[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN201215439Y - Wall repairing construction for step heating stove - Google Patents

Wall repairing construction for step heating stove Download PDF

Info

Publication number
CN201215439Y
CN201215439Y CNU200820077501XU CN200820077501U CN201215439Y CN 201215439 Y CN201215439 Y CN 201215439Y CN U200820077501X U CNU200820077501X U CN U200820077501XU CN 200820077501 U CN200820077501 U CN 200820077501U CN 201215439 Y CN201215439 Y CN 201215439Y
Authority
CN
China
Prior art keywords
wall
layer
walking beam
furnace
brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU200820077501XU
Other languages
Chinese (zh)
Inventor
杨福瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Taigang Stainless Steel Co Ltd
Original Assignee
Shanxi Taigang Stainless Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Taigang Stainless Steel Co Ltd filed Critical Shanxi Taigang Stainless Steel Co Ltd
Priority to CNU200820077501XU priority Critical patent/CN201215439Y/en
Application granted granted Critical
Publication of CN201215439Y publication Critical patent/CN201215439Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

A wall repair structure for walking beam furnace belongs to the repair technique of smelting furnace of metallurgical industry, which has three materials forming three layers, as a high-alumina brick building layer, an insulating brick layer and an alumina silicate fiber felt insulating layer from inner to outer, wherein the material layers are penetrated by anchoring bricks and connected with the anchoring bricks via cements. In the reparation on the furnace wall of a walking beam furnace, the metal components on the anchoring bricks are welded integrally with the steel piece reinforced ribs on the wall of the walking beam furnace, and the wall repair structure is attached with the wall of the walking beam furnace integrally via high temperature puddle. The reparation has simple operation and reduced time.

Description

The benefit wall construction of walking beam furnace
Technical field:
The utility model belongs to the recovery technique of metallurgical furnace in the metallurgical industry, is specifically related to a kind of benefit wall construction of walking beam furnace.
Background technology:
The fracture of body of wall anchored brick large tracts of land can take place in walking beam furnace after having moved certain time limit, cause the body of wall knockdown, directly has influence on slab and moves in stove, causes the substantial equipment accident of heating furnace blowing out.
At present, the restorative procedure of heating furnace routine is that broken parts is removed, carry out integrated poured with low cement deposit material to removing part, working procedure is: lower the temperature to walking beam furnace---removing broken parts---, and low cement deposit material is repaired, used repair time is longer, furnace outage time is longer, and the economic loss of enterprise is bigger.
Summary of the invention:
The utility model aims to provide the benefit wall construction of repair time than short a kind of walking beam furnace.
The realization the technical solution of the utility model is: constituting three-decker by three kinds of materials, is respectively that high-alumina brick is built layer, insulating brick layer, alumina silicate fiber felt thermal insulation layer by laying bricks or stones from inside to outside, and anchored brick passes each material layer and is connected with each layer with low cement deposit material.
Compared with prior art,, use the utility model the body of wall that damages is repaired, can save repair time 75% in equal damaged condition, same impaired area.
Description of drawings:
Fig. 1 is the structure chart of the utility model embodiment.
Among the figure: 1, high-alumina brick is built layer 2, insulating brick layer by laying bricks or stones
3, alumina silicate fiber felt thermal insulation layer 4, anchored brick
The specific embodiment:
Embodiment: the high-alumina brick block-by-block is built together with the high temperature clay, formed high-alumina brick and build layer by laying bricks or stones, spacing distance is reserved the position of anchored brick;
Anchored brick is arranged on the position that stays in advance, builds anchored brick by laying bricks or stones layer with high-alumina brick with cement and be cast in, form an integral body;
Build by laying bricks or stones on the layer with the high temperature clay heat insulation brick one deck (thickness is 116 millimeters) at high-alumina brick, form the insulating brick layer;
On the insulating brick layer, build the alumina silicate fiber felt of one deck 100 millimeters thick, form the alumina silicate fiber felt thermal insulation layer.
By above-mentioned steps, realize the utility model shown in Figure 1.
When repairing the furnace wall of walking beam furnace, steel part reinforcement on hardware on the anchored brick and the walking beam furnace body of wall is welded as a whole, with the high temperature clay the utility model and walking beam furnace body of wall is bonded as one then, the operation of reparation is simple, easy to operate, save time.
Illustrate: the anchored brick in the present embodiment is a prior art, omits it and describes in detail, and the reserved location of anchored brick is corresponding with the position of the reinforcement of the walking beam furnace body of wall that damages.

Claims (1)

1, the benefit wall construction of walking beam furnace, it is characterized in that it constitutes three-decker by three kinds of materials, be respectively that high-alumina brick is built layer, insulating brick layer, alumina silicate fiber felt thermal insulation layer by laying bricks or stones from inside to outside, anchored brick passes each material layer and is connected with each layer with low cement deposit material.
CNU200820077501XU 2008-06-05 2008-06-05 Wall repairing construction for step heating stove Expired - Fee Related CN201215439Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200820077501XU CN201215439Y (en) 2008-06-05 2008-06-05 Wall repairing construction for step heating stove

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200820077501XU CN201215439Y (en) 2008-06-05 2008-06-05 Wall repairing construction for step heating stove

Publications (1)

Publication Number Publication Date
CN201215439Y true CN201215439Y (en) 2009-04-01

Family

ID=40520643

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200820077501XU Expired - Fee Related CN201215439Y (en) 2008-06-05 2008-06-05 Wall repairing construction for step heating stove

Country Status (1)

Country Link
CN (1) CN201215439Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103471397A (en) * 2013-09-26 2013-12-25 福建乾达重型机械有限公司 Furnace bottom brick seat structure of step heating furnace
CN110205143A (en) * 2018-12-18 2019-09-06 西安华江环保科技股份有限公司 A kind of casting of dry coke quenching builds mixed structure for the cooling segment structure of furnace body and method
US12078420B2 (en) 2019-09-10 2024-09-03 Rishang (Suzhou) Light Chemical Textile High-Tech Co., Ltd Modular enclosure structure of high temperature heating furnace and installation method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103471397A (en) * 2013-09-26 2013-12-25 福建乾达重型机械有限公司 Furnace bottom brick seat structure of step heating furnace
CN103471397B (en) * 2013-09-26 2015-03-04 福建乾达重型机械有限公司 Furnace bottom brick seat structure of step heating furnace
CN110205143A (en) * 2018-12-18 2019-09-06 西安华江环保科技股份有限公司 A kind of casting of dry coke quenching builds mixed structure for the cooling segment structure of furnace body and method
CN110205143B (en) * 2018-12-18 2023-11-17 西安华江环保科技股份有限公司 Pouring masonry mixed structure for dry quenching of furnace body cooling section structure and preparation method thereof
US12078420B2 (en) 2019-09-10 2024-09-03 Rishang (Suzhou) Light Chemical Textile High-Tech Co., Ltd Modular enclosure structure of high temperature heating furnace and installation method

Similar Documents

Publication Publication Date Title
CN204174222U (en) The repair structure of iron-making heat wind furnace hot air duct and repairing mould thereof
CN108589986A (en) One kind being based on bolted assembled composite wall structure and its construction method
CN108015880A (en) Combined wall board and its making and installation method for assembling type steel structure building
CN105780964B (en) A kind of light block filling wall and frame structure construction technique
CN102191066A (en) Coke dry quenching slope air course supporting brick overhaul construction process
CN109667376B (en) Novel superposed floor system suitable for H-shaped steel beam of steel structure and construction method thereof
CN108104284B (en) Wall panel connection structure and assembly method with steel arm of shear wall embedded in floor slab
CN201215439Y (en) Wall repairing construction for step heating stove
CN101555709B (en) Mounting process for composite insulating concrete shear wall
CN105019606A (en) Precast concrete unit steel bar grouting connecting piece and connecting method
CN207660132U (en) A kind of wallboard connecting structure of shear wall overhanging steel arm insertion floor end
CN112324009A (en) A kind of prefabricated concrete hollow thermal insulation wall structure and construction technology
CN109797902A (en) Prefabrication ash wall body plate
CN109653404A (en) First fill the construction method and structural system of prefabricated big plate filled wall concrete structure
CN209854976U (en) Assembled heat preservation brickwork wall
CN102359200B (en) Construction method of inorganic heat-insulating wall body
CN205119788U (en) Prefabricated tunnel kiln
CN102182262B (en) Armored foam concrete insulation walls
CN104141321A (en) Basement side wall late poured band blocking method and used blocking steel plate
CN111472462A (en) A method for vertical mechanical connection of prefabricated shear walls
CN211572710U (en) Prefabricated high-ductility concrete reinforcing device for masonry brick column
CN102535935A (en) Method for constructing template of chimney shaft wall
CN103423999B (en) Charging end wall for heating furnace and construction method of charging end wall
CN207919809U (en) A kind of high ductility concrete shear force wall connection structure of assembled
CN209907695U (en) An integrated steel-concrete composite floor based on I-beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090401

Termination date: 20140605