[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN201620828U - A jet drainage device for cluster well group - Google Patents

A jet drainage device for cluster well group Download PDF

Info

Publication number
CN201620828U
CN201620828U CN2010200469098U CN201020046909U CN201620828U CN 201620828 U CN201620828 U CN 201620828U CN 2010200469098 U CN2010200469098 U CN 2010200469098U CN 201020046909 U CN201020046909 U CN 201020046909U CN 201620828 U CN201620828 U CN 201620828U
Authority
CN
China
Prior art keywords
gas
well
pipeline
pressure
group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010200469098U
Other languages
Chinese (zh)
Inventor
李莲明
李强
晁琼萧
胡均志
刘小江
侯亚龙
芦造华
许晓伟
周玉荣
史福军
张玉华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN2010200469098U priority Critical patent/CN201620828U/en
Application granted granted Critical
Publication of CN201620828U publication Critical patent/CN201620828U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Pipeline Systems (AREA)

Abstract

A jet drainage device for cluster well group is applied to the simultaneous continuous and stable gas production of a plurality of gas wells of the cluster well group of an oil and gas field. In the natural gas well group, the outlet of the wellhead valve group of each natural gas well is connected with a pipeline. An outlet pipeline of a well head valve group of one high-pressure gas well is connected with an inlet of a gas ejector, an outlet of the gas ejector is provided with a pipeline connected with a natural gas output pipeline, and an inlet pipeline and an outlet pipeline of the gas ejector are provided with gate valves. The suction inlet of the gas ejector is provided with an outlet which is connected with a wellhead valve group of the low-pressure gas well through a pipeline. A gate valve is arranged on a pipeline from an outlet of a wellhead valve group of the low-pressure gas well to a suction inlet of the gas ejector. The effect is as follows: high and low pressure gas wells can be produced simultaneously. The well opening time rate of the gas wells of the cluster well group is improved, and the gas wells are developed efficiently. The safety factor of the pipeline operation is improved.

Description

A kind of injection drainage system that is used for the cluster well group
Technical field
The utility model relates to oil gas field production gas technology field, and particularly many implications of gas field cluster well group well can continue simultaneously, stablize and carry out the device that gas production is produced.
Background technology
At present, the gas production of cluster well group is taked in some gas fields, enters the station, measures, separates, fails outward after promptly the next natural gas via main line manifold of many implications well well head closes.Owing in the natural gas well in the cluster well group, the gas well that is higher than system pressure is arranged, needs to throw in underground throttle device, controlled pressure; Also have the stratum energy deficiency, pressure is lower than the low-pressure gas well of system pressure, can't ordinary production.The recovery percent of each gas well and reservoir properties difference, the pressure of each gas well, tolerance there are differences in the well group, cause after same main line manifold closes phase mutual interference between each well.For avoiding phase mutual interference between well, can only take intermittently, production model is exploited by turns.Rate when influence drives a well has like this limited the performance of each gas well deliverability of cluster well group.In addition, exist in the cluster well group and drive gas well between low pressure, pressure descends rapidly during production, is difficult to continuous, steady production, and exploitation is difficulty comparatively.
The utility model content
The purpose of this utility model is: a kind of injection drainage system that is used for the cluster well group is provided, utilize other gas well of a bite high-pressure gas well injection in the cluster well group, make each gas well of cluster well group can be continuously, steady production, rate when improving the gas well gas production is to reach the purpose of the reasonable high-efficiency mining of cluster well group gas well.
The technical solution adopted in the utility model is: the injection drainage system that is used for the cluster well group, mainly form by high-pressure gas well, low-pressure gas well, gas ejector, slide valve and pipeline, in the natural gas well group, the outlet of the head valve group of each natural gas well is connected with pipeline.It is characterized in that: the outlet line of the head valve group of a bite high-pressure gas well connects the import of gas ejector, has pipeline to connect gas external transport pipeline in the outlet of gas ejector, on the suction line of gas ejector and outlet line slide valve is arranged.On the intake of gas ejector, there is pipeline to connect the outlet of the head valve group of low-pressure gas well.On the pipeline that exports to the gas ejector intake of the head valve group of low-pressure gas well, slide valve is arranged.High pressure, high gas rate well offer the continuous production of low-pressure gas well institute energy requirement.
If in a plurality of low-pressure gas wells, there is the pressure of other gas well to be higher than system pressure, can in pressure is higher than the gas well of system pressure, underground throttle device be installed, on the pipeline that exports to the gas ejector intake of the head valve group of the gas well that is higher than system pressure, slide valve be arranged.Other gas pressure that is higher than the gas well extraction of system pressure is reduced, can cooperate with other low-pressure gas wells.Make by drainage gas well pressure and all be lower than system pressure.
Convenient, easy to maintenance for gas production, the outlet line of the head valve group of high-pressure gas well connects gas external transport pipeline; The outlet line of the head valve group of low-pressure gas well connects gas external transport pipeline; The outlet line of head valve group that is higher than the gas well of system pressure connects gas external transport pipeline.
What underground throttle device adopted is the adjustable gas testing body of EJT ejector.There is sale in market.
The beneficial effects of the utility model: the utility model is used for the injection drainage system of cluster well group, has the following advantages:
1, cluster well group, high pressure, low-pressure gas well can be produced simultaneously.After the cluster well group use to be sprayed drainage system, gas well can drive a well simultaneously, and natural gas enters main after mixing, rate when having improved the driving a well of cluster well group gas well, and gas well is realized efficient exploitation.
2, utilize in the high-pressure gas well injection cluster well group between drive gas well, make gas well can be under lower pressure continuously, steady production, the rate during gas production of driving gas well between raising.
3, improve the pipeline operating safety factor.It is 5.2MPa that natural gas mixes back pressure, and the pipeline operating pressure reduces greatly, has improved the safety factor of pipeline operation.
4, reduce the methyl alcohol injection rate.When gas well is produced, stop up, need to inject methyl alcohol for preventing hydrate, use this device after, pressure reduces, and has reduced the hydrate formation condition, minimizing hydrate blocking pipeline is guaranteed the gas well continuous and stable production.
Description of drawings
Fig. 1 is the injection drainage system structural representation that the utility model is used for the cluster well group.
Among the figure, 1. high-pressure gas well, 2. gas ejector, 3. slide valve 4. is higher than the gas well of system pressure, 5. underground throttle device, 6. low-pressure gas well.
The specific embodiment
Embodiment 1: with one the gas well group of three implication wells being arranged is example, and the injection drainage system that the utility model is used for the cluster well group is described in further detail.
Consult Fig. 1.The utility model is used for the injection drainage system of cluster well group, mainly is made up of high-pressure gas well 1, low-pressure gas well, gas ejector 2, slide valve 3 and pipeline.
In the natural gas well group, the outlet of the head valve group of three each natural gas well of implication well is connected with pipeline.The outlet line of the head valve group of a bite high-pressure gas well 1 connects the import of the adjustable gas testing body of EJT ejector 2, there is pipeline to connect gas external transport pipeline 7 in the outlet of the adjustable gas testing body of EJT ejector 2, on the suction line of the adjustable gas testing body of EJT ejector 2 and outlet line, DN65 slide valve 3 arranged.On the intake of gas ejector 2, there is pipeline to connect the outlet of the head valve group of low-pressure gas well 6.On the pipeline that exports to the adjustable gas testing body of EJT ejector 2 intakes of the head valve group of low-pressure gas well 6, a DN65 slide valve 3 is arranged.
Be higher than at pressure underground throttle device 5 is installed in the gas well 4 of system pressure, on the pipeline that exports to gas ejector 2 intakes of the head valve group of the gas well 4 that is higher than system pressure, a DN65 slide valve 3 is arranged.
The outlet line of the head valve group of high-pressure gas well 1 connects gas external transport pipeline 7; The outlet line of the head valve group of low-pressure gas well 6 connects gas external transport pipeline 7; The outlet line of head valve group that is higher than the gas well 4 of system pressure connects gas external transport pipeline 7.

Claims (4)

1. an injection drainage system that is used for the cluster well group mainly is made up of high-pressure gas well (1), low-pressure gas well, gas ejector (2), slide valve (3) and pipeline, and in the natural gas well group, the outlet of the head valve group of each natural gas well is connected with pipeline; It is characterized in that: the outlet line of the head valve group of a bite high-pressure gas well (1) connects the import of gas ejector (2), outlet at gas ejector (2) has pipeline to connect gas external transport pipeline (7), on the suction line of gas ejector (2) and outlet line, slide valve (3) is arranged, on the intake of gas ejector (2), there is pipeline to connect the outlet of the head valve group of low-pressure gas well (6), on the pipeline that exports to gas ejector (2) intake of the head valve group of low-pressure gas well (6), slide valve (3) arranged.
2. the injection drainage system that is used for the cluster well group according to claim 1, it is characterized in that: be higher than at pressure underground throttle device (5) is installed in the gas well (4) of system pressure, on the pipeline that exports to gas ejector (2) intake of the head valve group that is higher than the gas well of system pressure (4), slide valve (3) is arranged.
3. the injection drainage system that is used for the cluster well group according to claim 1 is characterized in that: the outlet line of the head valve group of high-pressure gas well (1) connects gas external transport pipeline (7); The outlet line of the head valve group of low-pressure gas well (6) connects gas external transport pipeline (7); The outlet line of head valve group that is higher than the gas well (4) of system pressure connects gas external transport pipeline (7).
4. the injection drainage system that is used for the cluster well group according to claim 1 is characterized in that: what described underground throttle device (5) adopted is the adjustable gas testing body of EJT ejector.
CN2010200469098U 2010-01-14 2010-01-14 A jet drainage device for cluster well group Expired - Lifetime CN201620828U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010200469098U CN201620828U (en) 2010-01-14 2010-01-14 A jet drainage device for cluster well group

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010200469098U CN201620828U (en) 2010-01-14 2010-01-14 A jet drainage device for cluster well group

Publications (1)

Publication Number Publication Date
CN201620828U true CN201620828U (en) 2010-11-03

Family

ID=43024284

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010200469098U Expired - Lifetime CN201620828U (en) 2010-01-14 2010-01-14 A jet drainage device for cluster well group

Country Status (1)

Country Link
CN (1) CN201620828U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105317392A (en) * 2015-07-06 2016-02-10 中国石油天然气股份有限公司 Wellhead process module for gas production well, gas production well joint production system and method using same
CN111520108A (en) * 2020-04-30 2020-08-11 成都百胜野牛科技有限公司 Well group energy management method
CN112647908A (en) * 2021-01-08 2021-04-13 重庆科技学院 Combined drainage gas production system and method and underground atomization drainage gas production structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105317392A (en) * 2015-07-06 2016-02-10 中国石油天然气股份有限公司 Wellhead process module for gas production well, gas production well joint production system and method using same
CN105317392B (en) * 2015-07-06 2018-01-05 中国石油天然气股份有限公司 Wellhead process module for gas production well, gas production well joint production system and method using same
CN111520108A (en) * 2020-04-30 2020-08-11 成都百胜野牛科技有限公司 Well group energy management method
CN111520108B (en) * 2020-04-30 2022-05-24 成都百胜野牛科技有限公司 Well group energy management method
CN112647908A (en) * 2021-01-08 2021-04-13 重庆科技学院 Combined drainage gas production system and method and underground atomization drainage gas production structure
CN112647908B (en) * 2021-01-08 2024-09-03 重庆科技学院 Combined drainage gas production system, method and underground atomization drainage gas production structure

Similar Documents

Publication Publication Date Title
CN201963276U (en) Pressurized gas lift drainage gas production device
CN204457684U (en) Centralized pressurization gas lift drainage gas production system for low-pressure high-yield water and gas wells
CN102174882B (en) Medium-pressure gas collection technique based on cluster well
CN101864934B (en) Two-stage ejector supercharging gas production method for gas field
CN205117321U (en) Super supercritical carbon dioxide , nitrogen gas, compound fracturing system of water conservancy
CN202064905U (en) Gas lift liquid drainage device of vehicle-mounted natural gas compressor
CN201884015U (en) Liquid drainage and gas production device for natural gas well
CN106337672A (en) Method for extracting coal bed gas from circulating pulse type low temperature freeze-thawed anti-reflection coal
CN203531876U (en) Fracturing manifold
CN203559876U (en) Closed gas-lift liquid discharge combined tubing string for low-pressure oil and gas well
CN201620828U (en) A jet drainage device for cluster well group
CN201671606U (en) Two-stage supercharging gas production device utilizing injection and compressor
CN203531877U (en) Underground coal mine fracturing connecting device
CN203463092U (en) Novel manifold truck/pry with self-pressurization perfusion function for industrial large-scale fracturing
CN102562023A (en) System for improving air permeability of coal by using warm-pressing inert gas
CN105507860B (en) A kind of skid-mounted gas field individual well constant entropy supercharging integrated device
CN201620836U (en) High-pressure gas well draws and penetrates dividing open gas well mining devices
CN203201741U (en) Pump combination of movable type water injection system
CN205415845U (en) Two pressure boost high pressure synchronous generator wares of water sword
CN201705316U (en) Two-stage ejector supercharging gas production device for gas field
CN202001836U (en) Medium-pressure gas collection device based on cluster well
CN204460827U (en) A kind of twin-stage ejector refrigeration system of improvement
CN203925432U (en) A kind of production tree device
CN201802361U (en) Oil well associated gas pressure boost is defeated sledge thoughtlessly
CN116241217A (en) Coal bed fracturing and heat injection combined synchronous gas extraction device and method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20101103

CX01 Expiry of patent term