3mm.
Claims (7)
1. the hard isolating and protecting canopy of tools type section steel, is characterized in that: this protection canopy consists of the one group of unit canopy being fixed on building floor (1); Between adjacent cells canopy, through turnover panel (2), connect.
2. protection canopy according to claim 1, is characterized in that: described turnover panel (2) is connected with the one side upset of unit canopy through hinge (3).
3. protection canopy according to claim 1, is characterized in that: described unit canopy comprises frame, and frame is the rectangular frame that i iron (4) and reinforcing bar (5) are welded into; On frame, be equipped with protected apron (6), frame is provided with Cantilever Beams (7) by building one side, Cantilever Beams (7) is fixedly connected with the floor (1) of building through one group of fixation kit (8), frame outside is provided with protective guard (9), and frame outside sockets through wire rope (10) and the pre-buried anchor ring (11) on the floor of upper strata.
4. protection canopy according to claim 3, it is characterized in that: described fixation kit (8) comprises the U-shaped built-in fitting (12) in the floor (1) that is embedded in building, and the Cantilever Beams on frame (7) is positioned between two screw rods (13) on U-shaped built-in fitting (12) and is fixed on the floor (1) of building through pressing plate (14) and nut (15).
5. protection canopy according to claim 4, is characterized in that: two screw rods (13) of described U-shaped built-in fitting (12) are provided with sleeve pipe (16).
6. protection canopy according to claim 3, is characterized in that: described protective guard (9) is steel pipe welding fitting, and protective guard (9) is provided with protective screening (17); Frame outside is provided with one group of column (18), and protective guard (9) is pegged graft with column (18).
7. protection canopy according to claim 3, is characterized in that: on two angles in described frame outside, be welded with drawknot ring (19), wire rope (10) one end from drawknot ring (19) through doubling through wire clips (20) and wire rope (10) crimping; The pre-buried anchor ring (11) of wire rope (10) other end from the floor of upper strata passes rear doubling through wire clips (20) and wire rope (10) crimping.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320596529.5U CN203499277U (en) | 2013-09-26 | 2013-09-26 | Tool type section steel hard isolation protective shed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320596529.5U CN203499277U (en) | 2013-09-26 | 2013-09-26 | Tool type section steel hard isolation protective shed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203499277U true CN203499277U (en) | 2014-03-26 |
Family
ID=50330269
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320596529.5U Expired - Fee Related CN203499277U (en) | 2013-09-26 | 2013-09-26 | Tool type section steel hard isolation protective shed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203499277U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109184244A (en) * | 2018-11-08 | 2019-01-11 | 重庆建工住宅建设有限公司 | A kind of construction method that overhanging rope-mesh type is horizontal protective shed |
-
2013
- 2013-09-26 CN CN201320596529.5U patent/CN203499277U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109184244A (en) * | 2018-11-08 | 2019-01-11 | 重庆建工住宅建设有限公司 | A kind of construction method that overhanging rope-mesh type is horizontal protective shed |
CN109184244B (en) * | 2018-11-08 | 2023-11-10 | 重庆建工住宅建设有限公司 | Cantilever cable net type horizontal protection shed and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206784975U (en) | A kind of elevator horizontal protective structure | |
CN210067544U (en) | Prefabricated steel structure protective shed frame for railway business line | |
CN206859719U (en) | A kind of efficient assembled safety barrier for edge protection | |
CN203499277U (en) | Tool type section steel hard isolation protective shed | |
CN202194395U (en) | Tool type edge protector rack | |
CN201106280Y (en) | Hanging outrigger scaffold post-anchorage piece | |
CN204059904U (en) | A kind of hoistway operation platform being applied to multi-platform operation | |
CN206418861U (en) | A kind of switch base for facing skirt shield and multiduty skirt of facing are protected | |
CN107795133B (en) | Integral protective frame platform and construction method thereof | |
CN203334731U (en) | Assembly type double-layer protective shed for safe operation | |
CN203022328U (en) | Climbing operation platform | |
CN203684714U (en) | Temporary security protective barrier | |
CN202431011U (en) | Reusable tool type bolting reinforcing steel bar processing shed for construction site | |
CN204850515U (en) | Steel construction faces limit protector | |
CN201212256Y (en) | Safety flat net for construction of elevator shaft | |
CN203361676U (en) | Temporary protective guard for building construction | |
CN204552172U (en) | Assembly type is encorbelmented interim processing plant | |
CN202596186U (en) | Protector for concrete column corners | |
CN203834965U (en) | Edge protector with embedded iron wire and fixed steel pipe | |
CN204139634U (en) | The safe enclosed construction in a kind of fast-type hole | |
CN204960186U (en) | Triangle rigid coupling stair bone for building shape single face angle bead | |
CN104631844A (en) | Steel column mounting operation platform and mounting method thereof | |
CN204370826U (en) | A kind of building operations safety barrier | |
CN204920041U (en) | Bent type single face angle bead of stair for building | |
CN204552131U (en) | One can face bound defence rail by temporary traffic |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |