CN202467877U - Fore support for roadway provided with one group of two frames - Google Patents

Fore support for roadway provided with one group of two frames Download PDF

Info

Publication number
CN202467877U
CN202467877U CN2012200829321U CN201220082932U CN202467877U CN 202467877 U CN202467877 U CN 202467877U CN 2012200829321 U CN2012200829321 U CN 2012200829321U CN 201220082932 U CN201220082932 U CN 201220082932U CN 202467877 U CN202467877 U CN 202467877U
Authority
CN
China
Prior art keywords
hinged
body frame
main frame
base
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200829321U
Other languages
Chinese (zh)
Inventor
吕品
杜伟娟
耿彪
方涛
王兴龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU COAL MACHINERY INTEGRATED EQUIPMENT CO Ltd
Original Assignee
ZHENGZHOU COAL MACHINERY INTEGRATED EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU COAL MACHINERY INTEGRATED EQUIPMENT CO Ltd filed Critical ZHENGZHOU COAL MACHINERY INTEGRATED EQUIPMENT CO Ltd
Priority to CN2012200829321U priority Critical patent/CN202467877U/en
Application granted granted Critical
Publication of CN202467877U publication Critical patent/CN202467877U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a fore support for a roadway provided with one group of two frames. The fore support comprises a main frame and an auxiliary frame, wherein the main frame and the auxiliary frame both comprise bases, top beams, and upright posts arranged between the bases and the top beams; the auxiliary frame is arranged between open forks of the main frame; the front end of the base of the main frame is hinged with the front end of the base of the auxiliary frame through a push jack; the base at the front end of the auxiliary frame is provided with a frame adjusting jack; both sides of the main frame are respectively hinged with a protective top plate, and the protective top plates are respectively hinged with the top beam of the main frame through side picking jacks; the back end of the top beam of the main frame is hinged with an outrigger, and the outrigger is hinged with the back end of the top beam of the main frame through a back picking jack; and the outrigger is provided with a backwards stretched telescopic beam. The fore support, provided by the utility model, has the advantages that the automation of the fore support is realized, and the safe and effective production of a mining work surface is ensured. According to the utility model, the advance speed of the work surface is accelerated and the efficiency of a fully-mechanized work surface is fully exerted; furthermore, the fore reinforced support is satisfied, and the repeated support of the roadway top plate is avoided.

Description

Two one group of tunnel advance timberings
Technical field
The utility model relates to down-hole fully-mechanized mining working faces end head support, especially relates to two one group of tunnel advance timberings.
Background technology
According to " safety regulations in coal mine " regulation, all emergency exits of coal-face are in the 20 meters scopes in junction, tunnel, must add strong supporting.The head-room of fully-mechanized mining working in this scope must not be lower than 1.8 meters, promptly adopts in the 20 meters scopes in face two lanes and must take the advance support measure.The most of mining area of China coal-face lame advanced supporting mainly carries out supporting with individual prop complexed metal articulated roof beam at present, and this supporting method supporting intensity is low on the one hand, and it is many that individual prop bores the end, returns and removes difficulty; Return on the other hand and all adopt manpower when removing, labour intensity is big, the most important thing is that support cost is high, poor stability.
Summary of the invention
The utility model purpose is to provide two high, safe and reliable one group of tunnel advance timberings of a kind of automaticity.
For realizing above-mentioned purpose, the utility model is taked following technical proposals:
Described two one group of tunnel advance timberings of the utility model comprise body frame and subframe; Said body frame and subframe constitute by base, back timber, the column that is arranged between base and the back timber; Said subframe is arranged on said body frame and opens between the crotch; Body frame base front end is hinged through passing jack and subframe base front end; Subframe front end base is provided with transfers the frame jack; Be hinged with respectively in the both sides of body frame and protect top board, saidly protect that top board is chosen jack through side respectively and the body frame back timber is hinged; Be hinged with outrigger at the body frame top beam rear end, said outrigger through after choose jack and the body frame top beam rear end is hinged; Flexible backward extensible canopy is installed on outrigger.
Between the front and rear of said major and minor base and major and minor back timber, be respectively arranged with two connecting rods and quadric chain.
The utility model advantage is to realize the automation of advance support, ensures the safe and efficient production of exploitation work plane.When moving frame, be fulcrum, handle the subframe column and make subframe break away from top board a little, pass jack and stretch out, the subframe reach with the body frame.Handle the subframe column then and make the subframe back timber prop up top board, and make column reach setting load; Handling the body frame column and make body frame break away from top board a little, is fulcrum with the subframe, passes the jack withdrawal, the body frame reach.The subframe front end is provided with one and transfers the frame jack, the left and right sides position of adjustment support in the tunnel in the support walking process.Because set cap is longer, the stabilizing mechanism of support is arranged on two ends, and the rear end is provided with quadric chain, and front end is set up one two linkage, has strengthened the anti-twisting property and the stability of support.The back timber of support, base adopt the segmented box section, and be simple and reliable for structure.The body frame rear end is provided with outrigger and extensible canopy, and extensible canopy is positioned at outrigger, and is capable of expansion and contraction during work, helps control.Body frame back timber both sides are provided with protects top board, can protect pedestrains safety.This novel cost of winning that reduced has been accelerated the fltting speed of work plane, has given full play to the usefulness of fully mechanized coal face; Can satisfy and add strong supporting in advance, can avoid back to support repeatedly again.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Fig. 2 is the left TV structure sketch map of Fig. 1.
Fig. 3 is the plan structure sketch map of Fig. 1.
The specific embodiment
Like Fig. 1,2, shown in 3, described two one group of tunnel advance timberings of the utility model comprise body frame and subframe; Said body frame and subframe constitute by base, back timber, the column that is arranged between base and the back timber; Said subframe is arranged on said body frame and opens between the crotch; Body frame base front end is hinged with subframe base front end through passing jack 1; Subframe base front end is provided with transfers frame jack 2; Be hinged with respectively in the both sides of body frame back timber and protect top board 3, saidly protect top board 3 to choose jack 4 through side respectively hinged with body frame back timber 5; Be hinged with outrigger 6 in body frame back timber 5 rear ends, said outrigger 6 through after to choose jack 7 hinged with body frame back timber 5 rear ends; Flexible backward extensible canopy 8 is installed in outrigger 6.Between the front and rear of major and minor base and major and minor back timber 9, be respectively arranged with two linkages 10 and quadric chains 11.

Claims (2)

1. two one group of tunnel advance timberings comprise body frame and subframe; Said body frame and subframe constitute by base, back timber, the column that is arranged between base and the back timber; It is characterized in that: said subframe is arranged on said body frame and opens between the crotch; Body frame base front end is hinged with subframe base front end through passing jack (1); Subframe base front end is provided with transfers frame jack (2); Be hinged with respectively in the both sides of body frame and protect top board (3), saidly protect top board (3) to choose jack (4) through side respectively hinged with body frame back timber (5); Be hinged with outrigger (6) in body frame back timber (5) rear end, said outrigger (6) through after to choose jack (7) and body frame back timber (5) rear end hinged; Flexible backward extensible canopy (8) is installed on outrigger (6).
2. according to claim 1 two one group of tunnel advance timberings is characterized in that: between the front and rear of said major and minor base and major and minor back timber (9), be respectively arranged with two linkages (10) and quadric chain (11).
CN2012200829321U 2012-03-07 2012-03-07 Fore support for roadway provided with one group of two frames Expired - Fee Related CN202467877U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200829321U CN202467877U (en) 2012-03-07 2012-03-07 Fore support for roadway provided with one group of two frames

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200829321U CN202467877U (en) 2012-03-07 2012-03-07 Fore support for roadway provided with one group of two frames

Publications (1)

Publication Number Publication Date
CN202467877U true CN202467877U (en) 2012-10-03

Family

ID=46916042

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200829321U Expired - Fee Related CN202467877U (en) 2012-03-07 2012-03-07 Fore support for roadway provided with one group of two frames

Country Status (1)

Country Link
CN (1) CN202467877U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113803099A (en) * 2020-06-17 2021-12-17 李信斌 Support structure, supporting equipment and coal mining complete equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113803099A (en) * 2020-06-17 2021-12-17 李信斌 Support structure, supporting equipment and coal mining complete equipment
CN113803099B (en) * 2020-06-17 2024-04-16 李信斌 Support structure, supporting equipment and coal mining complete device

Similar Documents

Publication Publication Date Title
CN202882972U (en) Along-groove stepping split type advanced hydraulic support frame group
CN205047241U (en) Tunnel quick travel formula advance support support
CN102251789A (en) Integrated self-shift hydraulic support for placing top coal in steeply inclined roadway
CN104047627A (en) Mining roadway frame style advanced support bracket
CN203362199U (en) End-head hydraulic support for fully mechanized mining face
CN103032091A (en) Self-moving hydraulic support
CN202220614U (en) Integrated self-shift hydraulic support for placing top coal in steeply inclined roadway
CN201953391U (en) Comprehensively mechanized filling coal face tip hydraulic support
CN101509388A (en) Tunnel ahead support stent
CN202467877U (en) Fore support for roadway provided with one group of two frames
CN103216252B (en) Roadway advanced supporting supports capable of assisting machinery to move
CN210068218U (en) Multipurpose roadway advance support hydraulic support
CN203145979U (en) Tunnel forepoling hydraulic bracket
CN104018869A (en) Advanced support supporting device
CN104018868A (en) Integrated gate type fore support
CN204299601U (en) Pier stud type advance timbering
CN202768037U (en) Fore support frame of machine lane
CN202673314U (en) End support of fully-mechanized coal mining face
CN202215273U (en) Front-arranged single oscillating bar type end hydraulic support
CN201671647U (en) Horizontal reverse four-bar fore support with high inclination angle working surface
CN2890341Y (en) Excavation hydraulic support
CN202690098U (en) Hexastyle supporting type split combination ended hydraulic support
CN103410547A (en) Thin seam hydraulic support for coal mines
CN203962017U (en) Stope drift active workings frame type advance support rack
CN203223238U (en) Mechanical arm for moving racks in roadway

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121003

Termination date: 20160307

CF01 Termination of patent right due to non-payment of annual fee