CN203361596U - Auxiliary support of integrated lifting operation platform - Google Patents
Auxiliary support of integrated lifting operation platform Download PDFInfo
- Publication number
- CN203361596U CN203361596U CN 201320345163 CN201320345163U CN203361596U CN 203361596 U CN203361596 U CN 203361596U CN 201320345163 CN201320345163 CN 201320345163 CN 201320345163 U CN201320345163 U CN 201320345163U CN 203361596 U CN203361596 U CN 203361596U
- Authority
- CN
- China
- Prior art keywords
- operation platform
- lifting operation
- steel
- concrete structure
- auxiliary support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to the technical field of scaffolds of building construction, and discloses an auxiliary support of an integrated lifting operation platform. The auxiliary support of the integrated lifting operation platform comprises two stand columns made of I-steel, wherein the I-steel provided with installation holes is welded to the upper ends of the stand columns and serves as installation blocks used for installation of guide rail supports and hangers; the lower ends of the stand columns are welded with a base formed by welding channel steel, and the base is fixed to a building body concrete structure. The auxiliary support of the integrated lifting operation platform further comprises channel steel which is horizontally arranged and serves as a pull rod, one end of the pull rod is connected with the stand columns, and the other end of the pull rod is connected with an embedded bolt of the building body concrete structure. A rebar ring is welded to the connection position of the pull rod and the building body concrete structure, the rebar ring is connected with one end of a steel wire rope, and the other end of the steel wire rope is connected to the base. The stress requirement for connection between the integrated lifting operation platform and the main body structure when a structural steel beam is used for part or the structural sizes of the integrated lifting operation platform and the main body structure is large in difference can be met, and the safety problem is solved; components are suitable in size, and the auxiliary support is convenient to assemble, disassemble and carry; the auxiliary support can be recycled for many times and is low in cost.
Description
Technical field
The utility model relates to building operations Construction Formwork & Scaffold Technology field, espespecially a kind of integrated form lifting operation platform auxiliary stand.
Background technology
The integrated form lifting operation platform is a kind of external scaffolding often used in construction work, and for work high above the ground and protection, its safety is particularly important.How to guarantee that the integrated form lifting operation platform is connected with the stable of building, and simple, and reducing operating expenses is a very real problem.
The integrated form lifting operation platform comprises guide rail and the operating platform of erect installing, operating platform can oscilaltion under the effect of electric block (can be also other power set) so that construction operation.Guide rails assembling, in guide rail bearing, also arranges suspender member and usings as one of fulcrum that climbing frame is installed.In prior art, guide rail bearing and suspender member are generally used service sleeve in concrete structure, re-use bolt guide rail bearing and suspender member (by the position, hole on service sleeve) are fixed on concrete structure.The weak point that adopts this mode is while for part, using steel structure girder or double-layer structure size to differ larger (when the double-layer structure size exists conversion layer or staggered floor, this floor height exceeds the safe floor height of integrated form lifting operation platform design), be difficult to meet the force request of guide rail bearing and suspender member, have safety problem.
Therefore need to take the external scaffolding auxiliary stand, guarantee in the use of integrated form lifting operation platform, platform meets safety and instructions for use with being connected of agent structure.
Summary of the invention
The utility model technical issues that need to address are to overcome while due to part, using steel structure girder or double-layer structure size to differ larger, be difficult to meet the guide rail bearing of integrated form lifting operation platform and the force request of suspender member, cause existing the deficiency of safety problem, a kind of integrated form lifting operation platform auxiliary stand is provided.It can meet the force request that the integrated form lifting operation platform is connected with agent structure, the member suitable size, and dismounting and convenient in carrying, installation process safety, the material amount of expending is few, can repeatedly recycle, and cost is lower, material selection and easy to process, overall appearance.
The technical solution adopted in the utility model is:
A kind of integrated form lifting operation platform auxiliary stand, comprise two root posts of doing with the I-shaped steel, two corresponding configurations of guide rail of erectting settings of two described columns and integrated form lifting operation platform one side; Column upper end welding with the i iron of installing hole as mounting blocks, for mounting guide rail bearing and suspender member; Column lower end welding, by the base of channel-section steel welding production, is shaped with the installing hole be connected with building body concrete structure pre-embedded bolt on base, nut and bolt are spun base and building body concrete structure are fixed; Also comprise that horizontally disposed channel-section steel is as pull bar, an end of pull bar is used bolt to connect column, and the other end stays to be established installing hole and be connected with building body concrete structure pre-embedded bolt; At pull bar and building body concrete structure junction welded reinforcement ring, reinforced steel bar ring is connected with wire rope one end, and the other end of wire rope is connected to described base.
Technique scheme is further elaborated:
Two root posts connect by link.
Described link is included on each column many of welding tool short steel pipes at regular intervals each other, re-uses to socket the corresponding short steel pipes that steel pipe will be positioned on different columns and couple together.
The beneficial effects of the utility model are:
One, it can meet the force request that while due to part, using steel structure girder or double-layer structure size to differ larger, the integrated form lifting operation platform is connected with agent structure, has avoided safety problem.
Its two, with the integrated form lifting operation platform, adapt, the member suitable size.
Its three, be bolted dismounting and convenient in carrying.
Its four, installation process safety; The spillage of material amount is few, can recycled for multiple times, cost is lower; Material selection and easy to process, overall appearance.
The accompanying drawing explanation
Fig. 1 is that the utility model master looks diagram;
Fig. 2 is the utility model column master diagram;
Fig. 3 is the utility model stud sides diagram.
In figure: 1, integrated form lifting operation platform; 2, column; 3, mounting blocks; 4, base; 5, pull bar; 6, wire rope; 7, short steel pipes; 8, socket steel pipe; 9, guide rail bearing; 10, building body concrete structure.
The specific embodiment
Introduce the specific embodiment of the present utility model below in conjunction with accompanying drawing.
As shown in Figure 1, Figure 2 and Figure 3, a kind of integrated form lifting operation platform auxiliary stand, comprise two root posts 2 of doing with the I-shaped steel, erect the corresponding configurations of guide rail that arrange for two of two described columns 2 and integrated form lifting operation platform 1 one sides, column 2 upper ends welding with the i iron of installing hole as mounting blocks 3, for mounting guide rail bearing 9 and suspender member; Column 2 lower ends welding, by the base 4 of channel-section steel welding production, are shaped with the installing hole is connected with building body concrete structure 10 pre-embedded bolts on base 4, nut and bolt are spun base 4 and building body concrete structure 10 are fixed; Also comprise that horizontally disposed channel-section steel is as pull bar 5, an end of pull bar 5 is used bolt to connect column 2, and the other end stays to be established installing hole and be connected with building body concrete structure 10 pre-embedded bolts; At pull bar 5 and building body concrete structure 10 junction welded reinforcement rings, reinforced steel bar ring is connected with wire rope 6 one ends, and the other end of wire rope 6 is connected to described base 4.
Two root posts 2 connect by link.
Described link is included on each column 2 many of welding tool short steel pipes 7 at regular intervals each other, re-uses to socket the corresponding short steel pipes 7 that steel pipe 8 will be positioned on different columns 2 and couple together.
Embodiment of the present utility model just illustrates its specific embodiment, does not lie in and limits its technical scheme.The technician of the industry can make some and revise under the inspiration of the present embodiment, and the equivalence of doing according to the utility model the scope of the claims therefore all changes or modifies, and all belongs in the utility model Patent right requirement scope.
Claims (3)
1. an integrated form lifting operation platform auxiliary stand is characterized in that: comprise two root posts of doing with the I-shaped steel, two corresponding configurations of guide rail of erectting settings of two described columns and integrated form lifting operation platform one side; Column upper end welding with the i iron of installing hole as mounting blocks, for mounting guide rail bearing and suspender member; Column lower end welding, by the base of channel-section steel welding production, is shaped with the installing hole be connected with building body concrete structure pre-embedded bolt on base, nut and bolt are spun base and building body concrete structure are fixed; Also comprise that horizontally disposed channel-section steel is as pull bar, an end of pull bar is used bolt to connect column, and the other end stays to be established installing hole and be connected with building body concrete structure pre-embedded bolt; At pull bar and building body concrete structure junction welded reinforcement ring, reinforced steel bar ring is connected with wire rope one end, and the other end of wire rope is connected to described base.
2. a kind of integrated form lifting operation platform auxiliary stand according to claim 1, it is characterized in that: two root posts connect by link.
3. a kind of integrated form lifting operation platform auxiliary stand according to claim 2, it is characterized in that: described link is included on each column many of welding tool short steel pipes at regular intervals each other, re-uses to socket the corresponding short steel pipes that steel pipe will be positioned on different columns and couple together.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320345163 CN203361596U (en) | 2013-06-17 | 2013-06-17 | Auxiliary support of integrated lifting operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320345163 CN203361596U (en) | 2013-06-17 | 2013-06-17 | Auxiliary support of integrated lifting operation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203361596U true CN203361596U (en) | 2013-12-25 |
Family
ID=49809382
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320345163 Expired - Fee Related CN203361596U (en) | 2013-06-17 | 2013-06-17 | Auxiliary support of integrated lifting operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203361596U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104295083A (en) * | 2014-10-11 | 2015-01-21 | 中建八局大连建设工程有限公司 | Guidance and hanging separated cantilever beam composite structure of integrated climbing frame |
CN108005373A (en) * | 2018-01-09 | 2018-05-08 | 中国建筑第二工程局有限公司 | Integrated lifting platform system and assembling method thereof |
-
2013
- 2013-06-17 CN CN 201320345163 patent/CN203361596U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104295083A (en) * | 2014-10-11 | 2015-01-21 | 中建八局大连建设工程有限公司 | Guidance and hanging separated cantilever beam composite structure of integrated climbing frame |
CN108005373A (en) * | 2018-01-09 | 2018-05-08 | 中国建筑第二工程局有限公司 | Integrated lifting platform system and assembling method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203188589U (en) | Rigid-frame continuous beam zero block construction bracket supporting system | |
CN201417657Y (en) | Installation device of indoor transformer | |
CN104389419A (en) | Cantilevered formwork platform installation structure and construction method | |
CN202787926U (en) | Overhanging scaffold simple and convenient to disassemble and assemble | |
CN103206075B (en) | Suspension platform for construction of steel reinforced concrete cantilever structure | |
CN103669720A (en) | Precast beam and reinforced concrete structure with tenon anchor system | |
CN203361596U (en) | Auxiliary support of integrated lifting operation platform | |
CN204282803U (en) | To encorbelment formwork structure for mounting platform | |
CN203213019U (en) | Long cantilever bent cap cast-in-place construction support system | |
CN212866793U (en) | Assembled construction elevator stops layer platform | |
CN203487767U (en) | Cross plate scaffold | |
CN202944998U (en) | Attached installation and maintenance platform of calibrated tower crane | |
CN106150105A (en) | A kind of stiffened column installation method | |
CN201908429U (en) | Assembly integral building overhanging discharging platform | |
CN204850048U (en) | Overlap joint structure of quick hoist and mount of supplementary high -rise girder steel | |
CN205276846U (en) | Fixing device of builder's jack pole setting | |
CN205153515U (en) | Overhanging bearing frame makes up positioner | |
CN203429556U (en) | System for quickly installing and positioning cable saddle | |
CN204343647U (en) | A kind of the shaped steel suspension scaffolding bracing frame | |
CN204552051U (en) | The cradle structure of high-altitude crossbeam soffit monitoring point layout | |
CN204960324U (en) | Suspension type floor formwork support device | |
CN109577650B (en) | Assembled steel hanger for auxiliary prefabrication of large-scale steel reinforcement framework on construction site and construction method for auxiliary prefabrication of large-scale steel reinforcement framework | |
CN203383563U (en) | Fast assembled communication iron tower | |
CN210289075U (en) | Adjustable elevator shaft operating platform system that can have enough to meet need | |
CN204225503U (en) | Large span steel truss high altitude bulk conversion beam moulding bed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131225 Termination date: 20160617 |