[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN203191179U - Single body pressure testing tool and single body pressure testing tool assembly for blast furnace cooling equipment - Google Patents

Single body pressure testing tool and single body pressure testing tool assembly for blast furnace cooling equipment Download PDF

Info

Publication number
CN203191179U
CN203191179U CN 201220246812 CN201220246812U CN203191179U CN 203191179 U CN203191179 U CN 203191179U CN 201220246812 CN201220246812 CN 201220246812 CN 201220246812 U CN201220246812 U CN 201220246812U CN 203191179 U CN203191179 U CN 203191179U
Authority
CN
China
Prior art keywords
pressure testing
single body
testing tool
body pressure
blast furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220246812
Other languages
Chinese (zh)
Inventor
冯友泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No9 Metallurgical Construction Ltd Corp
Original Assignee
No9 Metallurgical Construction Ltd Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No9 Metallurgical Construction Ltd Corp filed Critical No9 Metallurgical Construction Ltd Corp
Priority to CN 201220246812 priority Critical patent/CN203191179U/en
Application granted granted Critical
Publication of CN203191179U publication Critical patent/CN203191179U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Examining Or Testing Airtightness (AREA)

Abstract

The utility model relates to a single body pressure testing tool and a single body pressure testing tool assembly for blast furnace cooling equipment. According to the technical scheme, the single body pressure testing tool for the blast furnace cooling equipment is characterized in that the single body pressure testing tool comprises a screw and a rubber hose sleeved on the screw; one end of the rubber hose is provided with a nut; and the nut is in threaded connection with the screw which enables the nut to press the rubber hose if the screw is rotated. The blast furnace cooling equipment single body pressure testing tool assembly is characterized in that two single bodies are connected together through a pressure testing hose. A method for testing pressure of a cooling wall single body is characterized in that the method comprises the following steps of: water filling; sealing in a series-connection manner; air exhausting; exhaust opening closing; and pressure boosting and leakage detection. By means of the above the technical scheme, the single body pressure testing tool for the blast furnace cooling equipment has the advantages that welding is not required, connection speed is high, the single body pressure testing tool can be detached after pressure testing is finished and can be used repeatedly, only the rubber hose needs to be replaced after the single body pressure testing tool is used for 30 times, a cooling wall can be provided with tubes normally after the single body pressure testing tool is detached, tube openings are not required to be re-treated, cost is saved, and construction period is short.

Description

Blast furnace cooling device monomer structure for pressure test, combination
Technical field:
The utility model relates to blast furnace cooling device monomer structure for pressure test, combination.
Background technology:
The blast furnace cooling device is that the blast furnace number of devices is maximum, the equipment that weight is the heaviest.Mainly be installed on the inner cooled furnace wall that plays a part of body of heater.Cooling wall water pipe material is the 10# thick-wall seamless.Before the cooling wall installation, unit in charge of construction's most important work guarantees that exactly every cooling wall workmanship is qualified, how to guarantee that the cooling device of showing up is specification product.Regulation and stipulation: should be by the regulation of equipment and technology file before installing, block-by-block carries out tightness experiment and flowing full test.There are not the unified equipment and the method that are used for pressure testing at present.
The utility model content:
The utility model purpose: short for a kind of duration is provided, safety, cost-effective blast furnace cooling device monomer structure for pressure test, combination and pressure-measuring method.
In order to reach as above purpose, blast furnace cooling device monomer structure for pressure test is taked following technical scheme: comprise screw rod and be enclosed within its outside rubber hose, rubber hose one end has nut, if nut thread is connected rotation then nut is compressed on the screw rod of rubber hose.
Further technical scheme of the present utility model is: described rubber hose two ends have packing ring one and packing ring two respectively, and rubber hose links to each other with nut by packing ring two.
Further technical scheme of the present utility model is: described screw rod is cored screw.
Further technical scheme of the present utility model is: the end that nut is arranged of described monomer has joint.
Adopt aforesaid blast furnace cooling device monomer structure for pressure test combination, it is characterized in that: couple together by the pressure testing flexible pipe between two monomers.
Further technical scheme of the present utility model is: described pressure testing flexible pipe is high pressure rubber hose.
Be used for the pressure-measuring method of cooling wall monomer, it is characterized in that: comprise following steps:
Pour water: to the cooling wall pipeline of pressure testing is filled water;
Serial connection sealing: with each pipeline with adopting structure for pressure test combined serial as previously discussed, with adjustable wrench or pipe wrench with mouth of pipe nut tightening, the axial compression rubber short tube, rubber short tube is radially expanded with the cooling wall pipe diameter produces enough friction force, when this friction force during greater than test pressure, tube wall two ends end cap also closely contacts with rubber tube, realizes being tightly connected;
Exhaust: the series connection pipe end connects tensimeter and exhausr port, opens motor test pump or handles manual pressure test pump, discharges air;
Remain silent: close terminal exhausr port;
Step up side oozes: boost, observing the mouth of pipe and each joint has the ne-leakage situation.
Further technical scheme of the present utility model is: boost to 1.5MPa during described step step up side oozes.
Adopt cover cored screw in the rubber short tube, contact with the cooling wall pipe diameter outward, by tightening cored screw, the axial compression rubber short tube, rubber short tube is radially expanded with the cooling wall pipe diameter produces enough friction force, when this friction force during greater than test pressure, tube wall two ends end cap also closely contacts with rubber tube, realizes being tightly connected.Be connected with steel pipe or high-pressure hose between joint and the joint, realize steel pipe series connection between cooling wall, thereby finish the monomer work pressure test.
Adopt as above the utility model of technical scheme, has following beneficial effect: need not welding, interface rate is fast, pressure testing finishes and removes immediately, repeatedly utilizes, and uses and only rubber hose is changed later on for 30 times, do not influence cooling wall after the dismounting pipe arrangement is installed, the mouth of pipe need not secondary treating, saves cost, and the duration is short.
Description of drawings:
In order to further specify the utility model, further describe below in conjunction with accompanying drawing:
Accompanying drawing is the structural representation of utility model:
Wherein: 1. a head; 2. packing ring one; 3. rubber hose; 4. packing ring two; 5. nut; 6. joint.
Embodiment:
Below in conjunction with accompanying drawing embodiment of the present utility model is described, embodiment does not constitute restriction of the present utility model:
Blast furnace cooling device monomer structure for pressure test is taked following technical scheme: comprise screw rod and be enclosed within its outside rubber hose 3, rubber hose 3 one ends have nut 5, if nut 5 is threaded in rotation then nut 5 is compressed on the screw rod of rubber hose 3.
Further technical scheme of the present utility model is: described rubber hose 3 two ends have packing ring 1 and packing ring 24 respectively, and rubber hose 3 links to each other with nut 5 by packing ring 24.
Further technical scheme of the present utility model is: described screw rod is cored screw.
Further technical scheme of the present utility model is: the end that nut 5 is arranged of described monomer has joint 6.
Set up wall monomer work pressure test platform, generally set up 150-300m according to cooling wall supply of material speed 2The trench drain is established in steel platform or the sand horsestone place through rolling around the place, and selects the water source.Establishing electronic box on the pressure testing platform.
The cooling wall that is up to the standards is placed on the steel platform of setting up after adopting on-the-spot truck crane block-by-block to unload, and must not overlappingly put.
According to on-site actual situations, choose the water source nearby, cause the pressure testing platform by sebific duct, establish steel water tank on the platform, store enough water yields.Prepare two 30kgf test pumps, every bench teat press pump is joined each 1 of water intaking valve, reverse checkvalve and draw-off valve, measurement instrument two covers.The selection principle of pressure: manometric full scale should be 1.5~2 times of maximum pressure value, and the tensimeter accuracy class is not less than 1.5 grades, is installed in the position of being convenient to observe.This engineering pressure table is elected Y-100.0-2.5MPa as, 1.5 grades of accuracy classes, and tensimeter must be up to the standards through legal metrological supervision mechanism and stick conformity certification after the lead sealing and can use.
Pressure testing connects adopts flexible pipe or high-pressure rubber pipe to link to each other with cooling wall, and the cooling wall joint is connected with steel pipe with homemade elastomer connector, and test pressure is 1.5MPa, after hydraulic pressure is increased to the 1.5MPa layer, keeps this pressure 30 minutes, and pressure drop is not more than 3% for qualified.
General work pressure test 3~4 people, per 4~6 cooling walls are one group of whole pressure testing, before the mouth of pipe connects structure for pressure test, earlier with flexible rubber hose to the cooling wall pipeline of pressure testing is filled water, again each pipeline is together in series with the pressure testing flexible pipe, with adjustable wrench or pipe wrench with mouth of pipe nut tightening.The series connection pipe end connects tensimeter and exhausr port (effect of exhausr port is that the air in the assurance flexible pipe is discharged smoothly), open motor test pump or handle manual pressure test pump, after discharging air, close terminal exhausr port, after boosting to 1.5MPa, observing the mouth of pipe and each joint has the ne-leakage situation, if handle after the seepage pressure release is arranged, forbids band to be pressed and handles.During the hydraulic testing, temperature is lower than 5 ℃ must take antifreezing measures, must blow interior liquid although pressure testing is intact.
In the pressure testing process, operating personnel stand in outside test cooling wall 3m, avoid joint to jump out and hurt sb.'s feelings.During the pressure testing, warning line should be set, by special messenger's nurse, with hydraulic testing unrelated person No Admittance around the pressure testing cooling wall; Pressure testing finishes and sends to the on-the-spot signature affirmation of managing by the technician, and the cooling wall of finishing pressure testing is numbered (consistent with cooling wall self numbering), enters next group cooling wall work pressure test simultaneously.
In the pressure testing operating process, adopt steel pipe to be connected in series interchangeability and the ease-to-operate that connects between the cooling wall pipe that can't guarantee different spacing, exchange through project technology groups multi-argument, change the steel pipe serial connection into the high pressure rubber hose serial connection, solved interchangeability and the versatility of use like this.
The pressure testing of cooling wall monomer, what adopted is the method for being welded to connect in the past, be connected technology with the rubber hose expanded joint and compare, many, the long construction period of this method operation, progress can't guarantee.Pressure testing finishes, and also need prescind joint and to the former mouth of pipe groove of polishing.Increased the demand of electroplating equipment wielding machine, wlding and special work post, construction cost is very high.Substantially use is eliminated in the pressure testing of cooling wall monomer.Adopt the utility model, need not welding, interface rate is fast, and pressure testing finishes and removes immediately, repeatedly utilizes, and uses and only rubber hose is changed later on for 30 times, does not influence cooling wall after the dismounting pipe arrangement is installed, and the mouth of pipe need not secondary treating.Above two kinds of methods are carried out economic analysis contrast, and more than 4100 mouth of pipe of cooling wall adopts in the rubber hose expanded joint connection to save surplus the construction cost 30 ten thousand yuan by calculating the comparable pressure-measuring method that is welded to connect, and saves 45 days durations.
More than show and described ultimate principle of the present utility model, principal character and advantage of the present utility model.The technician of the industry should understand; the utility model is not restricted to the described embodiments; that describes in above-described embodiment and the instructions just illustrates principle of the present utility model; the utility model also has various changes and modifications under the prerequisite that does not break away from the utility model spirit and scope, and these changes and improvements all fall in claimed the utility model scope.The claimed scope of the utility model is defined by appending claims and equivalent thereof.

Claims (6)

1. blast furnace cooling device monomer structure for pressure test, it is characterized in that: comprise screw rod and be enclosed within its outside rubber hose (3), rubber hose (3) one ends have nut (5), and nut (5) if be threaded in rotates then nut (5) is compressed on the screw rod of rubber hose (3).
2. blast furnace cooling device monomer structure for pressure test as claimed in claim 1, it is characterized in that: described rubber hose (3) two ends have packing ring one (2) and packing ring two (4) respectively, and rubber hose (3) links to each other with nut (5) by packing ring two (4).
3. blast furnace cooling device monomer structure for pressure test as claimed in claim 1, it is characterized in that: described screw rod is cored screw.
4. blast furnace cooling device monomer structure for pressure test as claimed in claim 1, it is characterized in that: the end that nut (5) is arranged of described monomer has joint (6).
5. adopt arbitrary described blast furnace cooling device monomer structure for pressure test combination as claim 1-4, it is characterized in that: couple together by the pressure testing flexible pipe between two monomers.
6. blast furnace cooling device monomer structure for pressure test combination as claimed in claim 5, it is characterized in that: described pressure testing flexible pipe is high pressure rubber hose.
CN 201220246812 2012-05-30 2012-05-30 Single body pressure testing tool and single body pressure testing tool assembly for blast furnace cooling equipment Expired - Lifetime CN203191179U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220246812 CN203191179U (en) 2012-05-30 2012-05-30 Single body pressure testing tool and single body pressure testing tool assembly for blast furnace cooling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220246812 CN203191179U (en) 2012-05-30 2012-05-30 Single body pressure testing tool and single body pressure testing tool assembly for blast furnace cooling equipment

Publications (1)

Publication Number Publication Date
CN203191179U true CN203191179U (en) 2013-09-11

Family

ID=49108032

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220246812 Expired - Lifetime CN203191179U (en) 2012-05-30 2012-05-30 Single body pressure testing tool and single body pressure testing tool assembly for blast furnace cooling equipment

Country Status (1)

Country Link
CN (1) CN203191179U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102809468A (en) * 2012-05-30 2012-12-05 九冶建设有限公司 Single body pressure testing tool, single body pressure testing tool combination and pressure testing method for blast furnace cooling equipment
WO2018157283A1 (en) * 2017-02-28 2018-09-07 深圳欣锐科技股份有限公司 Plug
CN114235319A (en) * 2021-12-15 2022-03-25 中国航发动力股份有限公司 Hollow turbine blade testing device and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102809468A (en) * 2012-05-30 2012-12-05 九冶建设有限公司 Single body pressure testing tool, single body pressure testing tool combination and pressure testing method for blast furnace cooling equipment
WO2018157283A1 (en) * 2017-02-28 2018-09-07 深圳欣锐科技股份有限公司 Plug
CN114235319A (en) * 2021-12-15 2022-03-25 中国航发动力股份有限公司 Hollow turbine blade testing device and method
CN114235319B (en) * 2021-12-15 2024-03-19 中国航发动力股份有限公司 Hollow turbine blade test device and method

Similar Documents

Publication Publication Date Title
CN107121371B (en) Indoor simulation test system and method suitable for sand layer permeation grouting
CN203191179U (en) Single body pressure testing tool and single body pressure testing tool assembly for blast furnace cooling equipment
CN109378769B (en) Clamping device
CN102809468A (en) Single body pressure testing tool, single body pressure testing tool combination and pressure testing method for blast furnace cooling equipment
CN105319029A (en) Oil cooling AC generator housing seal test apparatus
CN103776600A (en) Automatic water filling type leak tester for water pump
CN206012565U (en) A kind of inflating and tire-patching device and its Multifunctional inflating joint
CN205745852U (en) temporary pipeline plugging device
CN201993208U (en) Bogie pipeline pressure-maintaining testing device
CN204944762U (en) PCCP steel cylinder sealing hydrostatic test machine
CN210664886U (en) Railway bearing water seepage test bed
CN206515024U (en) Water test unit
CN204064559U (en) The stiffening ring leakage testing device that a kind of pressure stability is high
CN215807145U (en) Water-adjusting-free plugging air bag and water-adjusting-free water drainage pipeline detection device
CN212963861U (en) Oil seal leakage detection device for automobile power steering gear
CN210198861U (en) Testing device for passenger car brake hose
CN208333776U (en) A kind of brake tube detection device
CN208187725U (en) A kind of hydraulic type mechanical load of photovoltaic module test device
CN208283015U (en) Pump motor air-tightness detection device
CN217980696U (en) Movable testing device for air tightness of unit brake of subway train
CN205079904U (en) Belt cleaning device of grease in manometer
CN218382143U (en) High-pressure hose impact resistance test device
CN218993080U (en) Nitrogen charging protection tool
CN205642742U (en) Airtight test device
CN206208467U (en) Gas cylinder test device for air tightness

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130911