CN203113598U - Rapid-construction building block - Google Patents

Rapid-construction building block Download PDF

Info

Publication number
CN203113598U
CN203113598U CN 201320120295 CN201320120295U CN203113598U CN 203113598 U CN203113598 U CN 203113598U CN 201320120295 CN201320120295 CN 201320120295 CN 201320120295 U CN201320120295 U CN 201320120295U CN 203113598 U CN203113598 U CN 203113598U
Authority
CN
China
Prior art keywords
wall
outer walls
building block
rib
middle rib
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320120295
Other languages
Chinese (zh)
Inventor
黄靓
许仲远
黄梅梅
江超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuzhou Boerman Science & Technology Development Co Ltd
Original Assignee
Zhuzhou Boerman Science & Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuzhou Boerman Science & Technology Development Co Ltd filed Critical Zhuzhou Boerman Science & Technology Development Co Ltd
Priority to CN 201320120295 priority Critical patent/CN203113598U/en
Application granted granted Critical
Publication of CN203113598U publication Critical patent/CN203113598U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a rapid-construction building block and belongs to the field of building materials. The rapid-construction building block consists of two outer walls (1), two side ribs (2), a middle rib (3), two blocking heads (4) and two tapered haunches (5); the rapid-construction building block is characterized in that the two outer walls (1) are parallel to each other and the two blocking heads (4) are also parallel to each other, wherein the two blocking heads (4) are respectively arranged above the inner sides of the two outer walls (1), and are connected with the outer walls (1) by the tapered haunches (5). A certain distance is formed from the lower edges of the side ribs (2) and the middle rib (3) to the lower edges of the outer walls (1); the distance is 8mm-12mm smaller than the height difference between the blocking heads (4) and the outer walls (1), so that a seam for pulping is formed between upper and lower building blocks during a wall building process; and a chamfer (7) is respectively formed at the outer sides of the same end of the two outer walls (1), so that a seam for pulping is formed between left and right building blocks during the wall building process.

Description

A kind of rapid construction building block
Technical field
The utility model is mainly concerned with a kind of construction material, specifically is a kind of rapid construction building block.
Background technology
Hollow building-block for construction has been brought into play important effect in the body of wall field, and at present most widely used is Normal concrete small hollow block.But common building block is when masonry panel, needs to use a large amount of mortars, and this makes a lot of limiting factors of having built by laying bricks or stones of body of wall, and makes the speed of building by laying bricks or stones reduce, build by laying bricks or stones cost to raise, build environment by laying bricks or stones and be restricted.
The utility model content
The technical problems to be solved in the utility model just is: use, build the cost height by laying bricks or stones, build problems such as speed is slow, water impermeability difference by laying bricks or stones at the mortar that exists in the above-mentioned masonry, the utility model provides a kind of can effectively improve wall construction speed, reduce the body of wall cost, reduce building wall mortar amount, guarantee that simultaneously building block has the rapid construction building block of excellent waterproof impermeability.
For reaching above-mentioned target, the solution that the utility model proposes is: a kind of rapid construction building block is by two outer walls (1), article two, limit rib (2),, a middle rib (3), article two, dop (4), article two, haunch (5) is formed, it is characterized in that: two outer walls (1) are parallel to each other, be connected with a middle rib (3) by two the limit ribs (2) perpendicular to outer wall (1), article two, dop (4) is also parallel to each other, be connected with a middle rib (3) by two the limit ribs (2) perpendicular to outer wall (1), article two, dop (4) lays respectively at the inside front of two outer walls (1), link together by haunch (5) and outer wall (1), two perps (6) all are symmetrically distributed on limit rib (2) and the middle rib (3), knock out the cross through hole that can be formed for arranging transverse reinforcement and grout concrete lateral flow between perps (6) behind the concrete, outer wall (1), limit rib (2) and middle rib (3) form two and are used for arranging vertical reinforcement and the vertical vertical through holes that flows of concrete.
A nearlyer step ground, the following intermarginal certain distance that has of the lower edge of limit rib (2) and middle rib (3) and outer wall (1), distance exceeds the little 8mm of height of outer wall (1) to 12mm than dop (4), last hypodermis blockhouse is reserved the slit for hanging when making masonry panel, respectively there is a chamfering (7) in the same end outside at two outer walls (1), when making masonry panel about the skin blockhouse reserve slit for hanging.
The advantage of comparing the application with conventional art is:
(1) concrete block masonry need not a large amount of mortars, builds by laying bricks or stones simply, saves and builds by laying bricks or stones the time, saves cost, builds the restriction that work is not subjected to weather environment by laying bricks or stones.
(2) building block connected mode and dop design have favorable waterproof property.
(3) use the body of wall of this concrete block masonry, the hanging of reservation seam is arranged on the body of wall, be conducive to direct injection or smear mortar, do not influence the masonry performance simultaneously.
(4) light, the simple structure of building block deadweight is conducive to construction and saves cost.
Description of drawings
Fig. 1 is the axonometric drawing of the application master's building block;
Fig. 2 is a kind of axonometric drawing of joining piece of the application;
Fig. 3 knocks out axonometric drawing after perps is built concrete for the application;
Fig. 4 is the application's body of wall schematic diagram of arrangement of reinforcement and the grout that uses thermal insulation material not;
Fig. 5 is the application's arrangement of reinforcement and the body of wall schematic diagram that uses the concrete grout.
Description of reference numerals:
1 ?outer wall 2 ?limit rib 3 ?middle rib 4 ?dop 5 ?haunch 6 ?perps 7 ?chamfering 8 ?reinforcing bar 9 ?concrete 10 ?heat insulating material
The specific embodiment
Embodiment 1:
(1) cast-in-place or use prefabricated footing beam or collar tie beam, build the first skin building block by laying bricks or stones at beam, before building by laying bricks or stones the concrete between the perps on building block limit rib, the middle rib is knocked out, form cross through hole;
(2) build the second skin building block by laying bricks or stones, utilize when building by laying bricks or stones and join piece the hypodermis blockhouse fissure of displacement is built by laying bricks or stones;
(3) after this repeat by previous step, up to having built this layer or proper height by laying bricks or stones, and in building by laying bricks or stones in the vertical through holes of body of wall and the cross through hole fill insulant material.
Embodiment 2:
(1) cast-in-place or use prefabricated footing beam or collar tie beam, arrange at beam and to remain for the fixedly reserved steel bar of shear wall vertical reinforcement in advance, reserved steel bar can adopt body of wall Len req or appropriate length, before building by laying bricks or stones the concrete between the perps on building block limit rib, the middle rib is knocked out the formation cross through hole;
(2) build the first skin building block by laying bricks or stones at footing beam or collar tie beam, built by laying bricks or stones after this skin building block and placed and the fixed lateral reinforcing bar, and in the first skin building block, reserved clean-out hatch;
(3) build the second skin building block by laying bricks or stones, utilize when building by laying bricks or stones and join piece the hypodermis blockhouse fissure of displacement is built by laying bricks or stones, built after this skin building block also fixed lateral reinforcing bar of placement by laying bricks or stones;
(4) after this repeat by previous step, up to having built this layer or proper height by laying bricks or stones, the overlap joint vertical reinforcement is pricked by group, at the clean-out hatch place reserved steel bar and vertical reinforcement is carried out colligation and fixes;
(5) primary concreting one deck when building the grout concrete, or select suitable height, segmentation is built.
It is more preferably a kind of that above-mentioned drawings and Examples only are used for explanation the application; protection domain to the application does not constitute any limitation, and those skilled in the art carries out common variation and replace should being included within the protection domain of the present utility model in the utility model scheme scope.

Claims (2)

1. rapid construction building block, it is characterized in that: the rapid construction building block is by two outer walls (1), article two, limit rib (2),, a middle rib (3), article two, dop (4), article two, haunch (5) is formed, it is characterized in that: two outer walls (1) are parallel to each other, be connected with a middle rib (3) by two the limit ribs (2) perpendicular to outer wall (1), article two, dop (4) is also parallel to each other, be connected with a middle rib (3) by two the limit ribs (2) perpendicular to outer wall (1), article two, dop (4) lays respectively at the inside front of two outer walls (1), link together by haunch (5) and outer wall (1), two perps (6) all are symmetrically distributed on limit rib (2) and the middle rib (3), knock out the cross through hole that can be formed for arranging transverse reinforcement and grout concrete lateral flow between perps (6) behind the concrete, outer wall (1), limit rib (2) and middle rib (3) form two and are used for arranging vertical reinforcement and the vertical vertical through holes that flows of concrete.
2. a kind of rapid construction building block according to claim 1, it is characterized in that: the following intermarginal certain distance that has of the lower edge of limit rib (2) and middle rib (3) and outer wall (1), distance exceeds the little 8mm of height of outer wall (1) to 12mm than dop (4), last hypodermis blockhouse is reserved the slit for hanging when making masonry panel, respectively there is a chamfering (7) in the same end outside at two outer walls (1), when making masonry panel about the skin blockhouse reserve slit for hanging.
CN 201320120295 2013-03-15 2013-03-15 Rapid-construction building block Expired - Fee Related CN203113598U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320120295 CN203113598U (en) 2013-03-15 2013-03-15 Rapid-construction building block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320120295 CN203113598U (en) 2013-03-15 2013-03-15 Rapid-construction building block

Publications (1)

Publication Number Publication Date
CN203113598U true CN203113598U (en) 2013-08-07

Family

ID=48893961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320120295 Expired - Fee Related CN203113598U (en) 2013-03-15 2013-03-15 Rapid-construction building block

Country Status (1)

Country Link
CN (1) CN203113598U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103422605A (en) * 2013-08-20 2013-12-04 钟粤 Main body brick used for constructing hollow wall
CN103899029A (en) * 2014-04-16 2014-07-02 许昌金科建筑清运有限公司 Connecting structure of adjacent three building blocks in break joint masonry and reinforced masonry of connecting structure
CN104453063A (en) * 2014-06-18 2015-03-25 段炼山 Hollow building block
CN110965669A (en) * 2018-09-28 2020-04-07 陈韦丞 Bar planting brick
WO2020107313A1 (en) * 2018-11-29 2020-06-04 陈韦丞 Combination wall formed by reinforced bricks
WO2020107300A1 (en) * 2018-11-29 2020-06-04 陈韦丞 Brick for post-embedding of rebars

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103422605A (en) * 2013-08-20 2013-12-04 钟粤 Main body brick used for constructing hollow wall
CN103899029A (en) * 2014-04-16 2014-07-02 许昌金科建筑清运有限公司 Connecting structure of adjacent three building blocks in break joint masonry and reinforced masonry of connecting structure
CN103899029B (en) * 2014-04-16 2017-01-18 许昌金科资源再生股份有限公司 Connecting structure of adjacent three building blocks in break joint masonry and reinforced masonry of connecting structure
CN104453063A (en) * 2014-06-18 2015-03-25 段炼山 Hollow building block
CN110965669A (en) * 2018-09-28 2020-04-07 陈韦丞 Bar planting brick
WO2020107313A1 (en) * 2018-11-29 2020-06-04 陈韦丞 Combination wall formed by reinforced bricks
WO2020107300A1 (en) * 2018-11-29 2020-06-04 陈韦丞 Brick for post-embedding of rebars

Similar Documents

Publication Publication Date Title
CN203113598U (en) Rapid-construction building block
CN102182265B (en) A kind of Multifunctional die wallboard structural system for fast house building
CN103046579B (en) A kind of two-way eight track lakebed open cuts secretly bury tunnel structure
CN209339466U (en) A kind of assembled parapet constructing structure
CN204676609U (en) The reinforced waterproof construction of a kind of basement bottom plate rear pouring tape
CN204356976U (en) A kind of lightweight wall block
CN201588207U (en) Concreting device at construction joints
CN103343582A (en) Novel insulation filler wall system and construction method thereof
CN203821688U (en) Building block with openings at two ends
CN104790436A (en) High-rise building basement roof settlement post-pouring joint advanced water stop construction method
CN205617419U (en) Novel combination formula reinforced earth retaining wall structure
CN205475356U (en) Induced seam structure of basement roof
CN203684451U (en) Inner and outer wall joint for self-insulation block reinforced masonry structure
CN211286028U (en) Connection node of assembled floor and roof beam
CN203383245U (en) Cement board waterproof protective layer construction structure
CN203684515U (en) Novel self-insulation chain block
CN203145044U (en) Bidirectional eight-lane open-excavating and hidden-burying tunnel structure under lake
CN217001873U (en) Shield constructs big pipe shed structure in well end based on double-deck lining cutting
CN203684497U (en) Novel chain block
CN207131069U (en) One kind is without cavity isolation fireproof heat insulating component
CN203174860U (en) Novel rapid construction building block
CN204703363U (en) Energy-saving wall heat insulation building block
CN206570961U (en) A kind of outer wall precast slab is combined late poured band structure
CN203113378U (en) Wall footing structure reducing contraction cracks of basement exterior wall
CN203174855U (en) Small-sized interlocking concrete block

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130807

Termination date: 20160315