[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN203066579U - Light type power transmission emergency transmitting tower - Google Patents

Light type power transmission emergency transmitting tower Download PDF

Info

Publication number
CN203066579U
CN203066579U CN 201220563567 CN201220563567U CN203066579U CN 203066579 U CN203066579 U CN 203066579U CN 201220563567 CN201220563567 CN 201220563567 CN 201220563567 U CN201220563567 U CN 201220563567U CN 203066579 U CN203066579 U CN 203066579U
Authority
CN
China
Prior art keywords
tower
tower body
jam plate
aluminium extruded
extruded sections
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220563567
Other languages
Chinese (zh)
Inventor
王玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Lanbo Electric Power Machines Tools Technology Co.,Ltd.
Original Assignee
HEFEI LANBO ELECTRIC POWER MACHINES TOOLS TECHNOLOGY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEFEI LANBO ELECTRIC POWER MACHINES TOOLS TECHNOLOGY CO LTD filed Critical HEFEI LANBO ELECTRIC POWER MACHINES TOOLS TECHNOLOGY CO LTD
Priority to CN 201220563567 priority Critical patent/CN203066579U/en
Application granted granted Critical
Publication of CN203066579U publication Critical patent/CN203066579U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a light type power transmission emergency transmitting tower. The light type power transmission emergency transmitting tower comprises a base, a tapered hinge seat is fixedly arranged on the base, a tower body formed by sequential overlaying of several sections of aluminum profile ladder groups is arranged at the upper end of the tapered hinge seat in a rotating mode, auxiliary supporting bodies arranged at intervals are hinged on the periphery of the bottom end of the tapered hinge seat, the upper ends of the auxiliary supporting bodies are fixedly connected with the lower end face of the tower body, a roller used for lifting is arranged at the top end of the tower body, safety locks are arranged in sliding grooves of the aluminum profile ladders in a matching mode, the aluminum profile ladders are fixedly provided with lock plates, lock plate rings are arranged at the front ends of the lock plates, steel ropes penetrate through the lock plate rings, and the end portions of the steel ropes extend to the ground. The light type power transmission emergency transmitting tower is reasonable in structural design, small in occupied area and short in time, building work of a transmitting tower with the height of 30m can be finished in four hours by five workers, the largest height can reach 120m and wind speed resistance is more than 240/hour. In addition, storage and transportation are convenient, cost is low and safety performance is good.

Description

The emergent launching tower of a kind of lightweight transmission of electricity
Technical field
The utility model relates to a kind of emergent launching tower, relates in particular to the emergent launching tower of a kind of lightweight transmission of electricity.
Background technology
Because the many regional physical features complexity of China, and some power transmission tower is built up in areas such as more dangerously steep location and awful weather, as events such as big natural calamity or earthquake take place, and can cause collapsing and rupturing of part power transmission tower, bring to the area to have a power failure or significant impact such as other events.In case thing is thought to take at short notice to restore electricity, just must repairing power supply tower.What but the common electrical tower all adopted is steel work, highly is generally 30-80 rice and does not wait, and add that the location is precipitous, and vehicle can't arrive, and common power supply tower is that the steel work tonnage is heavier, and floor space is big.Tower work is very difficult so think to restore electricity at short notice.Particularly cause communicating interrupt under the natural calamity earthquake effect, this emergent launching tower can be used as interim communication launching tower and uses.
The utility model content
The purpose of this utility model is in order to remedy the deficiency of prior art, provide a kind of lightweight transmission of electricity emergent launching tower, solved existing emergent launching tower heavy snow is taking place, strong wind, the power supply tower can not get in time repairing the power failure that causes big face in the natural calamity of heavy rain after collapsing, and can't enter problems such as work under the environment at the dangerously steep vehicle of physical features.
The utility model is achieved through the following technical solutions:
The emergent launching tower structure of a kind of lightweight transmission of electricity, include base, it is characterized in that: be installed with the taper hinged seat on the described base, described taper hinged seat upper end is equipped with the several sections aluminium extruded sections ladder groups tower body of stack composition successively, the bottom periphery of described taper hinged seat is hinged with spaced supplemental support, and fixedly connected with the lower surface of tower body in the upper end of supplemental support, described tower body top is provided with the roller for lifting, also be combined with safety lock in the sliding tray of described aluminium extruded sections ladder, be installed with on the described aluminium extruded sections ladder and add jam plate, the described front end that adds jam plate is provided with and adds the jam plate ring,, there is steel wire penetrating described adding in the jam plate ring, and the end of wire rope extends to ground.
The periphery of the bottom of described taper hinged seat is evenly equipped with four supplemental support, and supplemental support adjusts direction with tower body and the direction adjustment number of degrees cooperate.
Described adding on the aluminium extruded sections ladder that jam plate is fixedly installed in diverse location on the tower body, different angles.
Its principle is: base is positioned over suitable place and will be fixed in ground around the base with anchor pole, anchor pole is squeezed into overhead 1-2 rice depths with machine hammer, after hinged seat is positioned on the base, 12 symmetrical screws are respectively arranged on base and the hinged seat, tighten with bolt and to be anchored on the base, the back is connected on base and the hinged seat with bolt by the direction position with 4 supplemental support and (annotates: owing to hinged seat is to adjust direction and the number of degrees, so supplemental support is set up another fixation after direction adjustment and the number of degrees adjustment.), again the aluminium extruded sections ladder is positioned on the hinged seat aluminium extruded sections ladder is docked with the hinged seat screw, use bolt, after the aluminium extruded sections ladder is positioned on the aluminium extruded sections ladder of lower end with bolt (annotate: every section aluminium extruded sections ladder highly is 2.904 meters) by same way as after highly reaching about 6 meters, safety lock is inserted in the sliding tray of aluminium extruded sections ladder, other end safety belt on one's body the engineering staff is connected.Gone up in going up most the aluminium extruded sections ladder by the engineering staff, will add jam plate and connect with bolt in the middle of placing the aluminium extruded sections ladder, with wire rope rope and add on the jam plate ring, the other end is given the ground handling personnel.The suitable location of ground handling personnel selection select spiral anchor rod with machine hammer with anchor pole about 1.5-2 rice of being driven underground.After with the steel wire penetrating bolthole with locker tension (annotate: strainer totally 4 groups be distributed in the tower peripheral direction respectively).
Treat after above work is carried out lifting gear to be used bolt after the chute of aluminium extruded sections ladder is drawn in highest point.Again with on steel wire rope support and the lifting gear roller one be with the aluminium extruded sections ladder of wanting lifting on, one be with automobile on pulling (annotate: the lifting mode has multiple, existing mode has the automobile pulling, and helicopter hangs and draws etc.) by that analogy height come fixed (notes: highly reach about 8 meters at every section and must erect Strain lock by actual conditions.) utilize lifting gear to draw high from, the aluminium extruded sections ladder chute in the same manner working platform at last suitably highly to erect the cable falsework after, finish the insulated electro magnet ring to the falsework and set up work by artificial going up.
The principle that the utility model the utility model is followed in design concept is: no matter be from execution architecture, in proper order, simplify densification and being easily understood in the operation as far as possible.Improve reliability, operability and the maintenanceability of equipment.Can be under the dangerously steep geographical conditions of physical features, finish in the short time take on as follows:
(a), the emergent launching tower of taking on power line or distribution wire;
(b), use as the emergent launching tower of communication;
(c), use as interim launching tower at the periodic maintenance duration of work;
(d), the interim launching tower as (wind energy) anemometer uses;
(e), the interim launching tower as the surface mining exploration uses;
(f), use as public safety and the interim launching tower of crucial communication in the remote regions.
The utility model has the advantages that:
The utility model reasonable in design, floor space is little, and the time spent is short.General 30 meters height launching towers can be finished tower in 4 hours 5 people and build work, maximum height can reach 120 meters and wind speed resistance be 240/ per hour more than, store convenient transportation simultaneously, cost is low, security performance is good.
Description of drawings
Fig. 1 is the utility model structural representation.
Fig. 2 is the partial structurtes schematic diagram that safety lock cooperates with aluminium extruded sections ladder sliding tray.
The specific embodiment
Referring to accompanying drawing, the emergent launching tower structure of a kind of lightweight transmission of electricity, include base 1, be installed with taper hinged seat 2 on the base 1, taper hinged seat 2 upper ends are rotatablely equipped with the several sections aluminium extruded sections ladder groups tower body 3 of stack composition successively, the periphery of the bottom of taper hinged seat 2 is hinged with spaced supplemental support 4, and fixedly connected with the lower surface of tower body 3 in the upper end of supplemental support 4, tower body 3 tops are provided with the roller 5 for lifting, also be combined with safety lock 10 in the sliding tray 9 of aluminium extruded sections ladder, be installed with on the aluminium extruded sections ladder and add jam plate 6, the front end that adds jam plate 6 is provided with and adds jam plate ring 7, adding has wire rope 8 to pass in the jam plate ring 7, and the end of wire rope 8 extends to ground; The periphery of the bottom of taper hinged seat 2 is evenly equipped with four supplemental support 4, and supplemental support 4 adjusts direction with tower body 3 and the direction adjustment number of degrees cooperate; Add on the aluminium extruded sections ladder that jam plate 6 is fixedly installed in diverse location, different angles on the tower body 3.

Claims (3)

1. the emergent launching tower structure of lightweight transmission of electricity, include base, it is characterized in that: be installed with the taper hinged seat on the described base, described taper hinged seat upper end is equipped with the several sections aluminium extruded sections ladder groups tower body of stack composition successively, the periphery of the bottom of described taper hinged seat is hinged with spaced supplemental support, and fixedly connected with the lower surface of tower body in the upper end of supplemental support, described tower body top is provided with the roller for lifting, also be combined with safety lock in the sliding tray of described aluminium extruded sections ladder, be installed with on the described aluminium extruded sections ladder and add jam plate, the described front end that adds jam plate is provided with and adds the jam plate ring,, there is steel wire penetrating described adding in the jam plate ring, and the end of wire rope extends to ground.
2. the emergent launching tower structure of lightweight according to claim 1 transmission of electricity, it is characterized in that: the periphery of the bottom of described taper hinged seat is evenly equipped with four supplemental support, and supplemental support adjusts direction with tower body and the direction adjustment number of degrees cooperate.
3. the emergent launching tower structure of lightweight according to claim 1 transmission of electricity is characterized in that: described adding on the aluminium extruded sections ladder that jam plate is fixedly installed in diverse location on the tower body, different angles.
CN 201220563567 2012-10-30 2012-10-30 Light type power transmission emergency transmitting tower Expired - Fee Related CN203066579U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220563567 CN203066579U (en) 2012-10-30 2012-10-30 Light type power transmission emergency transmitting tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220563567 CN203066579U (en) 2012-10-30 2012-10-30 Light type power transmission emergency transmitting tower

Publications (1)

Publication Number Publication Date
CN203066579U true CN203066579U (en) 2013-07-17

Family

ID=48765389

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220563567 Expired - Fee Related CN203066579U (en) 2012-10-30 2012-10-30 Light type power transmission emergency transmitting tower

Country Status (1)

Country Link
CN (1) CN203066579U (en)

Similar Documents

Publication Publication Date Title
US20040045226A1 (en) Self-erecting tower and method for raising the tower
CN102767303B (en) Precast concrete tower and construction method thereof
CN201670702U (en) Manual lifting operation equipment
CN201934004U (en) Suspended telescopic ladder
CN202756168U (en) Floating body steel rope and spline flying wheel set wave power generation system
CN103015445A (en) Transition-section-free single-pile foundation construction and fan equipment installation process for shallow sea area wind farm
US20130088012A1 (en) Wind energy turbine shell station (wetss)
CN201038657Y (en) Transmission line iron tower climbing machine
CN101775776A (en) Marine oil field multifunctional self-elevating supporting platform pedestrian hydraulic telescopic trestle
WO2015078476A1 (en) An internal tower structure for a wind turbine generator
CN201588168U (en) Hydraulic pedestrian expansion trestle for multifunctional self-elevating supporting platform of offshore oil field
CN203066579U (en) Light type power transmission emergency transmitting tower
CN202414173U (en) Fixed mooring system for tethered balloon
CN203615933U (en) Light hydrologic cableway
CN104150393A (en) Micro power electric equipment rotating and hoisting device
CN206053545U (en) Simple construction protection hurdle
CN204456157U (en) A kind of major diameter combination cable system for open caisson foundation location
CN202402221U (en) Tower frame with climbing device
CN203996841U (en) A kind of simple and easy regenerative apparatus that lays of underwater glider
CN112049503B (en) 5G iron tower safety device
CN106300128B (en) One kind changes double bundle conductor conductor spacer and puies forward the Line tool and application method
CN201891079U (en) Rocket launching arrangement structure
CN202696011U (en) Maintenance platform of transformer substation
CN202414917U (en) Vertical elevator with spare safety rope
CN201874478U (en) Tower hoisting device for drilling rig tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHENGDU LANBO ELECTRIC POWER EQUIPMENT CO., LTD.

Free format text: FORMER OWNER: HEFEI LANBO ELECTRICAL MACHINES AND TOOLS TECHNOLOGY CO.,LTD.

Effective date: 20140504

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 230601 HEFEI, ANHUI PROVINCE TO: 610000 CHENGDU, SICHUAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20140504

Address after: 109, room 6, building 1480, hi tech incubator Park, north section of Tianfu Road, Chengdu hi tech Zone, Sichuan, 610000

Patentee after: Chengdu Rambo Power Equipment Co. Ltd.

Address before: 230601 No. 159, Tian Du Road, Hefei economic and Technological Development Zone, Anhui, China

Patentee before: Hefei Lanbo Electric Power Machines Tools Technology Co.,Ltd.

ASS Succession or assignment of patent right

Owner name: HEFEI LANBO ELECTRICAL MACHINES AND TOOLS TECHNOLO

Free format text: FORMER OWNER: CHENGDU LANBO ELECTRIC POWER EQUIPMENT CO., LTD.

Effective date: 20150205

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 610000 CHENGDU, SICHUAN PROVINCE TO: 230000 HEFEI, ANHUI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150205

Address after: 230000, No. 159, Tian Cheng Road, peach blossom Industrial Park, Hefei economic and Technological Development Zone, Anhui, China

Patentee after: Hefei Lanbo Electric Power Machines Tools Technology Co.,Ltd.

Address before: 109, room 6, building 1480, hi tech incubator Park, north section of Tianfu Road, Chengdu hi tech Zone, Sichuan, 610000

Patentee before: Chengdu Rambo Power Equipment Co. Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130717

Termination date: 20151030

EXPY Termination of patent right or utility model