- Publication number
- CN202657861U CN202657861U CN 201220337141 CN201220337141U CN202657861U CN 202657861 U CN202657861 U CN 202657861U CN 201220337141 CN201220337141 CN 201220337141 CN 201220337141 U CN201220337141 U CN 201220337141U CN 202657861 U CN202657861 U CN 202657861U
- Authority
- CN
- China
- Prior art keywords
- longeron
- well
- pipeline
- pound
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model provides a pipeline assembly trolley. The trolley comprises an upper frame consisting of a pair of upper longitudinal beams and a pair of upper cross beams, wherein a stand column is arranged on the lower side of the upper frame, and the lower end of the stand column is connected with a lower longitudinal beam; an upper longitudinal beam rail is arranged inside each upper longitudinal beam, and a pound-shaped beam structure is arranged inside the upper longitudinal beam rail; the pound-shaped beam structure comprises cross beams of the pound-shaped beam and longitudinal beams of the pound-shaped beam; two ends of each cross beam of the pound-shaped beam are matched with the upper longitudinal beam rail through a traveling bearing, and two ends of each longitudinal beam of the pound-shaped beam are matched with the rail inside the cross beams of the pound-shaped beam through the traveling bearing; and a chain block is arranged on the longitudinal beam of the pound-shaped beam. The pipeline assembly trolley is simple in structure and practical in functions, can well complete the adjustment to the position of a pipeline to be assembled in a three-dimensional direction, and can guarantee quick location and assembly of the pipeline.
Description
Technical field
The utility model relates to a kind of pipeline chassis is installed.
Background technology
At present, large-scale pipeline is installed normal large-tonnage wheel crane or the gauntry crane of adopting and is installed because bore is large, weight is large.Prior art existing problems and not enough: utilize large-tonnage vapour crane pipe laying to have very strong manoevreability and alerting ability, shortcoming is often to be subjected to the restriction of workyard and to increase constructional difficulties.Large-scale pipeline is installed needs the multi-section large tonnage crane unite use usually, and the cooperation between the crane, commander's difficulty are very large.The large tonnage crane arm is long, and pipeline installation fineness is high, and installation rate is slow, and is high to the operating personal technical requirements.The operating costs of large tonnage crane is high, takies personnel many.
The gauntry crane pipe laying has the advantages such as speed of application is fast, the personnel that take are few, efficient is high, quality is good, safe.Shortcoming is limited by on-the-spot place, and the other gauntry crane track of need to mating formation has requirement to intensity, the planeness of track foundation, and the track construction cycle of mating formation is long, and expense is high.
The utility model content
The utility model provides a kind of pipeline that chassis is installed, and greatly improves the ability that pipeline is installed, and reduces the expense that pipeline is installed, and guarantees the quality that pipeline is installed.
In order to solve the problems of the technologies described above, the utility model adopts following technical scheme: a kind of pipeline is installed chassis, comprises the upper frame that is comprised of a pair of upper longeron and a pair of entablatrance, and the upper frame downside is provided with column, and the lower end of column connects by lower longeron; Upper longeron inboard is provided with the longeron track, be provided with " well " word girder construction in the upper longeron track, described " well " word girder construction comprises " well " word beam crossbeam and " well " word beam longeron, " well " word beam crossbeam two ends cooperate with upper longeron track by the walking bearing, and " well " word beam longeron two ends cooperate by the inboard track that arranges of walking bearing and " well " word beam crossbeam; On " well " word beam longeron chain and tackle block is installed.
Be provided with diagonal brace between column middle and lower part and the entablatrance.
Column and upper longeron, lower longeron junction are provided with reinforced company's fishplate bar.
Column arranges six, respectively perpendicular to upper longeron setting and be separately positioned on upper longeron two ends and central authorities.
The utility model is simple in structure, practical function, and the fine position adjustment of finishing on the pipeline stereoscopic three-dimensional direction to be installed has guaranteed fast in place and installation of pipeline.
The utility model specifically has following advantage: chassis processing is simple, and installation, conveniently moving are easy and simple to handle, and convenient the popularization is with low cost; The chassis pipe laying is quick, required artificial few, and expense is low; The chassis size can be manufactured according to bore and place, the camp site situation amount body of pipe laying; Trolley running available elevator machine travel in place or machinery (bulldozer) mode of traction.
Description of drawings
Fig. 1 is front view of the present utility model;
Fig. 2 is lateral plan of the present utility model;
Fig. 3 is the structural representation of " well " word girder construction.
The specific embodiment
Embodiment: as Figure 1-3, a kind of pipeline is installed chassis, comprises the upper frame that is comprised of a pair of upper longeron 11 and a pair of entablatrance 4, and the upper frame downside is provided with column 2, and the lower end of column 2 connects by lower longeron 1; Upper longeron 11 inboards are provided with the longeron track, be provided with " well " word girder construction in the upper longeron track, described " well " word girder construction comprises " well " word beam crossbeam 5 and " well " word beam longeron 6, " well " word beam crossbeam 5 two ends cooperate with upper longeron 11 tracks by walking bearing 9, and " well " word beam longeron 6 two ends cooperate with " well " word beam crossbeam 5 inboard tracks that arrange by walking bearing 10; The chain and tackle block 7 that is used for riser tubing is installed on " well " word beam longeron 6.Be provided with diagonal brace 3 between column 2 middle and lower parts and the entablatrance 4.Column 2 is provided with reinforced company's fishplate bar 8 with upper longeron 11, lower longeron 1 junction.Column 2 arranges six, arranges and be separately positioned on upper longeron 11 two ends and central authorities perpendicular to upper longeron 11 respectively.
Use procedure:
Chassis is in place: promote chassis by the winch traction or by bulldozer, loader, move to pipeline location;
The pipeline vertical direction is in place: utilize chain and tackle block on chassis " well " the word beam longeron pipeline of slinging, adjust duct height and make it to meet designing requirement;
The pipe level direction is in place: utilize manual lifting screw to promote chassis " well " word beam longeron and carry out parallel motion, reach adjustment pipe level position and make it installing on the axis;
Pipeline axial is in place: utilize manual lifting screw to promote chassis " well " word beam crossbeam and move axially, carry out the docking of pipeline opening (bell and spigot);
Restrained line unclasps chain and tackle block, finishes pipeline and installs.
Claims (4)
1. a pipeline is installed chassis, and it is characterized in that: comprise the upper frame that is comprised of a pair of upper longeron and a pair of entablatrance, the upper frame downside is provided with column, and the lower end of column connects by lower longeron; Upper longeron inboard is provided with the longeron track, be provided with " well " word girder construction in the upper longeron track, described " well " word girder construction comprises " well " word beam crossbeam and " well " word beam longeron, " well " word beam crossbeam two ends cooperate with upper longeron track by the walking bearing, and " well " word beam longeron two ends cooperate by the inboard track that arranges of walking bearing and " well " word beam crossbeam; On " well " word beam longeron chain and tackle block is installed.
2. pipeline according to claim 1 is installed chassis, it is characterized in that: be provided with diagonal brace between column middle and lower part and the entablatrance.
3. pipeline according to claim 2 is installed chassis, and it is characterized in that: column and upper longeron, lower longeron junction are provided with reinforced company's fishplate bar.
4. pipeline according to claim 3 is installed chassis, and it is characterized in that: column arranges six, respectively perpendicular to upper longeron setting and be separately positioned on upper longeron two ends and central authorities.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220337141 CN202657861U (en) | 2012-07-12 | 2012-07-12 | Pipeline assembly trolley |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220337141 CN202657861U (en) | 2012-07-12 | 2012-07-12 | Pipeline assembly trolley |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202657861U true CN202657861U (en) | 2013-01-09 |
Family
ID=47452782
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220337141 Expired - Fee Related CN202657861U (en) | 2012-07-12 | 2012-07-12 | Pipeline assembly trolley |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202657861U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105540448A (en) * | 2016-02-03 | 2016-05-04 | 湖南三一石油科技有限公司 | Pipe column lifting mechanism and pipe column conveying device |
CN112856038A (en) * | 2019-11-27 | 2021-05-28 | 中国石油天然气集团有限公司 | Pipeline assembly device |
-
2012
- 2012-07-12 CN CN 201220337141 patent/CN202657861U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105540448A (en) * | 2016-02-03 | 2016-05-04 | 湖南三一石油科技有限公司 | Pipe column lifting mechanism and pipe column conveying device |
CN112856038A (en) * | 2019-11-27 | 2021-05-28 | 中国石油天然气集团有限公司 | Pipeline assembly device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103334381B (en) | Full-bracket track-bogie bearing and moving device and construction method for installing steel box girders | |
CN102633194B (en) | Railway crane for high-speed railway rescue and construction | |
CN201825671U (en) | Hoisting trolley for track plate | |
CN102051860B (en) | Bridge erecting and track laying machine for railway | |
CN203428790U (en) | Crawler-type hydraulic loader-unloader | |
CN102862580A (en) | Overline operation crane for high-speed railways | |
CN105002831A (en) | Wheel-rail type loading and traveling cable crane | |
CN103074829B (en) | Railway switch changing construction method and railway switch track laying unit thereof | |
CN103628416B (en) | Stiffening girder of suspension bridge is to pulling type pier side bracket | |
CN201933415U (en) | Highway and railway twin-girder bridge erection machine | |
CN201634332U (en) | Heavy girder gantry crane | |
CN202657861U (en) | Pipeline assembly trolley | |
CN204343172U (en) | A kind of Bridge Erector | |
CN204152426U (en) | A kind of quick removal of home rig of hydraulic cylinder raising | |
CN104533461B (en) | A kind of tunnel construction trolley horizontal mobile device | |
CN202657865U (en) | Railway crane used for high speed railway and track traffic overline work | |
CN202429889U (en) | Crane travel mechanism for bridge crane | |
CN104875670A (en) | Conveying vehicle special for tower drum | |
CN201305409Y (en) | Bridge crane | |
CN204778394U (en) | Crane cart running gear | |
CN202705904U (en) | Small-radius hydraulic power tyre bridge girder erection machine | |
CN202429915U (en) | Large-tonnage lifting hook overhead crane | |
CN104514200B (en) | The rear auxiliary support apparatus of large-tonnage Bridge Erector | |
CN204875543U (en) | Wheel rail formula load walking cable carries loop wheel machine | |
CN203373673U (en) | Hauler used for bailey beam dismounting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130109 Termination date: 20200712 |
|