CN203360953U - Movable cast-in-place device for pouring ballastless track bed concrete - Google Patents

Movable cast-in-place device for pouring ballastless track bed concrete Download PDF

Info

Publication number
CN203360953U
CN203360953U CN 201320369983 CN201320369983U CN203360953U CN 203360953 U CN203360953 U CN 203360953U CN 201320369983 CN201320369983 CN 201320369983 CN 201320369983 U CN201320369983 U CN 201320369983U CN 203360953 U CN203360953 U CN 203360953U
Authority
CN
China
Prior art keywords
chute
concrete
ballastless track
place device
concreting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320369983
Other languages
Chinese (zh)
Inventor
苗永平
王新民
陈赛勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of 17th Bureau of China's Railroad Group
Second Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of 17th Bureau of China's Railroad Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of 17th Bureau of China's Railroad Group filed Critical Second Engineering Co Ltd of 17th Bureau of China's Railroad Group
Priority to CN 201320369983 priority Critical patent/CN203360953U/en
Application granted granted Critical
Publication of CN203360953U publication Critical patent/CN203360953U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a movable cast-in-place device for pouring ballastless track bed concrete. The movable cast-in-place comprises a frame capable of moving in the longitudinal direction. The frame is provided with a chute. The movable cast-in-place device is characterized in that the chute is connected with the frame through a steering device, a lifter is arranged in the steering device, one end of the chute is connected with a telescopic material receiving groove, the other end of the chute is connected with a rotation type material distributing groove, and the gradient of the chute is adjusted through the lifter. The movable cast-in-place device brings convenience to alignment of the chute and a concrete tank truck, enables the concrete to directly enter a mould, solves the problem of concrete pouring construction of a double-block ballastless track, provides support for improving the domestic pump concrete mould entering process into the mould direct entering process, and has wide popularization and application prospects.

Description

Portable cast-in-place device for ballastless track concreting
Technical field
The utility model relates to concrete casting device, is specially the removable cast-in-place device for the ballastless track concrete construction.
Background technology
In the double-blocked rail without ballast work progress, the construction logistics is a great problem of construction organization, because job site is narrow, with concrete transport vehicle, can't make concrete directly into mould, take special-purpose concrete casting machine to be built operation abroad, by the imperial formula feeding device of volume, concrete is sent in casting machine, but casting machine apparatus expensive, processing and manufacturing cycle are long, technical sophistication, fault rate is high, the domestic simple and easy method that often adopts substitutes, in the hope of reducing construction cost.
At present, double-blocked rail without ballast concreting operation often adopts the mode of pumping to complete concrete to enter mould, but because pumping technology has specific (special) requirements to concrete slump, causing the mixing concrete water supply volume larger, is one of important origin cause of formation of railway roadbed board concrete cracking; Simultaneously, a large amount of constructors need stand in auxiliary concrete on the section of track and enter the operations such as mould, and construction precision is had a negative impact, and the rear track circuit ride comfort that causes laying a railway track is adjusted workload and strengthened, and construction cost significantly improves;
The double-blocked rail without ballast concrete casting building technology of domestic-developed, be to take pumping of concrete as basis, fails to consider railway roadbed plank split and the large key element of construction precision two, haves much room for improvement and improve.For effectively controlling the railway roadbed plank split and improving the ballastless track construction precision, or take concrete directly into the mould mode as good, but the discharge chute limited length of general concrete waggon can't realize that concrete is directly into mould.
Summary of the invention
In view of drawback and the concrete transport vehicle of pumping of concrete can't be directly into the problems of mould, the utility model provide a kind of can be by concrete transport vehicle discharge chute spreading, and can move with concrete transport vehicle, realize that concrete is directly into mould, reach " the cast-in-place device of mobile concrete " simplifying construction, reduce the construction cost purpose.
For reaching above purpose, the utility model takes following technical scheme to be achieved:
Portable cast-in-place device for a kind of ballastless track concreting, comprise the vehicle frame that can vertically move, and is provided with chute on vehicle frame, it is characterized in that, described chute is connected with vehicle frame by transfer, is provided with the device that hoists in transfer, and an end of chute connects the telescopic groove that connects material; The other end connects rotary distributing trough, and chute is realized the adjustment of the chute gradient by the device that hoists.
In such scheme, described transfer comprises the rotating shaft that is located at the vehicle frame middle part, and this rotating shaft connects a horizontal rotating disc, and horizontal rotating disc turns to and is connected with the chute horizontal direction by gradient regulating shaft and the device that hoists.
The end that described chute is connected with rotary distributing trough is provided with the cloth control plate.The described device that hoists adopts the rhombic lifting jack principle to make.One end of described chute connects the telescopic groove that connects material and adopts the mode of wheel and rack to adjust the relative position between chute and telescoping connection hopper.
The logistics tissue is one of difficult point of double-blocked rail without ballast construction, and while being forced to adopt pumping technology, concrete water-cement ratio is bigger than normal in the past, is unfavorable for Concrete Crack Control; Employing is during directly into the mould casting craft, and the discharging chute limited length of concrete tank, can't realize that concrete is directly into mould, needs a large amount of indirect labors.After adopting the utility model device, can facilitate chute and concrete tank contraposition, can make again concrete directly into mould, solved the difficult problem of the concrete pouring construction (especially the second line) of double-blocked rail without ballast, be improved to directly into mold technique support is provided for domestic pumping of concrete enters mold technique, popularizing application prospect is wide.
The accompanying drawing explanation
Fig. 1 is the utility model structural representation.
The top view that Fig. 2 is Fig. 1 (in the chute plane after vertical rotary).
Fig. 3 is gradient lifting implement body structure chart in Fig. 1.
Fig. 4 is chute and the telescopic groove connection diagram that connects material in Fig. 1.
Fig. 5 is chute and the telescopic groove tooth bar connection diagram that connects material in Fig. 4.
In Fig. 1 to Fig. 5: 1. vehicle frame; 2. wheel; 3. drawing handle; 4. horizontal rotating disc; 5. rotating shaft; 6. gradient regulating shaft; 7. gradient lifting device (device hoists); 7-1. supporting rod; 7-2. bloster hinge; The rocking handle 7-3. hoist; 8. chute; 8-1. cloth control plate; 8-2 chute tooth bar; 9. the telescopic groove that connects material; The groove tooth bar 9-1. connect material; 9-2. gear; 9-3. rocking handle; 10. rotary distributing trough.
The specific embodiment
Referring to Fig. 1 Fig. 2, portable cast-in-place device for a kind of ballastless track concreting, comprise the vehicle frame 1 with four wheels 2, vehicle frame 1 one ends are drawing handle 3, the vehicle frame middle part is provided with rotating shaft 5 and connects a horizontal rotating disc 4, and horizontal rotating disc can turn to and be connected with the chute 8 of an arc by gradient regulating shaft 6 and gradient lifting device 7, and arc chute 8 one ends connect a telescopic groove 9 that connects material, the other end connects rotary distributing trough 10, and is provided with a cloth control plate 8-1.
The operating principle of this device
The cast-in-place device of movable type is pushed to the concreting position along between the double-blocked rail without ballast line; By chute 8 half-twists and fix with pin; Adjust the chute gradient, with the moistening chute of clear water; Adjust telescopic groove 9 length that connect material, make the concrete tank discharging opening over against the groove that connects material; Concrete, under the effect of self mobility, prolongs the smooth groove of the gradient and flows to rotary distributing trough 10, adjusts as required the cloth position; When certain position cloth finishes, with the cloth control plate, 8-1 suspends cloth, mentions plate behind the change position and continues cloth; After a certain paragraph cloth finishes, but advancing device carries out the operation of next paragraph; After the concreting end of job, by chute 8 half-twists, with pin, fix, shift out operating area, with clear water, thoroughly clean up standby.
In the utility model structure, utilize vehicle frame 1 to support the weight of chute 8, and guarantee that chute reaches the height needed; Utilize wheel 2 to be convenient to vertically moving of chute, alleviate labor strength; Utilize the rotary distributing trough 10 of chute end, the convenient concrete of adjusting enters the mould position; Utilize the spiral device 7 that hoists to adjust the gradient of chute, be beneficial to concrete and enter smoothly mould; Utilize the rhombic lifting jack principle to make the device 7(Fig. 3 that hoists); Utilize gear 9-2 and tooth bar 8-2,9-1 to adjust the relative position (Fig. 4 Fig. 5) between chute and telescoping connection hopper, change with the need chute length; 6. utilize horizontal rotating disc 4 that the operating mode of chute is changed: chute vertical with vehicle frame (Fig. 2) during work; Chute parallel with vehicle frame (Fig. 1) after finishing, be convenient in catwalk mobile in place; Utilize plate 8-1 to suspend the concrete distributing amount temporarily, open plate behind cloth to be adjusted position and continue cloth.

Claims (5)

1. a portable cast-in-place device for ballastless track concreting, comprise the vehicle frame that can vertically move, and is provided with chute on vehicle frame, it is characterized in that, described chute is connected with vehicle frame by transfer, is provided with the device that hoists in transfer, and an end of chute connects the telescopic groove that connects material; The other end connects rotary distributing trough, and chute is realized the adjustment of the chute gradient by the device that hoists.
2. portable cast-in-place device for ballastless track concreting as claimed in claim 1, it is characterized in that, described transfer comprises the rotating shaft that is located at the vehicle frame middle part, this rotating shaft connects a horizontal rotating disc, and horizontal rotating disc turns to and is connected with the chute horizontal direction by gradient regulating shaft and the device that hoists.
3. portable cast-in-place device for ballastless track concreting as claimed in claim 1, is characterized in that, the end that described chute is connected with rotary distributing trough is provided with the cloth control plate.
4. portable cast-in-place device for ballastless track concreting as claimed in claim 1, is characterized in that, the described device that hoists adopts the rhombic lifting jack principle to make.
5. portable cast-in-place device for ballastless track concreting as claimed in claim 1, is characterized in that, an end of described chute connects the telescopic groove that connects material and adopts the mode of wheel and rack to adjust the relative position between chute and telescoping connection hopper.
CN 201320369983 2013-06-25 2013-06-25 Movable cast-in-place device for pouring ballastless track bed concrete Expired - Fee Related CN203360953U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320369983 CN203360953U (en) 2013-06-25 2013-06-25 Movable cast-in-place device for pouring ballastless track bed concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320369983 CN203360953U (en) 2013-06-25 2013-06-25 Movable cast-in-place device for pouring ballastless track bed concrete

Publications (1)

Publication Number Publication Date
CN203360953U true CN203360953U (en) 2013-12-25

Family

ID=49808741

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320369983 Expired - Fee Related CN203360953U (en) 2013-06-25 2013-06-25 Movable cast-in-place device for pouring ballastless track bed concrete

Country Status (1)

Country Link
CN (1) CN203360953U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111794055A (en) * 2020-07-03 2020-10-20 中国建筑土木建设有限公司 Construction method for cast-in-place road shoulder of movable chute trolley
CN115450088A (en) * 2022-08-26 2022-12-09 中冶南方城市建设工程技术有限公司 Anti-segregation large-slump road concrete synchronous lateral distributing machine and using method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111794055A (en) * 2020-07-03 2020-10-20 中国建筑土木建设有限公司 Construction method for cast-in-place road shoulder of movable chute trolley
CN111794055B (en) * 2020-07-03 2022-05-17 中国建筑土木建设有限公司 Construction method for cast-in-place road shoulder of movable chute trolley
CN115450088A (en) * 2022-08-26 2022-12-09 中冶南方城市建设工程技术有限公司 Anti-segregation large-slump road concrete synchronous lateral distributing machine and using method thereof
CN115450088B (en) * 2022-08-26 2023-12-05 中冶南方城市建设工程技术有限公司 Anti-segregation high-slump road concrete synchronous lateral spreader and use method thereof

Similar Documents

Publication Publication Date Title
CN217710130U (en) Auxiliary device is laid to subway track
CN203360953U (en) Movable cast-in-place device for pouring ballastless track bed concrete
CN213897183U (en) Slope concrete paving equipment
CN202132052U (en) Fully-hydraulic tunnel inverted arch trestle-type mobile mold frame
CN201358464Y (en) Steep thin-wall concrete lining machine
CN208899259U (en) High-speed railway subgrade ballastless track supporting layer Slipform Paving shakes horizontal drawing hair tooling
CN207714093U (en) A kind of road administration concrete paver
CN204492846U (en) Movable type with inverted arch lining device crosses car trestle
CN201678920U (en) Ballastless track board paving no-slip limiting device
CN201008946Y (en) Automatic clearing mechanism for trolley surface
CN206844674U (en) cast-in-place concrete board thickness control device
CN203212958U (en) Side rollover type single sleeper drawing and replacing device
CN206926070U (en) A kind of preform production line
CN210387349U (en) Bending device for reinforcing steel bar
CN208996446U (en) A kind of column mould strengthening frame structure
CN114457633B (en) Self-compacting concrete construction process and construction device
CN216429628U (en) Side-based template rack
CN202672156U (en) High-speed-railway roadbed-section road-shoulder concrete pouring machine
CN206030209U (en) Prefab production line
CN202073570U (en) Inverted arch movable formwork trolley with crossing running gears
CN208473310U (en) A kind of removable, highly adjustable, folding concrete distributing device
CN207840105U (en) A kind of tilting casting machine
CN204370255U (en) Monolithic removable self-compacting concrete perfusion frock
CN212268601U (en) Material feeding unit is used in haydite concrete processing
CN214532995U (en) Movable type template trolley for tunnel inverted arch construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131225

Termination date: 20170625

CF01 Termination of patent right due to non-payment of annual fee