CN202047602U - Rebar bonding device - Google Patents
Rebar bonding device Download PDFInfo
- Publication number
- CN202047602U CN202047602U CN201120136116XU CN201120136116U CN202047602U CN 202047602 U CN202047602 U CN 202047602U CN 201120136116X U CN201120136116X U CN 201120136116XU CN 201120136116 U CN201120136116 U CN 201120136116U CN 202047602 U CN202047602 U CN 202047602U
- Authority
- CN
- China
- Prior art keywords
- rebar
- impact
- bonding device
- utility
- fixture
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
The utility model discloses a rebar bonding device, and particularly relates to the rebar bonding device used in strengthening engineering. The utility model provides the rebar bonding device, which is easy to use and comprises an impact drill and a rebar fixture, wherein the rebar fixture is connected onto an impact end of the impact drill. By clamping a rebar by using the rebar fixture and utilizing the impact shock counter force of the impact drill, the rebar gradually enters a reserved hole so as to achieve the purpose of bonding the rebar, thus, a large amount of labor power is saved, and uncertainty brought by the labor power is avoided; in addition, the rebar gradually enters the reserved hole in a manner of maintaining angle changeless, so that the length and the angle of the entered rebar can be controlled very easily; and a splashing phenomenon cannot be generated, so that the safety of a construction site is ensured.
Description
Technical field
The utility model relates to a kind of bar planting device, the bar planting device that uses in especially a kind of stabilization works.
Background technology
In the bar planting stabilization works of traditional handicraft, usually adopt the artificial sledgehammer that uses that reinforcing bar is vertically beaten, make reinforcing bar enter in the reserving hole, thereby reach the bar planting purpose, such construction technology falls behind already, and many disadvantages are arranged in the work progress: not only efficiency of construction is low to only depend on manpower, and the angle of beaing is also inconsistent, thereby causes construction quality to descend.In the process of beaing, be easy to generate splash, to constructor's safety formation threat.
The utility model content
Technical problem to be solved in the utility model provides a kind of wieldy bar planting device.
The bar planting device that its technical problem that solves the utility model adopts comprises Churn drill, also comprises rebar clips, and described rebar clips is connected on the impact end of Churn drill.
Further be that rebar clips is welded on the impact end of Churn drill.
Further be that rebar clips is the cover tubular.
The beneficial effects of the utility model are: utilize rebar clips to come the clamping reinforcing bar, utilize the impact endurance test shock counter-force of Churn drill again, thereby reinforcing bar is progressed in the reserving hole, thereby reach the bar planting purpose, so just can save great amount of manpower, the uncertainty of having avoided manpower to bring, reinforcing bar is to progress into when entering reserving hole, and angle is constant, controls length and the angle that reinforcing bar enters like this and just is very easy to, and can not produce splash phenomena, guarantee the safety of job site.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Component, position and numbering among the figure: Churn drill 1, impact end 2, rebar clips 3, reinforcing bar 4.
The specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
As shown in Figure 1, the utility model comprises Churn drill 1, also comprises rebar clips 3, and described rebar clips 3 is connected on the impact end 2 of Churn drill 1.In use, reinforcing bar 4 is clamped on the rebar clips 3, and reinforcing bar 4 is aimed at reserving hole, open Churn drill 1, utilize the impact endurance test shock counter-force of the impact end 2 of Churn drill 1, both reinforcing bar 4 constantly can be implanted in the reserving hole of concrete to impacting shelves.The impact endurance test shock counter-force has continous-stable, and is therefore convenient when operation, the consumption of having saved manpower, and when the implantation depth of controlling reinforcing bar 4 and angle, be more prone to.Though Churn drill 1 overall power is greater than manually beating, Churn drill 1 is continuous impact endurance test shock, and the impact that produces in the unit interval is far smaller than manually beats, and therefore just can not produce splash, avoids splash that personnel are produced threat.
For firm connecting reinforcement anchor clamps 3 and impact end 2, rebar clips 3 is welded on the impact end 2 of Churn drill 1.Utilize connecting reinforcement anchor clamps 3 and impact end 2 that welding just can be firm, this connection of just having avoided causing in long-term vibration is become flexible.
Concrete, as shown in Figure 1, rebar clips 3 is the cover tubular.Reinforcing bar 4 might not be clamped on the rebar clips 3 fully, therefore, adopt the rebar clips 3 of cover tubular convenient when reinforcing bar 4 is installed, and sleeve can effectively retrain the side-to-side movement of reinforcing bar 4, and do not retrain the implantation campaign of reinforcing bar 4, therefore, reinforcing bar 4 can only be implanted in the reserving hole in the process of vibrations substantially, and can not withdraw from reserving hole because of clamping.Rebar clips 3 can be set to the cover tubular that is complementary with reinforcing bar 4 sizes, thereby satisfies the demand of different reinforcing bars.
Claims (3)
1. the bar planting device comprises Churn drill (1), it is characterized in that: also comprise rebar clips (3), described rebar clips (3) is connected on the impact end (2) of Churn drill (1).
2. bar planting device as claimed in claim 1 is characterized in that: described rebar clips (3) is welded on the impact end (2) of Churn drill (1).
3. bar planting device as claimed in claim 1 or 2 is characterized in that: described rebar clips (3) is the cover tubular.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120136116XU CN202047602U (en) | 2011-05-03 | 2011-05-03 | Rebar bonding device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120136116XU CN202047602U (en) | 2011-05-03 | 2011-05-03 | Rebar bonding device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202047602U true CN202047602U (en) | 2011-11-23 |
Family
ID=44987915
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201120136116XU Expired - Fee Related CN202047602U (en) | 2011-05-03 | 2011-05-03 | Rebar bonding device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202047602U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106917472A (en) * | 2015-12-25 | 2017-07-04 | 世铠精密股份有限公司 | Threaded bar planting device and forming method thereof |
-
2011
- 2011-05-03 CN CN201120136116XU patent/CN202047602U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106917472A (en) * | 2015-12-25 | 2017-07-04 | 世铠精密股份有限公司 | Threaded bar planting device and forming method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201326876Y (en) | Tail regulator | |
CN209628260U (en) | Forestry nursery stock transplantation device | |
CN202047602U (en) | Rebar bonding device | |
CN208691929U (en) | Vibration shovel device for hydraulic crawler excavator | |
CN208751839U (en) | A kind of elastic supporting block preburied iron base pull-out bond test device | |
CN201125387Y (en) | Middle beam pad iron assembly in anchor rod construction | |
CN203347247U (en) | Preinstallation floor type support for brick masonry inner wire box | |
CN202577599U (en) | Anchor structure of tie bar | |
CN208408833U (en) | A kind of pipeline production cutter device | |
CN205036079U (en) | Hang hand hydraulic pressure floor braced system of column type | |
CN210968660U (en) | Full hall support dish nut quick adjustment device | |
CN205057125U (en) | Indoor roof bar planting drilling tool | |
CN208815527U (en) | Pile for prestressed pipe stake holes scavenging machine | |
JP6045038B2 (en) | Step mounting hole drilling device | |
CN201038648Y (en) | Section bar fixing rack | |
CN106906991B (en) | A kind of electric rubber hammer | |
CN201038649Y (en) | Quick-jointing supporting rack | |
CN209244259U (en) | Novel civil engineering mould plate supporting device | |
CN215281654U (en) | Pipeline positioning structure for water supply and drainage engineering | |
CN202391093U (en) | Pre-embedded tension piece for scaffold | |
CN216916224U (en) | Slurry pump suspension device | |
CN202500133U (en) | Small mixing pile machine | |
CN202831406U (en) | Prestress anchor bearing plate | |
CN221321809U (en) | Auxiliary vibrating device for bare concrete shear wall | |
CN214438498U (en) | Modified polyisocyanurate grouting material production agitating unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111123 Termination date: 20150503 |
|
EXPY | Termination of patent right or utility model |