[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN201273187Y - Formation pressure detection apparatus while drilling - Google Patents

Formation pressure detection apparatus while drilling Download PDF

Info

Publication number
CN201273187Y
CN201273187Y CNU200820210641XU CN200820210641U CN201273187Y CN 201273187 Y CN201273187 Y CN 201273187Y CN U200820210641X U CNU200820210641X U CN U200820210641XU CN 200820210641 U CN200820210641 U CN 200820210641U CN 201273187 Y CN201273187 Y CN 201273187Y
Authority
CN
China
Prior art keywords
pressure
drill bit
reducing valve
hydraulic pump
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU200820210641XU
Other languages
Chinese (zh)
Inventor
宋朝晖
罗维
周强
唐亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Xibu Drilling Engineering Co Ltd
Original Assignee
Karamay Drilling Technology Institute of CNPC Western Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Karamay Drilling Technology Institute of CNPC Western Drilling Engineering Co Ltd filed Critical Karamay Drilling Technology Institute of CNPC Western Drilling Engineering Co Ltd
Priority to CNU200820210641XU priority Critical patent/CN201273187Y/en
Application granted granted Critical
Publication of CN201273187Y publication Critical patent/CN201273187Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a formation pressure detecting device while drilling for an oil drilling, wherein the upper end of a turbine clutch controller (2) is connected with a power turbine (1), and the lower end thereof is connected with a hydraulic pump (3), a circuit bin (4) is arranged in the cavities of the hydraulic pump (3) and a pressure sensor (5), the pressure sensor (5) is located on the lower portion of the circuit bin (4) to communicate with the inner cavity of a pressure relief valve (6), a pressure relief pump motor (7) is arranged on the lower end of the pressure relief valve (6), an integrated change-over valve (8) is respectively connected with a drill bit driving motor (12) and a pulling piston (11) through a cable and a power line, and one end of the drill bit driving motor (12) is connected with the pressure relief valve (6), and the other end thereof is connected with a hollow drill bit (10), sealing rubber (9) is sleeved on the outer surface of the hollow drill bit (10), and the pulling piston (11) is sleeved on one end of the outer surface of the sealing rubber (9). The detecting device can detect and provide the accurate formation pressure in time, and controls the well drilling and the reasonable drilling liquid column pressure in time.

Description

A kind of with boring the formation pressure detection device
Technical field
The present invention relates to the measurement while-drilling instrument that oil drilling is used, particularly a kind of device that in drilling process strata pressure is detected in real time belongs to the device for subsurface measuring class.
Background technology
By land with offshore oil drilling practice process in, generally can bore the chance abnormal formation pressure, especially bore the high pressure formation run into and more than low-pressure stratum more and see.The abnormal pressure stratum is having a strong impact on the safety of drilling well, if fail in time to detect or predict and may bore the abnormal pressure stratum that runs into, the problem of following several respects will occur:
When (1) the drilling fluid column pressure of Shi Yonging is less than strata pressure, can cause serious well kick or gas blowout accident;
(2) if used drilling fluid column pressure during greater than the fracture pressure on stratum, will cause leakage again, and the drilled oil and gas reservoir of opening of severe contamination, especially bigger to the natural gas pool influence, cause killing oil-gas Layer, cause the mud logging unit device to detect and survey unusually, can not go out oil gas in the gas testing process less than gas.
Summary of the invention
The utility model is to provide a kind of can detect strata pressure at any time, and control reasonable drilling head of liquid provides foundation when creeping into for the bottom.
For achieving the above object, the utility model adopts following technical scheme: mainly be made up of dynamical system, pressure detecting system and backup system, dynamical system is made of power turbine, turbine clutch controller, hydraulic pump, the power turbine lower end connects the turbine clutch controller, and the hydraulic pump upper end connects the turbine clutch controller; Pressure detecting system is made of circuit storehouse, pressure sensor, reducing valve and drawdown pump motor, in the cavity of circuit position in storehouse between hydraulic pump and pressure sensor, reducing valve is an one way valve, pressure sensor is positioned at below, circuit storehouse and communicates with the reducing valve inner chamber, it has cable and wire to be connected with the circuit storehouse, and the drawdown pump motor is positioned at the reducing valve lower end; The backup system is made of integrated change valve, caulking gum, hollow boring bit, backup piston and drill bit CD-ROM drive motor, integrated change valve has cable and wire to be connected with drill bit CD-ROM drive motor and backup piston respectively, drill bit CD-ROM drive motor one end is connected with the port of export of reducing valve vertical boreholes axis, its other end is connected with hollow boring bit, caulking gum is enclosed within on the hollow boring bit external surface, caulking gum external surface one end suit backup piston.
The beneficial effects of the utility model are that apparatus and process is simple, cost is low, can detect strata pressure in real time, for the reasonable control of creeping into middle drilling fluid column pressure provides foundation.
Description of drawings
Fig. 1 is the utility model structural representation.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is further described.
As shown in Figure 1 a kind of mainly is made up of dynamical system, pressure detecting system and backup system with boring the formation pressure detection device; Dynamical system is made of power turbine 1, turbine clutch controller 2, hydraulic pump 3, and power turbine 1 lower end connects turbine clutch controller 2, and hydraulic pump 3 upper ends connect turbine clutch controller 2; Pressure detecting system is made of circuit storehouse 4, pressure sensor 5, reducing valve 6 and drawdown pump motor 7, in the cavity of circuit storehouse 4 between hydraulic pump 3 and pressure sensor 5, reducing valve 6 is an one way valve, pressure sensor 5 is positioned at 4 belows, circuit storehouse and communicates with reducing valve 6 inner chambers, it has cable and wire to be connected with circuit storehouse 4, and drawdown pump motor 7 is positioned at reducing valve 6 lower ends; The backup system is made of with drill bit CD-ROM drive motor 12 integrated change valve 8, caulking gum 9, hollow boring bit 10, backup piston 11, integrated change valve 8 has cable and wire to be connected with drill bit CD-ROM drive motor 12 and backup piston 11 respectively, drill bit CD-ROM drive motor 12 1 ends are connected with the port of export of reducing valve 6 vertical boreholes axis, its other end is connected with hollow boring bit 10, caulking gum 9 is enclosed within on hollow boring bit 10 external surfaces, caulking gum 9 external surfaces one end suit backup piston 11.
The main effect of dynamical system is for the backup system provides power, turbine clutch controller 2 mainly as being to connect and cut off passage between power turbine 1 and the hydraulic pump 3, and then control hydraulic pump 3 is worked.
It is to be used to place the electronic circuit of controlling with the pressure of the drill force detection system whole that pressure detecting system mainly acts on; 4 belows, circuit storehouse are pressure sensors 5, and pressure sensor 5 is connected with electronic circuit in the circuit storehouse 4 by cable; The main effect of reducing valve 6 is after finishing formation pressure detection, will discharge with the pressure of the drill force checking device pressure inside, makes the internal pressure of device and external pressure reach equilibrium state, avoids device to bear too high pressure; The main effect of drawdown pump motor 7 is to provide power for reducing valve 6.
It is that hollow boring bit 10 is sent in the stratum that the backup system mainly acts on, and finishes the detection to strata pressure; Integrated change valve 8 is between hollow boring bit 10 and hydraulic pump 3, it mainly acts on is to release caulking gum 9 and backup piston 11 with the pressure of the drill force checking device and be close to surface of stratum by regulating reversal valve, caulking gum 9 and backup piston 11 is withdrawn into in the pressure of the drill force checking device after detection is finished again; Caulking gum 9 is positioned at hollow boring bit 10 both sides, and main effect is that stratum to be measured and space outerpace are isolated, and guarantees that pressure sensor 5 detected pressure are strata pressure to be measured; Backup piston 11 is positioned at the outside of caulking gum 9, is mainly used in caulking gum 9 is applied an external force, guarantees the sealing effectiveness of caulking gum 9; Hollow boring bit 10 is positioned at caulking gum 9 inside, and the drill bit CD-ROM drive motor provides power for hollow boring bit 10.
Its operating principle is: when arriving position of stratum to be measured with the pressure of the drill force checking device, power turbine 1 is started working, driving hydraulic pump 3 is released caulking gum 9 and backup piston 11 with the pressure of the drill force checking device and is close on the stratum to be measured, backup piston 11 compresses caulking gum 9, guarantees sealing effectiveness.Drill bit CD-ROM drive motor 12 is started working then, hollow boring bit 10 is advanced stratum to be measured, this moment stratum to be measured with the inner connected state that forms of the pressure of the drill force checking device, pressure sensor 5 is treated the pressure of geodetic layer and is measured, electronic circuit is analyzed and is stored the data that measure.After pressure detecting is finished, drill bit CD-ROM drive motor 12 is regained hollow boring bit 10, do not form with stratum to be measured with the pressure of the drill force checking device this moment and be communicated with, drawdown pump motor 7 drives reducing valve 6 and starts working, to putting pressure, the pressure of the drill force checking device pressure inside is consistent for outside pressure with the pressure of the drill force checking device inside.Put press finish after, integrated change valve 8 is started working, hydraulic pump 3 is withdrawn into caulking gum 9 and backup piston 11 with the pressure of the drill force checking device inside, whole pressure detecting process finishes.

Claims (1)

1, a kind of with boring the formation pressure detection device, it is characterized in that: mainly form by dynamical system, pressure detecting system and backup system; Dynamical system is made of power turbine (1), turbine clutch controller (2), hydraulic pump (3), and power turbine (1) lower end connects turbine clutch controller (2), and hydraulic pump (3) upper end is connected with turbine clutch controller (2); Pressure detecting system is made of circuit storehouse (4), pressure sensor (5), reducing valve (6) and drawdown pump motor (7), circuit storehouse (4) is positioned at the cavity between hydraulic pump (3) and the pressure sensor (5), reducing valve (6) is an one way valve, pressure sensor (5) is positioned at below, circuit storehouse (4) and communicates with reducing valve (6) inner chamber, it has cable and wire to be connected with circuit storehouse (4), and drawdown pump motor (7) is positioned at reducing valve (6) lower end; The backup system is made of with drill bit CD-ROM drive motor (12) integrated change valve (8), caulking gum (9), hollow boring bit (10), backup piston (11), integrated change valve (8) has cable and wire to be connected with drill bit CD-ROM drive motor (12) and backup piston (11) respectively, drill bit CD-ROM drive motor (12) one ends are connected with the port of export of reducing valve (6) vertical boreholes axis, its other end is connected with hollow boring bit (10), caulking gum (9) is enclosed within on hollow boring bit (10) external surface, caulking gum (9) external surface one end suit backup piston (11).
CNU200820210641XU 2008-09-23 2008-09-23 Formation pressure detection apparatus while drilling Expired - Lifetime CN201273187Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200820210641XU CN201273187Y (en) 2008-09-23 2008-09-23 Formation pressure detection apparatus while drilling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200820210641XU CN201273187Y (en) 2008-09-23 2008-09-23 Formation pressure detection apparatus while drilling

Publications (1)

Publication Number Publication Date
CN201273187Y true CN201273187Y (en) 2009-07-15

Family

ID=40883535

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200820210641XU Expired - Lifetime CN201273187Y (en) 2008-09-23 2008-09-23 Formation pressure detection apparatus while drilling

Country Status (1)

Country Link
CN (1) CN201273187Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102174886A (en) * 2011-02-16 2011-09-07 中国地质大学(武汉) LWD (Logging While Drilling) real-time detection device and method of horizontal directional drilling depth of coal bed gas
CN102748015A (en) * 2011-04-22 2012-10-24 中国石油化工股份有限公司 Device and method for simulating formation pressure
CN103790574A (en) * 2012-11-02 2014-05-14 中国石油化工股份有限公司 Probe for measuring formation pressure
CN106555582A (en) * 2015-09-21 2017-04-05 中国石油化工股份有限公司 A kind of method with formation pressure testing device and measurement stratum pressure is bored
CN111734402A (en) * 2020-06-30 2020-10-02 中国石油天然气集团有限公司 Logging-while-drilling electronic device bin

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102174886A (en) * 2011-02-16 2011-09-07 中国地质大学(武汉) LWD (Logging While Drilling) real-time detection device and method of horizontal directional drilling depth of coal bed gas
CN102174886B (en) * 2011-02-16 2013-10-09 中国地质大学(武汉) LWD (Logging While Drilling) real-time detection device and method of horizontal directional drilling depth of coal bed gas
CN102748015A (en) * 2011-04-22 2012-10-24 中国石油化工股份有限公司 Device and method for simulating formation pressure
CN102748015B (en) * 2011-04-22 2015-08-26 中国石油化工股份有限公司 A kind of strata pressure analogue means and method
CN103790574A (en) * 2012-11-02 2014-05-14 中国石油化工股份有限公司 Probe for measuring formation pressure
CN103790574B (en) * 2012-11-02 2016-08-24 中国石油化工股份有限公司 Measure the probe of strata pressure
CN106555582A (en) * 2015-09-21 2017-04-05 中国石油化工股份有限公司 A kind of method with formation pressure testing device and measurement stratum pressure is bored
CN111734402A (en) * 2020-06-30 2020-10-02 中国石油天然气集团有限公司 Logging-while-drilling electronic device bin
CN111734402B (en) * 2020-06-30 2023-03-24 中国石油天然气集团有限公司 Logging-while-drilling electronic device bin

Similar Documents

Publication Publication Date Title
EP2368009B1 (en) Method for determining formation integrity and optimum drilling parameters during drilling
CA2786771C (en) Pressure release encoding system for communicating downhole information through a wellbore to a surface location
CA2484927C (en) Method and apparatus for mwd formation testing
US9222352B2 (en) Control of a component of a downhole tool
CA2557384A1 (en) Methods for using a formation tester
CN104533394B (en) One kind is with brill formation pressure testing device
CN201273187Y (en) Formation pressure detection apparatus while drilling
MX2007008965A (en) Pump control for formation testing.
NO339795B1 (en) Method of using formation property data
NO321471B1 (en) Method and apparatus for evaluating well conditions during well fluid circulation
CA2673849A1 (en) Drilling components and systems to dynamically control drilling dysfunctions and methods of drilling a well with same
CA2677617A1 (en) Pressure interference testing for estimating hydraulic isolation
BRPI0902663A2 (en) pressure test method of a geological formation, background tool for pressure test of a geological formation
US8408296B2 (en) Methods for borehole measurements of fracturing pressures
CA2692557C (en) Devices and methods for formation testing by measuring pressure in an isolated variable volume
NO344199B1 (en) Apparatus and methods for measuring the properties of a formation
NO20120866A1 (en) Apparatus and procedure for valve actuation
NO320901B1 (en) Method and apparatus for formation testing with fluid transfer between two formation zones
AU2011353550A1 (en) Method for a pressure release encoding system for communicating downhole information through a wellbore to a surface location
CN101936311A (en) Stratum pressure tester accumulator while drilling
CN103161438A (en) Tubular column of perforation fracturing test system
CN201778785U (en) Underground hydraulic control balanced valve
CN113250616A (en) Deepwater pressure control drilling system
RU2379505C1 (en) Parker apparatus on cable and oil and gas wells hydrodynamic research and sampling method
CN214538336U (en) Geological prospecting confined water test device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: WEST DRILLING ENGINEERING CO., LTD., CNPC

Free format text: FORMER OWNER: WESTERN DRILLING KELAMAYI DRILLING TECHNOLOGY INSTITUTE

Effective date: 20100727

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 834000 NO.80, HONGYAN ROAD, KARAMAY CITY, XINJIANG UYGHUR AUTONOMOUS REGION TO: 830026 NO.68, ZHONGYA SOUTH ROAD, ECONOMIC AND TECHNOLOGICAL DEVELOPMENT ZONE, URUMQI CITY, XINJIANG UYGHUR AUTONOMOUS REGION

TR01 Transfer of patent right

Effective date of registration: 20100727

Address after: 830026, No. 68 South Central Road, Urumqi economic and Technological Development Zone, the Xinjiang Uygur Autonomous Region

Patentee after: CNPC Xibu Drilling Engineering Company Limited

Address before: 834000 the Xinjiang Uygur Autonomous Region Karamay Hongyan Road No. 80

Patentee before: Western Drilling Kelamayi Drilling Technology Institute

CX01 Expiry of patent term

Granted publication date: 20090715

CX01 Expiry of patent term