CN201620828U - A jet drainage device for cluster well group - Google Patents
A jet drainage device for cluster well group Download PDFInfo
- Publication number
- CN201620828U CN201620828U CN2010200469098U CN201020046909U CN201620828U CN 201620828 U CN201620828 U CN 201620828U CN 2010200469098 U CN2010200469098 U CN 2010200469098U CN 201020046909 U CN201020046909 U CN 201020046909U CN 201620828 U CN201620828 U CN 201620828U
- Authority
- CN
- China
- Prior art keywords
- gas
- well
- pipeline
- pressure
- group
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000007789 gas Substances 0.000 claims abstract description 122
- 239000002343 natural gas well Substances 0.000 claims abstract description 9
- 238000002347 injection Methods 0.000 claims description 14
- 239000007924 injection Substances 0.000 claims description 14
- 230000008676 import Effects 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 14
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 abstract description 8
- 239000003345 natural gas Substances 0.000 abstract description 4
- 230000000694 effects Effects 0.000 abstract 1
- OKKJLVBELUTLKV-UHFFFAOYSA-N Methanol Chemical compound OC OKKJLVBELUTLKV-UHFFFAOYSA-N 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 238000010924 continuous production Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
Images
Landscapes
- Pipeline Systems (AREA)
Abstract
A jet drainage device for cluster well group is applied to the simultaneous continuous and stable gas production of a plurality of gas wells of the cluster well group of an oil and gas field. In the natural gas well group, the outlet of the wellhead valve group of each natural gas well is connected with a pipeline. An outlet pipeline of a well head valve group of one high-pressure gas well is connected with an inlet of a gas ejector, an outlet of the gas ejector is provided with a pipeline connected with a natural gas output pipeline, and an inlet pipeline and an outlet pipeline of the gas ejector are provided with gate valves. The suction inlet of the gas ejector is provided with an outlet which is connected with a wellhead valve group of the low-pressure gas well through a pipeline. A gate valve is arranged on a pipeline from an outlet of a wellhead valve group of the low-pressure gas well to a suction inlet of the gas ejector. The effect is as follows: high and low pressure gas wells can be produced simultaneously. The well opening time rate of the gas wells of the cluster well group is improved, and the gas wells are developed efficiently. The safety factor of the pipeline operation is improved.
Description
Technical field
The utility model relates to oil gas field production gas technology field, and particularly many implications of gas field cluster well group well can continue simultaneously, stablize and carry out the device that gas production is produced.
Background technology
At present, the gas production of cluster well group is taked in some gas fields, enters the station, measures, separates, fails outward after promptly the next natural gas via main line manifold of many implications well well head closes.Owing in the natural gas well in the cluster well group, the gas well that is higher than system pressure is arranged, needs to throw in underground throttle device, controlled pressure; Also have the stratum energy deficiency, pressure is lower than the low-pressure gas well of system pressure, can't ordinary production.The recovery percent of each gas well and reservoir properties difference, the pressure of each gas well, tolerance there are differences in the well group, cause after same main line manifold closes phase mutual interference between each well.For avoiding phase mutual interference between well, can only take intermittently, production model is exploited by turns.Rate when influence drives a well has like this limited the performance of each gas well deliverability of cluster well group.In addition, exist in the cluster well group and drive gas well between low pressure, pressure descends rapidly during production, is difficult to continuous, steady production, and exploitation is difficulty comparatively.
The utility model content
The purpose of this utility model is: a kind of injection drainage system that is used for the cluster well group is provided, utilize other gas well of a bite high-pressure gas well injection in the cluster well group, make each gas well of cluster well group can be continuously, steady production, rate when improving the gas well gas production is to reach the purpose of the reasonable high-efficiency mining of cluster well group gas well.
The technical solution adopted in the utility model is: the injection drainage system that is used for the cluster well group, mainly form by high-pressure gas well, low-pressure gas well, gas ejector, slide valve and pipeline, in the natural gas well group, the outlet of the head valve group of each natural gas well is connected with pipeline.It is characterized in that: the outlet line of the head valve group of a bite high-pressure gas well connects the import of gas ejector, has pipeline to connect gas external transport pipeline in the outlet of gas ejector, on the suction line of gas ejector and outlet line slide valve is arranged.On the intake of gas ejector, there is pipeline to connect the outlet of the head valve group of low-pressure gas well.On the pipeline that exports to the gas ejector intake of the head valve group of low-pressure gas well, slide valve is arranged.High pressure, high gas rate well offer the continuous production of low-pressure gas well institute energy requirement.
If in a plurality of low-pressure gas wells, there is the pressure of other gas well to be higher than system pressure, can in pressure is higher than the gas well of system pressure, underground throttle device be installed, on the pipeline that exports to the gas ejector intake of the head valve group of the gas well that is higher than system pressure, slide valve be arranged.Other gas pressure that is higher than the gas well extraction of system pressure is reduced, can cooperate with other low-pressure gas wells.Make by drainage gas well pressure and all be lower than system pressure.
Convenient, easy to maintenance for gas production, the outlet line of the head valve group of high-pressure gas well connects gas external transport pipeline; The outlet line of the head valve group of low-pressure gas well connects gas external transport pipeline; The outlet line of head valve group that is higher than the gas well of system pressure connects gas external transport pipeline.
What underground throttle device adopted is the adjustable gas testing body of EJT ejector.There is sale in market.
The beneficial effects of the utility model: the utility model is used for the injection drainage system of cluster well group, has the following advantages:
1, cluster well group, high pressure, low-pressure gas well can be produced simultaneously.After the cluster well group use to be sprayed drainage system, gas well can drive a well simultaneously, and natural gas enters main after mixing, rate when having improved the driving a well of cluster well group gas well, and gas well is realized efficient exploitation.
2, utilize in the high-pressure gas well injection cluster well group between drive gas well, make gas well can be under lower pressure continuously, steady production, the rate during gas production of driving gas well between raising.
3, improve the pipeline operating safety factor.It is 5.2MPa that natural gas mixes back pressure, and the pipeline operating pressure reduces greatly, has improved the safety factor of pipeline operation.
4, reduce the methyl alcohol injection rate.When gas well is produced, stop up, need to inject methyl alcohol for preventing hydrate, use this device after, pressure reduces, and has reduced the hydrate formation condition, minimizing hydrate blocking pipeline is guaranteed the gas well continuous and stable production.
Description of drawings
Fig. 1 is the injection drainage system structural representation that the utility model is used for the cluster well group.
Among the figure, 1. high-pressure gas well, 2. gas ejector, 3. slide valve 4. is higher than the gas well of system pressure, 5. underground throttle device, 6. low-pressure gas well.
The specific embodiment
Embodiment 1: with one the gas well group of three implication wells being arranged is example, and the injection drainage system that the utility model is used for the cluster well group is described in further detail.
Consult Fig. 1.The utility model is used for the injection drainage system of cluster well group, mainly is made up of high-pressure gas well 1, low-pressure gas well, gas ejector 2, slide valve 3 and pipeline.
In the natural gas well group, the outlet of the head valve group of three each natural gas well of implication well is connected with pipeline.The outlet line of the head valve group of a bite high-pressure gas well 1 connects the import of the adjustable gas testing body of EJT ejector 2, there is pipeline to connect gas external transport pipeline 7 in the outlet of the adjustable gas testing body of EJT ejector 2, on the suction line of the adjustable gas testing body of EJT ejector 2 and outlet line, DN65 slide valve 3 arranged.On the intake of gas ejector 2, there is pipeline to connect the outlet of the head valve group of low-pressure gas well 6.On the pipeline that exports to the adjustable gas testing body of EJT ejector 2 intakes of the head valve group of low-pressure gas well 6, a DN65 slide valve 3 is arranged.
Be higher than at pressure underground throttle device 5 is installed in the gas well 4 of system pressure, on the pipeline that exports to gas ejector 2 intakes of the head valve group of the gas well 4 that is higher than system pressure, a DN65 slide valve 3 is arranged.
The outlet line of the head valve group of high-pressure gas well 1 connects gas external transport pipeline 7; The outlet line of the head valve group of low-pressure gas well 6 connects gas external transport pipeline 7; The outlet line of head valve group that is higher than the gas well 4 of system pressure connects gas external transport pipeline 7.
Claims (4)
1. an injection drainage system that is used for the cluster well group mainly is made up of high-pressure gas well (1), low-pressure gas well, gas ejector (2), slide valve (3) and pipeline, and in the natural gas well group, the outlet of the head valve group of each natural gas well is connected with pipeline; It is characterized in that: the outlet line of the head valve group of a bite high-pressure gas well (1) connects the import of gas ejector (2), outlet at gas ejector (2) has pipeline to connect gas external transport pipeline (7), on the suction line of gas ejector (2) and outlet line, slide valve (3) is arranged, on the intake of gas ejector (2), there is pipeline to connect the outlet of the head valve group of low-pressure gas well (6), on the pipeline that exports to gas ejector (2) intake of the head valve group of low-pressure gas well (6), slide valve (3) arranged.
2. the injection drainage system that is used for the cluster well group according to claim 1, it is characterized in that: be higher than at pressure underground throttle device (5) is installed in the gas well (4) of system pressure, on the pipeline that exports to gas ejector (2) intake of the head valve group that is higher than the gas well of system pressure (4), slide valve (3) is arranged.
3. the injection drainage system that is used for the cluster well group according to claim 1 is characterized in that: the outlet line of the head valve group of high-pressure gas well (1) connects gas external transport pipeline (7); The outlet line of the head valve group of low-pressure gas well (6) connects gas external transport pipeline (7); The outlet line of head valve group that is higher than the gas well (4) of system pressure connects gas external transport pipeline (7).
4. the injection drainage system that is used for the cluster well group according to claim 1 is characterized in that: what described underground throttle device (5) adopted is the adjustable gas testing body of EJT ejector.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010200469098U CN201620828U (en) | 2010-01-14 | 2010-01-14 | A jet drainage device for cluster well group |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010200469098U CN201620828U (en) | 2010-01-14 | 2010-01-14 | A jet drainage device for cluster well group |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201620828U true CN201620828U (en) | 2010-11-03 |
Family
ID=43024284
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010200469098U Expired - Lifetime CN201620828U (en) | 2010-01-14 | 2010-01-14 | A jet drainage device for cluster well group |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201620828U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105317392A (en) * | 2015-07-06 | 2016-02-10 | 中国石油天然气股份有限公司 | Wellhead process module for gas production well, gas production well joint production system and method using same |
CN111520108A (en) * | 2020-04-30 | 2020-08-11 | 成都百胜野牛科技有限公司 | Well group energy management method |
CN112647908A (en) * | 2021-01-08 | 2021-04-13 | 重庆科技学院 | Combined drainage gas production system and method and underground atomization drainage gas production structure |
-
2010
- 2010-01-14 CN CN2010200469098U patent/CN201620828U/en not_active Expired - Lifetime
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105317392A (en) * | 2015-07-06 | 2016-02-10 | 中国石油天然气股份有限公司 | Wellhead process module for gas production well, gas production well joint production system and method using same |
CN105317392B (en) * | 2015-07-06 | 2018-01-05 | 中国石油天然气股份有限公司 | Wellhead process module for gas production well, gas production well joint production system and method using same |
CN111520108A (en) * | 2020-04-30 | 2020-08-11 | 成都百胜野牛科技有限公司 | Well group energy management method |
CN111520108B (en) * | 2020-04-30 | 2022-05-24 | 成都百胜野牛科技有限公司 | Well group energy management method |
CN112647908A (en) * | 2021-01-08 | 2021-04-13 | 重庆科技学院 | Combined drainage gas production system and method and underground atomization drainage gas production structure |
CN112647908B (en) * | 2021-01-08 | 2024-09-03 | 重庆科技学院 | Combined drainage gas production system, method and underground atomization drainage gas production structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201963276U (en) | Pressurized gas lift drainage gas production device | |
CN204457684U (en) | Centralized pressurization gas lift drainage gas production system for low-pressure high-yield water and gas wells | |
CN102174882B (en) | Medium-pressure gas collection technique based on cluster well | |
CN101864934B (en) | Two-stage ejector supercharging gas production method for gas field | |
CN205117321U (en) | Super supercritical carbon dioxide , nitrogen gas, compound fracturing system of water conservancy | |
CN202064905U (en) | Gas lift liquid drainage device of vehicle-mounted natural gas compressor | |
CN201884015U (en) | Liquid drainage and gas production device for natural gas well | |
CN106337672A (en) | Method for extracting coal bed gas from circulating pulse type low temperature freeze-thawed anti-reflection coal | |
CN203531876U (en) | Fracturing manifold | |
CN203559876U (en) | Closed gas-lift liquid discharge combined tubing string for low-pressure oil and gas well | |
CN201620828U (en) | A jet drainage device for cluster well group | |
CN201671606U (en) | Two-stage supercharging gas production device utilizing injection and compressor | |
CN203531877U (en) | Underground coal mine fracturing connecting device | |
CN203463092U (en) | Novel manifold truck/pry with self-pressurization perfusion function for industrial large-scale fracturing | |
CN102562023A (en) | System for improving air permeability of coal by using warm-pressing inert gas | |
CN105507860B (en) | A kind of skid-mounted gas field individual well constant entropy supercharging integrated device | |
CN201620836U (en) | High-pressure gas well draws and penetrates dividing open gas well mining devices | |
CN203201741U (en) | Pump combination of movable type water injection system | |
CN205415845U (en) | Two pressure boost high pressure synchronous generator wares of water sword | |
CN201705316U (en) | Two-stage ejector supercharging gas production device for gas field | |
CN202001836U (en) | Medium-pressure gas collection device based on cluster well | |
CN204460827U (en) | A kind of twin-stage ejector refrigeration system of improvement | |
CN203925432U (en) | A kind of production tree device | |
CN201802361U (en) | Oil well associated gas pressure boost is defeated sledge thoughtlessly | |
CN116241217A (en) | Coal bed fracturing and heat injection combined synchronous gas extraction device and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20101103 |
|
CX01 | Expiry of patent term |