[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN203213132U - 一种适用于光伏工程的圆柱桩基础结构 - Google Patents

一种适用于光伏工程的圆柱桩基础结构 Download PDF

Info

Publication number
CN203213132U
CN203213132U CN 201320237807 CN201320237807U CN203213132U CN 203213132 U CN203213132 U CN 203213132U CN 201320237807 CN201320237807 CN 201320237807 CN 201320237807 U CN201320237807 U CN 201320237807U CN 203213132 U CN203213132 U CN 203213132U
Authority
CN
China
Prior art keywords
foundation structure
pile foundation
cylindrical
sleeve pipe
pvc sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320237807
Other languages
English (en)
Inventor
陈加兴
黄春芳
万鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Zhongnan Engineering Corp Ltd
Hydrochina Zhongnan Engineering Corp
Original Assignee
Hydrochina Zhongnan Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Zhongnan Engineering Corp filed Critical Hydrochina Zhongnan Engineering Corp
Priority to CN 201320237807 priority Critical patent/CN203213132U/zh
Application granted granted Critical
Publication of CN203213132U publication Critical patent/CN203213132U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型涉及一种适用于光伏工程的圆柱桩基础结构。该结构包括混凝土圆柱桩和钢筋笼,混凝土圆柱桩的外圈包有PVC套管,内部有钢筋笼,顶部有预埋钢板,预埋钢板上固定有紧固件。本实用新型提供的圆柱桩基础结构,完全满足支架固定要求和安全要求,结构型式简单,施工非常方便,造价低。

Description

一种适用于光伏工程的圆柱桩基础结构
技术领域
本实用新型涉及一种适用于光伏工程的圆柱桩基础结构,属于光伏工程基础结构领域。
背景技术
1MW的光伏组件需要数以千计的固定支架。固定支架需要与其下的基础连接以保持稳固。目前的支架基础大多采用柱下独立基础或柱下条形基础(见附图1)。因为固定支架的数量非常多,且范围较广,采用柱下独立基础或柱下条形基础的施工效率低下,且工程量较大。
实用新型内容
本实用新型的目的在于,针对现有技术的缺陷,提供一种适用于光伏工程的圆柱桩基础结构。
本实用新型的技术方案为:一种适用于光伏工程的圆柱桩基础结构,包括混凝土圆柱桩和钢筋笼,其特征在于:混凝土圆柱桩的外圈包有PVC套管,内部有钢筋笼,顶部有预埋钢板,预埋钢板上固定有紧固件。
上述紧固件为螺栓。
上述PVC套管外有用于固定PVC套管的钢筋。
本实用新型以PVC套管作为开孔护壁及混凝土圆柱桩的模板,通过调整PVC套管的直径、长度及埋深,可以调整混凝土圆柱桩的直径、高度及埋深,从而满足混凝土圆柱桩基础的承载力要求、抗倾覆要求及抗拔要求;而通过埋设固定有螺栓的预埋钢板,满足与上部支架的固定连接要求。
本实用新型提供的圆柱桩基础结构,完全满足支架固定要求和安全要求,结构型式简单,施工非常方便,造价低。
附图说明
下面结合附图和实施例对本实用新型作进一步说明。
图1为目前采用的支架柱下独立基础结构示意图;
图2为本实用新型实施例的结构示意图;
图3 为本实用新型实施例的俯视图。
1——支架;2——柱下独立基础;3——PVC套管3;4——混凝土圆柱桩:5——钢筋笼;6——预埋钢板;7——钢筋。
具体实施方式
如图所示的圆柱桩基础结构的施工方法为:
1.通过基础承载力验算、抗倾覆验算及抗拔验算,确定混凝土圆柱桩4的直径、高度及埋深。
2.选用对应直径及长度的PVC套管3,在成孔后将PVC套管3根据埋深要求插入孔中护壁,将钢筋笼5置于PVC套管3内,用钢筋7固定PVC套管3,往PVC套管3内浇筑混凝土。
3.待混凝土浇筑至接近PVC套管3顶部时,将固定有螺栓的预埋钢板6置于PVC套管3顶部,浇筑混凝土至PVC套管3顶部,调平预埋钢板6,即完成圆柱桩基础结构施工。
最后得到的圆柱桩基础结构,包括PVC套管3和用于固定的钢筋7,以PVC套管3为模板而形成的混凝土圆柱桩4和其内部的钢筋笼5;混凝土圆柱桩4的顶部有固定有螺栓的预埋钢板6。
待混凝土圆柱桩4养护至设计要求时间后,还可以通过用于固定PVC套管3的钢筋7拆除PVC套管3并回收重复利用,进一步节约成本,提高效益。

Claims (3)

1.一种适用于光伏工程的圆柱桩基础结构,包括混凝土圆柱桩(4)和钢筋笼(5),其特征在于:混凝土圆柱桩(4)的外圈包有PVC套管(3),内部有钢筋笼(5),顶部有预埋钢板(6),预埋钢板(6)上固定有紧固件。
2.根据权利要求1所述一种适用于光伏工程的圆柱桩基础结构,其特征在于:所述紧固件为螺栓。
3.根据权利要求1所述一种适用于光伏工程的圆柱桩基础结构,其特征在于:所述PVC套管(3)外有用于固定PVC套管(3)的钢筋(7)。
CN 201320237807 2013-05-06 2013-05-06 一种适用于光伏工程的圆柱桩基础结构 Expired - Lifetime CN203213132U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320237807 CN203213132U (zh) 2013-05-06 2013-05-06 一种适用于光伏工程的圆柱桩基础结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320237807 CN203213132U (zh) 2013-05-06 2013-05-06 一种适用于光伏工程的圆柱桩基础结构

Publications (1)

Publication Number Publication Date
CN203213132U true CN203213132U (zh) 2013-09-25

Family

ID=49202680

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320237807 Expired - Lifetime CN203213132U (zh) 2013-05-06 2013-05-06 一种适用于光伏工程的圆柱桩基础结构

Country Status (1)

Country Link
CN (1) CN203213132U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790427A (zh) * 2015-04-24 2015-07-22 中利腾晖光伏科技有限公司 光伏阵列的短桩基础及其成型工艺
CN106759448A (zh) * 2017-03-15 2017-05-31 中国能源建设集团江苏省电力设计院有限公司 一种下沉式农业大棚光伏支架基础结构及其施工方法
CN108252320A (zh) * 2017-12-13 2018-07-06 中联西北工程设计研究院有限公司 一种地面光伏电站现浇混凝土桩基础结构及其浇筑装置
CN113818470A (zh) * 2021-09-20 2021-12-21 邱文建 一种建筑施工基桩

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790427A (zh) * 2015-04-24 2015-07-22 中利腾晖光伏科技有限公司 光伏阵列的短桩基础及其成型工艺
CN106759448A (zh) * 2017-03-15 2017-05-31 中国能源建设集团江苏省电力设计院有限公司 一种下沉式农业大棚光伏支架基础结构及其施工方法
CN108252320A (zh) * 2017-12-13 2018-07-06 中联西北工程设计研究院有限公司 一种地面光伏电站现浇混凝土桩基础结构及其浇筑装置
CN108252320B (zh) * 2017-12-13 2019-11-05 中联西北工程设计研究院有限公司 一种地面光伏电站现浇混凝土桩基础结构及其浇筑装置
CN113818470A (zh) * 2021-09-20 2021-12-21 邱文建 一种建筑施工基桩

Similar Documents

Publication Publication Date Title
CN203213132U (zh) 一种适用于光伏工程的圆柱桩基础结构
CN103276739A (zh) 一种带有斜向支撑和预应力围檩的基坑支护结构
CN202881958U (zh) 一种含有降水功能的基坑支护结构
CN202578107U (zh) 组合式膨胀杆塔基
CN203238640U (zh) 一种基坑支护内支撑用的复合式立柱
CN202273420U (zh) 吊模定位支撑装置
CN203222817U (zh) 地下室立柱连结构造
CN105507312A (zh) 一种变截面双向螺旋挤扩桩及其制作方法
CN205400121U (zh) 一种竖向换撑用的临时支撑装置
CN204125931U (zh) 基桩结构
CN204001214U (zh) 高精度柱顶预埋板
CN204212319U (zh) 一种旋入式温室立柱
CN204059947U (zh) 一种自稳式地下室外墙模板支撑体系
CN204080820U (zh) 一种混凝土结构基坑换撑装置
CN203684267U (zh) 一种新型海上风电基础结构
CN203878563U (zh) 悬挂单排脚手架
CN204080821U (zh) 一种钢结构基坑换撑装置
CN202627473U (zh) 钢筋混凝土双曲线冷却塔施工中的钢三脚挑架装置
CN202164832U (zh) 内伸缩外套钢管及用于现浇楼板、支撑模板的支撑装置
CN205100212U (zh) 一种变截面双向螺旋挤扩桩
CN202577311U (zh) 一种空腹式挡土墙结构
CN203080923U (zh) 现浇砼大截面梁施工的支模架斜撑系统
CN204000891U (zh) 一种带有斜撑与拉锚的组合式基坑支护结构
CN203307825U (zh) 一种带有斜向支撑和预应力围檩的基坑支护结构
CN203238624U (zh) 新型钢管水泥桩

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: HYDROCHINA ZHONGNAN ENGINEERING CORPORATION

Free format text: FORMER NAME: ZHONGNAN PROSPECTING DESIGN INST. CHINA HYDRAUELECTRIC CONSULTANT GROUP

Owner name: CHINA POWER GROUP ZHONGNAN INVESTIGATION DESIGN +

Free format text: FORMER NAME: HYDROCHINA ZHONGNAN ENGINEERING CORPORATION

CP01 Change in the name or title of a patent holder

Address after: 410014, 9 camphor Road, Yuhua District, Hunan, Changsha

Patentee after: HYDROCHINA ZHONGNAN ENGINEERING Corp.

Address before: 410014, 9 camphor Road, Yuhua District, Hunan, Changsha

Patentee before: Mid-South Hydroelectric Investigation & Design Institute of China Hydropower Engineering Consulting Group

CP03 Change of name, title or address

Address after: 410014 Hunan province Changsha Yuhua District, camphor Road No. 16

Patentee after: POWERCHINA ZHONGNAN ENGINEERING Corp.,Ltd.

Address before: 410014, 9 camphor Road, Yuhua District, Hunan, Changsha

Patentee before: HYDROCHINA ZHONGNAN ENGINEERING Corp.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130925