The utility model content
The utility model provides a kind of concrete distributing device and concrete mixer, to improve the durability of concrete pump truck arm, makes simultaneously the stay pipe of fixed ducts be convenient to dismounting and change.For this reason, the utility model embodiment adopts following technical scheme:
A kind of concrete distributing device comprises the first stay pipe, carrier pipe and jib, wherein:
Carrier pipe is fixedly connected with the first end of the first stay pipe;
The second end and the jib of the first stay pipe are bolted to connection.
Preferably,
Also comprise the second stay pipe;
The second end of the first stay pipe, the first end of the second stay pipe and the second end are respectively arranged with flange;
The flange of the first stay pipe the second end is arranged at the outside of the first side plate of jib, the flange of the second stay pipe first end is arranged at the inboard of the first side plate of jib, and the flange of the first stay pipe the second end, flange and first side plate of the second stay pipe first end are bolted to connection;
The flange of the second stay pipe the second end and the second side plate of jib are bolted to connection.
Preferably,
Be provided with installing hole on the second side plate of jib, the radius of installing hole is greater than the radius of the second stay pipe first end flange, less than the radius of the second stay pipe the second end flanges;
The flange of the first end of the second stay pipe passes the inboard that installing hole is positioned over jib the first side plate, and the flange of the second stay pipe the second end is bolted in the outside of the second side plate.
Preferably, be used for fixing the head of screw of bolt of the flange of flange, the second stay pipe first end of the first stay pipe the second end and the first side plate and the flange welding of the second stay pipe first end.
Preferably, the inboard of the second side plate is provided with pad, and the flange of pad, the second side plate and the second stay pipe the second end is bolted to connection, and the head of screw and pad welding.
Preferably,
Be respectively equipped with the first installing hole and the second installing hole on the first side plate of jib, the second side plate;
The axial two ends of the first installing hole are respectively arranged with the first outer retainer ring and the first interior retainer ring, and the axial two ends of the second installing hole are respectively arranged with the second outer retainer ring and the second interior retainer ring;
The second end of the first stay pipe passes the first outer retainer ring, the first installing hole, the first interior retainer ring, the second interior retainer ring, the second installing hole, the second outer retainer ring successively;
The first outer retainer ring, the first side plate and the first interior retainer ring are bolted to connection, and the second interior retainer ring, the second side plate, the second outer retainer ring are bolted to connection;
The first stay pipe is fixedly connected with in the first outer retainer ring, the first interior retainer ring, the second interior retainer ring, the second outer retainer ring at least one.
Preferably,
The first side plate of jib and the second side plate are by forming along the superstructure that separates on the length direction of jib and substructure;
The bottom of the superstructure of the first side plate is provided with mounting groove on first, and the top of the substructure of the first side plate is provided with mounting groove first time, and mounting groove and first time mounting groove consist of the first installing hole on first;
The bottom of the superstructure of the second side plate is provided with mounting groove on second, and the top of the substructure of the second side plate is provided with mounting groove second time, and mounting groove and second time mounting groove consist of the second installing hole on second.
Preferably, be used for to connect the nut-welding of bolt of the first outer retainer ring, the first side plate and the first interior retainer ring at the first interior retainer ring;
Be used for to connect the nut-welding of bolt of the second interior retainer ring, the second side plate, the second outer retainer ring at the second interior retainer ring.
Preferably, the material of jib is aluminium alloys.
A kind of concrete mixer comprises aforesaid concrete distributing device.
Compared with prior art, the concrete distributing device that the utility model embodiment provides comprises the first stay pipe, carrier pipe and jib, wherein, carrier pipe is fixedly connected with the first end of the first stay pipe, and the second end and the jib of the first stay pipe are bolted to connection.By this structure, need not to weld at the side plate of jib, in the process of using, jib is not prone to fatigue cracking, can improve the durability of concrete pump truck arm, and, with respect to the mode of welding, adopt the connected mode of bolt can make the stay pipe of fixed ducts be convenient to dismounting and change.
The specific embodiment
For specifying the technical solution of the utility model and effect, below in conjunction with specific embodiments and the drawings the utility model is done detailed description.
The utility model embodiment provides a kind of concrete distributing device, comprises the first stay pipe 1, carrier pipe 2 and jib 3, and wherein: carrier pipe 2 is fixedly connected with the first end of the first stay pipe 1; The second end and the jib 3 of the first stay pipe 1 are bolted to connection.The first stay pipe 1 is preferably steel cylindrical tube.Wherein, jib 3 comprises top board 31, base plate 32, the first side plate 33 and the second side plate 34.The first end that can adopt bent plate 8 and U-bolt 9 to fix carrier pipe 2, the first stay pipes 1 is fixed with bent plate 8, and carrier pipe 2 is fixed on the bent plate 8 by U-bolt 9.The one side that bent plate 8 protrudes can be fixed on the first end of the first stay pipe 1, the two ends of bent plate 8 are provided with bolt hole, and the two ends of U-bolt 9 are fixed in two bolts hole by nut respectively, thereby U-bolt 9 can be fixed on carrier pipe 2 on the bent plate 8.
The first stay pipe 1 and jib 3 adopt the fixing structure of bolt, need not to weld at the side plate of jib, the corresponding load ability that also can not reduce the jib side plate, in the process of using, jib is not prone to fatigue cracking, thereby can improve the durability of concrete pump truck arm, and, with respect to the mode of welding, adopt the structure of the connection of bolt can make the stay pipe of fixed ducts be convenient to dismounting and change.
Preferably, the material of jib 3 can be aluminium alloys.The material of jib 3 adopts aluminium alloys, can alleviate the weight of jib.
The below has provided respectively the instantiation of two kind of first stay pipe 1 and jib 3 syndetons:
Structure one
Shown in Fig. 1, Fig. 2, Fig. 3 (Fig. 3 is the A-A cross section view of Fig. 1), the syndeton of the first stay pipe 1 and jib 3 can be specially: also comprise the second stay pipe 4; The second end of the first stay pipe 1, the first end of the second stay pipe 4 and the second end are respectively arranged with flange; The flange of the first stay pipe 1 second end is arranged at the outside of the first side plate 33 of jib 3, the flange of the second stay pipe 4 first ends is arranged at the inboard of the first side plate 33 of jib 3, and flange and first side plate 33 of the flange of the first stay pipe 1 second end, the second stay pipe 4 first ends are bolted to connection; The flange of the second stay pipe 4 second ends and the second side plate 34 of jib 3 are bolted to connection.The second stay pipe 4 is preferably cylindrical tube.
Position corresponding on the flange of the flange of the first stay pipe 1 second end and the second stay pipe 4 first ends is provided with bolt hole, the position of corresponding erection bolt at the first side plate 33 also is provided with bolt hole, thereby, can the first stay pipe 1 and the second stay pipe 4 be fixed on by bolt the both sides of the first side plate 33.In addition, flange and second side plate 34 of the second stay pipe 4 second ends also can be bolted to connection, and can bolt hole be set at flange and second side plate 34 of the second stay pipe 4 second ends, are used for erection bolt.By the setting of the second stay pipe 4, can increase the intensity of jib 3 and the first stay pipe 1 fixed point, prevent deformation.
Concrete, being provided with installing hole 5 on the second side plate 34 of jib 3, the radius of installing hole 5 is greater than the radius of the second stay pipe 4 first end flanges, less than the radius of the second stay pipe 4 second end flanges; The flange of the second stay pipe 4 first ends passes installing hole 5, is bolted in the inboard of the first side plate 33, and the flange of the second stay pipe 4 second ends is bolted in the outside of the second side plate 34.
The length of the second stay pipe 4 equals the distance between the first side plate 33 and the second side plate 34, thereby when the flange of the second stay pipe 4 first ends was fixed on the first side plate 33 inboard, the flange of the second stay pipe 4 second ends can contact with the outside of the second side plate 34.Position that can (around the installing hole 5) is corresponding on the flange of the second stay pipe 4 second ends and the second side plate 34 arranges bolt hole, is used for erection bolt.By the setting of installing hole 5, can install more easily and fix the second stay pipe 4 and the first stay pipe 1.
Concrete, be used for fixing the flange of flange, the second stay pipe 4 first ends of the first stay pipe 1 second end and the first side plate 33 bolt screw head can with the flange welding of the second stay pipe 4 first ends.In addition, the inboard of the second side plate 34 can be provided with pad 6, and the flange of pad 6, the second side plate 34 and the second stay pipe 4 second ends is bolted to connection, and the head of screw and pad 6 welding.Wherein, the shape of pad 6 can be circular arc, can adopt two pads 6 to be separately positioned on the excircle of installing hole.Can make the second stay pipe 4 be connected ground with the second side plate 34 by pad 6 more fastening.The second stay pipe 4 is installed to the interior rear flank of jib 3 first side plates 33 by installing hole 5, the space of jib 3 inside is closed, and is not easy to carry out fastening to bolt.And the head of the screw of bolt is welded on the flange of the second stay pipe 4 first ends, when placing the second stay pipe 4, screw is passed from corresponding bolt hole, and screw reaches the outside of the first side plate 33 by bolt hole, thereby it is fastening to use easily nut to carry out.In like manner, the head of the screw of bolt is welded on the pad 6, screw is passed bolt hole on the second side plate 34 from inside to outside, and pad is sticked on the inboard of the second side plate 34, after the second stay pipe 4 is in place, screw reaches the outside of the second side plate 34 by bolt hole, thereby it is fastening to use easily nut to carry out.
Based on this structure, the installation procedure of the first stay pipe 1, the second stay pipe 4 and jib 3 can comprise the steps:
Step 1 is inserted into the screw of bolt in the bolt hole of pad 6, and with head and pad 6 welding of screw.Can adopt two circular arc pads 6, and at each pad 6 two bolts hole are set.
Step 2 passes above-mentioned screw from inside to outside by the bolt hole on the second side plate 34, and pad 6 is sticked on the inwall of the second side plate 34.
Step 3 is inserted into screw in the bolt hole on the second stay pipe 4 first end flanges, and with head and the flange welding of screw.
Step 4, aim at the outside that bolt hole on the first side plate 33 passes the first side plate 33 with being welded on screw on the second stay pipe 4 first end flanges, and the bolt hole on the second stay pipe 4 second end flanges aimed at be inserted in the screw that is welded on the pad 6, make the second stay pipe 4 second end flanges be attached to the outside of the second side plate 34, at the screw that passes the second stay pipe 4 second end flanges nut of screwing on.
Step 5, with the bolt hole alignment sleeve on the first stay pipe 1 second end flanges on the screw that is welded on the second stay pipe 4 first end flanges, and at the screw that passes the first stay pipe 1 second end flanges nut of screwing on.
Structure two
Such as Fig. 4, Fig. 5, shown in Figure 6, the syndeton of the first stay pipe 1 and jib 3 can be specially: be respectively equipped with the first installing hole and the second installing hole on the first side plate 33 of jib 3, the second side plate 34; The axial two ends that the axial two ends of the first installing hole are respectively arranged with the first outer retainer ring 71 and the first interior retainer ring 72, the second installing holes are respectively arranged with the second outer retainer ring 73 and the second interior retainer ring 74; The second end of the first stay pipe 1 passes the first outer retainer ring 71, the first installing hole, the first interior retainer ring 72, the second interior retainer ring 74, the second installing hole, the second outer retainer ring 73 successively; The first outer retainer ring 71, the first side plate 33 and the first interior retainer ring 72 are bolted to connection, and the second interior retainer ring 74, the second side plate 34, the second outer retainer ring 73 are bolted to connection; The first stay pipe 1 is fixedly connected with in the first outer retainer ring 71, the first interior retainer ring 72, the second interior retainer ring 74, the second outer retainer ring 73 at least one.On the first side plate 33 of jib 3 and the second side plate 34, all establish installing hole, make the first stay pipe 1 can pass jib 3, be equipped with retainer ring in the interior outside of the first side plate 33 and the second side plate 34, can make the bolt at two installing hole places connect more fastening; A retainer ring is all established in the outside in each installing hole, makes that any is fixedly connected with the first stay pipe 1 in 4 retainer rings, can make the first stay pipe 1 axial restraint; Such structure can increase jib 3 and the intensity that the first stay pipe 1 is connected, and prevents deformation.
Preferably, the first side plate 33 of jib 3 and the second side plate 34 are by forming along the superstructure that separates on the length direction of jib 3 and substructure; The bottom of the superstructure of the first side plate 33 is provided with mounting groove on first, and the top of the substructure of the first side plate 33 is provided with mounting groove first time, and mounting groove and first time mounting groove consist of the first installing hole on first; The bottom of the superstructure of the second side plate 34 is provided with mounting groove on second, and the top of the substructure of the second side plate 34 is provided with mounting groove second time, and mounting groove and second time mounting groove consist of the second installing hole on second.The biside plate of jib 3 forms by superstructure and substructure, can be so that the installation of the inside and outside retainer ring of installing hole.
Wherein, mounting groove can be semicircle, and the first stay pipe 1 can be for cylindrical, and the radius of mounting groove can equal the radius of the first stay pipe 1.Two bolts hole can be set in the edge of each mounting groove, and corresponding on the first outer retainer ring 71 and the first interior retainer ring 72 and on the second interior retainer ring 74 and the second outer retainer ring 73 four bolts hole are set, two bolts hole are corresponding with bolt hole on the superstructure in four bolts hole, and two bolts hole are corresponding with bolt hole on the substructure.The first stay pipe 1 can with the first outer retainer ring 71, the first interior retainer ring 72, the second outer retainer ring 73 and the 4th interior retainer ring 74 in any welding.The first outer retainer ring 71, the first interior retainer ring 72, the second interior retainer ring 74 and the second outer retainer ring 73 are preferably annular, and the radius of the interior ring of the retainer ring that can intert for the first stay pipe 1 on it can be identical with the radius of the first stay pipe 1.
Preferably, be used for to connect the nut-welding of bolt of the first outer retainer ring 71, the first side plate 33 and the first interior retainer ring 72 at the first interior retainer ring 72; Be used for to connect the nut-welding of bolt of the second interior retainer ring 74, the second side plate 34, the second outer retainer ring 73 at the second interior retainer ring 74.After the superstructure of two side plates of jib 3 and substructure put together, the enclose inside of jib 3, may bring inconvenience to fastening bolt, nut is welded on the first interior retainer ring 72 and the second interior retainer ring 74 in advance, can easily screw be screwed into from jib 3 outsides carry out the nut fastening.
Based on this structure, the installation procedure of the first stay pipe 1, jib 3 can comprise the steps:
Step 1 is placed on jib 3 on the workbench by the part jib that the substructure of the substructure of base plate 32, the first side plate 33 and the second side plate 34 consists of.
Step 2 is with the bolt hole place of nut-welding at the first interior retainer ring 72 and the second interior retainer ring 74.Step 3, the first stay pipe 1 is passed the first outer retainer ring 71, the first interior retainer ring 72, the second interior retainer ring 74, the second outer retainer ring 73 successively, and in the first outer retainer ring 71, the first interior retainer ring, the second interior retainer ring, the second outer retainer ring 73 any is welded on predetermined installation site on the first stay pipe 1.
Step 4, the first stay pipe 1 is placed in first time mounting groove and the second time mounting groove, the first outer retainer ring 71, the first interior retainer ring 72 are positioned at the both sides of first time mounting groove, the second interior retainer ring 74, the second outer retainer ring 73 are positioned at the both sides of second time mounting groove, ecto-entad penetrates the substructure of the first outer retainer ring 71, the first side plate 33 and the bolt hole on the first interior retainer ring 72 with screw, and ecto-entad penetrates the substructure of the second outer retainer ring 73, the second side plate 34 and the bolt hole on the second interior retainer ring 74 with screw, and and nut screwing clamping.
Step 5, cover the part jib that the top by the superstructure of top board 31, the first side plate 33 and the second side plate 34 of jib 3 consists of, ecto-entad penetrates the superstructure of the first outer retainer ring 71, the first side plate 33 and the bolt hole on the first interior retainer ring 72 with screw, and ecto-entad penetrates the superstructure of the second outer retainer ring 73, the second side plate 34 and the bolt hole on the second interior retainer ring 74 with screw, and and nut screwing clamping.
The utility model embodiment also provides a kind of concrete mixer, comprises aforesaid concrete distributing device.
Among the utility model embodiment, concrete distributing device comprises the first stay pipe, carrier pipe and jib, and wherein, carrier pipe is fixedly connected with the first end of the first stay pipe, and the second end and the jib of the first stay pipe are bolted to connection.By this structure, need not to weld at the side plate of jib, in the process of using, jib is not prone to fatigue cracking, can improve the durability of concrete pump truck arm, and, with respect to the mode of welding, adopt the connected mode of bolt can make the stay pipe of fixed ducts be convenient to dismounting and change.
The above only is preferred embodiment of the present utility model; should be pointed out that for those skilled in the art, under the prerequisite that does not break away from the utility model principle; can also make some improvements and modifications, these improvements and modifications also should be looked protection domain of the present utility model.