CN209326402U - Cooling tower is used in a kind of production of chemical reagent auxiliary agent - Google Patents

Cooling tower is used in a kind of production of chemical reagent auxiliary agent Download PDF

Info

Publication number
CN209326402U
CN209326402U CN201920022626.0U CN201920022626U CN209326402U CN 209326402 U CN209326402 U CN 209326402U CN 201920022626 U CN201920022626 U CN 201920022626U CN 209326402 U CN209326402 U CN 209326402U
Authority
CN
China
Prior art keywords
tower body
auxiliary agent
chemical reagent
reagent auxiliary
feed pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920022626.0U
Other languages
Chinese (zh)
Inventor
袁和生
何平如
李牛牯
黄建平
陈卫星
黄英明
黄小华
袁桂生
叶慧慧
左斌
汪慧平
钟深根
晏九根
李友生
糜建
黎火根
杨贵付
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yichun Shanggaoyuan Dali Chemical Co Ltd
Original Assignee
Yichun Shanggaoyuan Dali Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yichun Shanggaoyuan Dali Chemical Co Ltd filed Critical Yichun Shanggaoyuan Dali Chemical Co Ltd
Priority to CN201920022626.0U priority Critical patent/CN209326402U/en
Application granted granted Critical
Publication of CN209326402U publication Critical patent/CN209326402U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

The utility model discloses a kind of chemical reagent auxiliary agent production cooling towers, including upper tower body and lower tower body, the circular bottom part of upper tower body and the annular top of lower tower body respectively be fixedly connected at the top and bottom of ventilator cowling, lower tower body inner cavity is equipped with cooling pond, is fixedly installed with cooler on the right side of lower tower body.To quickly cool down to chemical reagent auxiliary agent, simultaneously by the way that chemical reagent auxiliary agent to be isolated with substances such as cold fluids, it avoids direct contact with, then the security and stability of chemical reagent auxiliary agent in production is improved, and the quality of chemical reagent auxiliary agent, and in the operating of double shaft servo motors, the rotation of second angular wheel is driven by the first angular wheel, so that the ellipse on shaft bar contradicts plate and contradicts and drive support rod and cover board to move up and down to assist air draft to cool down, when double shaft servo motors do not work, ventilation duct is blocked by cover board, it avoids extraneous pollutant from falling into tower body to pollute the substance of tower body.

Description

Cooling tower is used in a kind of production of chemical reagent auxiliary agent
Technical field
The utility model relates to chemical production technical field, cooling tower is used in specially a kind of chemical reagent auxiliary agent production.
Background technique
Cooling tower is a kind of circulating water equipment, is dispersed using the evaporation endothermic principle of water and is produced in industrial or refrigeration air-conditioner For raw waste heat to guarantee the device of the operation of system, cooling tower is to use water as circulating coolant, absorbs heat from a system It is emitted into atmosphere, to reduce the device of water temperature, cold is to carry out cold and hot exchange after contacting using water with air flowing to generate steaming Vapour, steam volatilization take away heat and reach the principles such as evaporative heat loss, convective heat transfer and radiant heat transfer to disperse industrial or refrigeration sky The waste heat generated in tune reduces the evaporating radiator of water temperature, and to guarantee the normal operation of system, device is generally tubbiness, therefore Entitled cooling tower, however the existing cooling tower cooling effect for the production of chemical industry chemical reagent auxiliary agent is poor, and there are one Fixed risk is easy to appear explosion, and ventilation opening blowing machine is substantially open type if control is bad, exists certain Risk, and be easy to pollute tower substance in vivo so that the substances such as leaf rubbish enter in tower body.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of chemical reagent auxiliary agent production cooling tower, solves Cooling effect is poor, and there are certain risk, if control is bad, be easy to appear explosion, and ventilation opening outlet air Machine is substantially open type, and there are certain risks, and is easy so that the substances such as leaf rubbish enter in tower body, to tower body The problem of interior substance pollutes.
(2) technical solution
To achieve the above object, the utility model provides the following technical solutions: a kind of chemical reagent auxiliary agent production cooling Tower, including upper tower body and lower tower body, the annular top of the circular bottom part of the upper tower body and lower tower body respectively with the top of ventilator cowling Portion is fixedly connected with bottom, and the lower tower body inner cavity is equipped with cooling pond, is fixedly installed with cooler on the right side of the lower tower body, The cooler is connected to cooling pond, and the bottom of the lower tower body inner wall is fixedly installed with booster water pump, the booster water pump Discharge ends tap have the first cold flow pipe and spray tube, the side surface of the spray tube offers multiple spray apertures, the upper tower The inner cavity of body is provided with feed pipe, and the top of the feed pipe is run through the top of upper tower body inner cavity and extended to outside it, described The other end of feed pipe runs through the right side of upper tower body inner cavity and extends to outside, and the both ends of the feed pipe are fixedly installed with respectively First regulating valve and the second regulating valve, the feed pipe spiral in the shape of a spiral in the inner cavity of upper tower body, in the pipe of the feed pipe Inserted with the second cold flow pipe, one end of the first cold flow pipe, which is inserted into the side of feed pipe and extends to it, manages interior and the second cold flow One end of pipe is fixedly connected, the other end of the second cold flow pipe through feed pipe inner wall and extend to outside it, it is described on The top of tower body is equipped with ventilation duct, and the inner wall of the ventilation duct, which is fixed by the bracket, is equipped with double shaft servo motors, described double The both ends of shaft servo motor output shaft are connected to air suction fan blade and the first angular wheel, first conical tooth with fixing sleeve respectively The second angular wheel is engaged on the left of wheel, second angular wheel is fixedly attached to the side surface of shaft bar, the shaft Bar both ends extend through the inside of bracket and extend to its lateral surface, and the shaft bar is connect with holder pivots, the shaft bar Both ends be fixedly connected to ellipse and contradict plate, the ellipse contradicts plate and is eccentrically set on one end of shaft bar, described ellipse The top that circle contradicts plate, which contradicts, is connected with support rod, and the bottom end of the support rod offers cooperation ellipse and contradicts what plate used Groove, the top of two support rods are fixedly connected with the bottom of cover board, the bottom of the cover board and the top of ventilation duct It connecting, the bottom of the cover board is fixedly installed with slide bar, and the side surface of the slide bar is slidably socketed there are two supporting block, and two The side of a supporting block is fixedly connected with the inner wall of ventilation duct, and the side surface fixing sleeve of the slide bar is connected to fixed ring, institute The side surface for stating slide bar is socketed with spring, the top with the bottom of fixed ring and downside supporting block respectively at the both ends of the spring It is fixedly connected.
Preferably, the inner wall of the upper tower body is fixedly connected with annular Diversion Plate, and the annular Diversion Plate is located at ventilator cowling Top.
Preferably, the side surface of the feed pipe is socketed with flase floor, and the side surface of the flase floor is interior with upper tower body Wall is fixedly connected.
Preferably, the bottom of the cover board is fixedly connected with waffle slab.
Preferably, the outer surface of the inner wall of the feed pipe and the second cold flow pipe is equipped with erosion resistant coating.
Preferably, the spherical shape of the shape of the cover board.
(3) beneficial effect
The utility model provides a kind of chemical reagent auxiliary agent production cooling tower.Have it is following the utility model has the advantages that
(1), chemical reagent auxiliary agent production cooling tower, by the setting of cooling pond and cooler, booster water pump, First cold flow pipe, spray tube, feed pipe, the second cold flow pipe, ventilation duct, double shaft servo motors, air suction fan blade, the first conical tooth Wheel, the second angular wheel, shaft bar, ellipse contradict plate, support rod, cover board, slide bar, supporting block, the phase of fixed ring and spring It is mutually used cooperatively, cooler persistently freezes the liquid of cooling pond, and booster water pump is defeated by the first cold flow pipe by cold fluid It is sent in the second cold flow pipe, is then flowed back into cooling pond by the second cold flow pipe, while cold fluid is sprayed also by spray tube Out, and chemical reagent auxiliary agent be flowed into feed pipe by the cold fluid of the second cold flow pipe to inside chemical reagent auxiliary agent carry out it is cold Heat alternately cools down, and outside carries out spraying cooling to the outside of feed pipe by spray tube, and cold fluid connects with spray tube when spray The high-temperature steam generated is touched, drives the quick discharge intracorporal steam of tower of air suction fan blade operating to reduce tower by double shaft servo motors Intracorporal temperature, to quickly cool down to chemical reagent auxiliary agent, while by by the objects such as chemical reagent auxiliary agent and cold fluid Matter isolation, avoids direct contact with, and then improves the security and stability and chemical reagent auxiliary agent of chemical reagent auxiliary agent in production Quality, and double shaft servo motors operating when, by the first angular wheel drive the second angular wheel rotation so that shaft Ellipse on bar contradicts plate and contradicts and drive support rod and cover board to move up and down to assist air draft to cool down, double shaft servo motors When not working, ventilation duct is blocked by cover board, avoids extraneous pollutant from falling into tower body and dirt is caused to the substance of tower body Dye.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the enlarged diagram of A in the utility model structure chart 1;
Fig. 3 is the enlarged diagram of B in the utility model structure chart 1.
In figure: 1, upper tower body;2, lower tower body;3, ventilator cowling;4, cooling pond;5, cooler;6, booster water pump;7, first Cold flow pipe;8, spray tube;9, feed pipe;10, the first regulating valve;11, the second regulating valve;12, the second cold flow pipe;13, ventilation duct; 14, double shaft servo motors;15, air suction fan blade;16, the first angular wheel;17, the second angular wheel;18, shaft bar;19, ellipse Circle contradicts plate;20, support rod;21, cover board;22, slide bar;23, supporting block;24, fixed ring;25, spring;26, annular diversion Plate;27, flase floor;28, waffle slab;29, erosion resistant coating.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
As shown in Figure 1-3, the utility model provides a kind of technical solution: a kind of chemical reagent auxiliary agent production cooling tower, Including upper tower body 1 and lower tower body 2, the annular top of the circular bottom part of upper tower body 1 and lower tower body 2 top with ventilator cowling 3 respectively It is fixedly connected with bottom, lower 2 inner cavity of tower body is equipped with cooling pond 4, and the right side of lower tower body 2 is fixedly installed with cooler 5, cooler 5 are connected to cooling pond 4, and the bottom of lower 2 inner wall of tower body is fixedly installed with booster water pump 6, and the discharge ends tap of booster water pump 6 has First cold flow pipe 7 and spray tube 8, the side surface of spray tube 8 offer multiple spray apertures, and the inner cavity of upper tower body 1 is provided with charging Pipe 9, the top of feed pipe 9 are run through the top of upper 1 inner cavity of tower body and are extended to outside it, and the other end of feed pipe 9 runs through upper tower The right side of 1 inner cavity of body simultaneously extends to outside, and the both ends of feed pipe 9 are fixedly installed with the first regulating valve 10 and the second regulating valve respectively 11, feed pipe 9 spirals in the shape of a spiral in the inner cavity of upper tower body 1, and inserted with the second cold flow pipe 12 in the pipe of feed pipe 9, first is cold One end of flow tube 7 is inserted into the side of feed pipe 9 and is extended in its pipe and is fixedly connected with one end of the second cold flow pipe 12, and second is cold The other end of flow tube 12 runs through the inner wall of feed pipe 9 and extends to outside it, and the inner wall of upper tower body 1 is fixedly connected with annular diversion Plate 26, annular Diversion Plate 26 are located at the top of ventilator cowling 3, and by the setting of annular Diversion Plate 26, upper tower body 1 will be sprayed by playing Cold fluid on inner wall is drained in cooling pond 4, and cold fluid is avoided to flow at ventilator cowling 3 and be lost outside tower and go, feed pipe 9 The outer surface of inner wall and the second cold flow pipe 12 is equipped with erosion resistant coating 29, improves feed pipe 9 and second by setting erosion resistant coating 29 The service life of cold flow pipe 12 avoids the corrosion of feed pipe 9 and the second cold flow pipe 12 by chemical reagent auxiliary agent, feed pipe 9 Side surface is socketed with flase floor 27, and the side surface of flase floor 27 is fixedly connected with the inner wall of upper tower body 1, passes through setting for flase floor 27 It sets, liquid contacts the steam progress partial blockage generated with feed pipe 9 after playing spray, and whole steam is avoided directly to pass through ventilation Pipe 13, which is directly emitted, to be caused largely to waste, and the top of upper tower body 1 is equipped with ventilation duct 13, and the inner wall of ventilation duct 13 passes through branch Frame is fixedly installed with double shaft servo motors 14, and the both ends of double 14 output shafts of shaft servo motor are connected to air draught with fixing sleeve respectively Flabellum 15 and the first angular wheel 16, the left side of the first angular wheel 16 are engaged with the second angular wheel 17, the second angular wheel 17 are fixedly attached to the side surface of shaft bar 18, and 18 both ends of shaft bar extend through the inside of bracket and extend to its lateral surface, Shaft bar 18 is connect with holder pivots, and the both ends of shaft bar 18 are fixedly connected to ellipse and contradict plate 19, and ellipse contradicts plate 19 are eccentrically set on one end of shaft bar 18, and the top that ellipse contradicts plate 19, which contradicts, is connected with support rod 20, support rod 20 Bottom end offers cooperation ellipse and contradicts the groove that plate 19 uses, and bottom of the top of two support rods 20 with cover board 21 is fixed Connection, the bottom of cover board 21 is fixedly connected with waffle slab 28, and by the setting of waffle slab 28, the steam to come will be absorbed by, which playing, leads to It crosses waffle slab 28 and carries out convolution isolation again, lift steam droplet and be collected, reduce the effect that vapor liquid is lost, cover board 21 The spherical shape of shape, the bottom of cover board 21 and the top of ventilation duct 13 connect, and the bottom of cover board 21 is fixedly installed with slide bar 22, the side surface of slide bar 22 is slidably socketed there are two supporting block 23, and the side of two supporting blocks 23 and the inner wall of ventilation duct 13 are solid Fixed connection, the side surface fixing sleeve of slide bar 22 are connected to fixed ring 24, and the side surface of slide bar 22 is socketed with spring 25, and the two of spring 25 End is fixedly connected with the top of the bottom of fixed ring 24 and downside supporting block 23 respectively.
In use, the liquid of cooling pond 4 is persistently freezed by cooler 5, and cold fluid is passed through the by booster water pump 6 One cold flow pipe 7 is transported in the second cold flow pipe 12, is then flowed back into cooling pond 4 by the second cold flow pipe 12, while cold fluid It sprays out and is flowed into the cooling pond of lower section also by spray tube 8, so that cold fluid is recycled, and it is chemical Reagent auxiliary agent be flowed into feed pipe 9 by the cold fluid of the second cold flow pipe 12 to inside chemical reagent auxiliary agent carry out hot and cold alternation into Row cooling, outside carry out spraying cooling to the outside of feed pipe 9 by spray tube 8, and cold fluid contacts generation with spray tube 8 when spray High-temperature steam, driving air suction fan blade 15 to operate quickly discharge tower intracorporal steam by double shaft servo motors 14 reduces tower body Interior temperature, to quickly cool down to chemical reagent auxiliary agent, while by by the substances such as chemical reagent auxiliary agent and cold fluid Isolation, avoids direct contact with, and then improves chemical reagent auxiliary agent security and stability in production and chemical reagent auxiliary agent Quality, and in the operating of double shaft servo motors 14, drive the second angular wheel 17 to rotate by the first angular wheel 16, so that Ellipse on shaft bar 18 contradicts plate 19 and contradicts and drive support rod 20 and the up and down motion of cover board 21 to assist air draft to cool down, by Slide bar stablizes cover board, at the same 25 auxiliary cover plate 21 of spring and support rod 20 quickly to get off to cooperate ellipse contradict plate 19 Operation, when double shaft servo motors 14 do not work, retracts cover board 21 under the action of spring 25 and blocks to ventilation duct 13, keep away Exempt from extraneous pollutant and falls into the content for polluting to the substance of tower body in tower body, while being not described in detail in this specification Belong to the prior art well known to professional and technical personnel in the field.
It can to sum up obtain, chemical reagent auxiliary agent production cooling tower by the setting of cooling pond 4 and cooler 5, increases Water pump 6, spray tube 8, feed pipe 9, the second cold flow pipe 12, ventilation duct 13, double shaft servo motors 14, is inhaled first cold flow pipe 7 Fan leaf 15, the first angular wheel 16, the second angular wheel 17, shaft bar 18, ellipse contradict plate 19, support rod 20, cover board 21, slide bar 22, supporting block 23, fixed ring 24 and spring 25 are used in conjunction with each other, and cooler 5 holds the liquid of cooling pond 4 Continuous refrigeration, and cold fluid is transported in the second cold flow pipe 12 by booster water pump 6 by the first cold flow pipe 7, then by the second cold flow Pipe 12 flows back into cooling pond 4, while cold fluid is sprayed out also by spray tube 8, and chemical reagent auxiliary agent be flowed into It carries out hot and cold alternation to inside chemical reagent auxiliary agent by the cold fluid of the second cold flow pipe 12 in expects pipe 9 to cool down, outside is by spraying Shower pipe 8 carries out spraying cooling to the outside of feed pipe 9, and cold fluid contacts the high-temperature steam of generation with spray tube 8 when spray, by double Shaft servo motor 14 drives air suction fan blade 15 to operate and the intracorporal steam of tower is quickly discharged to reduce the intracorporal temperature of tower, thus fastly Speed cools down to chemical reagent auxiliary agent, while by the way that chemical reagent auxiliary agent to be isolated with substances such as cold fluids, avoiding directly connecing Touching, then improves the quality of chemical reagent auxiliary agent security and stability in production and chemical reagent auxiliary agent, and it is double go out When axis servo motor 14 operates, the second angular wheel 17 is driven to rotate by the first angular wheel 16, so that ellipse on shaft bar 18 Circle contradicts plate 19 and contradicts and drive support rod 20 and cover board 21 to move up and down to assist air draft to cool down, double shaft servo motors 14 When not working, ventilation duct 13 is blocked by cover board 21, avoids extraneous pollutant from falling into tower body and the substance of tower body is made At pollution.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of production of chemical reagent auxiliary agent cooling tower, including upper tower body (1) and lower tower body (2), it is characterised in that: on described The circular bottom part of tower body (1) is fixedly connected at the top and bottom of ventilator cowling (3) respectively with the annular top of lower tower body (2), institute It states lower tower body (2) inner cavity and is equipped with cooling pond (4), be fixedly installed with cooler (5) on the right side of the lower tower body (2), it is described cold But device (5) is connected to cooling pond (4), and the bottom of lower tower body (2) inner wall is fixedly installed with booster water pump (6), the increasing The discharge ends tap of water pump (6) has the first cold flow pipe (7) and spray tube (8), and the side surface of the spray tube (8) offers more The inner cavity of a spray apertures, the upper tower body (1) is provided with feed pipe (9), and upper tower body (1) is run through on the top of the feed pipe (9) The top of inner cavity simultaneously extends to outside it, and the other end of the feed pipe (9) runs through the right side of upper tower body (1) inner cavity and extends to The both ends of outside, the feed pipe (9) are fixedly installed with the first regulating valve (10) and the second regulating valve (11), the charging respectively Pipe (9) spirals in the shape of a spiral in the inner cavity of upper tower body (1), inserted with the second cold flow pipe (12), institute in the pipe of the feed pipe (9) It states the side of one end insertion feed pipe (9) of the first cold flow pipe (7) and extends to one end in its pipe with the second cold flow pipe (12) It is fixedly connected, the other end of the second cold flow pipe (12) runs through the inner wall of feed pipe (9) and extends to outside it, the upper tower The top of body (1) is equipped with ventilation duct (13), and the inner wall of the ventilation duct (13), which is fixed by the bracket, is equipped with double shaft servo electricity Machine (14), the both ends of double shaft servo motor (14) output shafts are connected to air suction fan blade (15) and the first cone with fixing sleeve respectively Shape gear (16) is engaged with the second angular wheel (17) on the left of first angular wheel (16), second angular wheel (17) it is fixedly attached to the side surface of shaft bar (18), shaft bar (18) both ends extend through the inside of bracket and extend to Its lateral surface, the shaft bar (18) connect with holder pivots, and the both ends of the shaft bar (18) are fixedly connected to ellipse It contradicts plate (19), the ellipse contradicts one end that plate (19) are eccentrically set on shaft bar (18), and the ellipse contradicts plate (19) top contradicts and is connected with support rod (20), and the bottom end of the support rod (20) offers cooperation ellipse and contradicts plate (19) The top of the groove used, two support rods (20) is fixedly connected with the bottom of cover board (21), the cover board (21) The top of bottom and ventilation duct (13) connects, and the bottom of the cover board (21) is fixedly installed with slide bar (22), the slide bar (22) side surface is slidably socketed there are two supporting block (23), and the sides of two supporting blocks (23) is interior with ventilation duct (13) Wall is fixedly connected, and the side surface fixing sleeve of the slide bar (22) is connected to fixed ring (24), the side surface socket of the slide bar (22) Have spring (25), the both ends of the spring (25) are consolidated with the bottom of fixed ring (24) and the top of downside supporting block (23) respectively Fixed connection.
2. a kind of chemical reagent auxiliary agent production cooling tower according to claim 1, it is characterised in that: the upper tower body (1) inner wall is fixedly connected with annular Diversion Plate (26), and the annular Diversion Plate (26) is located at the top of ventilator cowling (3).
3. a kind of chemical reagent auxiliary agent production cooling tower according to claim 1, it is characterised in that: the feed pipe (9) side surface is socketed with flase floor (27), and the side surface of the flase floor (27) is fixedly connected with the inner wall of upper tower body (1).
4. a kind of chemical reagent auxiliary agent production cooling tower according to claim 1, it is characterised in that: the cover board (21) Bottom be fixedly connected with waffle slab (28).
5. a kind of chemical reagent auxiliary agent production cooling tower according to claim 1, it is characterised in that: the feed pipe (9) outer surface of inner wall and the second cold flow pipe (12) is equipped with erosion resistant coating (29).
6. a kind of chemical reagent auxiliary agent production cooling tower according to claim 1, it is characterised in that: the cover board (21) The spherical shape of shape.
CN201920022626.0U 2019-01-07 2019-01-07 Cooling tower is used in a kind of production of chemical reagent auxiliary agent Expired - Fee Related CN209326402U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920022626.0U CN209326402U (en) 2019-01-07 2019-01-07 Cooling tower is used in a kind of production of chemical reagent auxiliary agent

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920022626.0U CN209326402U (en) 2019-01-07 2019-01-07 Cooling tower is used in a kind of production of chemical reagent auxiliary agent

Publications (1)

Publication Number Publication Date
CN209326402U true CN209326402U (en) 2019-08-30

Family

ID=67730701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920022626.0U Expired - Fee Related CN209326402U (en) 2019-01-07 2019-01-07 Cooling tower is used in a kind of production of chemical reagent auxiliary agent

Country Status (1)

Country Link
CN (1) CN209326402U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114636321A (en) * 2020-12-15 2022-06-17 江苏中伟机械制造有限公司 Be applied to industrial production's cooling device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114636321A (en) * 2020-12-15 2022-06-17 江苏中伟机械制造有限公司 Be applied to industrial production's cooling device
CN114636321B (en) * 2020-12-15 2023-10-24 江苏中伟机械制造有限公司 Be applied to industrial production's cooling device

Similar Documents

Publication Publication Date Title
CN103743258B (en) The dry closed cooling tower of a kind of water saving
CN103776276A (en) Counter-flow closed-type cooling tower
CN102635909A (en) Evaporative cooling air conditioning unit provided with inertia filter and suitable for northwest districts
CN211575933U (en) Heat exchanger device
CN206330465U (en) A kind of High-efficient Water disperses cooling tower circulating water system
CN209326402U (en) Cooling tower is used in a kind of production of chemical reagent auxiliary agent
CN204757738U (en) Circulative cooling tower
CN209558937U (en) A kind of energy-saving cooling tower
CN203231662U (en) Surface-evaporation type air cooler with cleaning device
CN211739935U (en) Air cooler sprays heat transfer mechanism
CN209279713U (en) A kind of demisting energy-saving cooling tower
CN209706605U (en) One kind being based on steam cooling device
CN209113609U (en) A kind of Recirculated cooling water treatment device
CN111486728A (en) Heat pipe type heat exchanger
CN117190739A (en) Gas purification cooling tower with recyclable cooling liquid and operation method thereof
CN113720049B (en) Evaporative condenser for energy tower heat pump system
CN209524794U (en) A kind of chopped yarn heat exchange equipment of glass and chopped yarn heat exchange cycle system
CN220436830U (en) Evaporative condenser for centrifugal water chilling unit
CN209286990U (en) A kind of high-temp waste gas cooling purifier
CN110057001B (en) Sewage source heat pump equipment
CN208269690U (en) A kind of efficient cooling tower of formula easy to clean
CN113390272A (en) A fountain condenser for industrial production
CN221527422U (en) Air shower mechanism for heat exchanger
CN207335473U (en) A kind of high efficiency cooling tower
CN2271696Y (en) Jetting rotary atomizing cooling appts

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190830

Termination date: 20200107

CF01 Termination of patent right due to non-payment of annual fee