[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN202899720U - Steel pole provided with foot treadles and used for high-tension transmission line iron tower - Google Patents

Steel pole provided with foot treadles and used for high-tension transmission line iron tower Download PDF

Info

Publication number
CN202899720U
CN202899720U CN 201220530515 CN201220530515U CN202899720U CN 202899720 U CN202899720 U CN 202899720U CN 201220530515 CN201220530515 CN 201220530515 CN 201220530515 U CN201220530515 U CN 201220530515U CN 202899720 U CN202899720 U CN 202899720U
Authority
CN
China
Prior art keywords
steel
foot pedal
transmission line
pole
steel pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220530515
Other languages
Chinese (zh)
Inventor
毛伟敏
钱连仲
董树森
张志远
崔志国
周雪涛
尹泉军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Hebei Power Transmission and Transformation Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Hebei Power Transmission and Transformation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Hebei Power Transmission and Transformation Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN 201220530515 priority Critical patent/CN202899720U/en
Application granted granted Critical
Publication of CN202899720U publication Critical patent/CN202899720U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本实用新型公开了一种带脚踏板的高压输电线路铁塔用钢杆,包括杆体、设置在杆体两端的法兰、设置在杆体外壁上的安装钢杆桁架的安装架,所述杆体壁上通过安装架挂装有脚踏板,所述脚踏板的截面为几字形,脚踏板通过脚踏板几字形的挂钩挂接在安装架内。本实用新型应用于电力建设领域架设超高压输电线的铁塔,解决高压铁塔钢杆在施工组装过程中难以组装的难题,为工作人员提供更大的作用空间,在组装钢杆过程中,施工人员可以将脚踏板作为着力点,安全稳定,加快施工进度。

Figure 201220530515

The utility model discloses a steel rod for an iron tower of a high-voltage transmission line with pedals, which comprises a rod body, flanges arranged at both ends of the rod body, and a mounting frame for installing a steel rod truss arranged on the outer wall of the rod body. A foot pedal is hung by the installation frame, and the cross section of the foot pedal is several shapes, and the foot pedal is articulated in the installation frame by a hook of the foot pedal several shapes. The utility model is applied in the field of electric power construction to erect iron towers of ultra-high voltage transmission lines, solves the problem that the steel poles of high-voltage iron towers are difficult to assemble during the construction and assembly process, and provides workers with a larger working space. During the process of assembling steel poles, construction personnel The foot pedal can be used as a point of force, which is safe and stable, and speeds up the construction progress.

Figure 201220530515

Description

一种带脚踏板的高压输电线路铁塔用钢杆A steel pole for an iron tower of a high-voltage transmission line with a pedal

技术领域 technical field

本实用新型涉及一种电力建设领域架设超高压输电线的高压铁塔所用钢杆。 The utility model relates to a steel pole used for a high-voltage iron tower erecting an ultra-high-voltage transmission line in the electric power construction field.

背景技术 Background technique

在输电线路中,超高压输电线需要用高压铁塔架设,高压铁塔一般是由四组由若干根钢杆竖向组装而成的四角型铁塔,每一组串接在一起的竖立的钢杆之间还用槽钢或者角钢连接成桁架结构。钢杆的两端设置有连接两个钢杆的法兰盘,钢杆的侧壁上连接桁架角钢的位置焊接有安装架,安装架为一扣在钢杆壁上的槽型钢板,安装架的槽型钢板正面设置螺栓孔,用于连接角钢等桁架构件。架设高压铁塔等较高较重的构件时,需要用卷扬牵引机将钢杆等构件起吊到已经竖起的钢杆的上部。在起吊过程中需要在已经组装竖起的四组钢杆的顶部悬空设置一抱杆,抱杆的顶部设置滑轮,卷扬牵引机设置在地面上,在四组铁塔的中间的地面上也设置一个牵引用滑轮。起吊钢杆等构件的钢丝绳从抱杆上部的滑轮穿过,一端连接到地面上的准备起吊的钢杆上,另一端穿过四组铁塔中心地面上牵引用的滑轮然后连接到卷扬牵引机上,卷扬牵引机通过拉动钢丝绳将钢杆等构件起吊到抱杆的顶部,从而安装连接到已经竖起的的上部。 In the transmission line, the ultra-high voltage transmission line needs to be erected with a high-voltage iron tower. The high-voltage iron tower is generally a square-shaped iron tower composed of four groups of steel rods assembled vertically. Each group of vertical steel rods connected in series The rooms are also connected with channel steel or angle steel to form a truss structure. The two ends of the steel rod are provided with flanges connecting the two steel rods. The side wall of the steel rod is welded with a mounting frame at the position where the truss angle steel is connected. The mounting frame is a channel-shaped steel plate buckled on the wall of the steel rod. Bolt holes are set on the front of the channel steel plate for connecting angle steel and other truss members. When erecting taller and heavier components such as high-voltage iron towers, it is necessary to hoist components such as steel rods to the top of the erected steel rods with a winch tractor. During the hoisting process, it is necessary to set a pole in the air on the top of the four sets of steel poles that have been assembled and erected. A pulley is set on the top of the pole. A pulley for traction. The wire rope for hoisting steel poles and other components passes through the pulley on the upper part of the pole, one end is connected to the steel pole on the ground to be hoisted, and the other end passes through the traction pulleys on the ground in the center of the four sets of iron towers and then connected to the winch tractor , The winch tractor lifts the steel pole and other components to the top of the pole by pulling the wire rope, so as to install and connect to the upper part that has been erected.

在钢杆的两端都焊接有法兰盘,两个钢杆之间的连接主要是通过螺栓将两个法兰盘连接为一体。钢杆在起吊过程中是在不断的晃动,起吊的钢杆的法兰盘要想与已经安装好的钢杆的法兰盘及螺栓孔对正,并不是一件容易的事,所以吊装过程中需要施工人员站在已经安装好的钢杆的上端,需要通过人工对位于上、下的两个钢杆通过法兰进行连接,将起吊的钢杆的下端法兰盘及螺栓孔与已经安装好的钢杆的法兰盘及螺栓孔对正。但是,一般的钢杆上除了连接钢杆的法兰盘及连接桁架角钢的安装架外,没有供施工人员站立的其它部件。施工人员在组装钢杆及其桁架构件时,一般只能通过保险绳悬挂在钢杆上,同时每根钢杆都很粗,脚扣等登杆工具也不能使用,施工人员脚下没有着力点,这样使施工人员活动受到很大的限制,施工过程非常困难,并且也很危险,装卸时也非常不方便,容易造成施工事故的发生。 Both ends of the steel rods are welded with flanges, and the connection between the two steel rods is mainly to connect the two flanges together through bolts. The steel pole is constantly shaking during the hoisting process. It is not easy to align the flange plate of the hoisted steel pole with the flange plate and bolt holes of the installed steel pole, so the hoisting process The construction personnel need to stand on the upper end of the steel pole that has been installed, and need to manually connect the two steel poles located on the upper and lower sides through the flange, and connect the flange plate and bolt holes at the lower end of the lifted steel pole with the installed steel pole. Align the flanges and bolt holes of good steel rods. However, there are no other parts for construction personnel to stand on the general steel pole except the flange plate connecting the steel pole and the mounting frame connecting the truss angle steel. When construction workers assemble steel poles and their truss components, they can only hang them on the steel poles through safety ropes. At the same time, each steel pole is very thick, and climbing tools such as foot buckles cannot be used. Construction workers have no focus on their feet. The activities of construction personnel are greatly restricted like this, the construction process is very difficult and dangerous, and it is also very inconvenient during loading and unloading, which easily causes construction accidents.

实用新型内容 Utility model content

    本实用新型需要解决的技术问题是提供一种便于施工人员工作的高压输电线路的铁塔用钢杆。 The technical problem to be solved by the utility model is to provide a steel pole for the iron tower of the high-voltage transmission line that is convenient for construction personnel to work.

为解决上述技术问题,本实用新型所采取的技术方案是:一种带脚踏板的高压输电线路铁塔用钢杆,包括杆体、设置在杆体两端的法兰、焊接在杆体外壁上的用于安装钢杆桁架的安装架,所述杆体壁上通过安装架设置有脚踏板,所述脚踏板的截面为几字形,脚踏板通过脚踏板几字形的挂钩挂接在安装架内。 In order to solve the above-mentioned technical problems, the technical solution adopted by the utility model is: a steel rod for a high-voltage transmission line iron tower with pedals, including a rod body, flanges arranged at both ends of the rod body, welded on the outer wall of the rod for Install the mounting frame of the steel rod truss. The wall of the rod body is provided with a foot pedal through the mounting frame. .

本实用新型具体结构的进一步改进在于:所述脚踏板与挂钩相对的外侧设置有向上翘起的挡板。 The further improvement of the specific structure of the utility model is that: the outer side of the pedal opposite to the hook is provided with an upwardly tilted baffle.

本实用新型具体结构的进一步改进在于:所述脚踏板的内侧及挂钩上设置有与安装架上的螺栓孔配合的穿接螺栓用的螺栓孔。 The further improvement of the specific structure of the utility model is that: the inner side of the pedal and the hook are provided with bolt holes for piercing bolts matched with the bolt holes on the mounting frame.

本实用新型具体结构的进一步改进在于:所述杆体侧壁上的安装架上设置有光缆预留架。 The further improvement of the specific structure of the utility model lies in that: the mounting frame on the side wall of the rod body is provided with a reserved frame for optical cables.

由于采用了上述技术方案,本实用新型所取得的技术进步在于:本实用新型的高压塔用钢杆主要应用于电力建设领域架设超高压输电线的铁塔钢杆,是在钢杆预装上脚踏板等部件,从而解决高压铁塔钢杆在施工组装过程中难以组装的难题,为工作人员提供更大的作用空间,在组装钢杆过程中,施工人员可以将脚踏板作为着力点,施工过程安全稳定,大大加快了施工进度。 Due to the adoption of the above-mentioned technical scheme, the technical progress achieved by the utility model lies in that the steel pole for the high-voltage tower of the utility model is mainly used in the iron tower steel pole for erecting ultra-high voltage transmission lines in the field of electric power construction, and is pre-installed on the steel pole Pedals and other parts, so as to solve the difficult problem of assembling the steel poles of the high-voltage iron tower during the construction and assembly process, and provide a larger working space for the staff. The process is safe and stable, greatly speeding up the construction progress.

脚踏板上设置有向上翘起的挡板可以防止踩空或者打滑。用螺栓将脚踏板与钢杆的安装架穿接起来,可以进一步增大脚踏板悬挂的安全性。脚踏板是钩挂在安装架上,其可以随时拆卸,方便使用和移动。安装架上设置的光缆预留架,不但给光缆的安装提供预留的安装位置,而且可以起到脚踏支撑的作用。 The pedal is provided with an upturned baffle to prevent stepping on air or slipping. The foot pedal and the mounting frame of the steel rod are pierced and connected by bolts, which can further increase the safety of the foot pedal suspension. The foot pedal is hooked on the installation frame, and it can be disassembled at any time, which is convenient for use and movement. The optical cable reserve frame set on the installation frame not only provides a reserved installation position for the installation of the optical cable, but also can play the role of foot support.

附图说明 Description of drawings

图1为本实用新型结构示意图; Fig. 1 is the structural representation of the utility model;

图2为本实用新型的脚踏板的安装结构示意图; Fig. 2 is a schematic diagram of the installation structure of the pedal of the present utility model;

图3为本实用新型的脚踏板的俯视结构示意图。 Fig. 3 is a top structural schematic diagram of the pedal of the present invention.

图中:2、上法兰,3、光缆预留架,4、安装架,5、下法兰,30、杆体;32、脚踏板;35、挂钩,36、挡板,37、螺栓。 Among the figure: 2, upper flange, 3, optical cable reserved frame, 4, installation frame, 5, lower flange, 30, rod body; 32, pedal; 35, hook, 36, baffle plate, 37, bolt.

具体实施方式 Detailed ways

下面结合附图对本实用新型做进一步详细说明: Below in conjunction with accompanying drawing, the utility model is described in further detail:

如附图所示,一种带脚踏板的高压输电线路铁塔用钢杆,包括杆体30,杆体两端设置有法兰,在杆体外壁上设置有安装架,安装架正常情况下是用来安装铁塔的桁架角钢等部件的。在杆体壁上的安装架4上钩挂有脚踏板32。 As shown in the accompanying drawings, a steel pole for an iron tower of a high-voltage transmission line with pedals includes a pole body 30, flanges are arranged at both ends of the pole body, and a mounting frame is provided on the outer wall of the pole body. The mounting frame is normally used for Install the truss angle steel and other components of the iron tower. A pedal 32 is hooked on the mounting frame 4 on the body wall.

如图2、3所示,本实用新型的脚踏板32的截面为几字形,脚踏板32通过脚踏板几字形的挂钩挂接在安装架4内。所述脚踏板32与挂钩35相对的外侧设置有挡板36,挡板36向上翘起以挡住施工人员的脚,为施工人员提供脚踏板边缘的感觉。脚踏板32的内侧及挂钩35上设置有与安装架4上的螺栓孔配合的螺栓孔,脚踏板32挂在安装架4内后,可以再穿接一螺栓37以进一步固定防止脚踏板脱落。在杆体侧壁上的安装架4上还设置有光缆预留架3。 As shown in Figures 2 and 3, the cross-section of the pedal 32 of the present utility model is a zigzag, and the pedal 32 is articulated in the installation frame 4 by the hook of the zigzag of the pedal. A baffle plate 36 is arranged on the outer side of the pedal 32 opposite to the hook 35, and the baffle plate 36 is tilted upwards to block the construction personnel's feet, so as to provide the construction personnel with the feeling of the edge of the pedal. The inboard of pedal 32 and hook 35 are provided with the bolt hole that cooperates with the bolt hole on the installation frame 4, after pedal 32 is hung in the installation frame 4, can pass through a bolt 37 again to further fix and prevent pedal Board comes off. An optical cable reserved frame 3 is also arranged on the mounting frame 4 on the side wall of the rod body.

在电力建设中,高压铁塔一般是由四组由若干根钢杆竖向组装而成的四角型铁塔。架设时,卷扬牵引机通过拉动钢丝绳将钢杆等构件起吊到抱杆的顶部,在拉动的过程中,钢丝绳首先吊起钢杆的一端,直到卷扬牵引机将整个钢杆等构件起吊到已经竖起的钢杆的上部,吊装完成后,施工人员爬到两个钢杆连接处,将自身的保险绳套接在钢杆的上法兰2上,然后施工人员的两只脚分别站在一个脚踏板上,完成上钢杆与下钢杆的法兰之间的螺栓的连接工作。当需要安装其它位置的组件时,可以通过移动脚踏板而到达相应的位置。 In electric power construction, high-voltage iron towers are generally quadrangular iron towers assembled vertically from four sets of steel rods. When erecting, the winch tractor lifts the steel pole and other components to the top of the pole by pulling the wire rope. During the pulling process, the steel wire rope first lifts one end of the steel pole until the hoist tractor lifts the entire steel pole and other components to The upper part of the steel pole that has been erected, after the hoisting is completed, the construction personnel climb to the joint of the two steel poles, and connect their own safety ropes to the upper flange 2 of the steel pole, and then the two feet of the construction personnel stand separately. On one footboard, complete the bolt connection work between the flanges of the upper steel rod and the lower steel rod. When components in other positions need to be installed, the corresponding positions can be reached by moving the pedals.

Claims (4)

1.一种带脚踏板的高压输电线路铁塔用钢杆,包括杆体(30)、设置在杆体两端的法兰、焊接在杆体外壁上的用于安装钢杆桁架的安装架(4),其特征在于:所述杆体壁上通过安装架(4)设置有脚踏板(32),所述脚踏板(32)的截面为几字形,脚踏板(32)通过脚踏板几字形的挂钩(35)挂接在安装架(4)内。 1. A steel pole for an iron tower of a high-voltage transmission line with pedals, comprising a pole body (30), flanges arranged at both ends of the pole body, and a mounting frame (4) for installing a steel pole truss welded on the outer wall of the pole body, It is characterized in that: the wall of the rod body is provided with a foot pedal (32) through the mounting frame (4), the cross section of the foot pedal (32) is in the shape of a few characters, and the foot pedal (32) is in the shape of a few characters through the foot pedal The hook (35) is hooked in the installation frame (4). 2.根据权利要求1所述的一种带脚踏板的高压输电线路铁塔用钢杆,其特征在于:所述脚踏板(32)与挂钩(35)相对的外侧设置有向上翘起的挡板(36)。 2. A steel pole for a high-voltage transmission line tower with pedals according to claim 1, characterized in that: the outer side of the pedal (32) opposite to the hook (35) is provided with an upwardly tilted Baffle (36). 3.根据权利要求1或者2任一项所述的一种带脚踏板的高压输电线路铁塔用钢杆,其特征在于:所述脚踏板(32)的内侧及挂钩(35)上设置有与安装架(4)上的螺栓孔配合的穿接螺栓(37)用的螺栓孔。 3. A steel pole for a high-voltage transmission line iron tower with pedals according to any one of claims 1 or 2, characterized in that: the inner side of the pedal (32) and the hook (35) are set There are bolt holes for the threading bolts (37) that cooperate with the bolt holes on the mounting frame (4). 4.根据权利要求1所述的一种带脚踏板的高压输电线路铁塔用钢杆,其特征在于:所述杆体侧壁上的安装架(4)上设置有光缆预留架(3)。 4. A steel pole for a high-voltage transmission line tower with pedals according to claim 1, characterized in that: the installation frame (4) on the side wall of the pole body is provided with a reserved frame for optical cables (3) .
CN 201220530515 2012-10-17 2012-10-17 Steel pole provided with foot treadles and used for high-tension transmission line iron tower Expired - Fee Related CN202899720U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220530515 CN202899720U (en) 2012-10-17 2012-10-17 Steel pole provided with foot treadles and used for high-tension transmission line iron tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220530515 CN202899720U (en) 2012-10-17 2012-10-17 Steel pole provided with foot treadles and used for high-tension transmission line iron tower

Publications (1)

Publication Number Publication Date
CN202899720U true CN202899720U (en) 2013-04-24

Family

ID=48120406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220530515 Expired - Fee Related CN202899720U (en) 2012-10-17 2012-10-17 Steel pole provided with foot treadles and used for high-tension transmission line iron tower

Country Status (1)

Country Link
CN (1) CN202899720U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107013050A (en) * 2017-04-21 2017-08-04 五冶集团上海有限公司 Stepping system
CN107035128A (en) * 2017-04-21 2017-08-11 五冶集团上海有限公司 Step device
CN110721444A (en) * 2019-10-20 2020-01-24 国网山西省电力公司晋中供电公司 Detachable feet for transmission line steel towers

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107013050A (en) * 2017-04-21 2017-08-04 五冶集团上海有限公司 Stepping system
CN107035128A (en) * 2017-04-21 2017-08-11 五冶集团上海有限公司 Step device
CN107013050B (en) * 2017-04-21 2020-05-01 五冶集团上海有限公司 Stepping system
CN107035128B (en) * 2017-04-21 2020-05-05 五冶集团上海有限公司 Stepping device
CN110721444A (en) * 2019-10-20 2020-01-24 国网山西省电力公司晋中供电公司 Detachable feet for transmission line steel towers

Similar Documents

Publication Publication Date Title
CN105401714B (en) Attached lifting scaffold and lifting method
CN102535939B (en) Inversely assembling process for standing stay wire V-type tower
CN203128000U (en) Hoisting device for direct-driven wind power generator set
CN202899720U (en) Steel pole provided with foot treadles and used for high-tension transmission line iron tower
CN102082400B (en) Simple line spanning frame
CN203669328U (en) Quick-disassembly high-altitude working hanging basket
CN203128099U (en) Slipping type pipeline lifting device
CN205100531U (en) Lift scaffold support body assembly
CN109252733A (en) Adhesion type is from climbing pole lifting system
CN205873594U (en) Special construction elevator of cooling tower section of thick bamboo wall
CN220376298U (en) Hanging basket lifting device
CN105384097B (en) An operating platform structure applied to high-voltage line operations
CN208648493U (en) A kind of no scaffold installation elevator operation platform device
CN203359890U (en) Small-sized electric pole hoisting device
CN206384755U (en) Tower crane falling proof device above and below one kind
WO2019216866A1 (en) Method of installing tall and super-tall towers
CN214003869U (en) Attached lifting tower crane runway
CN115043343A (en) Light partition board installation construction device and construction method thereof
CN203699783U (en) Hanging bracket fixed with wire pole
CN202899721U (en) Steel pole provided with platform and used for high-tension transmission line iron tower
CN102923600A (en) Reverse pulley fixing device
CN208122299U (en) A kind of concrete of crossing soars aloft beam from climbing monoblock type tub system
CN208934380U (en) A kind of Excitations for Long Span Suspension operating platform
CN111962957A (en) Assembling tool for erecting power line steel pipe pole
CN102889019A (en) Steel pole for iron tower of high-tension transmission line

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130424

Termination date: 20181017

CF01 Termination of patent right due to non-payment of annual fee