[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN202817899U - Orderly power utility precision management device - Google Patents

Orderly power utility precision management device Download PDF

Info

Publication number
CN202817899U
CN202817899U CN 201220421406 CN201220421406U CN202817899U CN 202817899 U CN202817899 U CN 202817899U CN 201220421406 CN201220421406 CN 201220421406 CN 201220421406 U CN201220421406 U CN 201220421406U CN 202817899 U CN202817899 U CN 202817899U
Authority
CN
China
Prior art keywords
load
server
power utilization
orderly
scheme
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220421406
Other languages
Chinese (zh)
Inventor
谭刚
熊磊
黄建军
周玉玲
左庆邻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
Original Assignee
Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd filed Critical Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
Priority to CN 201220421406 priority Critical patent/CN202817899U/en
Application granted granted Critical
Publication of CN202817899U publication Critical patent/CN202817899U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The utility model relates to an orderly power utility precision management device, which is based on a standardization power consumer power utility information acquisition system and realizes the precision management on establishment of an orderly power utility scheme, load control performance analysis, load control operation monitoring, etc. An orderly power utility scheme establishment server is responsible for establishing the orderly power utility scheme and issuing parameters of the orderly power utility scheme; a load performance server is responsible for executing load prediction, real-time load tour detecting and load effect dynamic display based on data acquired from a power utility information acquisition system; a load operation monitoring server is responsible for monitoring execution condition of the orderly power utility scheme, power loss condition of limited power, key user load, power utility load and assessing load control modes; a prepositive server is responsible for communicating with a on-site acquisition terminal and is the only interface for the communication between the orderly power utility scheme establishment server and the on-site acquisition terminal; and a load control terminal is responsible for executing the orderly power utility scheme and is connected with the prepositive server mainly by a G communication channel to obtain a load control instruction.

Description

Orderly power utilization accurate management device
Technical Field
The utility model relates to an orderly power consumption management technical field, specific accurate management device of orderly power consumption that says so.
Background
In recent years, driven by rapid economic development, the electricity consumption of the whole society keeps continuously increasing, the problem of electric energy supply guarantee is increasingly prominent, the problem of large-scale power supply and demand shortage periodically appears, and the contradiction of local and seasonal power shortage exists for a long time. For this reason, the national grid company also continuously deepens the long-acting mechanism construction of orderly power management according to the requirements of specialization, standardization and standardization, and strengthens technical support measures.
Under the background of national shortage of power supply, every city is influenced by factors such as insufficient power installation, vigorous power demand, difficulty in purchasing power from other places and the like, and the contradiction of shortage of power supply and demand is more prominent. The trend of power supply will continue because the installed capacity of newly added power is limited and cannot meet the increase of power demand.
At present, most cities run on line to obtain standardized power consumer electricity information acquisition systems, based on the system, electric energy information can be acquired in real time, and although orderly electricity utilization management can be performed through intelligent terminals installed at special transformer users, the functions of the system have a series of defects in the aspects of special transformer user subdivision, service flow standardized management, negative control performance analysis, negative control scheme monitoring and the like, and the system cannot effectively support the implementation of orderly electricity utilization services. At present, the research of each domestic research unit on the orderly power utilization management is still in a test stage, and a mature and reliable orderly power utilization management device is not realized. Therefore, a specialized orderly power utilization management device needs to be built on the basis of a standardized power utilization information acquisition system of a power consumer to realize the accurate management of orderly power utilization, so that under the condition of short power supply, the livelihood is protected, a good investment environment is provided for the continuous increase of economy, and the satisfaction of common people, enterprises and governments is really achieved in the aspect of power guarantee effect.
Disclosure of Invention
The utility model aims at the not enough of prior art, the accurate management device of a orderly power consumption that provides, the device is based on standardized power consumer power consumption information acquisition system, realizes the accurate management of orderly power consumption scheme formulation, burden accuse performance analysis, burden accuse business control etc..
The utility model adopts the technical proposal that:
an orderly power utilization accurate management device mainly comprises an orderly power utilization scheme making server, a load performance server, a load control service monitoring server, a front server and a load control terminal; wherein,
the orderly power utilization scheme making server is responsible for making corresponding orderly power utilization schemes for different load control users, issuing orderly power utilization scheme parameters to the load control terminal through a front server of the power utilization information acquisition system, and guiding the making of the orderly power utilization schemes by the orderly power utilization scheme case library;
the load performance server is responsible for providing effective load prediction according to historical load data obtained from the power utilization information acquisition system; periodically testing the load data of the load control terminal, and displaying the multi-dimensional load performance on the basis of the tested load data;
the load service monitoring server is responsible for monitoring the execution condition of the ordered power utilization scheme, the condition of power limitation and power loss, the load of key users, the power utilization load and the evaluation of a load control mode;
the front-end server is used for communicating with the field terminal, the front-end server is an interface for establishing a server, the field negative control terminal and the acquisition terminal to communicate according to an orderly power utilization scheme, and the front-end server completes communication channel proxy, channel routing scheduling, communication protocol analysis, task scheduling and data persistence;
the load control terminal is responsible for executing the ordered power utilization scheme and is connected with the front-end server through a communication channel to obtain a load control instruction;
and the acquisition terminal is responsible for acquiring the electric energy data of the field terminal and uploading the acquired electric energy data to the power utilization information acquisition system through a public network channel or a private network channel.
The communication channel comprises a GPRS, CDMA and ADSL public network channel communicated with the load control terminal, and a 230MHz, PSTN and RS232 special line communicated with the acquisition terminal.
The accurate management of orderly power consumption in the utility model information is the business processing means such as intellectuality, the flow that the business was carried out, the transparence of burden accuse performance analysis, the universalization of load business control that the business was carried out through the modeling of burden accuse user segmentation, orderly power consumption scheme institute, realizes promoting comprehensively that orderly power consumption business carries out the level, improves orderly power consumption business operation normalization and the target is carried out to the business of rationality.
The utility model discloses the beneficial effect that can reach is:
(1) the utility model discloses a to burden accuse user's segmentation, can issue the accurate of orderly power consumption scheme to burden accuse family, solve the problem that the object of current load control and power consumption information acquisition system's measurement point do not correspond, realize accurate management.
(2) The utility model realizes load prediction, real-time load patrol and survey and dynamic load effect display according to the data obtained from the power utilization information acquisition system, thereby assisting the formulation of the ordered power utilization scheme and optimizing the management of ordered power utilization;
(3) the utility model discloses can monitor the evaluation of orderly power consumption scheme execution condition, limit for electricity loss electric quantity condition, key user load, power consumption load and burden accuse mode, the effective supervision to orderly power consumption business is realized to the multidimension degree;
(4) compared with the prior art, the utility model device design has simply, convenient to use, adjusts the power consumption condition of power consumption dry season, rich water phase through the device to realize the accurate management of orderly power consumption.
Drawings
FIG. 1 is a diagram of an orderly power utilization precision management device.
The system comprises a power utilization scheme setting server 1, a load performance server 2, a load control service monitoring server 3, a front-end server 4, a load control terminal 5, a communication channel 6 and an acquisition terminal 7.
Detailed Description
The technical solution of the present invention will be described in further detail with reference to the accompanying drawings and embodiments.
Example 1
In fig. 1, an orderly power utilization precision management device comprises:
the system comprises an ordered power utilization scheme making server 1, a load performance server 2, a load control business monitoring server 3, a front-end server 4 and a load control terminal 5 which can be computers.
The ordered power utilization scheme formulating server 1 is responsible for formulating the ordered power utilization scheme according to the sequence of firstly staggering peaks, then avoiding peaks and then limiting power on the premise of ensuring power utilization of resident life, agricultural production, key customers and the like on the basis of subdividing the load control users, and issuing the ordered power utilization scheme parameters to the load control terminal through a front server of the power utilization information acquisition system. The ordered power utilization case library realizes the management of the historical ordered power utilization scheme and the load control execution scheme, forms a case with guiding significance, provides data support for later-stage load control business, and realizes the intelligent development level of the ordered power utilization business.
The load performance server 2 is responsible for analyzing multidimensional historical load curves of industries, lines, transformer substations, power supply units and the like according to user historical load data obtained from the power utilization information acquisition system and by combining various factors such as load control related parameters, user power utilization periods, power utilization seasonal characteristics and the like, and providing an effective load prediction function; and periodically completing load data patrol measurement on the load control terminal, and developing multi-dimensional load performance display on the basis of the patrol measurement load data.
The load service monitoring server 3 is responsible for monitoring the execution condition of the ordered power utilization scheme, the condition of power limitation and power loss, the load of key users, the power utilization load and the evaluation of a load control mode.
The front-end server 4 is responsible for communication with the field terminals. The front-end server 4 is a unique interface for communication between the ordered power utilization scheme setting server 1 and the on-site negative control terminal 5 and the acquisition terminal. The requirements on the real-time performance, the safety, the stability and the like of the server are high, and a multi-front-end processor load balancing networking mode is supported. The front-end server has the functions of communication channel proxy, channel routing scheduling, communication protocol analysis, task scheduling, data persistence and the like.
The load control terminal 5 is responsible for executing the load control instruction, namely, under the condition that the sequential power utilization scheme passes examination and approval and can finish sending the load control parameters, when the load control is carried out at the power utilization peak, a load control task is formulated according to the sequential power utilization scheme to carry out effective load control execution. The system is mainly connected with a preposed server through public network channels such as GPRS, CDMA, ADSL and the like of a communication channel 6 and serial channels such as 230MHz, PSTN, RS232 private line and the like, and receives a load control instruction. The load control execution uses a flow operation mode, the load control execution is normalized, and the safety and the reliability of the load control execution are ensured.
The acquisition terminal 7 refers to various power field terminals such as a special transformer terminal, a public transformer area, a low-voltage centralized meter reading and the like, is mainly used for acquiring power field electric energy data, and uploads the acquired electric energy data to the power utilization information acquisition system through a public network channel or a special network channel.
The above embodiments are only for further explanation of the present invention, and are not intended to limit the present invention, and all equivalent implementations of the present invention should be included in the scope of the claims of the present invention.

Claims (2)

1. An orderly power utilization accurate management device is characterized by mainly comprising an orderly power utilization scheme making server, a load performance server, a load control service monitoring server, a front server and a load control terminal; wherein,
the orderly power utilization scheme making server is responsible for making corresponding orderly power utilization schemes for different load control users, issuing orderly power utilization scheme parameters to the load control terminal through a front server of the power utilization information acquisition system, and guiding the making of the orderly power utilization schemes by the orderly power utilization scheme case library;
the load performance server is responsible for providing effective load prediction according to historical load data obtained from the power utilization information acquisition system; periodically testing the load data of the load control terminal, and displaying the multi-dimensional load performance on the basis of the tested load data;
the load service monitoring server is responsible for monitoring the execution condition of the ordered power utilization scheme, the condition of power limitation and power loss, the load of key users, the power utilization load and the evaluation of a load control mode;
the front-end server is used for communicating with the field terminal, the front-end server is an interface for establishing a server, the field negative control terminal and the acquisition terminal to communicate according to an orderly power utilization scheme, and the front-end server completes communication channel proxy, channel routing scheduling, communication protocol analysis, task scheduling and data persistence;
the load control terminal is responsible for executing the ordered power utilization scheme and is connected with the front-end server through a communication channel to obtain a load control instruction;
and the acquisition terminal is responsible for acquiring the electric energy data of the field terminal and uploading the acquired electric energy data to the power utilization information acquisition system through a public network channel or a private network channel.
2. The orderly power consumption accurate management device as claimed in claim 1, wherein the communication channel comprises a GPRS, CDMA, ADSL public network channel communicating with the negative control terminal, and a 230MHz, PSTN, RS232 private line communicating with the collection terminal.
CN 201220421406 2012-08-23 2012-08-23 Orderly power utility precision management device Expired - Fee Related CN202817899U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220421406 CN202817899U (en) 2012-08-23 2012-08-23 Orderly power utility precision management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220421406 CN202817899U (en) 2012-08-23 2012-08-23 Orderly power utility precision management device

Publications (1)

Publication Number Publication Date
CN202817899U true CN202817899U (en) 2013-03-20

Family

ID=47876711

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220421406 Expired - Fee Related CN202817899U (en) 2012-08-23 2012-08-23 Orderly power utility precision management device

Country Status (1)

Country Link
CN (1) CN202817899U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103779961A (en) * 2013-12-06 2014-05-07 国家电网公司 District transformer intelligent economic operation control system and control method thereof
CN104331769A (en) * 2014-10-29 2015-02-04 国家电网公司 Orderly grid power utilization system and method based on monitoring closed-loop management
CN111817307A (en) * 2020-07-09 2020-10-23 中国南方电网有限责任公司 Power load switching control method and device, computer equipment and storage medium
CN114519501A (en) * 2022-01-13 2022-05-20 上海迈能创豪能源科技有限公司 Orderly power utilization management system based on power gap and supply and demand balance
CN117220416A (en) * 2023-11-03 2023-12-12 国网湖北省电力有限公司武汉供电公司 Smart power grid electric power information safety transmission system

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103779961A (en) * 2013-12-06 2014-05-07 国家电网公司 District transformer intelligent economic operation control system and control method thereof
CN103779961B (en) * 2013-12-06 2016-01-13 国家电网公司 Community becomes intellect economy operation control system and control method thereof
CN104331769A (en) * 2014-10-29 2015-02-04 国家电网公司 Orderly grid power utilization system and method based on monitoring closed-loop management
CN104331769B (en) * 2014-10-29 2017-11-14 国家电网公司 A kind of power network ordered electric system and method based on monitoring closed loop management
CN111817307A (en) * 2020-07-09 2020-10-23 中国南方电网有限责任公司 Power load switching control method and device, computer equipment and storage medium
CN111817307B (en) * 2020-07-09 2022-07-26 中国南方电网有限责任公司 Power load switching control method and device, computer equipment and storage medium
CN114519501A (en) * 2022-01-13 2022-05-20 上海迈能创豪能源科技有限公司 Orderly power utilization management system based on power gap and supply and demand balance
CN117220416A (en) * 2023-11-03 2023-12-12 国网湖北省电力有限公司武汉供电公司 Smart power grid electric power information safety transmission system
CN117220416B (en) * 2023-11-03 2024-01-16 国网湖北省电力有限公司武汉供电公司 Smart power grid electric power information safety transmission system

Similar Documents

Publication Publication Date Title
CN106707778B (en) Intelligent optimization management system for household comprehensive energy based on model predictive control
CN202817899U (en) Orderly power utility precision management device
CN109469157B (en) Secondary water supply system energy consumption monitoring platform and monitoring method
CN102013731B (en) Energy consumption management method
CN102497030A (en) Line-loss actual-measurement and positioning method based on high-voltage electric energy meter and system thereof
CN104165660B (en) A kind of distribution transforming intelligent monitoring terminal calculating winding temperature
CN103617720B (en) One possesses multi-channel control multifunctional meter counter device
CN202033394U (en) Data center power usage effectiveness (PUE) acquiring and displaying system
CN204494705U (en) Air-conditioning energy consumption detection system
CN202103702U (en) Energy consumption subitem metering system for large-scale public building
CN201378356Y (en) Building energy-consumption data collector
CN213072726U (en) Power distribution network architecture system based on intelligent concentrator
CN104269895A (en) Integrated intelligent charging parking garage for electric passenger car
CN108226664A (en) A kind of user side electric energy quality synthesis evaluation system and method
CN202872466U (en) Power using information acquisition system
Fan et al. Design and application of integrated distribution network line loss analysis system
CN202904325U (en) Electric energy consumption data remote-monitoring matching device
CN202886434U (en) Civil metering ammeter electricity theft and leakage monitoring system
CN118408312A (en) Portable energy efficiency detection and analysis system for refrigeration machine room
CN205787812U (en) Energy monitoring platform for heavy construction
CN111145525B (en) Water-gas-electricity three-meter wireless self-organizing meter reading control system and method
Yang et al. The design of smart meter with power quality monitoring
CN208539935U (en) A kind of electric quantity metering and monitoring device of energy-storage battery
CN201904656U (en) Energy consumption management system
CN202975741U (en) Energy management system used in hotels

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130320

Termination date: 20150823

EXPY Termination of patent right or utility model