CN203394108U - Fabricated bathroom - Google Patents
Fabricated bathroom Download PDFInfo
- Publication number
- CN203394108U CN203394108U CN201320403695.9U CN201320403695U CN203394108U CN 203394108 U CN203394108 U CN 203394108U CN 201320403695 U CN201320403695 U CN 201320403695U CN 203394108 U CN203394108 U CN 203394108U
- Authority
- CN
- China
- Prior art keywords
- chassis
- ground
- wallboard
- water
- groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model provides a fabricated bathroom, comprising a ground, a wall and a ceiling, wherein the ground comprises a chassis with a floor drain hole and a finish coat arranged on the chassis; a mounting groove is arranged in the edge of the chassis; the bottom or the inner side of the mounting groove is communicated with the chassis below the finish coat; the chassis is assembled on the ground of a building in the modes that the floor drain hole is communicated with a sewer of the building and the edges of the chassis are respectively adjoined with the wall of the building; the wall is formed by splicing a plurality of vertical wallboard wall tiles; the bottom end of each wallboard is embedded into the mounting groove of the chassis; the ceiling is mounted at the top end of the wall. According to the fabricated bathroom, the precast chassis, the finish coat, the wallboards and the ceiling are assembled into the bathroom in the bathroom space field of the building, the decoration working procedure of the bathroom is simplified, and the decoration construction period is shortened.
Description
Technical field
The utility model relates to house decoration field, more particularly, relates between a kind of assembling bathroom.
Background technology
Between bathroom, be requisite functional space in house, the finishing of washroom is in whole house decoration, to relate to operation to do one of many, project that the duration is the longest.
Between current bathroom, adopt the structures such as masonry panel, pipeline set aside pre-embedded, waterproofing course, sticking brick, its construction technology process is as follows: (1) building wall; (2) water service pipe and conduit fluting; (3) water service pipe, conduit tubine; (4) preformed groove sealing; (5) metope ash cake is made; (6) floated coat construction; (7) ground concrete levelling; (8) construction of waterproof layer; (9) waterproof is closed water check; (10) metope and the construction of ground waterproof topping; (11) metope and floor tile are transported to that indoor, binder for face brick stirs, metope paving walltile; (12) paving floor tile; (13) finished surface closes water check; (14) completion quality inspection.
From the work progress between above-mentioned bathroom, its operation is very numerous and diverse, and (comprise without hollowing because national acceptance standard is high, butt joint difference of height, surface finish all have clear and definite regulation), therefore constructor's technical ability is had relatively high expectations, the in the situation that of at present a large amount of real estate and house decoration, existing workman cannot meet the requirement of quality and the quantity of job site.And, due to the construction of must just marching into the arena after civil engineering structure completes between bathroom, cause the practice of construction time short, cannot ensure the quality of products.In addition, after construction of waterproof layer between bathroom is complete, also have a lot of operations not complete, very easily in follow-up construction, waterproofing course is damaged, cause in later stage use procedure, occurring seepage between bathroom.
Between existing bathroom, also have that site operation environmental protection and energy saving are poor (need to carry out on-site cutting by building size by wall brick, floor tile, dust is large, low precision, cracky, the proportion of goods damageds be high), the problem such as maintenance difficult (once there is leakage problems, original finishing surface, waterproofing course, pipeline etc. need to be cut again).
Utility model content
The technical problems to be solved in the utility model is, for construction complexity, longer problem of duration between above-mentioned house bathroom, provides between a kind of assembling bathroom.
The technical scheme that the utility model solves the problems of the technologies described above is, provides between a kind of assembling bathroom, comprises ground, metope and smallpox, described ground comprise have ground small opening chassis, be installed in the finish coat on chassis; The edge on described chassis is provided with the bottom of mounting groove and this mounting groove or inner side is communicated with the chassis of finish coat below, and this chassis is communicated with ground small opening the ground that the sewer built, mode that edge is close to respectively the metope of building are assembled to building; Described metope by a plurality of vertical wallboard wall covering surfaces, be spliced and the mounting groove on the embedding chassis, bottom of each wallboard in; Described smallpox is arranged on the top of metope.
In between assembling bathroom described in the utility model, described smallpox is formed by least two mold pressing ceiling splicings and described mold pressing ceiling and wallboard contact portion are provided with U-lag, and the top of described wallboard embeds described U-lag.
In between assembling bathroom described in the utility model, the bottom on described chassis is erected on the ground of building by a plurality of adjustable ground foot bolts, and the upper surface on described chassis has drainage grade centered by ground small opening, 1.5%.
In between assembling bathroom described in the utility model, described chassis is provided with the finish coat Bing Jianggai chassis protruding from chassis and is divided into two-part water-blocking bank, and described ground small opening is positioned at the below of water-blocking bank; One side of the water-blocking bank on described chassis has on access hole and described access hole and is coated with cover plate, has toilet sewer pipe installing hole on described cover plate.
In between assembling bathroom described in the utility model, the upper surface on the chassis of described water-blocking bank both sides has respectively a plurality of outstanding supporters, and described finish coat is erected on described supporter; Described water-blocking bank both sides are respectively equipped with the draining double-edged fine-toothed comb that is parallel to water-blocking bank.
In between assembling bathroom described in the utility model, the back side of described wallboard has many with equally distributed vertical rib.
In between assembling bathroom described in the utility model, in the vertical Lei gap at the back side of at least part of described wallboard, be provided with water/electric line.
In between assembling bathroom described in the utility model, described wallboard is divided into rotary corner plate and surface plate, and adjacent two blocks of wallboards have respectively vertical male groove and female groove and realize splicing by the mode that male groove embeds female groove in stitching portion.
In between assembling bathroom described in the utility model, the middle part of described public groove has vertical groove and this groove is communicated with the mounting groove on chassis.
In between assembling bathroom described in the utility model, the upper surface of the front of described wallboard and the finish coat on ground has respectively by the bonding ceramic tile of tile binding material.
Between assembling bathroom of the present utility model, the sanitary and balneal room Assembling by prefabricated chassis, finish coat, wallboard and smallpox in building becomes between bathroom,, can simplify finishing operation, shortening finishing duration between bathroom.And because above-mentioned splicing component is prefabricated, so industrialization degree is high, quality controllable, has avoided the quality problems that cause due to workman's difference of technology level.
Accompanying drawing explanation
Fig. 1 is the floor map of embodiment between the utility model assembling bathroom.
The schematic cross-section on Tu2Shi Tu1Zhong ground.
The mounting structure schematic diagram on Tu3Shi Tu1Zhong chassis.
The floor map on Tu4Shi Tu1Zhong chassis.
Fig. 5 is the schematic diagram of cover plate.
Fig. 6 is the schematic cross-section of Fig. 5 cover plate.
Fig. 7 is the schematic diagram of wallboard.
Fig. 8 is the schematic diagram of another wallboard.
Fig. 9 is the schematic cross-section of Fig. 8 deadlight.
Figure 10 is wallboard splicing construction schematic diagram.
Figure 11 is wallboard and chassis splicing construction schematic diagram.
Figure 12 is the structural representation of smallpox.
Figure 13 is the partial enlarged drawing at A place in Figure 12.
Figure 14 is the partial enlarged drawing at B place in Figure 12.
The specific embodiment
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein is only in order to explain the utility model, and be not used in restriction the utility model.
As shown in Figure 1-2, be the schematic diagram of embodiment between the utility model assembling bathroom.Between this bathroom, comprise ground 10, metope 20 and smallpox, above-mentioned ground 10 comprise have ground small opening 111 chassis 11, be installed in the finish coat 12 on chassis 11; And 11 edge, above-mentioned chassis is provided with the bottom of mounting groove 114 and this mounting groove 114 or inner side and is communicated with ,Gai chassis 11 with the chassis 11 of finish coat 12 belows and is communicated with the sewer of building, the mode of metope (example is exterior wall 60, interior wall 50 as shown in Figure 1) that edge is close to respectively building is assembled to the ground of building with ground small opening 111; Metope 20 by a plurality of vertical wallboard wall covering surfaces, be spliced and the mounting groove 114 on the embedding chassis, bottom 11 of each wallboard in; Smallpox is arranged on metope 20 top.
Above-mentioned chassis 11 can adopt FRP(FiberReinforcedPolymer, fibre-reinforced plastics) the waterproofing materials one-shot forming such as, so it has good water resistance, between assembling bathroom before construction, without do waterproof construction and waterproof test in building, greatly shortened the duration.
On chassis 11, also water-blocking bank 14 can be set, the finish coat 12 ,Bing Jianggai chassis 11 that this water-blocking bank 14 protrudes from chassis 11 are divided into He Shi district, dry district (toilet is installed) (being mainly shower area) two parts.Ground small opening 111 is positioned at the below of water-blocking bank 14.Above-mentioned water-blocking bank 14Ke Yu chassis 11 one, or adopt independently parts and be assembled to chassis 11.
As shown in Fig. 2,4-6, one side of the water-blocking bank 14 on chassis 11 (dry district) can arrange access hole 112, the upper surface that is coated with this cover plate 15 of cover plate 15(on this access hole 112 can be laid finish coat 12), and on this cover plate 15, there is toilet sewer pipe installing hole 151.Toilet 18 can be arranged on cover plate 15.By access hole 112, can realize the ground water pipe of the building of 11 belows, chassis or electric wire etc. are safeguarded to (such as sewer from blocking etc.).
The access hole 112 edge that the edge of above-mentioned cover plate 15 bottom surface is provided with the concentric Gong Cao, chassis 11 of at least two circles is provided with the concentric female groove of at least two circles, and the mode that cover plate 15 embeds female groove with male groove is attached to chassis 11.By said structure, can effectively prevent the infiltration at access hole 112 places.
Upper surface on the chassis 11 of water-blocking bank 14 both sides, has respectively a plurality of outstanding supporters 115, and finish coat 12 is erected on supporter 115.In water-blocking bank 14 both sides, be respectively equipped with the draining double-edged fine-toothed comb 13 that is parallel to water-blocking bank 14.Water at the upper surface of finish coat 12 can also can be fed directly between the supporter 115 on chassis 11 in finish coat 12 edge gap by draining double-edged fine-toothed comb 13 inflow place small openings 111, and final inflow place small opening 111.
Especially, the bottom on above-mentioned chassis 11 is erected at by a plurality of adjustable stone bolt 19 that on the ground of building, (for example above-mentioned stone bolt 19 can be located at the below of the mounting groove 114 on chassis 11, to accept the weight of wallboard; In addition, near access hole 112, also stone bolt 19 can be set, to accept the weight of toilet 18) upper surface on ,Qie Gai chassis 11 has drainage grade centered by ground small opening 111,1.5% (small opening 111 is positioned at the lowest part on chassis 11).On the ground of building (space between bathroom), can build a plurality of concrete block of wood 40, and on this concrete block of wood 40, lay hot-dip galvanizing sheet steel 41, stone bolt 19 bottom is supported on hot-dip galvanizing sheet steel 41, apical support on chassis 11 bottom (bottom on chassis 11 can arrange corresponding stone bolt 19 installation positions).The drainage grade on chassis 11 can be by regulating the height of the stone bolt 19 of diverse location to realize.
The wallboard that is spliced into metope 20 can comprise that the surface plate 22(shown in rotary corner plate shown in Fig. 7 21 and Fig. 8 is respectively vertical strip), wherein rotary corner plate 21 splicings are at the place, corner of building.Certainly, in use, wallboard comprises more specification, and for example the body of wall in Fig. 1 is spliced by the wallboard of six kinds of different sizes.
Integrated molding in above-mentioned rotary corner plate 21 and surface plate 22Dou factory, therefore can realize the seamless spliced of place, corner, makes whole metope 20 shape all-in-one-piece waterproofing systems, has thoroughly stopped the possibility of water percolation of wall.The structure that the surface plate 22 shown in Fig. 8 of take is below example explanation wallboard, the structure of rotary corner plate 21 is identical with the structure of surface plate 22.
Surface plate 22 comprises the Polymer by FRP(Fiber Reinforced) FRP plate 221 that material forms, the GaiFRPBan back side has many end portion supports with equally distributed vertical rib 2211 and this vertical rib 2211 on the metope of building.Above-mentioned vertical rib 2211 can increase the intensity of surface plate 22, and vertical rib 2211 also and between metope leaves gap towards the metope of building when mounted.The thickness of FRP plate 221 (comprising vertical rib 2211) can be 4CM left and right.
And, between above-mentioned vertical rib 2211, can be in advance fixing water/electric line, thereby can avoid the concrete wall fluting wiring in erecting bed.
The front of the FRP plate 221 of above-mentioned surface plate 22, is bonded with ceramic tile 223(prefabrication by tile binding material 222).The thickness of above-mentioned tile binding material 222 and ceramic tile 223 is 1CM left and right.Thereby the thickness of whole surface plate is about 5CM.The upper surface of the finish coat 12 on ground 10 is prefabricated ceramic tile by the way also.
At the FRPBan221 two ends of surface plate 22, be respectively equipped with vertical male groove 2212 and female groove 2213.As described in Figure 10, adjacent two blocks of wallboards (comprising surface plate 22 and rotary corner plate 21) are when splicing, and male groove 2212 embeds female groove 2213, thereby the stitching portion of wallboard is connected closely, are difficult for infiltration.
In addition, vertical groove and this groove can be set at the middle part of above-mentioned public groove 2212 is communicated with the mounting groove 114 on chassis 11.Like this, as shown in figure 11, because the bottom of wallboard is installed in the mounting groove 114 on chassis 11, even the infiltration of the stitching portion of wallboard, the current of infiltration also flow into the mounting groove 114 on chassis 11 by groove, and along the ground small opening 111 on mounting groove 114 inflow chassis 11.
As shown in Figure 12-14, smallpox is spliced by least two mold pressing ceilings 31.Above-mentioned mold pressing ceiling 31 can adopt SMC(Sheet Molding Compound) materials processing forms, and mold pressing ceiling 31 is provided with U-lag 311 with wallboard contact portion, and the top of wallboard embeds in U-lag 311.
Predeterminable on above-mentioned mold pressing ceiling 31 have light fixture, a super bath installing hole 32.Above-mentioned installing hole 32 can be simultaneously as the water pipe in later stage, the manhole of electric wire, be convenient to maintenance, renewal and the maintenance of later stage while using.
Certainly, in actual applications, smallpox also can adopt existing ceiling structure.
Metope between above-mentioned assembling bathroom, ground adopt sticking brick or stone material, meet current masses' habits and customs; And adopt integral type water-proof chassis between above-mentioned assembling bathroom, water resistance is good, and civil engineering waterproof can be cancelled, reduce operation, reduce construction cost.The systems such as feedwater, draining, illumination, all adopt the mode of the bright dress of pipeline, and installation, maintenance and later stage are changed equal convenience and high-efficiency.
Between above-mentioned assembling bathroom, can realize in the following manner splicing installs:
The first step: be communicated with on the ,Bing chassis, ground 11 that the sewer of building, mode that edge is close to respectively the metope of building be assembled to building and assemble finish coat 12 with ground small opening 111 thering is small opening 111 chassis 11, ground.This step can complete in civil engineering, installation exercise face is carried out after transferring (hydroelectric line joint is pre-buried putting in place all).
Particularly, this step can comprise: first concrete block of wood 40 opsition dependents of foundation bolt for supporting are built by laying bricks or stones and put in place, surface levelness error ± 5cm; Then chassis 11 is placed on concrete block of wood 40Shang, chassis 11 after floor drain, floor drain soil pipe are all in place in advance by stone bolt 19, by stone bolt 19, carries out Level-adjusting; Last checkdam 14, the draining double-edged fine-toothed comb 13 that finish coat 12, artificial stone material are installed successively on chassis 11.
Second step: bottom or inner side that a plurality of vertical wallboards are spliced into the mounting groove 114 at 11 edges, metope 20, chassis in the mode of the mounting groove 114 at 11 edges, embedding chassis, bottom are respectively communicated with the chassis 11 of finish coat below.
Particularly, can before assembled, the water of concealed work, electric line be installed to fix in position in advance at the back side of wallboard, then each wallboard is fixed, be supported by the mounting groove on chassis.First block of wallboard starts to install from door 28 rotary corner plates, then with male and female groove connecting method, fills second block of wallboard, the 3rd block of wallboard, the 4th block of wallboard, presses counterclockwise according to this until the wallboard of last piece wallboard of doorway and first installation splicing sealing backward.
The 3rd step: in the top of metope assembling smallpox.The top that smallpox is blocked wallboard by the U-lag carrying is supported, is fixed.
After smallpox installation, the water service pipe, the fulgurite that are arranged in advance after wallboard can be docked with water, the electric connection of embedment for Civil Works; Then stone material exterior window trim 29, door pocket 27, door 28 etc. are installed; Finally install five metals (such as tissue holder 26, toilet brush take in 16, showerhead 25 etc.), sanitary equipment (such as toilet 18), combined socket and switch, light fixture, super bath etc.
After installing, the finishing between bathroom completes.By survey data, show, two people install only needs 0.5 work day (conventional on-site wet combining ceramic tile needs 14 work days, relates to 6 work posts) between a set of assembling bathroom.And job site overall process does not have the participation of water, can reduce construction pollution; There is no on-the-spot secondary operation (as operations such as ceramic tile cuttings), the dust pollution in work progress is down to minimum, can reduce spillage of material, reduce building costs.
The above; it is only the preferably specific embodiment of the utility model; but protection domain of the present utility model is not limited to this; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; the variation that can expect easily or replacement, within all should being encompassed in protection domain of the present utility model.Therefore, protection domain of the present utility model should be as the criterion with the protection domain of claim.
Claims (10)
1. between an assembling bathroom, comprise ground, metope and smallpox, it is characterized in that: described ground comprise have ground small opening chassis, be installed in the finish coat on chassis; The edge on described chassis is provided with the bottom of mounting groove and this mounting groove or inner side is communicated with the chassis of finish coat below, and this chassis is communicated with ground small opening the ground that the sewer built, mode that edge is close to respectively the metope of building are assembled to building; Described metope by a plurality of vertical wallboard wall covering surfaces, be spliced and the mounting groove on the embedding chassis, bottom of each wallboard in; Described smallpox is arranged on the top of metope.
2. between assembling bathroom according to claim 1, it is characterized in that: described smallpox is formed by least two mold pressing ceiling splicings and described mold pressing ceiling and wallboard contact portion are provided with U-lag, and the top of described wallboard embeds described U-lag.
3. between assembling bathroom according to claim 1, it is characterized in that: the bottom on described chassis is erected on the ground of building by a plurality of adjustable ground foot bolts, and the upper surface on described chassis has drainage grade centered by ground small opening, 1.5%.
4. between assembling bathroom according to claim 1, it is characterized in that: described chassis is provided with the finish coat Bing Jianggai chassis protruding from chassis and is divided into two-part water-blocking bank, and described ground small opening is positioned at the below of water-blocking bank; One side of the water-blocking bank on described chassis has on access hole and described access hole and is coated with cover plate, has toilet sewer pipe installing hole on described cover plate.
5. between assembling bathroom according to claim 4, it is characterized in that: the upper surface on the chassis of described water-blocking bank both sides has respectively a plurality of outstanding supporters, described finish coat is erected on described supporter; Described water-blocking bank both sides are respectively equipped with the draining double-edged fine-toothed comb that is parallel to water-blocking bank.
6. between assembling bathroom according to claim 1, it is characterized in that: the back side of described wallboard has many with equally distributed vertical rib.
7. between assembling bathroom according to claim 6, it is characterized in that: in the vertical Lei gap at the back side of at least part of described wallboard, be provided with water/electric line.
8. between assembling bathroom according to claim 1, it is characterized in that: described wallboard is divided into rotary corner plate and surface plate, and adjacent two blocks of wallboards have respectively vertical male groove and female groove and realize splicing by the mode that male groove embeds female groove in stitching portion.
9. between assembling bathroom according to claim 8, it is characterized in that: the middle part of described public groove has vertical groove and this groove is communicated with the mounting groove on chassis.
10. between assembling bathroom according to claim 1, it is characterized in that: the upper surface of the front of described wallboard and the finish coat on ground has respectively by the bonding ceramic tile of tile binding material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320403695.9U CN203394108U (en) | 2013-07-08 | 2013-07-08 | Fabricated bathroom |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320403695.9U CN203394108U (en) | 2013-07-08 | 2013-07-08 | Fabricated bathroom |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203394108U true CN203394108U (en) | 2014-01-15 |
Family
ID=49905648
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320403695.9U Expired - Fee Related CN203394108U (en) | 2013-07-08 | 2013-07-08 | Fabricated bathroom |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203394108U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107090962A (en) * | 2017-06-26 | 2017-08-25 | 王明权 | Assembled toilet ground spacing system |
CN109106260A (en) * | 2018-08-31 | 2019-01-01 | 宁波联城住工科技有限公司 | Glass reinforced plastic bathroom chassis and its manufacturing method |
CN110847392A (en) * | 2019-11-26 | 2020-02-28 | 上海品宅装饰科技有限公司 | Construction method for splicing waterproof chassis |
CN112294163A (en) * | 2019-08-02 | 2021-02-02 | 北京维石住工科技有限公司 | Chassis and bathroom ground system |
CN114259184A (en) * | 2021-12-27 | 2022-04-01 | 广州鸿力筑工新材料有限公司 | Integral bathroom chassis structure and production method thereof |
-
2013
- 2013-07-08 CN CN201320403695.9U patent/CN203394108U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107090962A (en) * | 2017-06-26 | 2017-08-25 | 王明权 | Assembled toilet ground spacing system |
CN109106260A (en) * | 2018-08-31 | 2019-01-01 | 宁波联城住工科技有限公司 | Glass reinforced plastic bathroom chassis and its manufacturing method |
CN112294163A (en) * | 2019-08-02 | 2021-02-02 | 北京维石住工科技有限公司 | Chassis and bathroom ground system |
CN110847392A (en) * | 2019-11-26 | 2020-02-28 | 上海品宅装饰科技有限公司 | Construction method for splicing waterproof chassis |
CN114259184A (en) * | 2021-12-27 | 2022-04-01 | 广州鸿力筑工新材料有限公司 | Integral bathroom chassis structure and production method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103397790A (en) | Assembled bathroom and installation process | |
CN203394108U (en) | Fabricated bathroom | |
CN112240108A (en) | Construction method of assembly type building integrated bathroom system | |
AU2020256635A1 (en) | Panel and panel assembly for modular wet area construction | |
CN206189906U (en) | Bathroom room | |
CN206681418U (en) | The industrialization commercial residential buildings of energy-conserving and environment-protective | |
CN109707184A (en) | The hard-cover integral vacuum toilet of fulgurite separate type, wall setting water pipe groove | |
CN109779319A (en) | A kind of co-layer draining blank precast block toilet of outer wall provided pipe line groove hole | |
CN109797988A (en) | A kind of co-layer draining hard-cover precast block toilet of outer wall provided pipe line groove hole | |
CN106193685A (en) | Prefabricated assembled communications equipment room structure | |
CN104790472A (en) | Same floor drainage structure of toilet | |
WO1992006251A1 (en) | A modular slab on ground building system | |
CN206189914U (en) | Bathroom room | |
CN207453175U (en) | Assembled architecture outer wall structure | |
CN206554180U (en) | A kind of integrated water-proof chassis of toilet pipeline | |
CN109779309A (en) | The hard-cover integrated bathroom of outer wall provided pipe line groove hole | |
CN109779312A (en) | The blank integral vacuum toilet of fulgurite separate type, wall setting water pipe groove and hole | |
CN109707185A (en) | The blank integrated bathroom of inner wall provided pipe line groove hole | |
CN109779317A (en) | Fulgurite is embedded, the blank integral vacuum toilet of wall setting water pipe groove | |
CN109779311A (en) | The hard-cover integral vacuum toilet of fulgurite separate type, wall setting water pipe groove and hole | |
CN114809635B (en) | Penetrating construction method for fully assembled integral concrete shear wall high-rise residence | |
CN213774661U (en) | Assembled garbage room | |
CN103422671A (en) | Construction method of integrated process model house for building engineering construction | |
CN215106940U (en) | Prefabricated waterproof and drainage composite floor with integral assembly for bathroom and kitchen | |
CN220706594U (en) | Concrete modularization building slim wall membrane feed pipe secretly applies structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140115 |